This document package provides hydrologic and hydraulic information to support the Fargo Moorhead Metropolitan (FMM) Area Flood Risk Management Project, Southern Embankment Reach SE-2B solicitation. The solicitation is for flood risk management work on the Wild Rice River in North Dakota. The package includes daily and monthly flow hydrographs, stage hydrographs, and flow and stage duration curves from 1932 to 2021 to characterize historical hydrologic conditions at the project site. It presents hydrologic data collected from the Wild Rice River gage near Abercrombie, ND and applies rating curves to compute stage from discharge. The highest recorded flow and stage occurred in March 2009. The information is intended to inform responses to solicitation number W912ES23B0005 for reach SE-2B of the FMM project being conducted by the Department of the Army Corps of Engineers, St. Paul District.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2017 2018 2019 2020 2021 2022
1,000
1,500
2,000
2,500
3,000
3,500
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
F
LO
W I
N C
F S
2012 2013 2014 2015 2016 2017
1,000
1,500
2,000
2,500
3,000
3,500
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
F
LO
W I
N C
F S
FMM - SOUTHERN EMBANKMENT REACH 2B
WILD RICE RIVER
DAILY FLOW HYDROGRAPHS
JANUARY 01 - DECEMBER 31
2012 - 2021
SHEET NUMBER: 1 of 6
FMM - SOUTHERN EMBANKMENT REACH 2B
HYDROLOGIC INFORMATION
Notes:
1. The daily flow hydrographs are based on data collected at the Wild Rice River near Abrecrombie, ND USGS gage (05053000). Discahrge at the gage is assumed to be representative of discharge at the project location. There are 90 years of record (1932-2021). The highest recorded mean daily flow at the gage occurred on March 25, 2009 (14,000 cfs).
2. These daily flow hydrographs are based on the best information available. These daily flow hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
2017 2018 2019 2020 2021 2022
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
F
LO
W I
N C
F S
2012 2013 2014 2015 2016 2017
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
F
LO
W I
N
C F
S
FMM - SOUTHERN EMBANKMENT REACH
2B
WILD RICE RIVER
FLOW DURATION CURVES
JANUARY - JUNE
1932 - 2021
SHEET NUMBER: 2 of 6
FMM - SOUTHERN EMBANKMENT REACH 2B
HYDROLOGIC INFORMATION
Notes:
1. The monthly flow duration curves were derived using data collected at the Wild Rice River near Abrecrombie, ND USGS gage (05053000). Discharge at the gage is assumed to be representative of discharge at the project location. There are 90 years of record (1932-2021). The 2009 event (14,000 cfs peak) is the flood of record.
2. These flow duration curves are based on the best information available. These flow duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MARCH
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JUNE
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JANUARY
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
APRIL
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
FEBRUARY
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MAY
WILD RICE RIVER
FLOW DURATION CURVES
JULY - DECEMBER
1932 - 2021
SHEET NUMBER: 3 of 6
FMM - SOUTHERN EMBANKMENT REACH 2B
HYDROLOGIC INFORMATION
Notes:
1. The monthly flow duration curves were derived using data collected at the Wild Rice River near Abrecrombie, ND USGS gage (05053000). Discharge at the gage is assumed to be representative of discharge at the project location. There are 90 years of record (1932-2021). The 2009 event (14,000 cfs peak) is the flood of record.
2. These flow duration curves are based on the best information available. These flow duration curves represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
SEPTEMBER
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
DECEMBER
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JULY
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
OCTOBER
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
AUGUST
2,000
4,000
6,000
8,000
10,000
12,000
0 10 20 30 40 50 60 70 80 90 100
F
LO
W
IN
C F
S
NOVEMBER
2017 2018 2019 2020 2021 2022
1,000
1,500
2,000
2,500
3,000
3,500
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
F
LO
W I
N C
F S
2012 2013 2014 2015 2016 2017
1,000
1,500
2,000
2,500
3,000
3,500
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
F
LO
W I
N C
F S
FMM - SOUTHERN EMBANKMENT REACH 2B
WILD RICE RIVER
DAILY STAGE HYDROGRAPHS
JANUARY 01 - DECEMBER 31
2012 - 2021
SHEET NUMBER: 4 of 6
FMM - SOUTHERN EMBANKMENT REACH 2B
HYDROLOGIC INFORMATION
Notes:
1. The daily stage hydrographs are based on data collected at the Wild Rice River near Abrecrombie, ND USGS gage (05053000). Discharge recorded at the gage is assumed to be representative of discharge at the project location, and the rating curve at the Wild Rice River Structure is applied to compute stage at the project location. There are 90 years of record (1932-2021). The highest recorded stage at the site occurred on March 25, 2009 (918.25 ft).
2. These daily stage hydrographs are based on the best information available. These daily stage hydrographs represent the period shown, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
2017 2018 2019 2020 2021 2022
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
8)
2012 2013 2014 2015 2016 2017
J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
8)
WILD RICE RIVER
STAGE DURATION CURVES
JANUARY - JUNE
1932 - 2021
SHEET NUMBER: 5 of 6
FMM - SOUTHERN EMBANKMENT REACH 2B
HYDROLOGIC INFORMATION
Notes:
1. The monthly stage duration curves were derived using data collected at the Wild Rice River near Abrecrombie, ND USGS gage (05053000). Discharge recorded at the gage is assumed to be representative of discharge at the project location, and the rating curve at the Wild Rice River Structure is applied to compute stage at the project location. There are 90 years of record (1932-2021). The 2009 event is the flood of record (918.25 ft).
2. These stage duration curves are based on the best information available. These stage duration curves represent the period 1972-2021, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
MARCH
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JUNE
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JANUARY
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
APRIL
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
FEBRUARY
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
MAY
WILD RICE RIVER
STAGE DURATION CURVES
JULY - DECEMBER
1932 - 2021
SHEET NUMBER: 6 of 6
FMM - SOUTHERN EMBANKMENT REACH 2B
HYDROLOGIC INFORMATION
Notes:
1. The monthly stage duration curves were derived using data collected at the Wild Rice River near Abrecrombie, ND USGS gage (05053000). Discharge recorded at the gage is assumed to be representative of discharge at the project location, and the rating curve at the Wild Rice River Structure is applied to compute stage at the project location. There are 90 years of record (1932-2021). The 2009 event is the flood of record (918.25 ft).
2. These stage duration curves are based on the best information available. These stage duration curves represent the period 1972-2021, and do not necessarily represent all possible future conditions. Questions may be addressed to the office of the Corps of Engineers St. Paul, Minnesota.
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
SEPTEMBER
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
DECEMBER
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
8)
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
JULY
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
OCTOBER
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
PERCENTAGE OF TIME EQUALLED OR EXCEEDED
AUGUST
0 10 20 30 40 50 60 70 80 90 100
E
LE
V A
T
IO
N I
N F
E E
T
N A
V D
NOVEMBER
File details come from the government source that posted it. Updated .