This document is an abstract of bids received in response to Solicitation Number W912ES21B0005 for the Fargo Moorhead Metropolitan Area Flood Risk Management Project, Southern Embankment Reach SE-1.

The solicitation was issued by the Department of the Army Corps of Engineers Engineering District St Paul and sought bids for 35 different items related to construction services. Bids were received from seven contractors by the March 3, 2021 deadline and ranged in total from $2,231,275 to $4,990,682. Key items included in the solicitation were excavation and removal services, culvert and drainage installation, erosion control measures like geotextiles and riprap, and site work such as topsoil respreading and seeding. The apparent low bidder was HSG Park Joint Venture, LLC at $2,231,275 while the government estimate was $4,360,990. The contracting officer certified having opened, read and recorded all bids received by the deadline.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FMM Southern Embankment Reach SE-1 Solicitation Number: W912ES21B0005 US Army Corps of Engineers. 180 East 5th Street, Suite 700. Saint Paul, Minnesota 55101 BID OPENING: 03 MAR 2021 2:00pm

Contracting Officer: Kevin P. Henricks Contract Specialist: Scott E. Hendrix

Unit Unit Unit Unit Unit Unit Unit Unit Item Description Quantity Unit Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount

0001 Performance and Payment Bonds 1 JOB $30,000.00 $30,000.00 $19,000.00 $19,000.00 $32,650.00 $32,650.00 $30,914.00 $30,914.00 $11,800.00 $11,800.00 $18,186.15 $18,186.15 $15,000.00 $15,000.00 $22,230.00 $22,230.00 0002 Demolition 1 JOB $17,500.00 $17,500.00 $28,000.00 $28,000.00 $11,680.00 $11,680.00 $26,000.00 $26,000.00 $15,000.00 $15,000.00 $175,000.00 $175,000.00 $25,000.00 $25,000.00 $1,577.95 $1,577.95 0003 Traffic Control Signs 1 Job $15,000.00 $15,000.00 $27,000.00 $27,000.00 $24,951.00 $24,951.00 $25,000.00 $25,000.00 $9,050.00 $9,050.00 $10,500.00 $10,500.00 $351,000.00 $351,000.00 $11,669.65 $11,669.65 0004 Clearing and Grubbing 1 JOB $10,000.00 $10,000.00 $22,000.00 $22,000.00 $20,884.00 $20,884.00 $48,000.00 $48,000.00 $15,000.00 $15,000.00 $10,500.00 $10,500.00 $12,000.00 $12,000.00 $17,052.86 $17,052.86 0005 Road Removal 6,200 CY $23.70 $146,940.00 $9.80 $60,760.00 $5.00 $31,000.00 $6.00 $37,200.00 $5.05 $31,310.00 $9.67 $59,954.00 $5.75 $35,650.00 $7.88 $48,856.00 0006 Stripping

0006AA First 60,000 CY 60,000 CY $22.80 $1,368,000.00 $5.50 $330,000.00 $10.60 $636,000.00 $14.00 $840,000.00 $4.30 $258,000.00 $3.37 $202,200.00 $3.40 $204,000.00 $3.17 $190,200.00 0006AB Over 60,000 CY 6,000 CY $6.20 $37,200.00 $7.95 $47,700.00 $10.00 $60,000.00 $14.00 $84,000.00 $6.60 $39,600.00 $1.91 $11,460.00 $1.60 $9,600.00 $5.71 $34,260.00

0007 Inspection Trench 11,000 LF $25.25 $277,750.00 $17.00 $187,000.00 $18.00 $198,000.00 $31.00 $341,000.00 $16.10 $177,100.00 $8.87 $97,570.00 $18.50 $203,500.00 $5.24 $57,640.00 0008 Subgrade Excavation

0008AA First 5,000 CY 5,000 CY $23.00 $115,000.00 $10.00 $50,000.00 $17.00 $85,000.00 $18.00 $90,000.00 $6.85 $34,250.00 $6.70 $33,500.00 $3.30 $16,500.00 $2.85 $14,250.00 0008AB Over 5,000 CY 1,000 CY $23.00 $23,000.00 $10.00 $10,000.00 $41.00 $41,000.00 $18.00 $18,000.00 $8.05 $8,050.00 $6.70 $6,700.00 $3.30 $3,300.00 $2.71 $2,710.00

0009 Excavation 0009AA First 22,000 CY 22,000 CY $6.30 $138,600.00 $7.90 $173,800.00 $10.00 $220,000.00 $9.00 $198,000.00 $5.50 $121,000.00 $14.21 $312,620.00 $3.30 $72,600.00 $2.77 $60,940.00 0009AB Over 22,000 CY 4,000 CY $6.00 $24,000.00 $10.50 $42,000.00 $11.00 $44,000.00 $9.00 $36,000.00 $7.75 $31,000.00 $6.96 $27,840.00 $3.30 $13,200.00 $2.71 $10,840.00

