Amendment 0001 - Updated Seeding and TRM Specifications.pdf

PDF 429 KB Posted

Attached to
Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-1B
Solicitation number
W912ES23B0012
Issued by

About this file

This solicitation is for a firm fixed-price construction contract to build the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-1B. The project involves constructing an approximately 0.5 mile long earth dam embankment with a gravel road on top and seeded side slopes, as well as relocating two county roads including construction of a roundabout and adjacent ditching. The contract value is estimated between $10-25 million. The work also includes installing street lighting, culverts, and removing two abandoned water lines. The North American Industry Classification System code is 237990 for other heavy and civil engineering construction. The solicitation is a total small business set-aside issued as an invitation for bid, with bids due on unspecified dates. Interested vendors must register in the System for Award Management to receive an award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sout her n Embankment Reach W912ES23B0012

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 14 00. 00 13 WORK RESTRI CTI ONS

01 22 00. 00 13 MEASUREMENT AND PAYMENT

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 71 23. 05 13 CONTRACTOR SURVEYS

01 78 02. 00 10 CLOSEOUT SUBMI TTALS

DI VI SI ON 31 - EARTHWORK

31 00 00. 00 13 EARTHWORK

31 32 11 TURF REI NFORCEMENT MAT ( TRM)

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 92 19. 01 13 SEEDI NG

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1 SEM1B Januar y 12, 2024

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 00 13

WORK RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 GROUNDS AND ROADWAYS

1. 3. 1 Par ki ng

1. 3. 2 Snow Removal

1. 4 BLASTI NG

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON

3. 1 EXI STI NG UTI LI TI ES

3. 1. 1 Gener al

3. 1. 2 Haul Rout es

3. 1. 3 Bur i ed Ut i l i t i es

3. 1. 4 I nt er r upt i on of Ser vi ces

3. 1. 5 Nor t h Dakot a One Cal l Excavat i on Not i ce Syst em

3. 2 BORROW AND DI SPOSAL AREAS

3. 2. 1 On- Si t e Excavat i on

3. 2. 2 Of f - Si t e Bor r ow

3. 2. 3 Di sposal Ar eas

3. 3 DI VERSI ON I NLET STRUCTURE WI CK DRAI NS

3. 4 TRAFFI C CONTROL AND ROAD CLOSURES

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 00 13 Page 1

SECTI ON 01 14 00. 00 13

WORK RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s sect i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. FEDERAL HI GHWAY ADMI NI STRATI ON ( FHWA)

MUTCD ( 2009; Rev 2012) Manual on Uni f or m Tr af f i c Cont r ol Devi ces

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" c l assi f i cat i on.

Submi t t al s not havi ng a " G" or c l assi f i cat i on ar e f or i nf or mat i on onl y.

When used, a code f ol l owi ng t he " G" c l assi f i cat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Haul Rout es; G

Tr af f i c Cont r ol Pl an; G

1. 3 GROUNDS AND ROADWAYS

1. 3. 1 Par ki ng

Cont r act or par ki ng wi l l be per mi t t ed onl y i n t he ar ea( s) shown, i ncl udi ng t he Cont r act or ' s st agi ng ar ea. No par ki ng wi l l be al l owed on t he gr ass.

Cont r act or par ki ng shal l be coor di nat ed wi t h t he Gover nment .

1. 3. 2 Snow Removal

The Cont r act or shal l be r esponsi bl e f or snow r emoval i n t he Cont r act or ' s access, wor k, and par ki ng ar eas.

1. 4 BLASTI NG

Bl ast i ng wi l l not be per mi t t ed.

SECTI ON 01 14 00. 00 13 Page 2

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON

3. 1 EXI STI NG UTI LI TI ES

3. 1. 1 Gener al

The Cont r act or shal l be r esponsi bl e f or al l cost s r el at ed t o pr ot ect i ng exi st i ng ut i l i t i es.

3. 1. 2 Haul Rout es

Submi t a map showi ng pr oposed on- r oad haul r out es 30 cal endar days pr i or t o t he st ar t of haul i ng. The map shal l i ncl ude ant i c i pat ed r out es bet ween t he pr oj ect and of f - s i t e bor r ow or di sposal l ocat i ons, or ot her l ocat i ons wher e r epeat ed haul i ng i s ant i c i pat ed. The pl an shal l be updat ed and r esubmi t t ed i f haul r out es change f or per i ods exceedi ng 2 wor k days.

3. 1. 3 Bur i ed Ut i l i t i es

The appr oxi mat e l ocat i ons of known exi st i ng bur i ed ut i l i t i es ar e shown on t he dr awi ngs t o t he ext ent of avai l abl e i nf or mat i on at t he t i me t he dr awi ngs wer e pr epar ed. Pr i or t o commenci ng excavat i on, t he Cont r act or shal l accur at el y l ocat e al l such i nst al l at i ons. The Cont r act i ng Of f i cer shal l i mmedi at el y be not i f i ed i f t he Cont r act or damages any exi st i ng ut i l i t y l i nes not i nt ended t o be r emoved. Repai r of damaged ut i l i t i es shal l be i n accor dance wi t h Cont r act Cl ause 52. 236- 9 PROTECTI ON OF

EXI STI NG VEGETATI ON, STRUCTURES, EQUI PMENT, UTI LI TI ES, AND I MPROVEMENTS.

3. 1. 4 I nt er r upt i on of Ser vi ces

Ut i l i t y ser vi ces shal l not be i nt er r upt ed except f or br i ef per i ods t o f aci l i t at e cut - i ns. The Cont r act or shal l pr ovi de t empor ar y ser vi ce and shal l r el ocat e exi st i ng ut i l i t i es as r equi r ed t o const r uct t he wor k shown and i nsur e uni nt er r upt ed ser vi ce. I f i nt er r upt i on of ser vi ces i s unavoi dabl e, t he Cont r act or shal l r equest appr oval i n wr i t i ng at l east t en ( 10) cal endar days pr i or t o t he pr oposed i nt er r upt i on. Thi s submi t t al shal l f ul l y descr i be al l det ai l s of pr oposed i nt er r upt i on and t he r easons why al t er nat i ves ar e not f easi bl e. I nf or mat i on cont ai ned i n t he submi t t al shal l i ncl ude, but not be l i mi t ed t o, ut i l i t i es bei ng af f ect ed, dur at i on of out age, and any sket ches r equi r ed t o suppor t t he submi t t al . The Cont r act or shal l f ur t her coor di nat e wi t h t he owner of t he ut i l i t y and not i f y af f ect ed consumer s at l east t en ( 10) cal endar days i n advance of i nt er r upt i on of ser vi ces. The Cont r act i ng Of f i cer wi l l not , i n gener al , appr ove pr oposal s whi ch r equi r e i nt er r upt i on of ser vi ces f or mor e t han f our ( 4) cont i nuous hour s.

