W912ES19T0020_0002_Amendment.pdf

PDF 1 MB Posted

Attached to
HVAC Systems - Cross Lake, Leech Lake, and Pokegama Dam
Solicitation number
W912ES19T0020
Issued by

About this file

Amendment 0002 to RFQ W912ES19T0020

View the file

Other files

File Type Posted
W912ES19T0020_0003_Amendment.pdf PDF
W912ES19T0020_0001_Amendment.pdf PDF
W912ES19T0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6783547844

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of Amendment 0002 to RFQ W912ES19T0020 - HVAC Systems for Pokegama Dam and Leech Lake Dam Recreational Offices, and Central A/C Units for Cross Lake Recreational Office is to:

1. Revise Block 10 regarding Mechanical Bond requirement.

2. Revise CLIN 0002, CLIN 0003 and CLIN 0004 Descriptions.

3. Change Delivery Schedule.

4. Revise Notes to Quoters regarding Mechanical Bond requirement.

5. Update SOW specifications and completion date.

6. Change FAR Clause 52.211-10.

7. Revise Block 13A w ith extended due date and time for receipt of quotes.

See Page 2 for Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912ES19T0020

X 9B. DATED (SEE ITEM 11)

22-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Feb-2019

CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES19T0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 04-Feb-2019 02:00 PM to 22-Feb-2019 12:00 PM.

The required performance has changed from Heating, Ventilation, and Air Conditioning (HVAC) Systems for Pokegama Dam and Leech Lake Dam Recreational Area Offices located in Grand Rapids and Federal Dam, Minnesota respectively. Central Air Conditioning Unit for the Cross Lake Recreational Area Office located in Crosslake, Minnesota.Furnish all parts, materials, equipment, supplies, labor and transporation required for removal, disposal and replacement of existing air conditioners, ductwork, and LP Gas Furnaces at Pokegama Dan and Leech Lake Dam Recreation Offices, with new variable speed 96% high-efficiency, propane gas HVAC Systems at both office locations, as well as a new central air unit with a dual fuel, air-to-air heat pump at the Cross Lake Recreation Office.100% Small Business Set-AsideNAICS 238220, Plumbing, Heating and Air Conditioning ContractorsEstimated Price Range: Between $25,000 and $100,000MN Department of Labor and Industry Mechanical Bond Number (if currently registered): ___________________________ to Heating, Ventilation, and Air Conditioning (HVAC) Systems for Pokegama Dam and Leech Lake Dam Recreational Area Offices located in Grand Rapids and Federal Dam, Minnesota respectively. Central Air Conditioning Unit for the Cross Lake Recreational Area Office located in Crosslake, Minnesota.Furnish all parts, materials, equipment, supplies, labor and transporation required for removal, disposal and replacement of existing air conditioners, ductwork, and LP Gas Furnaces at Pokegama Dan and Leech Lake Dam Recreation Offices, with new variable speed minimum 96% high-efficiency, propane gas HVAC Systems at both office locations, as well as a new central air unit with a dual fuel, air-to-air heat pump at the Cross Lake Recreation Office.100% Small Business Set-AsideNAICS 238220, Plumbing, Heating and Air Conditioning ContractorsEstimated Price Range: Between $25,000 and $100,000MN Department of Labor and Industry Mechanical Bond Number (if currently registered): ___________________________ (Contractor or Subcontractor)..

CLIN 0002

The CLIN extended description has changed from:

Provide and Install New Variable Speed 96% High Efficiency Furnace (propane gas) with variable speed air-to-air heat pumps with minimum rating of 20 SEER and a 10 HSPF minimum 700-stage system including installation of electrical and electrical panels and dual fuel meters, if needed. Also provide and install new Air Conditioning unit and ductwork. Existing HVAC System shall be removed and disposed of off-sit according to local disposal codes.Work shall include furnishing all parts, materials, equipment, supplies, labor and transportation in strict accordance with State of Minnesota and local mechanical building codes.

