Amendment 2 W912ES20Q0005.pdf
PDF 366 KB Posted
- Attached to
- Lock and Dam 3 (LD3) Roof Replacement Project
- Solicitation number
- W912ES20Q0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 W912ES20Q0005.pdf | ||
| LD3 Roof Specifications W912ES20Q0005.pdf | ||
| LD3 Roof Plans and Photos W912ES20Q0005.pdf | ||
| LD3 RFQ W912ES20Q0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see the block 14 Continuation page for the purpose of this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES20Q0005
X 9B. DATED (SEE ITEM 11)
17-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Aug-2020
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 FIFTH STREET EAST
SUITE 700
SAINT PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES20Q0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 2
The purpose of this amendment is to answer the following vendor questions and extend the solicitation closing due date and time as noted below.
1. Question (Q): Is there lightning protection that must be removed and replaced?
Answer (A): No.
2. Q: Is there a list of approved manufacturers?
A: No.
3. Q: What are the interior dimensions of the catwalk?
A: The inside width of the upper gates handrails is wider than the lowers. They measure 68" across the inside, along with the auxiliary gates. The bridge is much wider than the narrow miter gate walkways.
4. Q: Is there a required INDOC class for our team to attend? If so, where?
A: No, the solicitation does not refer to any required meetings or trainings as an "INDOC" class. Refer to USACE safety manual EM 385-1-1 and solicitation specification section 01 35 26 regarding safety meetings and training required for Site Safety and Health Officer (SSHO) and others. There are meetings and training required for some contractor personnel; for two examples, consider the following:
A pre-construction conference is required on site, see FAR clause 52.236-26 in the RFQ.
There is a Construction Quality Management For Contractors (CQMC) training requirement in accordance with paragraph 1.3.3. of specification section 01 45 04.00 13. USACE periodically holds in-person classroom training at various locations including Winona, MN and there is also an option for online training.
5. Q: Can we drive a buggy on the catwalk?
A: See specification sections 01 14 00.00 13 and 01 35 26.
6. Q: Regarding Paragraph 1.4, the Grading Protection Plan. What type of material, and how many inches of protection is expected to be placed to accommodate light foot traffic, wheelbarrows, and buggys containing the maximum grating load as specified?
A: Please quote as specified. See paragraph 1.5 in the same section. Also see FAR clause 52.236-9.
7. Q: Will there be fresh water available on site?
A: Fresh water is available near the lock house. There is not fresh water available on the dam itself.
All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 31-Aug-2020 10:00 AM to 03-Sep-2020 10:00 AM.
W912ES20Q0005
(End of Summary of Changes)
File details come from the government source that posted it. Updated .