Brownsville_2_Pre_Temp.pdf
PDF 1 MB Posted
- Attached to
- Dredging Mississippi River near Brownsville MN
- Solicitation number
- W912ES19T0077
About this file
Survey data
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912ES19T0077_Amendment_0001.pdf | ||
| W912ES19T0077_Dredging_Mississippii_River_Near_Brownsville_MN.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUT #
Total Material To
Project Depth
CU YDS
Total Allowable Overdepth
CU YDS
CUT#
Total Removed To
Project Depth
CU YDS
Total Pay Removed In Overdepth
CU YDS
Total Pay Removed
CU YDS
Total Removed
CU YDS
1 3,811 797 1 0 2 6,373 1,504 2 0
TOTAL 10,184 2,301 TOTAL 0 0 0 0
CUT
DIMENSIONS
CUT AREA
SQ FT
DREDGE
DEPTH
OVER
DEPTH
CUT
COORDINATES X
CUT
COORDINATES Y
1 50 x 1605 80,250 11.0 0.3 LL 3346869.08 592310.18
UL 3346896.25 593914.95
LR 3346919.07 592309.33
UR 3346946.24 593914.10
2 100 x 1470 147,000 11.0 0.3 LL 3346615.22 592147.00
UL 3346640.11 593616.79
LR 3346715.21 592145.31
UR 3346740.10 593615.10
227,250
PROJECT: Brownsville ( 2 )
BD SURVEY: UM_SP_P08_20190702_AD_6886_6891 AD SURVEY:
SURVEY DATE: 02 JULY 2019 SURVEY DATE:
NOTES:
River Mile For Center Of Project: RM - 688.8
Total Pay Place
CU YDS
12,485
Placement Site & River Mile: Brownsville 8-688.7-RMP RM 688.7
4,608 7,877
EQUIPMENT : CM - 4
b6cowcm3
BROWNS TEMP PRE
CUTS 1-2 & TOTALS
File details come from the government source that posted it.