Amendment #1 with Scope of Work.

View the file

Other files

File Type Posted
IMG_5823.JPG JPG image
IMG_5822.JPG JPG image
IMG_5810.JPG JPG image
IMG_5831.JPG JPG image
IMG_5811.JPG JPG image
IMG_5833.JPG JPG image
IMG_9293.JPG JPG image
IMG_5832.JPG JPG image
17-T-0015-0003.pdf PDF
17-T-0015-0002_FBO.pdf PDF
17-T-0015-0001.pdf PDF
Lakewood_Pump_Station_Map.jpg JPG image
17-T-0015_Lakewood.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6763208119

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to remove the float sw itch requirement from the pumps. The third sentence in Paragraph 2.1 of the scope of w ork is revised from "The pump shall have an integral shut off f loat" to "No shut-off float sw itch shall be provided".

The RFQ closing date/time is extended to 3:00 PM on 27 December 2016.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-17-T-0015

X 9B. DATED (SEE ITEM 11)

13-Dec-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Dec-2016

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 5TH STREET EAST

SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-17-T-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 23-Dec-2016 03:00 PM to 27-Dec-2016 03:00 PM.

(End of Summary of Changes)

1 | P a g e

SCOPE OF WORK

Lakewood Pump Station

619 Fair Ave Devils Lake, ND 58301 Sump Pump Replacement

1 GENERAL

1.1 OVERVIEW

This scope of work is for: the delivery of two (2) sump pumps with controls, as specified below, to the Lakewood Pump Station in Devils Lake, ND; and the modification of the existing electrical at the Lakewood Pump Station to provide reliable 3-Phase power to designated receptacles. The Contractor shall coordinate all work performed to provide a functioning system. The Contractor shall verify as-built condition of all pertinent wiring and circuits prior to starting work.

1.2 SUBMITTALS

The contractor shall submit the following items electronically to the Contracting Officer’s Representative for approval.

1.2.1 Pump Submittals:

1. Pump Supplier Information

2. Pump Performance Curves

3. Pump Shop Drawings

4. Pump Material Data

5. Pump O&M Manual

6. Pump controller and panel

1.2.2 Electrical Submittals

1. As-Built drawings for work performed

2. Catalog cuts of any electrical components installed

3. Electrical license for contractor

1.3 REFERENCES

NFPA 70

National Electric Code

2 PRODUCT SPECIFICATIONS

2.1 PUMP SPECIFICATIONS

The sump pump shall be a submersible, thermally protected, 208V 3- Phase pump capable of a flow rate of 50-75 GPM at 40’ of head. Two

2 | P a g e pumps shall be provided that are identical to each other. No shut-off float switch shall be provided. The pump shall be able to pass solids up to ¼” and able to strain particles larger than ¼”. It shall be all metal construction, with the volute, impeller, and base made of cast iron; and the casing, motor housing, and hardware made of stainless steel. The pump shall utilize mechanical seals that are consistent with industry standards; seal materials include AIST PB-229 stainless steel, solid tungsten-carbide, Buna-N vinylidene-fluoride-hexafluoropropylene, EPT, tetrafluoroethylene, carbon-ceramic, or other materials as approved. The portion of the pump system to be handled in the wetwell shall not weigh in excess of 75lbs. The pump shall have a 2” NPT-M top discharge. Contractor shall install a 2” male cam-action coupler to the pump discharge. The pump shall have at minimum a 50’ power cable. The plug on the pump shall match the wall receptacles after all pump station electrical modification are completed.

Pump supplier shall provide a motor controller/disconnect panel equipped with a “Start”, “Stop” and “Overload Reset” pushbuttons. A red “Motor Running” and an amber “Power Avail” Push-to-test lights.

The motor controller/disconnect panel shall also house the thermal overloads, and motor starter components. The motor controller/disconnect panel control power shall be 120 volts. The controller shall be installed in the same location as the existing disconnect switch.

2.2 ELECTRICAL SPECIFICATIONS

The contractor shall provide and install electrical components and wiring as needed to supply 208 volt, 3-Phase power to designated outlets and 208/120 volt, 3-phase power to the motor controller/disconnect panel. Reference Lakewood Sump Pump Schematic at the end of this specification for required wiring details. All components shall be UL listed; and all components and workmanship shall conform to applicable local, state, and national electrical codes. The contractor shall verify proper wiring of the pump with respect to the wiring in the wall outlet. All work shall be performed by a licensed electrician of Journeyman level or higher.

3 ELECTRICAL SCOPE OF WORK

3.1 SCOPE

The Lakewood Pump Station currently has 125/250V NEMA 14L-30 outlets installed that are wired for 208/120 volt Single-Phase. The sump pump disconnect switch is a 3-phase disconnect switch but, has been wired 208 volts, single-phase (Figure 3-5).

3 | P a g e

The work performed shall modify the existing power system from panelboard “LP” to the sump pump outlets from 208/120 volt Single- Phase to 208 volt, 3-Phase. The contractor shall provide all work, associated materials, and equipment required to convert the sump pump system to a three-phase system including removal and replacement of the existing disconnect switch. Figure 3-1 shows the electrical system as originally designed. The new motor controller shall be installed in same location as the existing disconnect switch.