To:

Provide and Install New Variable Speed minimum 96% High Efficiency Furnace (propane gas) with variable speed air-to-air heat pumps with minimum rating of 16 SEER and a 10 HSPF minimum 700-stage system including installation of electrical and electrical panels and dual fuel meters, if needed. Also provide and install new Air Conditioning unit and ductwork. Existing HVAC System shall be removed and disposed of off-sit according to local disposal codes.Work shall include furnishing all parts, materials, equipment, supplies, labor and transportation in strict accordance with State of Minnesota and local mechanical building codes.

CLIN 0003

Replace existing Central Air Unit with a Dual-Fuel Air-to-Air Heat Pump with a minimum rating of 18.5 SEER and a 10 HSPF. Existing central air unit shall be removed and disposed of off-sit according to local disposal codes.Work shall include furnishing all parts, materials, equipment, supplies, labor and transportation in strict accordance with State of Minnesota and local mechanical building codes.

Replace existing Central Air Unit with a Dual-Fuel Air-to-Air Heat Pump with a minimum rating of 16 SEER and a 10 HSPF. Existing central air unit shall be removed and disposed of off-sit according to local disposal codes.Work shall include furnishing all parts, materials, equipment, supplies, labor and transportation in strict accordance with State of Minnesota and local mechanical building codes.

CLIN 0004

Provide and Install New Variable Speed 96% High Efficiency Furnace (propane gas) with variable speed air-to-air heat pumps with minimum rating of 20 SEER and a 10 HSPF minimum 700-stage system including installation of electrical and electrical panels and dual fuel meters, if needed. Also provide and install new Air Conditioning unit and ductwork. Existing HVAC System shall be removed and disposed of off-sit according to local disposal codes.Work shall include furnishing all parts, materials, equipment, supplies, labor and transportation in strict accordance with State of Minnesota and local mechanical building codes.

Provide and Install New Variable Speed minimum 96% High Efficiency Furnace (propane gas) with variable speed air-to-air heat pumps with minimum rating of 16 SEER and a 10 HSPF minimum 700-stage system including installation of electrical and electrical panels and dual fuel meters, if needed. Also provide and install new Air Conditioning unit and ductwork. Existing HVAC System shall be removed and disposed of off-sit according to local disposal codes.Work shall include furnishing all parts, materials, equipment, supplies, labor and transportation in strict accordance with State of Minnesota and local mechanical building codes.

The following Delivery Schedule item for CLIN 0002 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

19-APR-2019 1 LEECH LAKE

JEFF STEERE

01217 FEDERAL DAM DR. NE

FEDERAL DAM MN 56641-0111

651-290-5808 FOB: Destination

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

31-MAY-2019 1 LEECH LAKE

JEFF STEERE

01217 FEDERAL DAM DR. NE

FEDERAL DAM MN 56641-0111

The following Delivery Schedule item for CLIN 0003 has been changed from:

CAGE

19-APR-2019 1 CROSS LAKE DAM

CORRINE HODAPP

CROSS LAKE RECREATION AREA

35507 COUNTY ROAD 66

CROSS LAKE MN 56442-0036

715-775-5562

PINE

CAGE

31-MAY-2019 1 CROSS LAKE DAM

CORRINE HODAPP

CROSS LAKE RECREATION AREA

35507 COUNTY ROAD 66

CROSS LAKE MN 56442-0036

715-775-5562

PINE

The following Delivery Schedule item for CLIN 0004 has been changed from:

CAGE

19-APR-2019 1 POKEGAMA/WINNIBIGOSHISH

USACE - POKEGAMA LAKE

34385 W. HWY 2

GRAND RAPIDS MN 55744-9663

218-326-6128

B6R0NH1

CAGE

31-MAY-2019 1 POKEGAMA/WINNIBIGOSHISH

USACE - POKEGAMA LAKE

34385 W. HWY 2

GRAND RAPIDS MN 55744-9663

218-326-6128

B6R0NH1

The following have been modified:

NOTES TO QUOTERS

This solicitation is a Request for Quote (RFQ). The U.S. Army Corps of Engineers (USACE) intends to award one firm fixed price contract. This RFQ is not an Invitation for Bid (IFB) or Request for Proposal (RFP).