3. 1. 5 Nor t h Dakot a One Cal l Excavat i on Not i ce Syst em

For cont r act wor k per f or med wi t hi n t he St at e of Nor t h Dakot a, t he Cont r act or shal l meet t he r equi r ement s of Nor t h Dakot a St at ut es, Chapt er 42- 23 " One Cal l Excavat i on Not i ce Syst em. " The Nor t h Dakot a One Cal l not i f i cat i on cent er t el ephone number s ar e:

Hot l i ne 800- 795- 0555 Quest i ons 701- 475- 2942

SECTI ON 01 14 00. 00 13 Page 3

3. 2 BORROW AND DI SPOSAL AREAS

I mper vi ous Fi l l mat er i al wi l l be sour ced f r om t he pr oj ect s i t e and a Ci t y of Far go st ockpi l e l ocat i on, as not ed on t he pl ans. Bor r ow obt ai ned f r om t he Ci t y of Far go st ockpi l e cannot be used i n t he dam embankment .

3. 2. 1 On- Si t e Excavat i on

I mper vi ous f i l l mat er i al can be sour ced f r om wi t hi n t he pr oj ect l i mi t s as shown i n t he pl an set . I mper vi ous f i l l may be sour ced f r om t he B2 Di t ch, t he exi st i ng Di ver si on I nl et St r uct ur e embankment , and t he I mper vi ous Fi l l Sour ce Sout h.

I mper vi ous f i l l gener at ed on si t e shal l be used i n t he dam embankment .

On- si t e i mper vi ous f i l l excavat i ons must be backf i l l ed wi t h unsui t abl e mat er i al and t opsoi l . The ar eas must be gr aded, pr epar ed, and seeded i n accor dance wi t h Sect i on 32 92 19. 01 13 SEEDI NG.

3. 2. 2 Of f - Si t e Bor r ow

Sour ce bor r ow f or t he r oadway embankment f r om t he ci t y of Far go St ockpi l e, t he l ocat i on f or whi ch i s shown i n t he pl ans. Fi l l f r om t he ci t y of Far go St ockpi l e shal l onl y be used i n t he r oadway embankment ; i t shal l not be used i n t he dam embankment .

The ci t y of Far go st ockpi l e has been r eser ved f or use i n t hi s cont r act .

The Cont r act or shal l onl y access t he si t e v i a a 64t h Ave S. , bet ween 45t h St S and t he sout hwest cor ner of t he s i t e. No ot her access r out e wi l l be per mi t t ed. Thi s segment of 64t h Ave S. i s a r ecent l y i mpr oved r oad wi t h a cr ushed concr et e sur f ace. I t wi l l be c l osed t o t he publ i c dur i ng bor r ow oper at i ons, but may be used by f ar m equi pment . The Cont r act or shal l be r esponsi bl e f or mai nt ai ni ng t he r oad dur i ng haul i ng oper at i ons and shal l r et ur n t he r oad t o or i gi nal condi t i on af t er haul i ng oper at i ons ar e compl et e.

When bor r ow i s compl et e, gr ade t he si t e t o dr ai n and appl y a t empor ar y mul ch i n accor dance wi t h Sect i on 32 92 19. 01 13 SEEDI NG. Do not pl ace t opsoi l and seed.

3. 2. 3 Di sposal Ar eas

Onsi t e di sposal l ocat i ons ar e i dent i f i ed on t he pl an set .

Any bor r ow and/ or di sposal s i t es pr oposed by t he Cont r act or t hat ar e not al r eady i dent i f i ed by t he Gover nment as appr oved f or t hi s pr oj ect ar e subj ect t o appr oval by t he Cont r act i ng Of f i cer . Pr oposed si t es consi der ed t o be cul t ur al l y or envi r onment al l y sensi t i ve ar eas wi l l not be appr oved.

Obt ai ni ng t he necessar y per mi t s f or Cont r act or pr oposed bor r ow and/ or di sposal woul d be t he r esponsi bi l i t y of t he Cont r act or . Mi t i gat i on necessar y f or envi r onment al i mpact s at a Cont r act or pr oposed si t e woul d be at t he cost of t he Cont r act or . Cul t ur al r esour ce r evi ew det er mi ned necessar y may r equi r e addi t i onal coor di nat i on ( not t o exceed 45 days) . No cont r act compl et i on dat es wi l l be ext ended by t he Gover nment and t he Gover nment wi l l pay no addi t i onal cost s t o t he cont r act or r egar di ng t he appr oval or di sappr oval by t he Gover nment of any cont r act or pr oposed bor r ow and/ or di sposal s i t es.

SECTI ON 01 14 00. 00 13 Page 4

3. 3 DI VERSI ON I NLET STRUCTURE WI CK DRAI NS

Dur i ng const r uct i on of t he Di ver si on I nl et St r uct ur e ( DI S) , wi ck dr ai ns wer e i nst al l ed t o t he nor t h and sout h of t he DI S. The Cont r act or may encount er t he wi ck dr ai ns dur i ng excavat i on f or t hi s cont r act . Shoul d t hi s occur , t he Cont r act or shal l r ebur y t he wi ck dr ai n wi t h i mper vi ous f i l l . Damage t o t he wi ck dr ai ns does not need t o be r epai r ed.

3. 4 TRAFFI C CONTROL AND ROAD CLOSURES

The t r af f i c cont r ol i nf or mat i on depi ct ed i n t he pl an set i s a pot ent i al pl an t o assi st wi t h bi ddi ng. Submi t a Tr af f i c Cont r ol Pl an t o t he Cont r act i ng Of f i cer f or appr oval 14 days pr i or t o i mpl ement at i on.

Compl et e t he pl an i n accor dance wi t h t he Manual on Uni f or m Tr af f i c Cont r ol Devi ces MUTCD and speci f i ed i n Sect i on 01 55 26. Ref l ect any pr oj ect phasi ng i n t he t r af f i c cont r ol pl an. Any changes t o t he appr oved pl an shal l be appr oved by t he Cont r act i ng Of f i cer pr i or t o i mpl ement at i on.

Do not i mpact t r af f i c on CR16 and CR17 dur i ng t he f i r st const r uct i on season. Compl et e al l pavi ng dur i ng t he second const r uct i on season.

Pr ovi de t empor ar y f i el d access as r equi r ed by t he pr oper t y owner s i f exi st i ng access i s di sr upt ed by t he wor k.