0010 Borrow Excavation 0010AA First 95,000 CY 95,000 CY $11.50 $1,092,500.00 $11.75 $1,116,250.00 $13.80 $1,311,000.00 $14.00 $1,330,000.00 $8.90 $845,500.00 $6.51 $618,450.00 $9.25 $878,750.00 $9.10 $864,500.00 0010AB Over 95,000 CY 15,000 CY $8.30 $124,500.00 $9.00 $135,000.00 $14.00 $210,000.00 $14.00 $210,000.00 $10.10 $151,500.00 $4.52 $67,800.00 $9.25 $138,750.00 $9.14 $137,100.00

0011 Geotextile - Type 2 21,000 SY $2.10 $44,100.00 $2.50 $52,500.00 $2.00 $42,000.00 $5.00 $105,000.00 $2.40 $50,400.00 $3.68 $77,280.00 $1.75 $36,750.00 $2.44 $51,240.00 0012 Aggregate Surface 7,000 TON $44.00 $308,000.00 $20.00 $140,000.00 $54.00 $378,000.00 $35.00 $245,000.00 $20.30 $142,100.00 $47.77 $334,390.00 $25.00 $175,000.00 $26.33 $184,310.00 0013 Topsoil Respread

0013AA First 20,000 CY 20,000 CY $5.70 $114,000.00 $2.00 $40,000.00 $6.00 $120,000.00 $15.00 $300,000.00 $2.60 $52,000.00 $9.53 $190,600.00 $2.00 $40,000.00 $3.10 $62,000.00 0013AB Over 20,000 CY 4,000 CY $5.70 $22,800.00 $2.00 $8,000.00 $4.00 $16,000.00 $15.00 $60,000.00 $3.65 $14,600.00 $5.55 $22,200.00 $2.00 $8,000.00 $3.23 $12,920.00

