15-T-0016.pdf
PDF 358 KB Posted
- Solicitation number
- W912ES-15-T-0016
About this file
SF-1449
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912ES-15-T-0016 09-Dec-2014
b. TELEPHONE NUMBER
651-290-5444
8. OFFER DUE DATE/LOCAL TIME
03:00 PM 17 Dec 2014
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912ES9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JESSE L ONKKA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W81G6743379978
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
500 Employees
NAICS:
213111
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF70
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912ES-15-T-0016
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 90 Hours Tracked geotechnical drilling rig
FFP
All-Terrain Vehicle (ATV), Track-Mounted Rig with rotary drill and accessory equipment, designed for geotechnical drilling, rock coring, hollow stem augering, and split-spoon sampling, with automatic driven hammer AND cathead-driven safety hammer, for conducting SPT’s per ASTM 1586-84. Drill rig must be designed for accessing remote sites, traveling over uneven terrain, over snow, and on very soft and/or wet ground. It should have a ground pressure variant of 4 psi or less with proper weight distribution and stability. Two hydraulic leveling jacks shall be fitted at the rear of the vehicle and at least one on the front. The drill mast shall be operated hydraulically, and shall be fitted with sheaves for at least three
(3) cables and one (1) rope. The drill rig shall be transported on a trailer between sites. The drill rig shall also be equipped with an attached or attachable water tank of at least 100 gallons that can be brought into remote mud-rotary drill sites that trailered water tanks or support vehicles with water tanks cannot access. The drill rig shall also be equipped with a pump capable to pump bentonite drilling fluid required to keep the holes open and remove cuttings, as well as cementious grout mixes to abandon the borings or wells.
FOB: Destination
MILSTRIP: W81G6743379978
PURCHASE REQUEST NUMBER: W81G6743379978
NET AMT
0002 1 Each Mob/Demob
FFP
Mobilization/Demobilization FOB: Destination
0003 18 Days Per Diem / individual
FFP
Per Diem / individual FOB: Destination
0004 16 Each Portland Cement
FFP
Portland Cement – 94-Pound Bags FOB: Destination
0005 12 Each Bentonite Chips
FFP
Bentonite Chips – 50-Pound Bags FOB: Destination
0006 6 Each Wall Samples
FFP
5-inch Thin-Wall Samples FOB: Destination
SCOPE OF WORK
PERFORMANCE WORK STATEMENT
DRILL RIG RENTAL AND SUPPORT SERVICES CONTRACT
C-1 GENERAL. Rental of Drilling Equipment with Operating Personnel and Supplies. Mileage for all vehicle use necessary to accomplish the work, and that is not covered by mobilization and demobilization, shall be included in payment for Rental of Drilling Equipment. There shall be no separate payment for mileage. A Government Inspector will be on-site to log borings and inspect the work. At the time of the contract award the Contractor shall have all the necessary licenses, registration, etc, for personnel and equipment, to begin work immediately in all the states in which the awarded contract applies. The Contractor shall furnish drilling equipment, support vehicle(s), supplies, and operating personnel capable of efficiently performing the following:
a. 4-inch through 8-inch flight auger borings;
b. Borings through cohesionless and cohesive soils with 3-inch through 8-inch diameter fishtail, or tricone roller bits, and a split-spoon sampler using drilling mud in lieu of casing. Upward directed drilling fluid return type bits may be required in engineered embankments;
c. Borings using 4-inch through 8-inch diameter pipe casing;
d. Auger-through and split-spoon sampling of cohesionless and cohesive soils with 3 ¼-inch, 4 ¼-inch, 6 ¼-inch, and 8 ¼-inch I.D. hollow stem augers;
e. Standard Penetration Tests (SPT’s) per ASTM 1586-84 (Re-approved 1992), with automatic drive hammer and cathead driven safety hammer. Split-spoon sampler shall conform to "Standard Split-Barrel Assembly" detailed in
ASTM 1586-84;
f. Continuous soil sampling with the SPT barrel and a 2-inch I.D X 2 1/2-inch O.D. X 3-foot-long split-barrel sampler;
g. 3-inch and 5-inch thin wall undisturbed soil sampling;
h. 3-inch and 5-inch Hvorslev-type fixed piston undisturbed sampling;
i. Coring of bedrock and rebar reinforced concrete with NQ-3, HQ-3, HQ-Wireline, PQ-3 and 6-inch x 7 3/4-inch diameter core barrels or equivalent. The appropriate diamond and carbide coring bits shall include internal and bottom discharge type;
j. Abandonment and backfilling of boreholes and CPTu soundings, per appropriate state requirements, by gravity and/or pump and tremie system with cement/bentonite, high solids bentonite, bentonite chips, barite and/or neat cement grout;
k. Rotary borings through rock, reinforced concrete, and cohesionless and cohesive soils. A mud pump, mud pan or tank, mud mixing apparatus, water tank and pump for filling tank, appropriate hoses, and bentonite drilling mud shall be on site for each project;
l. Well screen and riser installations, for the purpose of constructing observation and monitoring wells (up to 2-inch diameter), direct burial piezometers and/or standpipe piezometers (up to 2-inch diameter), installing inclinometer casing (3.5-inch O.D.), instrument protective casings and covers, and other instrumentation. Borings through cohesive and granular soils, concrete, and rock, to set instrument pipe and casing, to install protective casing, and to backfill instrument installations with selected materials, as requested by the Contracting Officer;
m. All types of soil and rock borings in Level D or Level C personal protective gear as defined by OSHA;
n. Decontamination of all equipment before the Contractor arrives at the drilling site, between the sample intervals, boreholes, or before the Contractor leaves the drilling site as is deemed necessary in the SCOPE OF
WORK;
o. Remote drill-site access prior to drilling to include removal of brush and small trees with chainsaw or appropriate methods, snow removal, site leveling as necessary;
p. Worksite restoration to pre-drilling conditions to include, but not limited to, removing auger and drill cuttings and repair ground damage at borehole sites, as requested by the Contracting Officer;
q. Drill the majority of holes to a depth of less than 100 feet using DRILL RIGS A-D listed below. However, the Contractor may be required to drill and sample up to 300 feet in depth using equipment identified as DRILL RIGS B and DRILL RIG C. DRILL RIG A shall be capable to drill and sample to depths of at least 200 feet. DRILL RIG E shall be capable to drill and sample to a depth of 50 feet;
C-2 EQUIPMENT AND SUPPLIES. A support vehicle (pickup truck or cargo truck) shall be included in the rental of each Drill Rig or CPTu SYSTEM. No separate payment will be made for a support vehicle.