The panelboard circuits needed for the sump pump are circuits 13, 15, and 17. Currently, panelboard “LP” (Figures 3-2, 3-3 and 3-4) has a 2-pole breaker installed in circuits 13 and 15 that provides power to the existing sump pump receptacles, and has a spare circuit breaker in circuit 17. These circuit breakers shall be removed and replaced with a 3-Pole 20A circuit breaker.

The sump pump disconnect switch (Figure 3-5), shows single phase, 208 volt wiring. The Contractor shall remove and replace the existing disconnect switch and install a new motor controller/disconnect panel.

The Contractor shall provide additional wiring through the existing conduits from panelboard “LP” and wire gutter to the motor controller/disconnect panel as needed to complete the 3-Phase, 208/120 volt installation of the motor controller/disconnect panel, Figure 3-8 and Figure 3-9 show current wire routing from the existing disconnect switch to panelboard “LP”.

The receptacles are wired for 208/120 volt, single-phase (Figure 3-6 and Figure 3-7). The receptacles wiring shall be modified to 208 volts, 3-phase with equipment ground. The contractor shall modify the color of the neutral wire (white wire) to a phase conductor by adding identifying tape at each access point, tape color shall match the color of the new phase conductor from motor controller/disconnect panel. The contractor shall disconnect the neutral wire from the receptacles to panelboard “LP” in the wire gutter and then connecting to the new phase conductor from motor controller/disconnect panel. The receptacle wiring routes from the receptacles (Figure 3-10 and Figure 3-11) back to the wire gutter (Figure 3-12) located above the Motor Control Center (Figure 3-9).

It is believed that the work specified within paragraph 3.1 can be accomplished without the installation of additional conduits. If the contractor has reason to believe that the work cannot be performed as specified above, the Contractor shall contact the Contracting Officer’s Representative and get written approval from the Contracting Officer prior to any deviation from this scope of work.

Contractor shall create As-Built drawings of all electrical work performed to include all new and existing wiring, and to include data on all wiring connections to the disconnect switch and receptacles including new and existing connections.

4 | P a g e

Figure 3-1: Power Plan Overview

5 | P a g e

Figure 3-2: Electrical Panel "LP"

6 | P a g e

Figure 3-3: Panel LP Circuit Plan (Left Side)

Figure 3-4: Panel LP Circuit Plan (Right Side)

7 | P a g e

Figure 3-5: Sump Pump Disconnect Switch (Note 20 in Figure 3-1)

8 | P a g e

Figure 3-6: Outlet Front

Figure 3-7: Outlet Wiring

9 | P a g e

Figure 3-8: Sump Pump Disconnect Switch South Wall

Figure 3-9: Electrical Panel "LP" West Wall

10 | P a g e

Figure 3-10: Sump Pump Receptacle North Wall

Figure 3-11: Sump Pump Receptacle East Wall

11 | P a g e

Figure 3-12: Wire Gutter Above MCC

4 PUMP SCOPE OF WORK

4.1 SCOPE

Contractor shall have pumps delivered to the Lakewood Pump Station as specified. The contractor shall ensure that the receptacles and pump plug are wired properly and ensure the proper function and rotation of the sump pump. The contractor shall take the appropriate steps to verify that both receptacles will operate the pump prior to full testing of the pumps. The contractor shall be responsible to properly coordinate this effort.

The contractor shall ensure the 2” male cam-action connector is properly installed and is compatible with the existing discharge hosing provided by the city.

Pumps are to be thoroughly tested before the COR, for at least 1 hour of continuous operation. The pumps should be observed for proper flow to both the gatewell and stilling basin. All components of the pump system shall be tested for functionality (i.e. pushbuttons, pump operation, etc). During testing, pumps are to be monitored for excess noise, vibration, or other factors that could lead to premature pump failure.

5 DELIVERY AND INSPECTION

Delivery of Sump Pumps and any other items should be made to the Lakewood Pump Station located in Devils Lake, ND. All deliveries shall

12 | P a g e be coordinated with the COR. Upon delivery, the COR will visually inspect the pumps and other items for any obvious damage prior to acceptance.

OL

RESET

OL

M

M

START

STOP

R

A

RUNNING

MOTOR

AVAILABLE

POWER

F

FU

BREAKER

CIRCUIT

20AMP

LP 13,15,17

A

B

C

N

G

3 AMP

M

PUMP

SUMP

M

T1

T2

T3

G

L1

L2

L3

SWITCH

DISCONNECT

PLUG

RECEPTACLE AND

NEMA 14L-30

OLs

PANEL

DISCONNECT

CONTROLLER/

MOTOR

PANELBOARD "LP"

FLOAT SWITCH

SWITCH

INTERGAL FLOAT

SUMP PUMP WITH

LAKEWOOD SUMP PUMP SCHEMATIC

B6CT9JLO

Cross-Out

B6CT9JLO

Line

B6CT9JLO

Line

B6CT9JLO

Line

File details come from the government source that posted it. Updated .