0014 Seeding 40 AC $2,000.00 $80,000.00 $2,200.00 $88,000.00 $3,601.00 $144,040.00 $1,500.00 $60,000.00 $1,680.00 $67,200.00 $1,735.33 $69,413.20 $2,300.00 $92,000.00 $2,114.77 $84,590.80 0015 Turf Reinforcement Mat (TRM) 9,200 SY $5.70 $52,440.00 $8.50 $78,200.00 $8.00 $73,600.00 $8.00 $73,600.00 $8.80 $80,960.00 $9.88 $90,896.00 $9.00 $82,800.00 $5.46 $50,232.00 0016 Traffic Gate 2 EA $2,500.00 $5,000.00 $2,800.00 $5,600.00 $21,160.00 $42,320.00 $12,000.00 $24,000.00 $21,200.00 $42,400.00 $8,000.00 $16,000.00 $22,000.00 $44,000.00 $10,175.04 $20,350.08 0017 36" RCP Culvert 177 LF $300.00 $53,100.00 $210.00 $37,170.00 $529.00 $93,633.00 $280.00 $49,560.00 $161.40 $28,567.80 $176.24 $31,194.48 $175.00 $30,975.00 $202.29 $35,805.33 0018 24" RCP Culvert 138 LF $175.00 $24,150.00 $108.00 $14,904.00 $391.00 $53,958.00 $170.00 $23,460.00 $104.30 $14,393.40 $110.65 $15,269.70 $104.00 $14,352.00 $106.50 $14,697.00 0019 15" CSP Culvert 115 LF $75.00 $8,625.00 $90.00 $10,350.00 $199.00 $22,885.00 $80.00 $9,200.00 $109.20 $12,558.00 $74.10 $8,521.50 $62.00 $7,130.00 $51.82 $5,959.30 0020 30" CSP Culvert 42 LF $165.00 $6,930.00 $135.00 $5,670.00 $487.00 $20,454.00 $175.00 $7,350.00 $151.80 $6,375.60 $127.85 $5,369.70 $103.00 $4,326.00 $112.69 $4,732.98 0021 36" CSP Culvert 43 LF $185.00 $7,955.00 $155.00 $6,665.00 $365.00 $15,695.00 $195.00 $8,385.00 $163.80 $7,043.40 $152.65 $6,563.95 $131.00 $5,633.00 $127.24 $5,471.32 0022 36" Twin Pipe Headwall 1 EA $12,000.00 $12,000.00 $20,000.00 $20,000.00 $345,699.00 $345,699.00 $20,000.00 $20,000.00 $44,900.00 $44,900.00 $58,271.41 $58,271.41 $42,700.00 $42,700.00 $25,482.44 $25,482.44 0023 36" Single Pipe Headwall 1 EA $7,800.00 $7,800.00 $14,500.00 $14,500.00 $337,668.00 $337,668.00 $15,000.00 $15,000.00 $33,900.00 $33,900.00 $45,353.26 $45,353.26 $16,000.00 $16,000.00 $21,343.87 $21,343.87 0024 24" RCP Flared End Section 4 EA $1,250.00 $5,000.00 $1,753.00 $7,012.00 $7,900.00 $31,600.00 $2,000.00 $8,000.00 $1,520.00 $6,080.00 $2,974.13 $11,896.52 $2,000.00 $8,000.00 $1,343.88 $5,375.52 0025 36" RCP Flared End Section 3 EA $2,200.00 $6,600.00 $2,300.00 $6,900.00 $12,602.00 $37,806.00 $3,000.00 $9,000.00 $2,330.00 $6,990.00 $4,909.06 $14,727.18 $3,755.00 $11,265.00 $2,471.75 $7,415.25 0026 15" CSP Flared End Section 6 EA $350.00 $2,100.00 $380.00 $2,280.00 $2,523.00 $15,138.00 $800.00 $4,800.00 $544.60 $3,267.60 $458.31 $2,749.86 $278.00 $1,668.00 $293.30 $1,759.80 0027 30" CSP Flared End Section 2 EA $950.00 $1,900.00 $935.00 $1,870.00 $7,799.00 $15,598.00 $1,200.00 $2,400.00 $823.80 $1,647.60 $996.57 $1,993.14 $670.00 $1,340.00 $819.62 $1,639.24 0028 36" CSP Flared End Section 2 EA $1,250.00 $2,500.00 $1,150.00 $2,300.00 $8,161.00 $16,322.00 $1,600.00 $3,200.00 $960.20 $1,920.40 $1,179.14 $2,358.28 $1,482.00 $2,964.00 $993.33 $1,986.66 0029 36" Flap Gate 3 EA $18,500.00 $55,500.00 $10,200.00 $30,600.00 $9,797.00 $29,391.00 $8,000.00 $24,000.00 $6,940.00 $20,820.00 $9,009.79 $27,029.37 $7,700.00 $23,100.00 $8,810.15 $26,430.45 0030 R30 Riprap 150 CY $155.00 $23,250.00 $125.00 $18,750.00 $250.00 $37,500.00 $150.00 $22,500.00 $159.20 $23,880.00 $196.49 $29,473.50 $213.00 $31,950.00 $192.25 $28,837.50 0031 R140 Riprap 350 CY $155.00 $54,250.00 $125.00 $43,750.00 $231.00 $80,850.00 $150.00 $52,500.00 $148.60 $52,010.00 $192.83 $67,490.50 $220.00 $77,000.00 $186.05 $65,117.50 0032 B1 Bedding 60 CY $110.00 $6,600.00 $110.00 $6,600.00 $381.00 $22,860.00 $125.00 $7,500.00 $191.30 $11,478.00 $157.08 $9,424.80 $187.00 $11,220.00 $117.84 $7,070.40 0033 B2 Bedding 90 CY $110.00 $9,900.00 $110.00 $9,900.00 $395.00 $35,550.00 $125.00 $11,250.00 $170.40 $15,336.00 $157.55 $14,179.50 $187.00 $16,830.00 $199.49 $17,954.10 0034 Geotextile - Type 1 750 SY $5.00 $3,750.00 $3.75 $2,812.50 $8.50 $6,375.00 $5.00 $3,750.00 $2.40 $1,800.00 $3.82 $2,865.00 $2.00 $1,500.00 $2.78 $2,085.00 0035 Filter Material 175 CY $130.00 $22,750.00 $41.00 $7,175.00 $169.00 $29,575.00 $5.00 $875.00 $106.30 $18,602.50 $152.83 $26,745.25 $187.00 $32,725.00 $72.24 $12,642.00

$4,360,990.00 $2,910,018.50 $4,990,682.00 $4,464,444.00 $2,509,390.30 $2,834,536.25 $2,798,078.00 $2,231,275.00

I certify that I have opened, read, and recorded on this abstract all bids received in response to this solicitation.

Kevin P. Henricks Contracting Officer

TOTAL BID

Government Estimate Hough Inc of Detroit Lakes Scherbenske Inc Mohawk Valley Materials, Inc.

PO Box 2 Detroit Lakes, MN 56501 Jamestown, ND 58401 Rome, NY 13440-6117

1501 E. Dominick ST. 2511 17th St. SE

Moltron Meyer LLC PO Box 213; 2972 25th St

NE

Harvey, ND 58341

Sellin Brothers, Inc.

424 Winnetka Ave N Golden Valley, MN 55427

HSG Park Joint Venture, LLC Tunheim Construction LLC

1204 Hobart Street; PO Box

Hawley, MN 56549 3950 25th St. N.

Fargo, ND 58102

2021-03-04T10:19:26-0600
HENRICKS.KEVIN.PHILIP.1249726873