The equipment will be used on all types of terrain including but not limited to woods, steep hills, bogs frozen lakes and swamps, and site conditions, dry, wet, or muddy. It will be used in all weather conditions; snow, rain, ice, sub-zero temperatures. Rental equipment may be used on Government-owned or rented floating plants on rivers, harbors, and lakes. The Contractor shall furnish all equipment and supplies necessary to perform the required drilling to include, but not limited to, the following:
a. DRILL RIG A: All-Terrain Vehicle (ATV), Track-Mounted Rig with rotary drill and accessory equipment, designed for geotechnical drilling, rock coring, hollow stem augering, and split-spoon sampling, with automatic driven hammer AND cathead-driven safety hammer, for conducting SPT’s per ASTM 1586-84. Drill rig must be designed for accessing remote sites, traveling over uneven terrain, over snow, and on very soft and/or wet ground.
It should have a ground pressure variant of 4 psi or less with proper weight distribution and stability. Two hydraulic leveling jacks shall be fitted at the rear of the vehicle and at least one on the front. The drill mast shall be operated hydraulically, and shall be fitted with sheaves for at least three (3) cables and one (1) rope. The drill rig shall be transported on a trailer between sites. The drill rig shall also be equipped with an attached or attachable water tank of at least 100 gallons that can be brought into remote mud-rotary drill sites that trailered water tanks or support vehicles with water tanks cannot access. The drill rig shall also be equipped with a pump capable to pump bentonite drilling fluid required to keep the holes open and remove cuttings, as well as cementious grout mixes to abandon the borings or wells.
b. ‘AW’ size and ‘N’ or ‘NW’ size drill rods;
c. Rotary tricone and drag-type drill bits, and split-spoon & split-barrel samplers, to perform 3-inch through 8-inch borings;
d. Flight augers (4-inch through 8-inch), hollow stem augers ("3-1/4", "4-1/4", "6-5/8" I.D.), and iron pipe casing (4-inch through 10-inch);
e. Triple-tube core barrels (NQ-3, HQ-3, and PQ-3) and appropriate bits to include diamond and carbide surfaced as well as bottom and internal discharge. Double-tube core barrel (6" x 7 3/4" or equivalent) and appropriate bits to include diamond and carbide surfaced as well as bottom and internal discharge. HQ Wireline core barrel system with a split-inner tube and appropriate bits to include diamond and carbide surfaced as well as bottom and internal discharge;
f. 3-inch and 5-inch undisturbed thin wall sample tubes;
g. 3-inch and 5-inch Hvorslev type, fixed piston undisturbed samplers and sample tubes;
h. Powdered Wyoming bentonite, Type I or Type II Portland cement, medium Wyoming bentonite chips, and barite drilling fluid additive;
m. Mud pumps, grout pumps, auxiliary pumps, tremie pipe, hoses, mud pan or tank, mud mixing apparatus, and water tanks. One water tank must have a minimum size of 300 gallons. The mud pump and/or grout pumps shall have the capacity for, and be designed for, the type of work listed in this STATEMENT OF WORK and in the individual project SCOPE OF WORK included in each task order upon issuance;
i. All hand tools needed to complete subsurface exploration work, routine maintenance, and set-up and cleanup of the drill site;
j. Portable propane torches for winter work and to heat wax for sealing undisturbed samples;
k. Sample inspection table measuring at least 3 feet x 3 feet x 42 inches high with a pipe vise mounted on one end;
l. Bailers suitable for removing water, drilling mud, or sand from boreholes or instruments;
m. Portable steam-cleaner;
n. Precise survey equipment to determine elevations of bore holes and stadia distances, including a transit or level with a tripod and a leveling survey rod. The survey rod shall be legible and read in feet, be graduated in 10ths and 100ths of a foot, and be capable of telescoping, or otherwise accurately extending, to at least 25 feet;
o. Adapters, tools, and related items, which are not specifically listed herein, but are necessary for use with the equipment in achieving the performance requirements set forth in paragraph C-1 (GENERAL) shall be furnished or made available for use as required;
C-2.1 Projects likely to encounter contaminated soils, water, and rock or requiring subsurface samples for chemical analysis may require the following:
a. Level C or D personal protective equipment as defined by OSHA;
b. Containerizing contaminated soils and/or drilling fluids;
c. Decontamination equipment and supplies sufficient to enable all drilling and sampling equipment to be satisfactorily cleaned before the Contractor arrives at the drilling site, and between each sample if such equipment or supplies are deemed necessary in the SCOPE OF WORK for the Task Order.
