A22_W912ES19T0042_0001_-_solicitation_amendment.pdf
PDF 793 KB Posted
- Attached to
- Bubbler Piping and Associated Materials Federal contract opportunity
- Solicitation number
- W912ES19T0042
About this file
SF 30 Solicitation Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A22_W912ES19T0042_0002_-_solicitation_amendment.pdf | ||
| A02_Bubbler_Piping_Diagram.pdf | ||
| A22_W912ES19T0042_Bubbler_Piping.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6790981586
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er Vendor questions.
The quote submission date and time has been extended to 05/21/2019 at 10:00am Central Time.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES19T0042
X 9B. DATED (SEE ITEM 11)
02-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-May-2019
CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES19T0042
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
VENDOR QUESTIONS
Vendor Question:
In reviewing the list of materials requested and the one diagram that has been provided subsequent to our prior request, for the 19 Items listed below there is either no Drawing and/or insufficient information to be able to provide the Item requested:
Item 0001AC Item 0001AD Item 0001AE Item 000A2 Item 0002AA Item 0002AC Item 0003 Item 0003AC Item 0004 Item 0004AC Item 0006 Item 0007 Item 0007AC Item 0008 Item 0009AD Item 0010 Item 0010AA Item 0011 Item 0016
Response:
We do not draw every item - some of these items are common pipe fittings. They need to be made of the correct material. The below table annotates in red the paragraphs that describe the items within the SOW.
Description Qty Unit
Pipe, Schedule 10, 304 Stainless Steel 2 inch diameter pipe with holes as shown in attached sketch (gate bubbler pipe) 240
LF
2.5 inch diameter pipe with holes as shown in attached sketch (screen and recess bubbler pipe) 452 LF
2 inch diameter pipe without holes (for quoin bubbler supply) (Paragraph 2.1 & 2.1.1 – this is 2” dia 304 Stainless Steel Pipe) 140 LF
2.5 inch diameter pipe without holes (note as Schedule 10) (Paragraph 2.1& 2.1.1 – this is 2.5” dia 304 Stainless Steel Pipe) 120 LF
3 inch diameter pipe without holes (note as Schedule 10) (Paragraph 2.1 & 2.1.1 – this is 3” dia 304 Stainless Steel Pipe) 120 LF
Pipe, Schedule 40, 304 Stainless Steel 2 inch diameter for gate bubbler supply (Paragraph 2.1 & 2.1.1) 80 LF
2.5 inch diameter for recess bubbler supply 300 LF 3 inch diameter for crossover and screen supply (Paragraph 2.1 & 2.1.1) 540 LF
Couplings, 316 Stainless Steel 2 inch diameter 120 EA
2.5 inch diameter 140 EA 3 inch diameter (Paragraph 2.3 and 2.3.1) 140 EA
Off Set Clamps, 316 Stainless Steel 2 inch diameter 76 EA
2.5 inch diameter 120 EA 3 inch diameter (Paragraph 2.4.1) 120 EA
U-Bolts, 316 Stainless Steel, including spacers, washers, and nuts
For 2 inch pipe 150 EA
Expansion Anchors, 316 Stainless Steel
0.5 inch x 6.5 inch (Paragraph 2.4.3) 525 EA
Elbows, 90 Degree, Schedule 10, 316 Stainless Steel 2 inch diameter 20 EA
2.5 inch diameter 30 EA 3 inch diameter (Paragraph 2.3) 16 EA
Tees, Schedule 10, 316 stainless steel 3 inch diameter(Paragraph 2.3) 6 EA
Description Qty Unit
Caps, Schedule 10, 316 Stainless Steel
2 inch diameter with holes (quoin bubbler) 4 EA 2 inch diameter 12 EA
2.5 inch diameter 12 EA 3 inch diameter(Paragraph 2.3 & 2.3.2) 10 EA
Reducers, Schedule 10, 316 Stainless Steel
3 inch x 2.5 inch (screen bubbler) (Paragraph 2.3) 6 EA
2.5 inch x 2 inch (gate bubbler) 6 EA
Elbows, 45 degree, Schedule 10, 316 Stainless Steel
2 inch diameter(Paragraph 2.3) 4 EA
2.5 inch diameter(Paragraph 2.3) 24 EA 3 inch diameter(Paragraph 2.3) 8 EA
Air Hose (150 PSIG) with schedule 40, 316 stainless steel cut groove ends
3 inch diameter x 12 feet long 6 EA
Threadolets, 304 Stainless Steel
0.5 inch outlet, 2.5 inch to 2 inch pipe run, 3000# welded over drilled holes (includes spares)
160 EA
Pipe Nipples, 316 Stainless Steel, Schedule 40, both ends threaded, one end attached at factory and factory banded to rubber check valves
0.5 inch x 3” 200 EA
Rubber Check Valves for 0.5 inch, Schedule 40 stainless steel pipe factory banded to pipe nipple with 316 stainless steel clamp
200 EA
Pipe, Schedule 40, Hot-dipped galvanized, Carbon steel
2-inch diameter pipe without holes (along railing, for quoin and gate bubbler supply) (Paragraph 2.1 & 2.1.1)
200 LF
Butterfly Valves, Ductile Iron, 300 psi pressure rated
2.5-inch diameter 10 EA 2-inch diameter 20 EA
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-May-2019 10:00 AM to 21-May-2019 10:00 AM.
(End of Summary of Changes)