This document is an Abstract of Bids for the solicitation W912ES22B0009 "UPPER MISSISSIPPI RIVER LOCKS 4 & 3 MITER GATE SUPPLY" issued by the U.S. Army Corps of Engineers, Saint Paul District. The solicitation is for the supply and delivery of miter gate assemblies, anchorage assemblies, and disposal of existing miter gates for Lock 4 and Lock 3 on the Upper Mississippi River.

The bid opening date is August 21, 2024 at 2:00pm CST. The solicitation includes a base contract with 9 contract line items (CLINs) and three option periods. The base contract CLINs cover the miter gate assemblies, delivery, barge demurrage, and disposal for Lock 4. The option periods include the same requirements for Lock 3 as well as long-term storage options. The abstract provides unit prices and total amounts for the three bidders - Johnson Machine Works, Inc., G&G Steel, Inc., and the Government Estimate. Mathematical errors were noted in the bid tabulation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPPER MISSISSIPPI RIVER LOCKS 4 & 3 MITER GATE SUPPLY Solicitation Number: W912ES22B0009 US Army Corps of Engineers. 332 Minnesota Street, SuiteE15700. Saint Paul, Minnesota 55101 BID OPENING: August 21, 2024 2:00pm CST

Contracting Officer: Kenneth J. Eshom Contract Specialist: Scott E. Hendrix

Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount

BASE (CLINS 0001 - 0009)

0001 Bonds (Performance and Payment) 1 JOB $171,118.00 $171,118.00 $72,990.00 $72,990.00 $69,250.00 $69,250.00 0002 Lock 4 Upstream Miter Gate Assembly (20' High) 1 JOB $3,024,308.00 $3,024,308.00 $4,364,750.00 $4,364,750.00 $3,152,456.00 $3,152,456.00 0003 Lock 4 Downstream Miter Gate Assembly (23' High) 1 JOB $3,864,554.00 $3,864,554.00 $4,427,880.00 $4,427,880.00 $3,298,634.00 $3,298,634.00 0004 Delivery of Lock 4 Miter Gate Assemblies 1 JOB $112,720.00 $112,720.00 $40,130.00 $40,130.00 $217,366.00 $217,366.00 0005 Barge Demurrage for Lock 4 Miter Gate Assemblies

0005AA First 30 Days 30 DAY $479.00 $14,370.00 $1,200.00 $36,000.00 $435.00 $13,050.00 0005AB Each Additional Day 120 DAY $336.00 $40,320.00 $260.00 $31,200.00 $435.00 $52,200.00

Lock 4 Disposal of Existing Upstream Miter Gate Assembly (20' High) 1 JOB $45,000.00 $45,000.00 $12,590.00 $12,590.00 $43,355.00 $43,355.00

Lock 4 Disposal of Existing Downstream Miter Gate Assembly (23' High) 1 JOB $45,000.00 $45,000.00 $12,590.00 $12,590.00 $43,355.00 $43,355.00

0008 Anchorage Assembly for Lock 3 Miter Gates 8 EACH $177,555.00 $1,420,440.00 $223,660.00 $1,789,280.00 $205,920.00 $1,647,360.00 0009 Anchorage Assembly for Lock 4 Miter Gates 16 EACH $177,555.00 $2,840,880.00 $178,720.00 $2,859,520.00 $145,162.00 $2,322,592.00

TOTAL BASE $11,578,710.00 $13,646,930.00 $10,859,618.00

OPTION 1 (CLINS 1001 - 1007)

1001 Bonds (Performance and Payment) 1 JOB $127,914.00 $127,914.00 $52,590.00 $52,590.00 $48,000.00 $48,000.00 1002 Lock 3 Upstream Miter Gate Assembly (25' High) 1 JOB $4,063,660.00 $4,063,660.00 $4,360,680.00 $4,360,680.00 $3,400,172.00 $3,400,172.00 1003 Lock 3 Downstream Miter Gate Assembly (30' High) 1 JOB $4,198,970.00 $4,198,970.00 $4,545,260.00 $4,545,260.00 $3,510,064.00 $3,510,064.00 1004 Delivery of Lock 3 Miter Gate Assemblies 1 JOB $115,947.00 $115,947.00 $49,490.00 $49,490.00 $230,310.00 $230,310.00 1005 Barge Demurrage for Lock 3 Miter Gate Assemblies

0005AA First 30 Days 30 DAY $494.00 $14,820.00 $1,200.00 $36,000.00 $435.00 $13,050.00 0005AB Each Additional Day 120 DAY $347.00 $41,640.00 $260.00 $31,200.00 $435.00 $52,200.00

Lock 3 Disposal of Existing Upstream Miter Gate Assembly (25' High) 1 JOB $46,122.00 $46,122.00 $12,590.00 $12,590.00 $41,462.00 $41,462.00

Lock 3 Disposal of Existing Downstream Miter Gate Assembly (30' High) 1 JOB $46,122.00 $46,122.00 $12,590.00 $12,590.00 $41,462.00 $41,462.00

TOTAL OPTION 1 $8,655,195.00 $9,100,400.00 $7,336,720.00

OPTION 2 (CLINS 2001 - 2002)

2001 Bonds (Performance and Payment) 1 JOB $327.00 $327.00 $80.00 $80.00 $1,250.00 $1,250.00 2002 Long Term Storage for Lock 3 Miter Gates 180 DAY $121.00 $21,780.00 $60.00 $10,800.00 $50.00 $9,000.00

TOTAL OPTION 2 $22,107.00 $10,880.00 $10,250.00

OPTION 3 (CLINS 3001 - 3002)

3001 Bonds (Performance and Payment) 1 JOB $319.00 $319.00 $80.00 $80.00 $1,250.00 $1,250.00 3002 Long Term Storage for Lock 4 Miter Gates 180 DAY $118.00 $21,240.00 $60.00 $10,800.00 $50.00 $9,000.00

TOTAL OPTION 3 $21,559.00 $10,880.00 $10,250.00

TOTAL BASE AND ALL OPTIONS $20,277,571.00 $22,769,090.00 $18,216,838.00

Note: Upon reviewing the bids, mathamatical errors were discovered for the highlighted items. The highlighted amount and subsequent totals are correct.

I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.

Kenneth J. Eshom Contracting Officer

Government Estimate Johnson Machine Works, Inc G&G Steel, Inc.

318 N, 11th Street

Chariton, IA 50049 15825 Hwy 243 Industrial Park

Russellville, AL 35654

2024-08-21T15:32:53-0500
ESHOM.KENNETH.JAMES.1165952878