- - End of Sect i on - -

SECTI ON 01 14 00. 00 13 Page 5

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 13

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 REFERENCES

1. 2 COMPENSATI ON

1. 3 APPROVAL OF MATERI ALS OR ALTERNATES

1. 4 QUANTI TY SURVEYS

1. 5 MEASUREMENT BY WEI GHT

1. 6 MEASUREMENT UNI TS

1. 7 SUBMI TTALS

1. 8 JOB PAYMENT I TEMS

1. 8. 1 Per f or mance and Payment Bonds

1. 8. 1. 1 Payment

1. 8. 1. 2 Uni t of Measur ement

1. 8. 2 Demol i t i on

1. 8. 2. 1 Payment

1. 8. 2. 2 Uni t of Measur ement

1. 8. 3 Tr af f i c Cont r ol

1. 8. 3. 1 Payment

1. 8. 3. 2 Uni t of Measur ement

1. 8. 4 Tempor ar y Er osi on Cont r ol

1. 8. 4. 1 Payment

1. 8. 4. 2 Uni t of Measur ement

1. 8. 5 Topsoi l St r i ppi ng

1. 8. 5. 1 Payment

1. 8. 5. 2 Uni t of Measur ement

1. 8. 6 Pavement Mar ki ng

1. 8. 6. 1 Payment

1. 8. 6. 2 Uni t of Measur e

1. 8. 7 Per manent Hi ghway Si gns

1. 8. 7. 1 Payment

1. 8. 7. 2 Uni t of Measur e

1. 8. 8 Per manent Hi ghway Li ght i ng

1. 8. 8. 1 Payment

1. 8. 8. 2 Uni t of Measur e

1. 8. 9 Medi an Landscapi ng

1. 8. 9. 1 Payment

1. 8. 9. 2 Uni t of Measur e

1. 8. 10 Tempor ar y I r r i gat i on Syst em

1. 8. 10. 1 Payment

1. 8. 10. 2 Uni t of Measur e

1. 8. 11 Wat er i ng

1. 8. 11. 1 Payment

1. 8. 11. 2 Measur ement

1. 8. 11. 3 Uni t of Measur e

1. 9 UNI T PRI CE PAYMENT I TEMS

1. 9. 1 I nspect i on Tr ench

SECTI ON 01 22 00. 00 13 Page 1

1. 9. 1. 1 Payment

1. 9. 1. 2 Measur ement

1. 9. 1. 3 Uni t of Measur e

1. 9. 2 Excavat i on

1. 9. 2. 1 Payment

1. 9. 2. 2 Measur ement

1. 9. 2. 3 Uni t of Measur e

1. 9. 3 Bor r ow Excavat i on

1. 9. 3. 1 Payment

1. 9. 3. 2 Measur ement

1. 9. 3. 3 Uni t Of Measur e

1. 9. 4 Embankment

1. 9. 4. 1 Payment

1. 9. 4. 2 Measur ement

1. 9. 4. 3 Uni t of Measur e

1. 9. 5 Tur f Rei nf or cement Mat ( TRM)

1. 9. 5. 1 Payment

1. 9. 5. 2 Measur ement

1. 9. 5. 3 Uni t of Measur e

1. 9. 6 Aggr egat e Sur f ace

1. 9. 6. 1 Payment

1. 9. 6. 2 Measur ement

1. 9. 6. 3 Uni t of Measur e

1. 9. 7 Sal vaged Base Cour se

1. 9. 7. 1 Payment

1. 9. 7. 2 Measur ement

1. 9. 7. 3 Uni t of Measur e

1. 9. 8 Per manent CR16 & CR17 Asphal t Pavement

1. 9. 8. 1 Payment

1. 9. 8. 2 Measur ement

1. 9. 8. 3 Uni t of Measur e

1. 9. 9 Per manent CR16 & CR17 Concr et e Pavement

1. 9. 9. 1 Payment

1. 9. 9. 2 Measur ement

1. 9. 9. 3 Uni t of Measur e

1. 9. 10 Edgedr ai n

1. 9. 10. 1 Payment

1. 9. 10. 2 Measur ement

1. 9. 10. 3 Uni t of Measur e

1. 9. 11 Headwal l - Pr ecast Concr et e 4- I nch

1. 9. 11. 1 Payment

1. 9. 11. 2 Measur ement

1. 9. 11. 3 Uni t of Measur e

1. 9. 12 Pi pe: Al l Types and Si zes

1. 9. 12. 1 Payment

1. 9. 12. 2 Measur ement

1. 9. 12. 3 Uni t Of Measur e

1. 9. 13 End Sect i on: Al l Types and Si zes

1. 9. 13. 1 Payment

1. 9. 13. 2 Measur ement

1. 9. 13. 3 Uni t of Measur e

1. 9. 14 Topsoi l Respr ead

1. 9. 14. 1 Payment

1. 9. 14. 2 Measur ement

1. 9. 14. 3 Uni t of Measur e

1. 9. 15 Seedi ng: Zones 1 t hr ough 5

1. 9. 15. 1 Payment

1. 9. 15. 2 Measur ement

1. 9. 15. 3 Uni t of Measur e

SECTI ON 01 22 00. 00 13 Page 2

1. 9. 16 Seedi ng: Zones X

1. 9. 16. 1 Payment

1. 9. 16. 2 Measur ement

1. 9. 16. 3 Uni t of Measur e

1. 9. 17 Ri pr ap - Gr ade I

1. 9. 17. 1 Payment

1. 9. 17. 2 Measur ement

1. 9. 17. 3 Uni t of Measur e

1. 9. 18 Access Gat e

1. 9. 18. 1 Payment

1. 9. 18. 2 Measur ement

1. 9. 18. 3 Uni t of Measur e

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 13 Page 3

SECTI ON 01 22 00. 00 13

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.

NATI ONAL I NSTI TUTE OF STANDARDS AND TECHNOLOGY ( NI ST)

NI ST HB 44 ( 2018) Speci f i cat i ons, Tol er ances, and Ot her Techni cal Requi r ement s f or Wei ghi ng and Measur i ng Devi ces

1. 2 COMPENSATI ON

The payment pr ovi ded f or i n t he cont r act shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l mat er i al s and f or per f or mi ng al l wor k under t he cont r act i n a compl et e and accept abl e manner . The cont r act wor k shal l i ncl ude pr ovi di ng pl ant , equi pment , t ool s, suppl i es, l abor , super vi s i on, i nci dent al mat er i al s, qual i t y cont r ol , envi r onment al pr ot ect i on, and meet i ng saf et y r equi r ement s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

Compensat i on f or al l wor k shown, speci f i ed, or essent i al t o compl et i on of t he pr oj ect ( whet her or not t he speci f i c mat er i al or oper at i on i s i ndi cat ed) shal l be i ncl uded on t he bi ddi ng schedul e. The payment pr ovi ded f or i n t he cont r act i ncl udes compensat i on f or al l r i sk, l oss, damage, and expense ar i s i ng out of t he nat ur e of t he wor k or i t s pr osecut i on, subj ect t o condi t i ons of t he cont r act . Payment f or each cont r act l i ne i t em wi l l const i t ut e f ul l compensat i on f or f ur ni shi ng t he mat er i al s and const r uct i ng t he wor k compl et e i n pl ace as speci f i ed.

No payment shal l be made unt i l t he I ni t i al Pr oj ect Schedul e i s accept ed by t he Gover nment and upl oaded t o RMS, i n accor dance wi t h Sect i on

01 32 01. 00 10 PROJECT SCHEDULE.

1. 3 APPROVAL OF MATERI ALS OR ALTERNATES

Request s f or appr oval of mat er i al s and pr oduct s, or subst i t ut es t her eof , wi l l not be consi der ed pr i or t o awar d of t he cont r act .

1. 4 QUANTI TY SURVEYS

The Cont r act or shal l pr ovi de quant i t y sur veys f or bul k mat er i al s measur ed by vol ume or wei ght , unl ess an al t er nat e met hod of measur ement i s speci f i ed. Quant i t y sur veys ar e speci f i ed i n Sect i on 01 71 23. 05 13

CONTRACTOR SURVEYS.