C-2.2 The Government will furnish appropriate containers for all soil and rock samples, except undisturbed samples, which will be retained in the sampling tube provided by the Contractor.
C-3 CONE PENETROMETER TESTS. The following criteria must be met for Cone Penetrometer testing procedure (cone testing will be completed in conjunction with the rental of one of the drill rigs above):
(a) The CPT test should be conducted in accordance with ASTM D 5778-95, "Standard Test Method for Electronic Friction Cone and Piezocone Penetration Testing of Soils". If CPTu (Piezocone) tests are being conducted, the cone shall have the pore pressure element location immediately behind the cone tip (u2) with a new saturated filter element prior to each test.
(b) Prior to penetration, the cone temperature should be adjusted to the anticipated soil temperature, as reasonably possible.
(c) Routine profiling is to be conducted with a 10-ton capacity cone.
(d) Calibration of the cone will be done in accordance with ASTM D 5778-95, "Standard Test Method for Electronic Friction Cone and Piezocone Penetration Testing of Soils". There will be a piezometric calibration chamber to test the cone prior to starting a task order and then calibration will be completed every tenth probe hole.
C-3.1 CPT Data Reporting must fulfill the following requirements:
(a) The data report for the cone penetration tests, as a minimum, shall meet the reporting requirements outlined by ASTM D5778-95, "Standard Test Method for Electronic Friction Cone and Piezocone Penetration Testing of Soils".
These data must include the raw data taken during penetration.
(b) The graphical data shall be supplied in a format produced by the program DIGITAL CONEPLOT available from ARA/Vertek or Rapid CPT by Dataforensics.
(c) CPT data should be presented in the following units:
Depth - feet Tip resistance (qc) – tons/sq ft (tsf) Sleeve friction (fs) – tsf, Pore Pressure (u2) - psi Inclination – degrees from vertical Temperature – degrees F.
C-3.2 Graphical (x-y) plots shall be submitted for each cone test with the test report. The format of the plots should be as follows:
(a) CPTU sounding qc (x-axis) vs. depth (y-axis) Rf (x-axis) vs. depth (y-axis) u2 (x-axis) vs. depth (y-axis) Soil behavior type vs. depth (y-axis)
C-4 MOBILIZATION AND DEMOBILIZATION
a. Mobilization and Demobilization (Mob and Demob) covers all costs incurred in moving the drilling equipment, personnel, support vehicles, and supplies to the work site and returning them to the Contractor's permanent facility when the job is completed. Initial and final cleaning and decontamination of the drilling equipment and tools, by steaming if necessary, shall also be included in the mobilization and de mobilization costs. Mobilization shall end when drilling and sampling has started. Demobilization begins once the last boring is grouted or the Contracting Officer designates the job is complete. This payment will be the same for each job within the specific area called for in the task order, regardless of its location within the area, according to the amounts stated in the bid schedule.
b. Only one Mob and Demob charge per drill rig per task order will be allowed unless approved by the Contracting Officer.
C-5 SITE SAFETY, UTILITY MEETINGS, NOTIFICATIONS, ROAD USE PERMITS, MONITORING
WELL PERMITS, BORING and WELL ABANDONMENTS
a. All drilling operations shall be conducted per the current version, dated 2008, of the Corps of Engineers Safety Manual (EM 385-1-1). Section 18-H “Drilling Equipment” will serve as the primary reference source for safety during drilling operations. Drilling tools shall not extend above the rig mast more than 1-foot or the minimum necessary to connect/disconnect drilling tools, and the use of slip rings is prohibited. Utility meetings for the purpose of locating buried lines, pipes, cables, and all underground utilities shall be conducted by the Contractor unless directed otherwise by the Contracting Officer. Road use permits and parking permits at drill sites shall also be the responsibility of the Contractor unless otherwise directed by the Contracting Officer. The Contractor shall abide by all applicable state laws concerning utility meetings and road use and provide any necessary safety equipment, such as but not limited to cones, barriers, lighting, for operation on and adjacent to roadways, walkways or other areas that could pose a hazard to the public. The Contractor shall be responsible for meeting all Health Department and/or Department of Natural Resource filing or permit requirements. The Contractor shall be responsible for all notifications, obtaining all permits, and meeting abandonment criteria when required in the appropriate state and county. The Contractor is not exempt from paying permit fees, or from the coordination and filing requirements.
C-6 MILEAGE
a. No separate payment for daily mileage shall be made for the drill rigs or support vehicles; any mileage shall be included in the cost of drill rig rental. The movement of equipment from boring to boring is addressed in Section C-
9; “OPERATING AND WORKING TIME.”
C-7 PROJECT LOCATION
a. This acquisition is divided into two geographic area, the east and west areas of the St. Paul District, shown on the attached map. One contract may be awarded for the entire area (both east and west), or a contract may be awarded for each of the two areas. The work may occur anywhere in the area covered by the specific contract.
