LD-5_CONTRACT_DRAWINGS.pdf
PDF 18 MB Posted
- Attached to
- Remove and replace Ethylene Propylene Diene Monomer roof at Lock and Dam 5 in Minnesota City, MN
- Solicitation number
- W912ES-15-T-0102
About this file
Drawings LD5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| LD_5_Roof_Amendment_1.pdf | ||
| W912ES-15-T-0102_SPECIFICATION.pdf | ||
| RFQ_W912ES15T0102_LD_5_Roof.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL CONTROL STATION ROOF REPLACEMENT
LOCK AND DAM 5
WINONA COUNTY, MINNESOTA
CONTRACT DRAWINGS
DESCRIPTION PAGE
CONSTRUCTION DRAWINGS 1
SITE ACCESS AND STAGING AREAS 2
SITE PHOTOS 3
WINONA COUNTY, MINNESOTA
CONSTRUCTION DRAWINGS
B6ECDSAT
Polygon
B6ECDSAT
Callout
REMOVE AND RESET A/C UNIT
B6ECDSAT
Callout
WEATHER STATION
SEE NOTE 14
B6ECDSAT
Text Box
REMOVE AND STOCKPILE GRAVEL BALLAST.
B6ECDSAT
Text Box
12. REMOVE AND RESET DOWNSPOUTS.
13. REMOVE AND RESET GROUNDING WIRES.
14. REMOVES WEATHER STATION AND GIVE TO LOCKMASTER FOR
RELOCATION.
15. ROOFING PAVERS AND RUBBER PADS TO BE REMOVED AND
RESET.
16. REMOVE AND REPLACE EPDM PER MANUFACTURERS RECOMENDATIONS
AND INSTRUCTIONS.
17. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND
FINISHED PER MANUFACTURERS RECOMENDATIONS AND INSTRUCTIONS.
B6ECDSAT
Callout
ROOF PAVER SYSTEM
SEE NOTE 15
B6ECDSAT
Callout
GRAVEL BALLAST
SEE NOTE 6
B6ECDSAT
Callout
REMOVE AND RESET A/C UNIT
Line
B6ECDSAT
Line
B6ECDSAT
Callout
FURNISH AND INSTALL A NEW ICE GUARD/SNOW BAR
B6ECDSAT
Callout
FURNISH AND INSTALL A NEW ICE GUARD/SNOW BAR
B6ECDSAT
Callout
FURNISH AND INSTALL NEW RIGID INSULATION
B6ECDSAT
Callout
FURNISH AND INSTALL NEW TAPERED INSULATION
B6ECDSAT
Callout
NEW EPDM MEMBRANE TO EXTEND UNDER METAL CAP
B6ECDSAT
Callout
REMOVE AND RESET PARAPET CAP TO INSTALL EPDM MEMBRANE
B6ECDSAT
Callout
NEW EPDM MEMBRANE TO EXTEND UNDER METAL CAP
B6ECDSAT
Callout FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS
B6ECDSAT
Callout
REMOVE AND STOCKPILE GRAVEL BALLAST
B6ECDSAT
Callout FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS
B6ECDSAT
Line
B6ECDSAT
Callout
REMOVE AND STOCKPILE GRAVEL BALLAST
B6ECDSAT
Callout
REMOVE AND RESET PARAPET CAP TO INSTALL EPDM MEMBRANE
B6ECDSAT
Callout FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS
B6ECDSAT
Callout
REMOVE AND STOCKPILE GRAVEL BALLAST
B6ECDSAT
Callout
REMOVE AND STOCKPILE GRAVEL BALLAST
B6ECDSAT
FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS
ROOF /
CONSTRUCTION
ACCESS BY
EXTERIOR
STAIRWAY
Line
B6ECDSAT
Callout
FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR
B6ECDSAT
Line
B6ECDSAT
FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR
SITE ACCESS AND STAGING AREAS
STAGING AREA TO BE
COORDINTAED WITH
LOCK MASTER
B6ECDSAT
Callout
ROOF
ACCESS
B6ECDSAT
Callout
PEDESTRIAN
GATE WILL BE
OPEN FOR
CONTRACTORS
USAGE
B6ECDSAT
Callout
PUBLIC RESTROOM
FACILITIES
B6ECDSAT
Callout
CONTRACTOR
PARKING IN
PUBLIC LOT OR
IN SECURE LOT
B6ECDSAT
Callout
APPROX. LOCATION OF
BALLAST STOCKPILE
B6ECDSAT
Callout
SITE ACCESS
B6ECDSAT
Callout
SITE EXIT ONLY
B6ECDSAT
Callout
SECURITY GATE
REQUIRES
APPROVED
ACCESS
B6ECDSAT
Callout
RAILROAD
CROSSING
SITE PHOTOS
Figure 1: Roof Access from the stairwell located at the North corner of Central Control Station (CCS).
Parapet wall metal cap shall be removed and reset.
Figure 2: Ballast material shall be removed and stockpiled, and roof paver system shall be removed and reset.
Figure 3: Standing in South corner looking to the East corner of CCS roof.
Figure 4: Standing in South corner looking to the West corner of the CCS roof.
Figure 5: Standing at fixed AC unit looking at East corner of CCS roof.
Figure 6: Standing in East corner looking at the South corner of the CCS roof;
Weather station in the South corner of CCS shall be removed and given to Lockmaster for relocation.
Figure 7: New ice guard/snow bar to be installed on NW and SW sides of metal roof shall match existing ice guard/snow bar as shown above.
Figure 8: A/C units shall be removed and reset in a manner to protect warranties.
Figure 9: Standing in North corner looking at the West corner of the CCS roof.
Figure 10: Roof drains and grounding wire shall be removed and reset.
Figure 11: Ballast material shall be removed and stockpiled near sandbags along the tree line in storage yard.
| CONTRACT DRAWINGS |
| CONSTRUCTION DRAWINGS |
| PLAN VIEW EDPM ROOF |
| PLAN VIEW METAL ROOF & DETAILS |
| ELEVATION VIEW - DS & RW |
| ELEVATION VIEW - US & LW |
| SITE ACCESS AND STAGING AREAS |
| SITE PHOTOS |