LD-5_CONTRACT_DRAWINGS.pdf

PDF 18 MB Posted

Attached to
Remove and replace Ethylene Propylene Diene Monomer roof at Lock and Dam 5 in Minnesota City, MN
Solicitation number
W912ES-15-T-0102
Issued by

About this file

Drawings LD5

View the file

Other files

File Type Posted
Amendment_2.pdf PDF
LD_5_Roof_Amendment_1.pdf PDF
W912ES-15-T-0102_SPECIFICATION.pdf PDF
RFQ_W912ES15T0102_LD_5_Roof.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CENTRAL CONTROL STATION ROOF REPLACEMENT

LOCK AND DAM 5

WINONA COUNTY, MINNESOTA

CONTRACT DRAWINGS

DESCRIPTION PAGE

CONSTRUCTION DRAWINGS 1

SITE ACCESS AND STAGING AREAS 2

SITE PHOTOS 3

WINONA COUNTY, MINNESOTA

CONSTRUCTION DRAWINGS

B6ECDSAT

Polygon

B6ECDSAT

Callout

REMOVE AND RESET A/C UNIT

B6ECDSAT

Callout

WEATHER STATION

SEE NOTE 14

B6ECDSAT

Text Box

REMOVE AND STOCKPILE GRAVEL BALLAST.

B6ECDSAT

Text Box

12. REMOVE AND RESET DOWNSPOUTS.

13. REMOVE AND RESET GROUNDING WIRES.

14. REMOVES WEATHER STATION AND GIVE TO LOCKMASTER FOR

RELOCATION.

15. ROOFING PAVERS AND RUBBER PADS TO BE REMOVED AND

RESET.

16. REMOVE AND REPLACE EPDM PER MANUFACTURERS RECOMENDATIONS

AND INSTRUCTIONS.

17. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND

FINISHED PER MANUFACTURERS RECOMENDATIONS AND INSTRUCTIONS.

B6ECDSAT

Callout

ROOF PAVER SYSTEM

SEE NOTE 15

B6ECDSAT

Callout

GRAVEL BALLAST

SEE NOTE 6

B6ECDSAT

Callout

REMOVE AND RESET A/C UNIT

Line

B6ECDSAT

Line

B6ECDSAT

Callout

FURNISH AND INSTALL A NEW ICE GUARD/SNOW BAR

B6ECDSAT

Callout

FURNISH AND INSTALL A NEW ICE GUARD/SNOW BAR

B6ECDSAT

Callout

FURNISH AND INSTALL NEW RIGID INSULATION

B6ECDSAT

Callout

FURNISH AND INSTALL NEW TAPERED INSULATION

B6ECDSAT

Callout

NEW EPDM MEMBRANE TO EXTEND UNDER METAL CAP

B6ECDSAT

Callout

REMOVE AND RESET PARAPET CAP TO INSTALL EPDM MEMBRANE

B6ECDSAT

Callout

NEW EPDM MEMBRANE TO EXTEND UNDER METAL CAP

B6ECDSAT

Callout FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS

B6ECDSAT

Callout

REMOVE AND STOCKPILE GRAVEL BALLAST

B6ECDSAT

Callout FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS

B6ECDSAT

Line

B6ECDSAT

Callout

REMOVE AND STOCKPILE GRAVEL BALLAST

B6ECDSAT

Callout

REMOVE AND RESET PARAPET CAP TO INSTALL EPDM MEMBRANE

B6ECDSAT

Callout FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS

B6ECDSAT

Callout

REMOVE AND STOCKPILE GRAVEL BALLAST

B6ECDSAT

Callout

REMOVE AND STOCKPILE GRAVEL BALLAST

B6ECDSAT

FURNISH AND INSTALL EPDM MEMBRANE, FLASHING, CLAMPING, CONNECTIONS, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURERS REQUIREMENTS

ROOF /

CONSTRUCTION

ACCESS BY

EXTERIOR

STAIRWAY

Line

B6ECDSAT

Callout

FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR

B6ECDSAT

Line

B6ECDSAT

FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR

SITE ACCESS AND STAGING AREAS

STAGING AREA TO BE

COORDINTAED WITH

LOCK MASTER

B6ECDSAT

Callout

ROOF

ACCESS

B6ECDSAT

Callout

PEDESTRIAN

GATE WILL BE

OPEN FOR

CONTRACTORS

USAGE

B6ECDSAT

Callout

PUBLIC RESTROOM

FACILITIES

B6ECDSAT

Callout

CONTRACTOR

PARKING IN

PUBLIC LOT OR

IN SECURE LOT

B6ECDSAT

Callout

APPROX. LOCATION OF

BALLAST STOCKPILE

B6ECDSAT

Callout

SITE ACCESS

B6ECDSAT

Callout

SITE EXIT ONLY

B6ECDSAT

Callout

SECURITY GATE

REQUIRES

APPROVED

ACCESS

B6ECDSAT

Callout

RAILROAD

CROSSING

SITE PHOTOS

Figure 1: Roof Access from the stairwell located at the North corner of Central Control Station (CCS).

Parapet wall metal cap shall be removed and reset.

Figure 2: Ballast material shall be removed and stockpiled, and roof paver system shall be removed and reset.

Figure 3: Standing in South corner looking to the East corner of CCS roof.

Figure 4: Standing in South corner looking to the West corner of the CCS roof.

Figure 5: Standing at fixed AC unit looking at East corner of CCS roof.

Figure 6: Standing in East corner looking at the South corner of the CCS roof;

Weather station in the South corner of CCS shall be removed and given to Lockmaster for relocation.

Figure 7: New ice guard/snow bar to be installed on NW and SW sides of metal roof shall match existing ice guard/snow bar as shown above.

Figure 8: A/C units shall be removed and reset in a manner to protect warranties.

Figure 9: Standing in North corner looking at the West corner of the CCS roof.

Figure 10: Roof drains and grounding wire shall be removed and reset.

Figure 11: Ballast material shall be removed and stockpiled near sandbags along the tree line in storage yard.

CONTRACT DRAWINGS
CONSTRUCTION DRAWINGS
PLAN VIEW EDPM ROOF
PLAN VIEW METAL ROOF & DETAILS
ELEVATION VIEW - DS & RW
ELEVATION VIEW - US & LW
SITE ACCESS AND STAGING AREAS
SITE PHOTOS

File details come from the government source that posted it. Updated .