SECTI ON 01 22 00. 00 13 Page 4

1. 5 MEASUREMENT BY WEI GHT

Bul k mat er i al s pai d f or by wei ght wi l l be measur ed by wei ghi ng each t r uck l oad on an appr oved scal e bef or e bei ng pl aced i n t he wor k. Scal es shal l be of suf f i c i ent l engt h t o per mi t s i mul t aneous wei ghi ng of al l axl e l oads and shal l be sensi t i ve t o a change i n l oad of 0. 2 per cent t hr oughout t he r ange of t he scal e. The scal e' s accur acy shal l conf or m t o t he appl i cabl e r equi r ement s of NI ST HB 44 and shal l be cer t i f i ed by a scal e ser vi c i ng company or by an i nspect or of t he St at e I nspect i on Bur eau. Each l oad shal l be accompani ed by a del i ver y t i cket cer t i f i ed by t he wei ghmast er .

Del i ver y t i cket s shal l be col l ect ed by t he Cont r act or , and copi es t her eof shal l be f ur ni shed t o t he Cont r act i ng Of f i cer . As a mi ni mum, each t i cket shal l cont ai n t he f ol l owi ng i nf or mat i on:

( 1) Dat e and t i me.

( 2) Vehi c l e number .

( 3) Gr oss wei ght .

( 4) Vehi c l e t ar e wei ght .

( 5) Net wei ght .

( 6) Si gnat ur e of wei ghmast er .

( 7) Si gnat ur e of Cont r act or ' s r ecei ver .

1. 6 MEASUREMENT UNI TS

When mat er i al s ar e measur ed i n uni t s ot her t han t he measur ement uni t s speci f i ed as t he basi s of payment , t he measur ed quant i t i es shal l be conver t ed t o t he speci f i ed uni t of measur e. Fact or s f or conver si ons f r om one basi s or uni t of measur ement t o anot her shal l be appr oved by t he Cont r act i ng Of f i cer .

1. 7 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Del i ver y Ti cket

Submi t cer t i f i ed del i ver y t i cket s.

1. 8 JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI D SCHEDULE and descr i bed bel ow.

Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

SECTI ON 01 22 00. 00 13 Page 5

1. 8. 1 Per f or mance and Payment Bonds

1. 8. 1. 1 Payment

Payment wi l l be made f or t he cost s associ at ed wi t h Per f or mance and Payment Bonds i n accor dance wi t h t he cont r act r equi r ement s. Bonds wi l l be pai d f or on a j ob basi s i n accor dance wi t h Cont r act Cl ause 52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS

1. 8. 1. 2 Uni t of Measur ement

Uni t of measur e: j ob.

1. 8. 2 Demol i t i on

1. 8. 2. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or t he r emoval and of f - s i t e di sposal of i t ems desi gnat ed f or r emoval as shown and speci f i ed. Wor k shal l i ncl ude, but not be l i mi t ed t o:

1. Removal of pi pe, al l t ypes and si zes, and al l appur t enances.

2. Removal and of f s i t e sal vage or di sposal of asphal t pavement .

3. Removal of abandoned wat er mai ns.

4. Al l c l ear i ng and gr ubbi ng.

1. 8. 2. 2 Uni t of Measur ement

Uni t of measur e: j ob.

1. 8. 3 Tr af f i c Cont r ol

1. 8. 3. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or t he i nst al l at i on of al l t empor ar y t r af f i c cont r ol i t ems i ncl udi ng si gns and bar r i cades, f l agger s, and ot her r equi r ement s as shown and speci f i ed.

1. 8. 3. 2 Uni t of Measur ement

Uni t of measur e: j ob.

1. 8. 4 Tempor ar y Er osi on Cont r ol

1. 8. 4. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or t he i nst al l at i on of al l t empor ar y er osi on cont r ol i t ems i ncl udi ng er osi on cont r ol bl anket , f i ber r ol l , dust suppr essi on, and ot her r equi r ement s as shown and speci f i ed.

1. 8. 4. 2 Uni t of Measur ement

Uni t of measur e: j ob.

SECTI ON 01 22 00. 00 13 Page 6

1. 8. 5 Topsoi l St r i ppi ng

1. 8. 5. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or st r i ppi ng and st ockpi l i ng t opsoi l as shown and speci f i ed. St r i ppi ng t opsoi l t o t he l i nes and gr ades shown i n t he pl ans i s r equi r ed. St r i ppi ng and st ockpi l i ng t opsoi l out s i de of t he l i nes and gr ades shown on t he pl an set , compl et ed at t he di scr et i on of t he Cont r act or , shal l be i nci dent al t o t hi s i t em. Thi s may i ncl ude, but i s not l i mi t ed t o st r i ppi ng t opsoi l bet ween t he embankment t oe and bor r ow di t ch, and st r i ppi ng t opsoi l bet ween t he embankment t oe and dr ai nage di t ch.

1. 8. 5. 2 Uni t of Measur ement

Uni t of measur e: j ob.

1. 8. 6 Pavement Mar ki ng

1. 8. 6. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment and l abor and per f or mi ng al l oper at i ons necessar y f or per manent pavement mar ki ng as shown and speci f i ed.

1. 8. 6. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 8. 7 Per manent Hi ghway Si gns

1. 8. 7. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment and l abor and per f or mi ng al l oper at i ons necessar y f or per manent t r af f i c cont r ol s i gnage as shown and speci f i ed.

1. 8. 7. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 8. 8 Per manent Hi ghway Li ght i ng

1. 8. 8. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment and l abor and per f or mi ng al l oper at i ons necessar y f or per manent st r eet l i ght i ng as shown and speci f i ed.

1. 8. 8. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 8. 9 Medi an Landscapi ng

1. 8. 9. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and f or per f or mi ng al l oper at i ons necessar y f or pl ant i ng t he CR16/ CR17

SECTI ON 01 22 00. 00 13 Page 7 medi an pl ant i ng as shown and speci f i ed. Wor k i ncl udes, but i s not l i mi t ed t o, shr ubs, geot ext i l e, 1. 5 i nch r i ver r ock, mai nt enance of shr ubs t hr ough t he war r ant y per i od, and r epl acement of f ai l ed pl ant i ngs.

1. 8. 9. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 8. 10 Tempor ar y I r r i gat i on Syst em

1. 8. 10. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and f or per f or mi ng al l oper at i ons necessar y f or t empor ar y i r r i gat i on syst em. Wor k i ncl udes desi gn, i nst al l at i on, mai nt enance and r emoval .

1. 8. 10. 2 Uni t of Measur e

Uni t of measur e: j ob.

1. 8. 11 Wat er i ng

1. 8. 11. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or wat er i ng f or t ur f est abl i shment as speci f i ed.

1. 8. 11. 2 Measur ement

Wat er i ng wi l l be pai d on a j ob basi s f or al l wor k r el at ed t o t hi s i t em.

1. 8. 11. 3 Uni t of Measur e

Uni t of measur e: j ob.