C-8 OPERATING PERSONNEL
a. The Contractor shall provide an experienced crew consisting of one driller and one driller’s assistant for each drill rig.
b. "Experienced" for the driller is defined as a minimum of 2 complete years of current experience operating the assigned drill rig(s) or equivalent for broad-based geotechnical exploration work and monitoring well installations (not exclusively monitoring water well work) and drilling and sampling subsurface materials typical of those in the contract area.
c. "Experienced" for the driller’s assistant is defined as 1 complete year of current experience assisting an experienced driller in broad-based geotechnical exploration, work (not exclusively monitoring well and water well work).
d. The drill crew shall be experienced and skilled in drilling with hollow stem augers, flight augers, setting and pulling casing, backfilling boreholes, installing and abandoning monitoring and observation wells, piezometers, inclinometers, and other instrumentation, mixing and drilling with bentonite drilling mud, drive sampling, standard penetration testing, taking thin wall and fixed-piston-type undisturbed samples, and core drilling in hard and soft rock. The drill crew shall be OSHA certified to perform subsurface exploration work in the appropriate level of personal protective gear. The Contractor shall ensure that the operating personnel have the proper drilling licenses and certifications as required by each relevant state and in accordance with federal guidelines and regulations prior to the commencement of drilling operations. No payment for an additional helper shall be authorized except as approved by the Contracting Officer prior to the execution of the individual Task Order.
C-9 MAINTENANCE AND REPLACEMENT OF EQUIPMENT
a. All repairs to equipment, and replacement of parts, including drill bits, split spoon samplers, core barrels; and all drilling apparatus shall be made at the expense of the Contractor. The working equipment supplied by the contractor shall be in good-working condition and shall be kept in good-working condition when in use. Downtime or other time performing maintenance or equipment repairs shall not be authorized for payment. The Contractor shall have spare replacement parts and supplies on hand for typical items that wear out or are consumed during the drilling process. These are such items including, but not limited to: split spoon samplers, auger teeth/bits, roller bits, powdered bentonite drilling mud, basket retainers, sampler shoes, and other expendable drilling supplies.
C-10 OPERATING AND WORKING TIME
a. The hourly rates for drilling equipment are for drilling time only and include payment for supplies and personnel necessary to perform the work as listed in the SCOPE OF WORK and in each TASK ORDER. Drilling time is defined as all work necessary to accomplish the drilling and sampling such as set-up time, moving drilling equipment between borings, clean-up time not related to mob or demob., instrument installation and abandonment, backfilling of boreholes, containerizing contaminated soils and/or drilling fluids, and Government-directed non-drilling time. Powdered bentonite for mixing drilling mud and added to cementious grout mixtures shall be included in the supplies for drilling, and no separate payment will be made. Drilling with equipment or using techniques that are not productive, as determined by the Contracting Officer, will not be authorized for payment.
Time performing routine maintenance or equipment repairs will not be authorized for payment.
b. Work Days: The Contractor shall be prepared to operate 10 hours per day, 6 days per week until completion of the TASK ORDER, weather and other conditions permitting. Work on Sundays and holidays is not anticipated under this contract, except when deemed necessary and approved by Contracting Officer. Alternative work schedules may be considered. The Contractor shall be responsible for travel expenses related to changing staff or transporting them to and from the field site.
c. Suspension of work: When, in the opinion of the Contracting Officer, conditions at the drill site during the periods of operation preclude the possibility of obtaining satisfactory production, temporary suspension of work will be ordered by the Contracting Officer, and payment will not be made for rental time during such periods of suspension.
C-11 PER DIEM
The per diem is invoiced on a per individual basis. The number of individuals in the crew, as requested in the Task Order, will determine the number of per diem days allowed for that Task Order. Per Diem will be authorized if at least eight (8) hours of drilling hours have been worked for the day or for a mob or demob. day with at least 4 hours of drilling time. In the event of severe weather of other unforeseen actions or events that necessitate drilling operations be suspended, the Contracting Officer will determine if per diem payment is authorized for the period that drilling is suspended. Additional per diem days resulting from excessive downtime, caused by the Contractor, shall not be invoiced for payment. Per Diem will not be allowed for scheduled non-work days except when the standard work schedule of 10 hours per day, 6 days per week is utilized, or, if an alternate work schedule is approved by the Contracting Officer. Alternate work schedules that adversely affect the project schedule or increase cost to the Government will not be considered. Per Diem days for mobilization and demobilization without at least 4 hours of drilling time will not be allowed.
C-12 MONITORING WELL & PIEZOMETER MATERIALS
a. Protective black iron or steel casing (4, 6, or 8-inch diameter) with lockable covers meeting state and local well code requirements where the work will be performed;
b. Monitoring Well & Piezometer construction materials shall be new and consist of nominal 2-inch diameter PVC pipes and screens. The components shall meet ASTM Schedule 40 thickness and strength specifications and have an inside diameter of no less than 2.00 inches. All PVC components shall have flush-threaded joints with o-rings for watertight connections. Well screens shall have a continuous-slot design and a #10 slot-size (0.010-inch);
c. Filter Sand for Monitoring Wells and Piezometers shall be commercially produced, packaged, and washed silica sand. Individual 50-lb. packages must be clearly marked with gradation information. The sand shall be well graded and be retained on US Standard Sieves #16 through #80. Filter sand shall have less than 10% passing US Standard Sieve #80;
c. Protective guard posts at least four inches square or four inches in diameter shall be made of reinforced concrete, decay-resistant wood, or ASTM Schedule 40 steel or black iron pipe. Posts or pipes shall be 8-feet in length. Pipes shall be filled with concrete, or capped with an overlapping, threaded, or welded steel or iron cap;
Drilling Project SCOPE OF WORK
Project Location: Marsh Lake / Near Montevideo, MN
This soil boring program requires the rental of one drilling unit. The drilling unit must be a tracked drilling rig and all supplies necessary to drill approximately 12-15 holes. The results from the holes will be used for stability analysis. The borings will average 30 feet in depth, but may be as deep as 90 feet. A Government inspector, on site, will determine the final field location and depth of each boring. The borings will be taken on a mixture of private property and Government owned land. A minimum of 90 feet of at least 3 1/4-inch I.D. hollow stem auger will be required, and bentonite mud with rotary drilling may be necessary to advance the boring below the water table.
