This file describes a federal solicitation for construction services. The U.S. Army Corps of Engineers Engineering District St Paul is seeking offers for a Corps Island Stabilization Construction Project. Offerors must submit proposals in response to solicitation number W912ES23B0010 by September 28, 2023. The project involves stabilizing an island to prevent further erosion. The solicitation package is 25MB and includes plans for the required construction work. Awards are expected to be made in 2023 for on-site work to be completed by 2024. Pricing is to be provided on a firm-fixed-price basis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912ES23B0010 Bid Abstract - Corps Island 31Oct23.pdf | ||
| W912ES23B0010-0002 Corps Island Stabilization - Spec Change WD Update 25Oct23.pdf | ||
| W912ES23B0010-0001 Corps Island Stabilization - Bidder Inquiry Key 29Sep23.pdf | ||
| W912ES23B0010 Corps Island Stabilization - Bidder Inquiry Key 29Sep23.pdf | ||
| W912ES23B0010 Corps Island Stabilization SPECS 28Sep23.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KNOFF.MICHAEL.RI
CHARD.1231198497
Digitally signed by
KNOFF.MICHAEL.RICHARD.123
1198497 Date: 2023.09.26 15:04:17 -05'00'
SENTZ.JAMES.D.12
31191743
Digitally signed by
SENTZ.JAMES.D.1231191743
Date: 2023.09.22 16:06:55 -05'00'
BEHLING.CHRISTOPHE
R.W.1230533535
Digitally signed by
BEHLING.CHRISTOPHER.W.1230533535
Date: 2023.09.22 13:16:37 -05'00'
Digitally signed by Kari Hauck Date: 2023.09.22 11:39:25 -05'00'
LEVINE.ANTHONY.M.1
538731230
Digitally signed by
LEVINE.ANTHONY.M.1538731230
Date: 2023.09.22 11:18:26 -05'00'
W
2E S2
3B
W912ES23B0010
2018 2019 2020 2021 2022 2023
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
2013 2014 2015 2016 2017 2018
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
CORPS ISLAND BANK STABILIZATION
MISSISSIPPI RIVER
DAILY FLOW HYDROGRAPHS
JANUARY 01 - DECEMBER 31
2013 - 2022
SHEET NUMBER: 1 of 6
LOCK AND DAM 3
HYDROLOGIC INFORMATION
2018 2019 2020 2021 2022 2023
20,000
40,000
60,000
80,000
100,000
120,000
140,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W
C
FS
2013 2014 2015 2016 2017 2018
20,000
40,000
60,000
80,000
100,000
120,000
140,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W
C
FS
Notes:
1. The daily flow hydrographs are based on data collected by the U.S. Army Corps of Engineers at Lock and Dam 3. There are 64 years of record (1959-2022). The highest recorded flow occurred on April 18, 1965 (224,800 cfs).
2. These daily flow hydrographs are based on the best information available. These daily flow hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
CORPS ISLAND BANK STABILIZATION
MISSISSIPPI RIVER
FLOW DURATION CURVES
JANUARY - JUNE
1959 - 2022
SHEET NUMBER: 2 of 6
LOCK AND DAM 3
HYDROLOGIC INFORMATION
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MARCH
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JUNE
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JANUARY
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
APRIL
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
FEBRUARY
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MAY
Notes:
1. The monthly flow duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 3 daily flow data for the period January 1959 through September 2022. The 1965 event (224,800 cfs peak) is the flood of record.
2. These flow duration curves are based on the best information available. These flow duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
FLOW DURATION CURVES
JULY - DECEMBER
1959 - 2022
SHEET NUMBER: 3 of 6
LOCK AND DAM 3
HYDROLOGIC INFORMATION
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
SEPTEMBER
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
DECEMBER
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JULY
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
OCTOBER
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
AUGUST
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
220,000
0 10 20 30 40 50 60 70 80 90 100
FL
O
W
IN
C
FS
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
NOVEMBER
Notes:
1. The monthly flow duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 3 daily flow data for the period January 1959 through September 2022. The 1965 event (224,800 cfs peak) is the flood of record.
2. These flow duration curves are based on the best information available. These flow duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
2018 2019 2020 2021 2022 2023
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
2013 2014 2015 2016 2017 2018
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
FL
O
W I
N C
FS
CORPS ISLAND BANK STABILIZATION
MISSISSIPPI RIVER
DAILY POOL ELEVATION HYDROGRAPHS
JANUARY 01 - DECEMBER 31
2013 - 2022
SHEET NUMBER: 4 of 6
LOCK AND DAM 3
HYDROLOGIC INFORMATION
2018 2019 2020 2021 2022 2023
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
2013 2014 2015 2016 2017 2018
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
Notes:
1. The daily pool elevation hydrographs are based on data collected by the U.S. Army Corps of Engineers at Lock and Dam 3.
There are 87 years of record (1936-2022). The highest recorded pool elevation occurred on April 19, 1965 (687.86 feet).
MSL 1912 - 0.37 ft = NAVD 88 at Lock and Dam 3.
2. These daily pool elevation hydrographs are based on the best information available. These daily pool elevation hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
POOL DURATION CURVES
JANUARY - JUNE
1972 - 2022
SHEET NUMBER: 5 of 6
LOCK AND DAM 3
HYDROLOGIC INFORMATION
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MARCH
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JUNE
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JANUARY
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
APRIL
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
FEBRUARY
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MAY
Notes:
1. These monthly duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 3 daily pool elevation data for the period January 1972 through September 2022. MSL 1912 - 0.37 ft = NAVD 88 at Lock and Dam 3. Note pool elevation data exists prior to 1972 but was not used to compute duration curves due to a change in operation that occurred in 1971.
2. These elevation duration curves are based on the best information available. These elevation duration curves represent the period 1972-2022, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
POOL DURATION CURVES
JULY - DECEMBER
1972 - 2022
SHEET NUMBER: 6 of 6
LOCK AND DAM 3
HYDROLOGIC INFORMATION
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
SEPTEMBER
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
DECEMBER
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JULY
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
OCTOBER
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
AUGUST
0 10 20 30 40 50 60 70 80 90 100
EL
EV
AT
IO
N I
N F
EE
T
(N
AV
D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
NOVEMBER
Notes:
1. These monthly duration curves were derived using the U.S. Army Corps of Engineers Lock and Dam 3 daily pool elevation data for the period January 1972 through September 2022. MSL 1912 - 0.37 ft = NAVD 88 at Lock and Dam 3. Note pool elevation data exists prior to 1972 but was not used to compute duration curves due to a change in operation that occurred in 1971.
2. These elevation duration curves are based on the best information available. These elevation duration curves represent the period 1972-2022, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
| CISTAB_SIGN_21Sept2023.pdf |
| CISTAB_G-001 |
| CISTAB_G-002 |
| CISTAB_G-003 |
| CISTAB_GC101 |
| CISTAB_C-101 |
| CISTAB_C-301 |
| CISTAB_C-302 |
| CISTAB_C-601 |
File details come from the government source that posted it. Updated .