1. 9 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI D SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k, i ncl udi ng i nci dent al wor k, r equi r ed f or each of t he uni t pr i ce i t ems.

1. 9. 1 I nspect i on Tr ench

1. 9. 1. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y t o excavat e t he I nspect i on Tr ench shown and speci f i ed. Wor k shal l i ncl ude, but i s not l i mi t ed t o, excavat i on, backf i l l , i nspect i on and r epor t s.

1. 9. 1. 2 Measur ement

I nspect i on Tr ench shal l be measur ed f or payment by t he l i neal f oot of

SECTI ON 01 22 00. 00 13 Page 8 excavat i on t o t he near est whol e f oot . The quant i t y wi l l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Excavat i on out si de t he l i nes and gr ades shown wi l l not be measur ed f or payment .

1. 9. 1. 3 Uni t of Measur e

Uni t of measur e: l i neal f oot .

1. 9. 2 Excavat i on

1. 9. 2. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , and per f or mi ng al l oper at i ons necessar y f or excavat i on ot her t han i mper vi ous f i l l gener at i on, whi ch wi l l be pai d as Embankment and Bor r ow Excavat i on.

Wor k i ncl udes, but i s not l i mi t ed t o, per manent di t chi ng, f i el d gr adi ng, unst abl e mat er i al r emoval , or t he excavat i on of ot her mat er i al t hat wi l l not be used i n embankment s. Excavat i on does not i ncl ude excavat i on f or :

st r uct ur es i ncl udi ng cul ver t s, headwal l s, ut i l i t y r el ocat i ons, i nspect i on t r ench, on- si t e i mper vi ous f i l l gener at i on, of f - s i t e bor r ow gener at i on, and di t chi ng excavat i on wher e mat er i al i s t o be i ncor por at ed i nt o dam and r oadway embankment s. Dewat er i ng i s i nci dent al t o t he Excavat i on CLI N.

1. 9. 2. 2 Measur ement

Excavat i on shal l be measur ed f or payment by t he cubi c yar d of excavat i on.

The quant i t y wi l l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS.

Excavat i on out si de t he l i nes and gr ades shown wi l l not be measur ed f or payment .

1. 9. 2. 3 Uni t of Measur e

Uni t of measur e: cubi c yar d.

1. 9. 3 Bor r ow Excavat i on

1. 9. 3. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or of f - s i t e bor r ow excavat i on as shown and speci f i ed. Wor k shal l i ncl ude, but not be l i mi t ed t o, of f - s i t e excavat i on, haul i ng mat er i al t o t he s i t e, t empor ar y st ockpi l i ng, r est or at i on of t he bor r ow ar ea, and r est or at i on of 64t h Ave S.

1. 9. 3. 2 Measur ement

Bor r ow Excavat i on shal l be measur ed f or payment by t he cubi c yar d of excavat i on. The quant i t y wi l l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Onl y I mper vi ous Fi l l mat er i al wi l l be measur ed f or payment .

St r i ppi ng of t opsoi l and r espr eadi ng t opsoi l wi l l be measur ed separ at el y under t he r espect i ve i t ems.

1. 9. 3. 3 Uni t Of Measur e

Uni t of measur e: cubi c yar d.

SECTI ON 01 22 00. 00 13 Page 9

1. 9. 4 Embankment

1. 9. 4. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , l abor , and per f or mi ng al l oper at i ons necessar y f or const r uct i on of t he dam embankment and r oadway embankment as shown and speci f i ed. Wor k i ncl udes, but i s not l i mi t ed t o, subgr ade pr epar at i on, subgr ade cor r ect i on, on- si t e excavat i on and t r anspor t at i on of i mper vi ous f i l l f r om on- si t e sour ces, i ncor por at i on of of f - s i t e bor r ow i nt o t he embankment , embankment const r uct i on, and al l r equi r ed t est i ng. Dewat er i ng i s i nci dent al t o t he embankment CLI N.

1. 9. 4. 2 Measur ement

Embankment shal l be measur ed f or payment by t he cubi c yar d of pl aced mat er i al , i ncl udi ng bor r ow mat er i al . The quant i t y wi l l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Fi l l out s i de l i nes and gr ades shown wi l l not be measur ed f or payment .

1. 9. 4. 3 Uni t of Measur e

Uni t of measur e: cubi c yar d.

1. 9. 5 Tur f Rei nf or cement Mat ( TRM)

1. 9. 5. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or t he i nst al l at i on of Tur f Rei nf or cement Mat ( TRM) as shown and speci f i ed. Wor k shal l i ncl ude, but i s not l i mi t ed t o, soi l pr epar at i on, anchor pi ns, and anchor t r enches, 1- i nch t opsoi l , over l ay wi t h seed and hydr aul i c mul ch.

1. 9. 5. 2 Measur ement

Tur f Rei nf or cement Mat shal l be measur ed f or payment by t he squar e yar d.

The ar ea measur ed f or payment wi l l be l i mi t ed t o t he ar eas desi gnat ed f or TRM as shown on t he dr awi ngs. The quant i t y wi l l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on

01 71 23. 05 13 CONTRACTOR SURVEYS.

1. 9. 5. 3 Uni t of Measur e

Uni t of measur e: squar e yar d.

1. 9. 6 Aggr egat e Sur f ace

1. 9. 6. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or pl aci ng Aggr egat e Sur f ace as shown and speci f i ed. Wor k shal l i ncl ude, but i s not l i mi t ed t o, pl aci ng aggr egat e, f ur ni shi ng and pl aci ng geot ext i l e per t ype shown and speci f i ed, subgr ade pr epar at i on, pr oof - r ol l i ng, and subgr ade cor r ect i on. Aggr egat e pl aced i n conj unct i on wi t h f eat ur es such as cul ver t s, edgedr ai n, et c, shal l be consi der ed i nci dent al t o t hose i t ems.

SECTI ON 01 22 00. 00 13 Page 10

1. 9. 6. 2 Measur ement

Aggr egat e Sur f ace shal l be measur ed f or payment by t he t on ( 2, 000 pounds avoi r dupoi s) i n accor dance wi t h par agr aph MEASUREMENT BY WEI GHT. A Sur vey f or Ver i f i cat i on of Desi gn Sect i on i s r equi r ed t o det er mi ne i f pl acement i s wi t hi n t he neat l i nes and t ol er ances. The sur vey shal l be i n accor dance t o t he Sur vey f or Ver i f i cat i on of Desi gn Sect i on speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Payment wi l l be made onl y f or aggr egat e pl aced wi t hi n t he speci f i ed t ol er ances. Al l aggr egat e per mi t t ed by t he Cont r act i ng Of f i cer t o r emai n out si de t he t ol er ances speci f i ed shal l be deduct ed f r om t he payment quant i t y. The excess vol ume shal l be deduct ed f r om t he payment quant i t y at t he r at e of 1. 60 t ons per cubi c yar d, r egar dl ess of act ual wei ght per cubi c yar d.

1. 9. 6. 3 Uni t of Measur e

Uni t of measur e: t on.