Water levels are important for stability analysis, and may be somewhat slow to obtain in the soils anticipated. Short auger borings (approx. 20-25 feet), offset from the pilot holes, and allowed to stand open overnight may be necessary to obtain water levels. The Government inspector will make that determination in the field.
All holes will be sampled continuously, unless directed otherwise by the Government
Inspector. Standard penetration equipment (SPT) will be used in combination with a 2-½ inch
O.D. by 3-foot long split spoon sampler. Auger cuttings for Proctor analysis may also be collected. An automatic hammer will be required for standard penetration testing. 5-inch diameter undisturbed samples (Shelby-type and/or piston-type) will be required. The government inspector will make that determination in the field. Soils expected to be encountered include interbedded alluvial sands, silts, and clays as well as glacial clays and tills.
Jar samples will be taken by a Government inspector every 5 feet or change in material.
The Government representative will take care of all samples; prepare the boring log, coordinate rights-of-entries, and utility checks.
The boring crew should be prepared to tremie cement-bentonite grout to backfill borings and instrumentation clusters.
The work will be performed between 05 January and 06 February, 2015
Upon award of this delivery order, field coordination POC is Kevin Nelson at
(651) 290-5844 or Terry Jorgenson at 651-290-5598.
WAGE RATES
WD 05-2289 (Rev.-16) was first posted on www.wdol.gov on 08/05/2014
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2289 Diane C. Koplewski Division of | Revision No.: 16 Director Wage Determinations| Date Of Revision: 07/25/2014 State: Minnesota
Area: Minnesota Counties of Benton, Big Stone, Blue Earth, Brown, Chippewa, Cottonwood, Dodge, Douglas, Faribault, Fillmore, Freeborn, Goodhue, Grant, Houston, Jackson, Kandiyohi, Lac Qui Parle, Le Sueur, Lincoln, Lyon, Martin, McLeod, Meeker, Mille Lacs, Morrison, Mower, Murray, Nicollet, Nobles, Olmsted, Pipestone, Pope, Redwood, Renville, Rice, Rock, Sherburne, Sibley, Stearns, Steele, Stevens, Todd, Traverse, Wabasha, Waseca, Watonwan, Winona, Yellow Medicine **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 15.01 01012 - Accounting Clerk II 16.84 01013 - Accounting Clerk III 18.84 01020 - Administrative Assistant 18.78 01040 - Court Reporter 17.56 01051 - Data Entry Operator I 12.38 01052 - Data Entry Operator II 13.51 01060 - Dispatcher, Motor Vehicle 18.67 01070 - Document Preparation Clerk 14.53 01090 - Duplicating Machine Operator 14.53 01111 - General Clerk I 12.59 01112 - General Clerk II 13.74
01113 - General Clerk III 15.42 01120 - Housing Referral Assistant 19.59 01141 - Messenger Courier 13.19 01191 - Order Clerk I 12.32 01192 - Order Clerk II 13.86 01261 - Personnel Assistant (Employment) I 13.60 01262 - Personnel Assistant (Employment) II 15.21 01263 - Personnel Assistant (Employment) III 17.07 01270 - Production Control Clerk 21.31 01280 - Receptionist 12.39 01290 - Rental Clerk 11.24 01300 - Scheduler, Maintenance 15.70 01311 - Secretary I 15.70 01312 - Secretary II 17.56 01313 - Secretary III 19.59 01320 - Service Order Dispatcher 16.62 01410 - Supply Technician 20.25 01420 - Survey Worker 17.44 01531 - Travel Clerk I 14.01 01532 - Travel Clerk II 15.12 01533 - Travel Clerk III 16.22 01611 - Word Processor I 13.32 01612 - Word Processor II 14.95 01613 - Word Processor III 16.72 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 18.27 05010 - Automotive Electrician 16.40 05040 - Automotive Glass Installer 15.72 05070 - Automotive Worker 15.72 05110 - Mobile Equipment Servicer 14.52 05130 - Motor Equipment Metal Mechanic 17.08 05160 - Motor Equipment Metal Worker 15.72 05190 - Motor Vehicle Mechanic 17.86 05220 - Motor Vehicle Mechanic Helper 13.84 05250 - Motor Vehicle Upholstery Worker 15.20 05280 - Motor Vehicle Wrecker 15.72 05310 - Painter, Automotive 16.40 05340 - Radiator Repair Specialist 15.72 05370 - Tire Repairer 12.59 05400 - Transmission Repair Specialist 17.08 07000 - Food Preparation And Service Occupations 07010 - Baker 12.75 07041 - Cook I 12.10 07042 - Cook II 13.43 07070 - Dishwasher 8.16 07130 - Food Service Worker 9.58 07210 - Meat Cutter 15.17 07260 - Waiter/Waitress 9.15 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 16.94 09040 - Furniture Handler 12.31 09080 - Furniture Refinisher 16.47 09090 - Furniture Refinisher Helper 13.66 09110 - Furniture Repairer, Minor 15.13 09130 - Upholsterer 16.54 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 10.20 11060 - Elevator Operator 10.20 11090 - Gardener 14.76 11122 - Housekeeping Aide 11.26 11150 - Janitor 11.26 11210 - Laborer, Grounds Maintenance 12.07 11240 - Maid or Houseman 9.89 11260 - Pruner 12.14 11270 - Tractor Operator 13.96 11330 - Trail Maintenance Worker 12.07