This is a 100% Small Business Set-Aside RFQ. The Contractor’s quote shall contain sufficient information so that USACE can determine that the Contractor has a clear understanding of the requirements. The Contractor should be prepared to defend any discrepancies between the price quoted and a fair and reasonable estimate prepared by the Government.

In addition to the Payment Bond requirements of FAR Clause 52.228-13, Contract Awardee, or its Subcontractor (if a subcontractor is performing the work), must register a Mechanical Bond with the State of Minnesota, Department of Labor and Industry, and provide proof of Mechanical Bond execution to the Contracting Offcer within 21 days of contract award. If an Offeror, or its Subcontractor, currently holds a Mechanical Bond with the State of Minnesota, they may provide that Bond Number for verification purposes only, in Block 10, Page 1, when submitting a quote.

No evaluation preference will be given to Offerors or Subcontractors currently holding Mechanical Bonds with the State of Minnesota.

Please email all questions to: Toni Wasgatt at toni.w.wasgatt@usace.army.mil.

Please submit your quote as a PDF attachment to an email (preferred) sent to toni.w.wasgatt@usace.army.mil.

or by mail/courier to:

U.S. Army Corps of Engineers Attn: Contracting / Toni Wasgatt 180 5th Street East, Suite 700 St. Paul, MN 55101-1678

Quotes shall be evaluated by price and past performance.

All pricing (unit, total, subtotal, grand total, etc.) must be in whole penny amounts.

Offerors shall be registered in SAM (System for Award Management) https://www.sam.gov to include the FAR and DFARS Reps and Certs sections with the NAICS code applicable to this solicitation.

For assistance with SAM, please contact:

SAM by GSA Hours of Operation: Monday – Friday 8am to 8pm ET, U.S. Calls 866-606-8220 Service desk website: http://www.fsd.gov/

RESPONSIBILITY DETERMINATION. Offeror qualification information: Before a quote is considered for award, the offeror may be requested by the Government to submit a statement regarding their previous experience in performing comparable work, their business and technical organization, financial resources, and plan available to be used in performing the work. This information (if requested) must be received by the Contracting Officer within two

(2) business days and will be treated as confidential commercial or financial information to the extent permitted by law under exemption 4 to the Freedom of Information Act, 5 U.S.C. § 552(b)(4).

STATEMENT OF WORK

HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEMS

For

POKEGAMA DAM AND LEECH LAKE DAM RECREATIONAL OFFICES

And

AIR CONDITIONING UNIT

For

CROSS LAKE RECREATIONAL OFFICE

1.0 GENERAL

1.1 Description of Work. All equipment, labor, materials, and transportation required for removal, disposal, and replacement of the existing air conditioners, ductwork, and LP Gas Furnaces at Pokegama Dam and Leech Lake Recreation Area Offices, with new variable speed minimum 96% high-efficiency, propane gas HVAC Systems at both recreation office locations, as well as a new central air unit at the Cross Lake Recreation Office, with dual fuel air-to-air heat pump.

1.2 Payment. Payment will be made upon completion and acceptance of all contract work. The contractor must submit a detailed invoice to the Section Supervisor, Jeff Steere for payment at US Army Corps of Engineers, P.O. Box 625, 34385 US Highway 2 West, Grand Rapids, MN. 55744 or email to antonia.v.huber@usace.army.mil.

1.3 Description and Location. The Pokegama, Leech and Cross Lake Dams are Corps of Engineers-managed sites that include heavily utilized facilities including a dam, campground, boat ramp, picnic areas, playground, etc. Pokegama Dam is located 2 miles west of Grand Rapids, Minnesota off of State Highway 2 in Itasca County, Leech Lake Dam is located in Federal Dam, Minnesota off of County Road 8 in Cass County and Cross Lake Dam is located in Crosslake, Minnesota off of County Road 66 in Crow Wing County.