1. 9. 7 Sal vaged Base Cour se

1. 9. 7. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and f or per f or mi ng al l oper at i ons necessar y f or pl aci ng Sal vaged Base Cour se as shown and speci f i ed. Wor k shal l i ncl ude, but not be l i mi t ed t o, subgr ade pr epar at i on, subgr ade cor r ect i on, f ur ni shi ng and pl aci ng geot ext i l e per t ype shown and speci f i ed, pl aci ng aggr egat e, and compact i on.

1. 9. 7. 2 Measur ement

Sal vaged Base Cour se shal l be measur ed f or payment by t he cubi c yar d. A Quant i t y Sur vey i s r equi r ed t o det er mi ne i f pl acement i s wi t hi n t he neat l i nes and t ol er ances. The sur vey shal l be i n accor dance wi t h t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Payment wi l l be made onl y f or Sal vaged Base Cour se pl aced wi t hi n t he speci f i ed t ol er ances. Al l mat er i al per mi t t ed by t he Cont r act i ng Of f i cer t o r emai n out si de t he t ol er ances speci f i ed shal l be deduct ed f r om t he payment quant i t y.

1. 9. 7. 3 Uni t of Measur e

Uni t of measur e: cubi c yar d.

1. 9. 8 Per manent CR16 & CR17 Asphal t Pavement

1. 9. 8. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or t he const r uct i on of t he Per manent CR16 and CR17 Asphal t Pavement as shown and speci f i ed. Wor k shal l i ncl ude, but not be l i mi t ed t o pr ovi di ng and pl aci ng asphal t pavement , t ack coat , pr i me coat , and const r uct i ng r umbl e st r i ps.

1. 9. 8. 2 Measur ement

Per manent CR16 and CR17 Asphal t Pavement shal l be measur ed f or payment by t he squar e yar d and quant i t i es shal l be det er mi ned by t he measur ement of t he as- bui l t sur f ace ar ea of t he pavement wi t hi n t he ar eas desi gnat ed f or Per manent CR16 and CR17 Asphal t Pavement as shown and speci f i ed. A Sur vey

SECTI ON 01 22 00. 00 13 Page 11 f or Ver i f i cat i on of Desi gn Sect i on i s r equi r ed t o det er mi ne i f pl acement i s wi t hi n t he neat l i nes and t ol er ances. The quant i t y shal l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment . Bot h sur veys shal l be compl et ed as speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS.

1. 9. 8. 3 Uni t of Measur e

Uni t of measur e: squar e yar d.

1. 9. 9 Per manent CR16 & CR17 Concr et e Pavement

1. 9. 9. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or t he const r uct i on of t he Per manent CR16 and CR17 Concr et e Pavement as shown and speci f i ed.

1. 9. 9. 2 Measur ement

Per manent CR16 and CR17 Concr et e Pavement shal l be measur ed f or payment by t he squar e yar d and quant i t i es shal l be det er mi ned by t he measur ement of t he as- bui l t sur f ace ar ea of t he pavement wi t hi n t he ar eas desi gnat ed f or Per manent CR16 and CR17 Concr et e Pavement as shown and speci f i ed. A Sur vey f or Ver i f i cat i on of Desi gn Sect i on i s r equi r ed t o det er mi ne i f pl acement i s wi t hi n t he neat l i nes and t ol er ances. The quant i t y shal l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment . Bot h sur veys shal l be compl et ed as speci f i ed i n Sect i on 01 71 23. 05 13

CONTRACTOR SURVEYS.

1. 9. 9. 3 Uni t of Measur e

Uni t of measur e: squar e yar d.

1. 9. 10 Edgedr ai n

1. 9. 10. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and f or per f or mi ng al l oper at i ons necessar y f or const r uct i on of t he edgedr ai n as shown and speci f i ed. Wor k i ncl udes, but i s not l i mi t ed t o, excavat i on, aggr egat e, geot ext i l e, per f or at ed pi pe, and al l f i t t i ngs, connect i ons, and appur t enances.

1. 9. 10. 2 Measur ement

Edgedr ai n shal l be measur ed f or payment by l i neal f oot .

1. 9. 10. 3 Uni t of Measur e

Uni t of measur e: l i neal f oot .

1. 9. 11 Headwal l - Pr ecast Concr et e 4- I nch

1. 9. 11. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and f or per f or mi ng al l oper at i ons necessar y f or pr ecast 4- i nch headwal l s as shown and speci f i ed. Wor k i ncl udes, but i s not l i mi t ed t o, excavat i on, backf i l l , al l f i t t i ngs, connect i ons, and appur t enances.

SECTI ON 01 22 00. 00 13 Page 12

1. 9. 11. 2 Measur ement

Headwal l shal l be measur ed f or payment by each.

1. 9. 11. 3 Uni t of Measur e

Uni t of measur e: each.

1. 9. 12 Pi pe: Al l Types and Si zes

1. 9. 12. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment and l abor and per f or mi ng al l oper at i ons necessar y f or i nst al l at i on of st or m cul ver t s per s i ze and t ype as shown and speci f i ed. Wor k i ncl udes, but i s not l i mi t ed t o, t r ench excavat i on, backf i l l , al l f i t t i ngs, connect i ons, and appur t enances.

1. 9. 12. 2 Measur ement

Pi pe shal l be measur ed f or payment by t he l i near f oot and shal l be measur ed al ong t he cent er l i ne of t he pi pe not i ncl udi ng t he f l ar ed end sect i on or headwal l .

1. 9. 12. 3 Uni t Of Measur e

Uni t of measur e: l i neal f oot .

1. 9. 13 End Sect i on: Al l Types and Si zes

1. 9. 13. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and f or per f or mi ng al l oper at i ons necessar y f or f l ar ed end sect i on per s i ze and mat er i al as shown and speci f i ed. Wor k i ncl udes, but i s not l i mi t ed t o, excavat i on, backf i l l , t oe wal l , al l f i t t i ngs, connect i ons, and appur t enances.

1. 9. 13. 2 Measur ement

End Sect i ons shal l be measur ed f or payment by each.

1. 9. 13. 3 Uni t of Measur e

Uni t of measur e: each.

1. 9. 14 Topsoi l Respr ead

1. 9. 14. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or r espr eadi ng t opsoi l ( excl udi ng 1" t opsoi l r e- spr ead on t op of TRM) as shown and speci f i ed.

1. 9. 14. 2 Measur ement

Topsoi l shal l be measur ed f or payment by t he cubi c yar d ( CY) i n pl ace. The sur vey shal l be i n accor dance t o t he Quant i t y Sur veys f or Measur ement and

SECTI ON 01 22 00. 00 13 Page 13

Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Payment wi l l be made onl y f or t opsoi l pl aced wi t hi n t he speci f i ed t ol er ances. Al l t opsoi l per mi t t ed by t he Cont r act i ng Of f i cer t o r emai n out si de t he t ol er ances speci f i ed shal l be deduct ed f r om t he payment quant i t y.

1. 9. 14. 3 Uni t of Measur e

Uni t of measur e: cubi c yar d.