11360 - Window Cleaner 12.25 12000 - Health Occupations 12010 - Ambulance Driver 15.93 12011 - Breath Alcohol Technician 15.93 12012 - Certified Occupational Therapist Assistant 21.86 12015 - Certified Physical Therapist Assistant 20.19 12020 - Dental Assistant 19.57 12025 - Dental Hygienist 34.27 12030 - EKG Technician 24.15 12035 - Electroneurodiagnostic Technologist 24.15 12040 - Emergency Medical Technician 15.93 12071 - Licensed Practical Nurse I 14.24 12072 - Licensed Practical Nurse II 15.93 12073 - Licensed Practical Nurse III 17.77 12100 - Medical Assistant 14.65 12130 - Medical Laboratory Technician 18.86 12160 - Medical Record Clerk 14.63 12190 - Medical Record Technician 17.14 12195 - Medical Transcriptionist 15.90 12210 - Nuclear Medicine Technologist 35.02 12221 - Nursing Assistant I 10.78 12222 - Nursing Assistant II 12.12 12223 - Nursing Assistant III 13.23 12224 - Nursing Assistant IV 14.84 12235 - Optical Dispenser 16.48 12236 - Optical Technician 11.65 12250 - Pharmacy Technician 14.18 12280 - Phlebotomist 14.84 12305 - Radiologic Technologist 26.50 12311 - Registered Nurse I 19.59 12312 - Registered Nurse II 23.96 12313 - Registered Nurse II, Specialist 23.96 12314 - Registered Nurse III 28.99 12315 - Registered Nurse III, Anesthetist 28.99 12316 - Registered Nurse IV 34.74 12317 - Scheduler (Drug and Alcohol Testing) 19.75 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 18.61 13012 - Exhibits Specialist II 23.06 13013 - Exhibits Specialist III 28.23 13041 - Illustrator I 18.61 13042 - Illustrator II 23.06 13043 - Illustrator III 28.23 13047 - Librarian 25.57 13050 - Library Aide/Clerk 13.64 13054 - Library Information Technology Systems 23.06 Administrator 13058 - Library Technician 19.38 13061 - Media Specialist I 16.65 13062 - Media Specialist II 18.61 13063 - Media Specialist III 20.76 13071 - Photographer I 16.94 13072 - Photographer II 18.94 13073 - Photographer III 23.46 13074 - Photographer IV 28.70 13075 - Photographer V 33.26 13110 - Video Teleconference Technician 16.23 14000 - Information Technology Occupations 14041 - Computer Operator I 15.37 14042 - Computer Operator II 17.19 14043 - Computer Operator III 19.17 14044 - Computer Operator IV 21.30 14045 - Computer Operator V 23.58 14071 - Computer Programmer I (see 1) 19.02 14072 - Computer Programmer II (see 1) 23.57 14073 - Computer Programmer III (see 1)
14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 27.62 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 15.37 14160 - Personal Computer Support Technician 21.30 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 29.12 15020 - Aircrew Training Devices Instructor (Rated) 35.22 15030 - Air Crew Training Devices Instructor (Pilot) 41.01 15050 - Computer Based Training Specialist / Instructor 29.12 15060 - Educational Technologist 25.40 15070 - Flight Instructor (Pilot) 41.01 15080 - Graphic Artist 20.03 15090 - Technical Instructor 19.78 15095 - Technical Instructor/Course Developer 24.20 15110 - Test Proctor 15.96 15120 - Tutor 15.96 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 11.42 16030 - Counter Attendant 11.42 16040 - Dry Cleaner 14.39 16070 - Finisher, Flatwork, Machine 11.42 16090 - Presser, Hand 11.42 16110 - Presser, Machine, Drycleaning 11.42 16130 - Presser, Machine, Shirts 11.42 16160 - Presser, Machine, Wearing Apparel, Laundry 11.42 16190 - Sewing Machine Operator 15.22 16220 - Tailor 16.09 16250 - Washer, Machine 12.66 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 21.56 19040 - Tool And Die Maker 24.94 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 14.45 21030 - Material Coordinator 21.31 21040 - Material Expediter 21.31 21050 - Material Handling Laborer 13.98 21071 - Order Filler 12.27 21080 - Production Line Worker (Food Processing) 14.45 21110 - Shipping Packer 13.34 21130 - Shipping/Receiving Clerk 13.34 21140 - Store Worker I 14.83 21150 - Stock Clerk 19.13 21210 - Tools And Parts Attendant 14.45 21410 - Warehouse Specialist 14.67 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 23.33 23021 - Aircraft Mechanic I 22.45 23022 - Aircraft Mechanic II 23.33 23023 - Aircraft Mechanic III 24.22 23040 - Aircraft Mechanic Helper 16.98 23050 - Aircraft, Painter 20.76 23060 - Aircraft Servicer 18.93 23080 - Aircraft Worker 19.74 23110 - Appliance Mechanic 21.55 23120 - Bicycle Repairer 12.59 23125 - Cable Splicer 25.70 23130 - Carpenter, Maintenance 18.16 23140 - Carpet Layer 21.21 23160 - Electrician, Maintenance 26.33 23181 - Electronics Technician Maintenance I 20.70 23182 - Electronics Technician Maintenance II 21.62 23183 - Electronics Technician Maintenance III 22.45 23260 - Fabric Worker 19.85 23290 - Fire Alarm System Mechanic 22.45