POKEGAMA DAM

34385 US Highway 2 west Grand Rapids, MN 55744

LEECH LAKE DAM

01217 Federal Dam NE Federal Dam, MN 56641 651-290-5470

CROSS LAKE DAM

35507 County Road 66 Crosslake, MN 56442 651-290-5790

1.4 Work Hours. Work shall be conducted between the hours of 8:00 am and 4:30 pm, Monday through Friday excluding holidays and weekends.

1.5 Contract Period. All contract work must be completed by 31 May 2019.

1.6 Safety. All work shall be performed in accordance with all state, federal and local laws and regulations and the Corps of Engineers Safety and Health Manual, EM-385-1-1. A copy of this manual can be found on line at:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf?ver=2015-04-09-142531-467

1.7 Site Visit. Interested Contractors are encouraged to schedule a site visit prior to submitting a quote. To schedule a site visit for Pokegama Dam, contact Jeff Steere at 651-290- 5808. To schedule a site visit for Leech Lake, contact Timm Rennecke at 651-290-5470. To schedule a site visit for Cross Lake Dam, contact Corrine Hodapp at 651-290-5790.

1.8 Orientation. Prior to the start of work, the Government will conduct a preconstruction meeting and provide an orientation to the Contractor and their personnel which will include discussion of contract requirements, facility inventory, safety considerations, quality control, security and administration.

2.0 SPECIFICATIONS

2.1 Office Building Description. All office buildings are cedar-sided, metal buildings with metal roofs. The buildings’ office area to be heated and cooled at Pokegama and Leech are 40 foot wide by 40 foot long with 12 foot high walls and a 13.5 foot peak. The Cross Lake office is 60 feet wide by 40 feet long with 12 foot high walls and a 13.5 foot peak. See attached photos of the interior rooms and layout of the office areas. The Leech Lake office furnace ductwork is currently located in the concrete floor. The Pokegama Dam and Cross Lake offices’ ductwork is located above the ceiling at both sites. All office building walls have four inches of fiberglass insulation and the ceilings are schedule to have R57 spray foam insulation installed by mid- March 2019..

2.2 High Efficiency Propane Gas and Natural Gas Furnaces with Dual Fuel Heat Pump Systems. The Contractor shall provide and install new variable speed minimum 96% high efficiency Propane Gas furnaces at Pokegama Dam and Leech Lake Offices with variable speed, duel fuel air-to-air heat pumps with a minimum size rating of 16 (SEER) Seasonal Energy Efficiency Ratio and a 10 (HSPF) Heating Seasonal Performance Factor minimum 700 stage system. The Contractor must provide and install dual-fuel meters and the electrical/electrical panels, if needed. The new furnaces shall be sized similar to the existing 100,000 BTU/HR two stage units currently in use. The Contractor shall replace the central air unit at the Cross Lake Office with a dual fuel air-to-air heat pump with a minimum size rating of 16 (SEER) Seasonal Energy Efficiency Ratio and a 10 (HSPF) Heating Seasonal Performance Factor. The gas furnaces and heat pumps must be installed according to the manufacturer’s recommendations and follow all National, State of Minnesota and local mechanical and electric codes. The systems must be installed by a State of Minnesota Mechanical-Bonded Contractor using industry-standard installation methods and following local building codes. The heat pump’s condensing units for Pokegama Dam and Leech Lake offices shall be located in the same area as the existing central air conditioner’s condensing units on the side of the office buildings. Cross Lake Office’s heat pump condensing unit shall be located on the north end of the building. The heat pumps shall be set on a concrete pad in accordance with the manufacturer’s recommendations.