1. 9. 15 Seedi ng: Zones 1 t hr ough 5

1. 9. 15. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or seedi ng per zone ( excl udi ng seed and mul ch pl acement on t op of TRM) as shown and speci f i ed. Wor k shal l i ncl ude, but i s not l i mi t ed t o, soi l pr epar at i on, pl acement of seed, mul ch, and mai nt enance.

1. 9. 15. 2 Measur ement

Seedi ng shal l be measur ed f or payment by t he acr e ( AC) t o t he near est 0. 1 acr e. The ar ea measur ed f or payment wi l l be l i mi t ed t o t he ar eas desi gnat ed f or seedi ng as shown on t he dr awi ngs. The quant i t y wi l l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Tempor ar y seedi ng and t empor ar y cover cr ops ar e not measur ed f or payment .

1. 9. 15. 3 Uni t of Measur e

Uni t of measur e: acr e.

1. 9. 16 Seedi ng: Zones X

1. 9. 16. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or soi l decompact i on and seedi ng as shown and speci f i ed. Wor k shal l i ncl ude, but i s not l i mi t ed t o, soi l decompact i on, soi l pr epar at i on, pl acement of seed, mul ch, wat er i ng, and mai nt enance.

1. 9. 16. 2 Measur ement

Seedi ng shal l be measur ed f or payment by t he acr e ( AC) t o t he near est 0. 1 acr e. The ar ea measur ed f or payment wi l l be l i mi t ed t o t he ar eas desi gnat ed f or seedi ng as shown on t he dr awi ngs. The quant i t y wi l l be det er mi ned by t he Quant i t y Sur veys f or Measur ement and Payment speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Tempor ar y seedi ng and t empor ar y cover cr ops ar e not measur ed f or payment .

1. 9. 16. 3 Uni t of Measur e

Uni t of measur e: acr e.

SECTI ON 01 22 00. 00 13 Page 14

1. 9. 17 Ri pr ap - Gr ade I

1. 9. 17. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and per f or mi ng al l oper at i ons necessar y f or pl aci ng r i pr ap as shown and speci f i ed. Wor k shal l i ncl ude, but i s not l i mi t ed t o, subgr ade pr epar at i on, subgr ade cor r ect i on, aggr egat e base cour se beddi ng per t ype shown and speci f i ed, geot ext i l e per t ype shown and speci f i ed, and r i pr ap.

1. 9. 17. 2 Measur ement

Ri pr ap shal l be measur ed f or payment by t he t on ( 2, 000 pounds avoi r dupoi s) i n accor dance wi t h par agr aph MEASUREMENT BY WEI GHT. A Sur vey f or Ver i f i cat i on of Desi gn Sect i on i s r equi r ed t o det er mi ne i f pl acement i s wi t hi n t he neat l i nes and t ol er ances. The sur vey shal l be i n accor dance t o t he Sur vey f or Ver i f i cat i on of Desi gn Sect i on speci f i ed i n Sect i on 01 71 23. 05 13 CONTRACTOR SURVEYS. Payment wi l l be made onl y f or r i pr ap pl aced wi t hi n t he speci f i ed t ol er ances. Al l aggr egat e per mi t t ed by t he Cont r act i ng Of f i cer t o r emai n out si de t he t ol er ances speci f i ed shal l be deduct ed f r om t he payment quant i t y. The excess vol ume shal l be deduct ed f r om t he payment quant i t y at t he r at e of 1. 50 t ons per cubi c yar d, r egar dl ess of act ual wei ght per cubi c yar d.

1. 9. 17. 3 Uni t of Measur e

Uni t of measur e: t on.

1. 9. 18 Access Gat e

1. 9. 18. 1 Payment

Payment wi l l be made f or f ur ni shi ng al l mat er i al s, equi pment , and l abor and f or per f or mi ng al l oper at i ons necessar y f or const r uct i on access gat es as shown and speci f i ed.

1. 9. 18. 2 Measur ement

Access gat es shal l be measur ed f or payment by each.

1. 9. 18. 3 Uni t of Measur e

Uni t of measur e: each.

PART 2 PRODUCTS ( Not Appl i cabl e)

PART 3 EXECUTI ON ( Not Appl i cabl e)

- - End of Sect i on - -

SECTI ON 01 22 00. 00 13 Page 15

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 35 26

GOVERNMENTAL SAFETY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 DEFI NI TI ONS

1. 2. 1 Compet ent Per son ( CP)

1. 2. 2 Hi gh Ri sk Act i v i t i es

1. 2. 3 Hi gh Vi s i bi l i t y Acci dent

1. 2. 4 Load Handl i ng Equi pment ( LHE)

1. 2. 5 Medi cal Tr eat ment

1. 2. 6 Near Mi ss

1. 2. 7 Oper at i ng Envel ope

1. 2. 8 Qual i f i ed Per son ( QP)

1. 2. 9 USACE Pr oper t y and Equi pment

1. 2. 10 Load Handl i ng Equi pment ( LHE) Acci dent or Load Handl i ng

Equi pment ( LHE) Mi shap

1. 3 SUBMI TTALS

1. 4 MONTHLY EXPOSURE REPORTS

1. 5 REGULATORY REQUI REMENTS

1. 6 SI TE QUALI FI CATI ONS, DUTI ES, AND MEETI NGS

1. 6. 1 Per sonnel Qual i f i cat i ons

1. 6. 1. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)

1. 6. 1. 1. 1 Addi t i onal Si t e Saf et y and Heal t h Of f i cer ( SSHO)

Requi r ement s and Dut i es

1. 6. 1. 2 Compet ent Per son Qual i f i cat i ons

1. 6. 1. 3 Qual i f i ed Tr ai ner Requi r ement s

1. 6. 1. 4 Cr ane Oper at or s/ Ri gger s

1. 6. 2 Per sonnel Dut i es

1. 6. 2. 1 Dut i es of t he Si t e Saf et y and Heal t h Of f i cer ( SSHO)

1. 6. 3 Meet i ngs

1. 6. 3. 1 Pr econst r uct i on Conf er ence

1. 6. 3. 2 Saf et y Meet i ngs

1. 7 ACCI DENT PREVENTI ON PLAN ( APP)

1. 7. 1 Names and Qual i f i cat i ons

1. 7. 2 Pl ans

1. 7. 2. 1 St andar d Li f t Pl an ( SLP)

1. 7. 2. 2 Cr i t i cal Li f t Pl an - Cr ane or Load Handl i ng Equi pment

1. 7. 2. 2. 1 Cr i t i cal Li f t Pl an Pl anni ng and Schedul e

1. 7. 2. 2. 2 Li f t s of Per sonnel

1. 7. 2. 3 Mul t i - Pur pose Machi nes, Mat er i al Handl i ng Equi pment , and

Const r uct i on Equi pment Li f t Pl an

1. 7. 2. 4 Excavat i on Pl an

1. 8 ACTI VI TY HAZARD ANALYSI S ( AHA)

1. 8. 1 AHA Management

1. 8. 2 AHA Si gnat ur e Log

1. 9 DI SPLAY OF SAFETY I NFORMATI ON

1. 9. 1 Saf et y Bul l et i n Boar d

SECTI ON 01 35 26 Page 1

1. 9. 2 Saf et y and Occupat i onal Heal t h ( SOH) Def i c i ency Tr acki ng Syst em