23310 - Fire Extinguisher Repairer 18.63 23311 - Fuel Distribution System Mechanic 23.36 23312 - Fuel Distribution System Operator 19.84 23370 - General Maintenance Worker 16.52 23380 - Ground Support Equipment Mechanic 22.45 23381 - Ground Support Equipment Servicer 18.93 23382 - Ground Support Equipment Worker 19.74 23391 - Gunsmith I 18.63 23392 - Gunsmith II 20.70 23393 - Gunsmith III 22.45 23410 - Heating, Ventilation And Air-Conditioning 24.71 Mechanic 23411 - Heating, Ventilation And Air Contditioning 25.69 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 21.11 23440 - Heavy Equipment Operator 21.22 23460 - Instrument Mechanic 22.45 23465 - Laboratory/Shelter Mechanic 21.62 23470 - Laborer 11.82 23510 - Locksmith 20.91 23530 - Machinery Maintenance Mechanic 22.71 23550 - Machinist, Maintenance 20.00 23580 - Maintenance Trades Helper 14.25 23591 - Metrology Technician I 22.45 23592 - Metrology Technician II 23.34 23593 - Metrology Technician III 24.24 23640 - Millwright 22.45 23710 - Office Appliance Repairer 20.26 23760 - Painter, Maintenance 17.37 23790 - Pipefitter, Maintenance 29.66 23810 - Plumber, Maintenance 27.18 23820 - Pneudraulic Systems Mechanic 22.45 23850 - Rigger 22.45 23870 - Scale Mechanic 20.70 23890 - Sheet-Metal Worker, Maintenance 24.69 23910 - Small Engine Mechanic 20.03 23931 - Telecommunications Mechanic I 23.26 23932 - Telecommunications Mechanic II 25.62 23950 - Telephone Lineman 20.04 23960 - Welder, Combination, Maintenance 19.39 23965 - Well Driller 22.45 23970 - Woodcraft Worker 22.45 23980 - Woodworker 18.98 24000 - Personal Needs Occupations 24570 - Child Care Attendant 9.15 24580 - Child Care Center Clerk 11.42 24610 - Chore Aide 12.41 24620 - Family Readiness And Support Services 11.97 Coordinator 24630 - Homemaker 13.88 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 23.95 25040 - Sewage Plant Operator 21.36 25070 - Stationary Engineer 23.95 25190 - Ventilation Equipment Tender 18.56 25210 - Water Treatment Plant Operator 21.36 27000 - Protective Service Occupations 27004 - Alarm Monitor 18.13 27007 - Baggage Inspector 13.21 27008 - Corrections Officer 19.76 27010 - Court Security Officer 20.63 27030 - Detection Dog Handler 16.09 27040 - Detention Officer 19.76 27070 - Firefighter 19.76 27101 - Guard I 13.21 27102 - Guard II 16.09
27131 - Police Officer I 25.07 27132 - Police Officer II 27.86 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 10.78 28042 - Carnival Equipment Repairer 11.23 28043 - Carnival Equpment Worker 9.13 28210 - Gate Attendant/Gate Tender 14.96 28310 - Lifeguard 13.72 28350 - Park Attendant (Aide) 17.23 28510 - Recreation Aide/Health Facility Attendant 11.99 28515 - Recreation Specialist 14.65 28630 - Sports Official 13.72 28690 - Swimming Pool Operator 16.40 29000 - Stevedoring/Longshoremen Occupational Services 29010 - Blocker And Bracer 20.72 29020 - Hatch Tender 20.72 29030 - Line Handler 20.72 29041 - Stevedore I 19.87 29042 - Stevedore II 21.65 30000 - Technical Occupations 30010 - Air Traffic Control Specialist, Center (HFO) (see 2) 35.77 30011 - Air Traffic Control Specialist, Station (HFO) (see 2) 24.66 30012 - Air Traffic Control Specialist, Terminal (HFO) (see 2) 27.16 30021 - Archeological Technician I 18.02 30022 - Archeological Technician II 20.21 30023 - Archeological Technician III 25.58 30030 - Cartographic Technician 25.58 30040 - Civil Engineering Technician 23.43 30061 - Drafter/CAD Operator I 18.45 30062 - Drafter/CAD Operator II 20.64 30063 - Drafter/CAD Operator III 23.02 30064 - Drafter/CAD Operator IV 28.32 30081 - Engineering Technician I 16.21 30082 - Engineering Technician II 18.21 30083 - Engineering Technician III 20.37 30084 - Engineering Technician IV 25.22 30085 - Engineering Technician V 29.98 30086 - Engineering Technician VI 37.34 30090 - Environmental Technician 25.58 30210 - Laboratory Technician 23.02 30240 - Mathematical Technician 25.58 30361 - Paralegal/Legal Assistant I 18.85 30362 - Paralegal/Legal Assistant II 23.34 30363 - Paralegal/Legal Assistant III 28.56 30364 - Paralegal/Legal Assistant IV 34.55 30390 - Photo-Optics Technician 25.58 30461 - Technical Writer I 25.58 30462 - Technical Writer II 31.29 30463 - Technical Writer III 37.85 30491 - Unexploded Ordnance (UXO) Technician I 22.74 30492 - Unexploded Ordnance (UXO) Technician II 27.51 30493 - Unexploded Ordnance (UXO) Technician III 32.97 30494 - Unexploded (UXO) Safety Escort 22.74 30495 - Unexploded (UXO) Sweep Personnel 22.74 30620 - Weather Observer, Combined Upper Air Or (see 2) 23.02 Surface Programs 30621 - Weather Observer, Senior (see 2) 25.58 31000 - Transportation/Mobile Equipment Operation Occupations 31020 - Bus Aide 10.37 31030 - Bus Driver 15.11 31043 - Driver Courier 12.63 31260 - Parking and Lot Attendant 11.71 31290 - Shuttle Bus Driver 13.15 31310 - Taxi Driver 11.51 31361 - Truckdriver, Light 13.15 31362 - Truckdriver, Medium 16.11