2.3 Ductwork. The Contractor shall cap and abandon the present in-floor ductwork system at Leech Lake Office. The Contractor shall remove and dispose of the above the ceiling ductwork at Pokegama. The Contractor is responsible for removing and replacing the existing drop ceiling track system and ceiling tiles in order to install the new ductwork. The Contractor shall install new, rigid steel sheet metal overhead ductwork systems with no more than six foot runs of flexible ductwork from the sheet metal to the diffusers in the ceilings. Any damaged materials shall be replaced by the Contractor at no cost to the Government. The Contractor should note that the ceilings in the meeting rooms and utility room are approximately 10 foot and in the remaining rooms the ceilings are approximately 8 feet high. All ceilings, except the utility room, have a grid system drop ceiling. The utility room has a ½ inch sheet rock 10 foot ceiling. The Contractor shall also provide and install insulation on the outside of the ductwork.

2.4 Controls. The Contractor shall replace the existing controls with new programmable controls capable of maximizing efficiency and operation of the new variable speed HVAC Systems. The controls must communicate with the indoor and outdoor sensors and the HVAC equipment. The controls must have a Wi-Fi communication option and the capability to be configured for a heat pump, heating and cooling, dual-fuel, heating only, or cooling only. The Contractor shall test and program the HVAC System to make sure it is operating according to the manufacturer’s recommendations.

2.5 Existing HVAC Equipment.

Pokegama: The furnace is a YORK model # P3DHB12N07501B, propane gas furnace. The air conditioning unit is a York model H4DB030S06A. The furnace is horizontally mounted above the ceiling in the utility room.

Leech Lake: The furnace is a YORK model # TG95080B12MP11 propane gas furnace. The air conditioning unit is a TEMPSTAR model # CA5536VKD1.

Cross Lake: The furnace is a 2014 LENNOX model # EL296UH110XV60C - 05 natural gas furnace. The furnace is horizontally mounted above the ceiling in the utility room.

2.6 Vents. The Contractor shall cover and seal the existing furnace vents (exhaust & fresh air), if they are not used in the new HVAC systems.

2.7 Warranty. The new heat pumps shall have a minimum, standard 10-year limited warranty on the outdoor coil, internal parts and the compressor.

2.8 Disposal. The Contractor shall dispose of the old furnace, ductwork and air conditioning condensing unit off-site according to all local and state disposal codes.

2.9 Work Area. The Contractor is responsible for leaving the work area in the same condition as before the start of contract work. Any damages shall be repaired at the Contractor’s expense.

All construction debris shall be removed and disposed of off-site in accordance with local and state regulations.

2.10 Security. The Contractor is responsible for securing the work areas so that park visitors or USACE staff have to maintain a safe distance from all work areas. The Contractor is also responsible for securing the Offices when work is not being performed if USACE personnel are not present, to ensure that the offices are not vandalized during the construction.

2.11 Approval Design Drawing and Equipment. The Contractor shall submit design drawings and catalog cuts of the HVAC Systems with the manufacturer and models of the furnaces and heat pumps, as well as the size and layout of the ductwork systems with their quote to the Contracting Officer. The design drawings and catalog cuts shall be annotated specifically for either Pokegama, Leech or Cross Lake.

2.12 Work Plan. The Contractor shall submit a Work Plan that details the sequence and scheduling of the proposed work during a Monday-Friday work week. The Work Plan shall be submitted within 10 days of notice to proceed and shall be discussed at the initial pre-construction meeting. The Work Plan shall be approved by the Government prior to start of work.

2.13 Testing and Acceptance. The Contractor shall test each system in the presence of a Government representative to ensure the entire system is fully operational according to the manufacturer’s recommendations. Both the heating mode and cooling modes shall be tested and demonstrated in both cooling and heating modes. The Contractor shall provide two (2) hours of training to the Government staff at each site for the proper operation of the new HVAC systems including the control system. The Contractor shall also provide contact information (preferably local) for follow-on questions and maintenance. Final and complete Operation and Maintenance manuals shall be submitted for all new HVAC systems.

3.0 PHOTOS

Pokegama Furnace

Pokegama Office Layout

Leech Furnace

Leech Office Layout

Cross Lake Furnace

Cross Lake Office Layout

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) -

ALTERNATE I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 31 May 2019. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 18 March 2019. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it.