1. 10 SI TE SAFETY REFERENCE MATERI ALS

1. 11 EMERGENCY MEDI CAL TREATMENT

1. 12 NOTI FI CATI ONS and REPORTS

1. 12. 1 Mi shap Not i f i cat i on

1. 12. 2 Acci dent Repor t s

1. 12. 3 LHE I nspect i on Repor t s

1. 12. 4 Cer t i f i cat e of Compl i ance and Pr e- l i f t Pl an/ Checkl i st f or LHE and Ri ggi ng

1. 13 CONFI NED SPACE ENTRY REQUI REMENTS

1. 13. 1 Ent r y Pr ocedur es

1. 13. 2 For ced Ai r Vent i l at i on

1. 13. 3 Rescue Pr ocedur es and Coor di nat i on wi t h Local Emer gency

Responder s

1. 14 SEVERE STORM PLAN

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 CONSTRUCTI ON AND OTHER WORK

3. 1. 1 Wor ksi t e Communi cat i on

3. 1. 2 Hazar dous Mat er i al Excl usi ons

3. 1. 3 Unf or eseen Hazar dous Mat er i al

3. 2 EQUI PMENT

3. 2. 1 Mat er i al Handl i ng Equi pment ( MHE)

3. 2. 2 Load Handl i ng Equi pment ( LHE)

3. 2. 3 Machi ner y and Mechani zed Equi pment

3. 2. 4 Base Mount ed Dr um Hoi st s

3. 3 EXCAVATI ONS

3. 3. 1 Ut i l i t y Locat i ons

3. 3. 2 Ut i l i t y Locat i on Ver i f i cat i on

3. 3. 3 Ut i l i t i es Wi t hi n and Under Concr et e, Bi t umi nous Asphal t , and

Ot her I mper vi ous Sur f aces

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 35 26 Page 2

SECTI ON 01 35 26

GOVERNMENTAL SAFETY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF SAFETY PROFESSI ONALS ( ASSP)

ASSP A10. 22 ( 2007; R 2017) Saf et y Requi r ement s f or Rope- Gui ded and Non- Gui ded Wor ker s’ Hoi st s

ASSP A10. 34 ( 2021) Pr ot ect i on of t he Publ i c on or Adj acent t o Const r uct i on Si t es

AMERI CAN SOCI ETY OF MECHANI CAL ENGI NEERS ( ASME)

ASME B30. 20 ( 2018) Bel ow- t he- Hook Li f t i ng Devi ces

ASME B30. 22 ( 2023) Ar t i cul at i ng Boom Cr anes

ASME B30. 23 ( 2022) Per sonnel Li f t i ng Syst ems Saf et y St andar d f or Cabl eways, Cr anes, Der r i cks, Hoi st s, Hooks, Jacks, and Sl i ngs

ASME B30. 26 ( 2015; R 2020) Ri ggi ng Har dwar e

ASME B30. 3 ( 2020) Tower Cr anes

ASME B30. 5 ( 2021) Mobi l e and Locomot i ve Cr anes

ASME B30. 9 ( 2018) Sl i ngs

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 10 ( 2022; ERTA 1 2021) St andar d f or Por t abl e Fi r e Ext i ngui sher s

NFPA 241 ( 2022) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Oper at i ons

NFPA 70 ( 2023; ERTA 4 2023) Nat i onal El ect r i cal Code

NFPA 70E ( 2024) St andar d f or El ect r i cal Saf et y i n t he Wor kpl ace

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2024) Saf et y - - Saf et y and Heal t h

SECTI ON 01 35 26 Page 3

Requi r ement s Manual

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

29 CFR 1910 Occupat i onal Saf et y and Heal t h St andar ds

29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Const r uct i on

29 CFR 1926. 1400 Cr anes and Der r i cks i n Const r uct i on

29 CFR 1926. 16 Rul es of Const r uct i on

29 CFR 1926. 450 Scaf f ol ds

1. 2 DEFI NI TI ONS

1. 2. 1 Compet ent Per son ( CP)

The CP i s a per son desi gnat ed i n wr i t i ng, who, t hr ough t r ai ni ng, knowl edge and exper i ence, i s capabl e of i dent i f y i ng, eval uat i ng, and addr essi ng exi st i ng and pr edi ct abl e hazar ds i n t he wor ki ng envi r onment or wor ki ng condi t i ons t hat ar e danger ous t o per sonnel , and who has aut hor i zat i on t o t ake pr ompt cor r ect i ve measur es wi t h r egar ds t o such hazar ds. Def i ni t i ons of t he compet ent per son qual i f i cat i ons f or speci f i c i t ems such as Cr anes and Ri ggi ng, Fal l Pr ot ect i on, and t he Compet ent Per son ( CP) Tr ai ner ar e def i ned i n EM 385- 1- 1 Chapt er 1 - 2. c.

1. 2. 2 Hi gh Ri sk Act i v i t i es

Hi gh Ri sk Act i v i t i es ar e act i v i t i es t hat i nvol ve wor k at hei ght s, cr ane and r i ggi ng, excavat i ons and t r enchi ng, scaf f ol di ng, el ect r i cal wor k, and conf i ned space ent r y.

1. 2. 3 Hi gh Vi s i bi l i t y Acci dent

A Hi gh Vi s i bi l i t y Acci dent i s any mi shap whi ch may gener at e negat i ve publ i c i t y or may r esul t i n a Ser i ous I nci dent Repor t bei ng gener at ed.

1. 2. 4 Load Handl i ng Equi pment ( LHE)

As def i ned i n EM 385- 1- 1 Chapt er 16.

1. 2. 5 Medi cal Tr eat ment

Medi cal Tr eat ment i s t r eat ment admi ni st er ed by a physi c i an or by r egi st er ed pr of essi onal per sonnel under t he st andi ng or der s of a physi c i an. Medi cal t r eat ment does not i ncl ude f i r st ai d t r eat ment even t hr ough pr ovi ded by a physi c i an or r egi st er ed per sonnel .

1. 2. 6 Near Mi ss

A Near Mi ss i s a mi shap r esul t i ng i n no per sonal i nj ur y and zer o pr oper t y damage, but gi ven a shi f t i n t i me or posi t i on, damage or i nj ur y may have occur r ed ( e. g. , a wor ker f al l s of f a scaf f ol d and i s not i nj ur ed; a cr ane swi ngs ar ound t o move t he l oad and nar r owl y mi sses a par ked vehi c l e) .

SECTI ON 01 35 26 Page 4

1. 2. 7 Oper at i ng Envel ope

The Oper at i ng Envel ope i s t he ar ea sur r oundi ng any cr ane or l oad handl i ng equi pment . I nsi de t hi s " envel ope" i s t he cr ane, t he oper at or , r i gger s and cr ane wal ker s, ot her per sonnel i nvol ved i n t he oper at i on, r i ggi ng gear bet ween t he hook, t he l oad, t he cr ane' s suppor t i ng st r uct ur e ( i . e.