31363 - Truckdriver, Heavy 18.58 31364 - Truckdriver, Tractor-Trailer 18.58 99000 - Miscellaneous Occupations 99030 - Cashier 8.55 99050 - Desk Clerk 8.78 99095 - Embalmer 25.36 99251 - Laboratory Animal Caretaker I 11.29 99252 - Laboratory Animal Caretaker II 12.10 99310 - Mortician 25.36 99410 - Pest Controller 18.41 99510 - Photofinishing Worker 11.95 99710 - Recycling Laborer 18.71 99711 - Recycling Specialist 20.77 99730 - Refuse Collector 17.08 99810 - Sales Clerk 11.12 99820 - School Crossing Guard 14.52 99830 - Survey Party Chief 22.62 99831 - Surveying Aide 13.23 99832 - Surveying Technician 17.27 99840 - Vending Machine Attendant 19.77 99841 - Vending Machine Repairer 21.62 99842 - Vending Machine Repairer Helper 19.77
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.02 per hour or $160.80 per week or $696.79 per month
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE FOLLOWING:
1) Does not apply to employees employed in a bona fide executive, administrative, or professional capacity as defined and delineated in 29 CFR 541. (See CFR 4.156)
2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS - NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic pay for any hours worked between 6pm and 6am.
If you are a full-time employed (40 hours a week) and Sunday is part of your regularly scheduled workweek, you are paid at your rate of basic pay plus a Sunday premium of 25% of your basic rate for each hour of Sunday work which is not overtime (i.e.
occasional work on Sunday outside the normal tour of duty is consideredovertime work).
HAZARDOUS PAY DIFFERENTIAL: An 8 percent differential is applicable to employees employed in a position that represents a high degree of hazard when working with or in close proximity to ordinance, explosives, and incendiary materials. This includes work such as screening, blending, dying, mixing, and pressing of sensitive ordance, explosives, and pyrotechnic compositions such as lead azide, black powder and photoflash powder. All dry-house activities involving propellants or explosives.
Demilitarization, modification, renovation, demolition, and maintenance operations on sensitive ordnance, explosives and incendiary materials. All operations involving regrading and cleaning of artillery ranges.
A 4 percent differential is applicable to employees employed in a position that represents a low degree of hazard when working with, or in close proximity to ordance, (or employees possibly adjacent to) explosives and incendiary materials which involves potential injury such as laceration of hands, face, or arms of the employee engaged in the operation, irritation of the skin, minor burns and the like; minimal damage to immediate or adjacent work area or equipment being used. All operations involving, unloading, storage, and hauling of ordance, explosive, and incendiary ordnance material other than small arms ammunition. These differentials are only applicable to work that has been specifically designated by the agency for ordance, explosives, and incendiary material differential pay.
** UNIFORM ALLOWANCE **
If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract, by the employer, by the state or local law, etc.), the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:
The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition, where uniform cleaning and maintenance is made the responsibility of the employee, all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargainingagreement providing for a different amount, or the furnishing of contrary affirmative proof as to the actual cost), reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However, in those instances where the uniforms furnished are made of "wash and wear" materials, may be routinely washed and dried with other personal garments, and do not require any special treatment such as dry cleaning, daily washing, or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract, by the contractor, by law, or by the nature of the work, there is no requirement that employees be reimbursed for uniform maintenance costs.
The duties of employees under job titles listed are those described in the "Service Contract Act Directory of Occupations", Fifth Edition, April 2006, unless otherwise indicated. Copies of the Directory are available on the Internet. A links to the Directory may be found on the WHD home page at http://www.dol.gov/esa/whd/ or through the Wage Determinations On-Line (WDOL) Web site at http://wdol.gov/.
REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE {Standard Form
1444 (SF 1444)}
Conformance Process:
The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e., the work to be performed is not performed by any classification listed in the wage determination), be classified by the contractor so as to provide a reasonable relationship (i.e., appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .