A22_Solicitation_Fort_McCoy_Firebreaks.pdf

PDF 857 KB Posted

Attached to
Fire Breaks & Maintenance at Fort McCoy, WI
Solicitation number
W912ES-15-R-0005
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
SP_contour_11.jpg JPG image
NP_contour_38.jpg JPG image
NP_contour_48.jpg JPG image
NP_contour_30.jpg JPG image
NP_contour_29.jpg JPG image
Legend_A.jpg JPG image
NP_contour_44.jpg JPG image
Legend.jpg JPG image
NP_contour_39.jpg JPG image
SP_contour_21.jpg JPG image
SP_contour_18.jpg JPG image
Amendment_1.pdf PDF
Map_1.JPG JPG image
Map_2.JPG JPG image
A22_Technical_Exhibit_3_Maps.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6751486747

Firebreak Construction and Maintenance at Fort McCoy, WI.

Work consists of, but is not limited to: all labor, supplies, equipment, and management necessary to accomplish the required specified tasks.

Tasks may include mow ing (steep & level surfaces), tree & stump removal, scarif ied f irebreak (steep & level surfaces), boundary erosion repair, mulching, and seeding.

This solicitation is issued as a Request for Proposals (RFP) and is 100% set-aside for small business concerns. The solicitation w ill result in an Indefinite Delivery Indefinite Quantity (IDIQ) type contract consisting of a base period and four (4) optional periods. The estimated price range for the contract is betw een $1,000,000 and $5,000,000. The North American Industry Classif ication System (NAICS) code for this procurement is 115310 w ith a small business size standard of $19,0000,000.

JUSTIN H ROSE 651-290-5422

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

14-Aug-2015

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10 Alt1

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________14 Sep 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

W912ES

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912ES-15-R-0005 202

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912ES-15-R-0005

SCOPE OF WORK

TECHNICAL EXHIBIT 1 – PERFORMANCE REQUIREMENTS SUMMARY

TECHNICAL EXHIBIT 2 – DELIVERABLES SCHEDULE

TECHNICAL EXHIBIT 4 ESTIMATED WORKLOAD DATA

TECHNICAL EXHIBIT 5 SEEDING AND MULCHING SPECIFICATIONS

NOTES TO OFFERORS

PRICING

Section 00100 - Bidding Schedule/Instructions to Bidders

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (JUL 2015)

52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN

CERTIFIED COST OR PRICING DATA (OCT 2010)

52.216-1 TYPE OF CONTRACT (APR 1984)

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY

2014) ALTERNATE I (MAY 2014)

52.233-2 SERVICE OF PROTEST (SEP 2006)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

Section 00600 - Representations & Certifications

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(NOV 2011)

252.203-7998 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements—Representation (DEVIATION 2015-O0010) (FEB 2015)

252.209-7992 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX

LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW—FISCAL YEAR 2015

APPROPRIATIONS (DEVIATION 2015-OO0005) (DEC 2014)

Section 00700 - Contract Clauses 52.202-1 Definitions (NOV 2013)

52.203-3 GRATUITIES (APR 1984)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

52.203-7 ANTI-KICKBACK PROCEDURES. (MAY 2014)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(OCT 2010)

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM

EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)

52.204-7 SYSTEM FOR AWARD MANAGEMENT (JULY 2013)

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(JULY 2013)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

52.204-18 Commercial and Government Entity Code Maintenance (Jul 2015)

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC

2014)

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (AUG 2013)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (JULY 2013)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (DEC 2014)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)

52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN

CERTIFIED COST OR PRICING DATA -- MODIFICATIONS (OCT 2010)

52.215-4005 Preparation and Evaluation of Proposals (Construction) 52.216-18 Ordering. (OCT 1995) 52.216-19 Order Limitations. (OCT 1995)

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)

52.222-3 CONVICT LABOR (JUN 2003)

52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME COMPENSATION.

(MAY 2014)

52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)

52.222-7 WITHHOLDING OF FUNDS (MAY 2014)

52.222-8 PAYROLLS AND BASIC RECORDS (MAY 2014)

52.222-9 APPRENTICES AND TRAINEES (JUL 2005)

52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)

52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)

52.222-12 CONTRACT TERMINATION--DEBARMENT (MAY 2014)

52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED

REGULATIONS (MAY 2014)

52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)

52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

52.222-26 EQUAL OPPORTUNITY (APR 2015)

52.222-27AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION(APR 2015)98

52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS--PRICE ADJUSTMENT (NONE OR

SEPARATELY SPECIFIED METHOD) (MAY 2014)

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014)

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

52.222-37 EMPLOYMENT REPORTS ON VETERANS (JULY 2014)

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT

(DEC 2010)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (AUG 2013)

52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2014)

52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND

CONSTRUCTION CONTRACTS (SEP 2013)

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-

DESIGNATED ITEMS (MAY 2008)

52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND

CONSTRUCTION CONTRACTS (MAY 2008)

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING

(AUG 2011)

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT

(DEC 2007)

52.227-4 PATENT INDEMNITY--CONSTRUCTION CONTRACTS (DEC 2007)

52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)

52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION (JAN 1997)

52.228-11 PLEDGES OF ASSETS (JAN 2012)

52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS. (MAY 2014)

52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)

52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)

52.232-17 INTEREST (MAY 2014)

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2-14) - ALTERNATE I (APR 1984)

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD

MANAGEMENT (JULY 2013)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC

2013)

52.233-1 DISPUTES. (MAY 2014)

52.233-3 PROTEST AFTER AWARD (AUG. 1996)

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

52.236-2 DIFFERING SITE CONDITIONS (APR 1984)

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)

52.236-4 PHYSICAL DATA (APR 1984)

52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)

52.236-8 OTHER CONTRACTS (APR 1984)

52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (APR 1984)

52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)

52.236-12 CLEANING UP (APR 1984)

52.236-13 ACCIDENT PREVENTION (NOV 1991) – ALTERNATE I (NOV 1991)

52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

52.236-16 QUANTITY SURVEYS (APR 1984)

52.236-17 LAYOUT OF WORK (APR 1984)

52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)

52.242-13 BANKRUPTCY (JUL 1995)

52.242-14 SUSPENSION OF WORK (APR 1984)

52.243-4 CHANGES (JUN 2007)

52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (APR 2015)

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)

52.248-3 VALUE ENGINEERING--CONSTRUCTION (OCT 2010)

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012) -

ALTERNATE I (SEP 1996)

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP

2011)

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-

CONTRACT-RELATED FELONIES (DEC 2008)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS(SEP 2013).164

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)

252.203-7999 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements

(DEVIATION 2015-O0010)(FEB 2015)

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

252.204-7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION (NOV

2013)

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC

1991)

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM (DEC 2014)

252.223-7004 DRUG-FREE WORK FORCE (SEP 1988)

252.223-7008 Prohibition of Hexavalent Chromium (JUN 2013)

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)

252.225-7048 EXPORT-CONTROLLED ITEMS (JUNE 2013)

252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(JUNE 2012)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

252.236-7000 MODIFICATION PROPOSALS - PRICE BREAKDOWN (DEC 1991)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)

252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (APR 2014)

252.247-7024 Notification of Transportation of Supplies by Sea (MAR 2000)

Section 00800 - Special Contract Requirements

52.000-4004 PARTNERING

52.217-4002 EXERCISE OF OPTION TO EXTEND SERVICES

52.228-4002 INSURANCE

52.232-4004 INVOICE PROCEDURES

52.236-4004 AVAILABILITY AND USE OF UTILITY SERVICES

52.236-4006 SAFETY AND HEALTH REQUIREMENTS MANUAL INTERIM CHANGES, EM 385-1-1

(MAR 2015) 185

52.236-4014 PURCHASE ORDERS

52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS

MVP-0002 APPARENT CLERICAL MISTAKES

MVP-0003 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

(S-102) CONTRACTOR SUPPLY and USE OF ELECTRONIC SOFTWARE FOR PROCESSING DAVIS- BACON ACT CERTIFIED LABOR PAYROLLS (April 2011)

WAGE RATES

SCOPE OF WORK

Firebreak Construction and Maintenance Fort McCoy, Wisconsin

PART 1

GENERAL INFORMATION

1. GENERAL: This contract shall provide construction and maintenance on firebreaks associated with the North Impact Area (NIA) and select firing ranges and to create a firebreak on designated segments in and around Fort McCoy, Wisconsin. The Government shall not exercise any supervision or control over the contractor performing the work herein. The contractor / subcontractor(s) shall be accountable solely to the prime contractor who, in turn is responsible to the Government.

1.1 Description / Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to create a firebreak or maintain firebreaks in accordance with this scope of work, attachments, and the terms and conditions in this contract. The NIA, ranges, and installation boundary has been divided into segments. This award includes completion of work on funded segments. Other segments are not ready for the firebreak to be created or maintained and may be included in future contracts. Contractor's work and responsibility shall include, but is not limited to: all job planning, labor, scheduling, administration, inspection, and management necessary to accomplish the required specified tasks. The Contractor shall assure that all work is accomplished in accordance with contract requirements, all applicable laws and regulations, and/or written directives issued by the Contracting Officer.

1.2 Background: Fort McCoy is situated on approximately 60,000 acres in West Central Wisconsin. It is located on HWY 21 between Sparta and Tomah. Fort McCoy’s primary mission is to underpin readiness of the Force by serving as a training center and support site for power projection missions. Fort McCoy is known as the Total Force Training Center because this installation supports the training and mobilization of reserve and active component military personnel from all branches of America's armed forces. The installation's varied terrain, state-of-the-art ranges, new as well as renovated facilities and extensive support infrastructure, combine to afford our military personnel with an excellent environment in which to develop and sustain the skills necessary for their mission success.

1.3 Objectives: There are two objectives of this contract:

Create a minimum of 40 feet wide firebreak around designated portions of installation boundary that can be accessed by emergency vehicles for suppressing wildfires and to delineate the boundary for soldiers training on Fort McCoy and for the civilian population residing, working or recreating on lands adjacent to Fort McCoy.

Maintain mineral soil firebreaks around the NIA and select ranges to prevent wildfires from escaping and damaging government and private property.

1.4 Scope: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to perform firebreak maintenance activities or create firebreaks as defined in this scope of work for Fort McCoy. The Contractor is not responsible for the removal of hazardous materials, biohazards, or other waste materials not specifically mentioned. The Contractor shall perform to the standards in this contract and the standards listed in American National Standards Institute (ANSI) A300 parts 1-7 and 9.

1.5 Period of Performance: The period of performance shall be for one (1) Base Period and four (4) option years. The Period of Performance reads as follows:

Base Period: Date of Award – Plus One Year Option 1: End of Base Period – Plus One Year Option 2: End of Option 1 – Plus One Year Option 3: End of Option 2 – Plus One Year Option 4: End of Option 3 – Plus One Year

1.6 General Information

1.6.1 Federal Observed Holidays: The contractor is not required to perform work on holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.2 Hours of Operation: The contractor may work on site between the hours of 7:00 am to 5:00 pm (or official local sunset, whichever is later) Monday through Friday except Federal holidays and when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.6.3 Place of Performance: In and around Fort McCoy, Wisconsin.

1.6.4 Government and Personal Property: The contractor is responsible for safeguarding U.S. Government (USG) and personal property. The contractor shall conduct work so that Government property, personnel, and work areas shall be protected at all times from inconvenience, damage, or injury. In the event of loss or damage of any nature, caused by contractor operations or employees, due to improper protection, precaution or safety measures, such damages shall be repaired or replaced by the contractor at their expense. In the event the contractor does not satisfactorily repair or replace such damages, the Government reserves the right to make necessary correction and the contractor shall reimburse the Government for all labor and materials costs associated with repairs or replacement.

1.6.5 Quality Control / Quality Assurance: The contractor is solely responsible for quality control under this contract. The Government will conduct quality assurance to ensure that the Contractor provides the required work and that required performance standards are achieved. The Performance Requirements Summary (PRS) identifies the performance standards for specific contract deliverables, the frequency of Government surveillance, and the minimum acceptable quality levels. Government surveillance of contractor performance is not limited to the items identified in the PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this award.

1.6.6 Type of Contract: The Government anticipates award of an Indefinite Delivery Indefinite Quantity (IDIQ) with task orders (TO) firm fixed-price (FFP) contract.

1.6.7 Reserved

1.6.7.1 Reserved

1.6.7.2 Reserved

1.6.7.2.1 Reserved

1.6.7.2.2 Reserved

1.6.7.3 Reserved

1.6.8 Special Qualifications: The contractor shall ensure all Federal, State, County insurance and licensing, certification requirements and permits are met and kept current. Employees must have a valid driver’s license and/or Commercial Drivers License (CDL) as required for the type and class of vehicles used in the performance of this contract. The contractor shall submit documentation of insurance and employee licensing and certifications (if required for equipment operation) within 21 calendar days of award, upon any changes, and upon request, to the Government Point of Contact (GPC), Contracting Officer’s Representative (COR), and/or the Contracting Officer (KO).

1.6.9 Post Award Conference / Periodic Progress Meetings: The contractor shall attend any post award conference convened by the Government in accordance with Federal Acquisition Regulation (FAR) Subpart 42.5. The Contracting Officer, COR, and/or GPOC will meet periodically with the contractor to review the contractor's performance. At these meetings the Government will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of any problems being experienced. Appropriate action shall be taken to resolve issues.

1.6.10 Contracting Officer’s Representative (COR): The COR monitors all aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: Assure the contractor performs the various requirements of the contract; perform inspections necessary in connection with contract performance;

maintain written and oral communications with the contractor concerning various aspects of the contract; monitor contractor's performance and notifies both the KO and contractor of any deficiencies; and coordinate availability of government furnished property. The COR is not authorized to change any of the terms or conditions of the contract, including price and period of performance.

1.6.11 Key Personnel: The following personnel are considered key personnel by the Government: Contract / Project Manager and Alternate Contract / Project Manager.

The contractor shall submit the name and phone number of the designated Contract / Project Manager and alternate who shall be responsible for the performance of the work. The Contract / Project Manager and alternate shall have full authority to act for the contractor on all matters relating to daily operation of this contract. The Contract / Project Manager or alternate shall be available by phone between 8:00 am to 5:00 pm, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons.

1.6.12 Identification of Contractor Employees: All contractor personnel attending meetings and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. All documents or reports produced by the contractor must be marked as contractor products.

Contractor participation must always be disclosed.

1.6.13 Reserved

1.6.14 Contractor Personnel Conduct: Contractor personnel’s conduct shall not reflect discredit upon the Government. The contractor shall ensure that personnel present a professional appearance. The contractor’s employees shall observe and comply with all policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.

The contractor is responsible for ensuring that any contractor employees providing work under this contract conduct themselves and perform in a professional, safe, and responsible manner. The contractor shall remove from the job site any employee for reasons of misconduct or security. In accordance with DOD Directive 5500.7-R, “Joint Ethics Regulation”, contractor employees must avoid improper influence in the execution of their duties under the contract. Particular attention shall be paid to acceptance of gifts / gratuities, and non-disclosure of sensitive or classified information.

The contractor shall ensure employee conduct complies with 41 U.S. C 423 relative to release of acquisition related information or actions or discussions which may prejudice future competitions. The contractor shall ensure no contractor employees conduct political related activities or events on the installation.

1.6.15 Reserved

1.6.16 Reserved

1.6.17 Reserved

1.6.18 Reserved

1.6.19 Antiterrorism (AT) and Operations Security (OPSEC)

1.6.19.1 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract award. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the GPOC or the COR.

1.6.19.2 Access and General Protection / Security Policy and Procedures: Contractor and all associated sub-contractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by Government representatives). The contractor shall provide all information required for background checks to meet installation access requirements accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor employees must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.6.19.3 iWATCH Training: The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the GPOC, COR, and the Contracting Officer. This training shall be completed within 60 calendar days of contract award and within 60 calendar days of new employees commencing performance with the results reported to the GPOC and COR.

1.6.19.4 Reserved

1.6.19.5 Reserved

1.6.19.6 Reserved

1.6.19.7 Reserved

1.6.19.8 Reserved

1.6.19.9 Reserved

1.6.19.10 Reserved

1.6.19.11 Reserved

1.6.19.12 Reserved

1.6.20 Emergency Services

1.6.20.1 The contractor shall have competent personnel trained and capable of dealing with minor personnel injuries. Contractor employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The contractor will, in turn, notify the Installation Safety Office at 608-388-3403, GPOC, COR, and Contracting Officer within one hour of the incident.

1.6.20.2 Emergency medical treatment and services for contractor personnel is the responsibility of the contractor.

1.7 Environmental Controls

1.7.1 Compliance with Laws and Regulations: The contractor shall be knowledgeable of and comply with all applicable Federal, State, Interstate and local laws and permits, regulations and requirements regarding environmental protections. This includes Army regulations, operating procedures and permit conditions. Contractor operations are subject to environmental compliance inspections without notice. In the event environmental laws/regulations changed during the term of this contract, the contractor shall comply as such laws come into effect.

1.7.2 Notification of Environmental Spills: If the contractor spills or releases any material in performance of this contract or any other substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to Fort McCoy dispatch at 608-388-2000 option 4, then notify the COR. When a fluid leak is discovered, the operator must immediately shut down the equipment and not drive the leaking equipment to the staging area. The only exception is if the leak is noticed when operating the equipment immediately adjacent to a wetland or water body, then it is required to move the equipment far enough away from the wetland or water body to eliminate the potential for the leak to run into the water body or wetland.

1.7.3 Liability: The contractor shall assume liability for acts or omission in regard to compliance with Federal, State and local environmental statues, regulations and applicable guidelines, including, but not limited to fines or penalties associated with enforcement actions and costs for environmental restoration (removal actions, remedial actions and corrective actions). The contractor and any subcontractor shall assume liability in the event that their actions result in the release of hazardous substance into the environment. The liability for the spill or release of such substances rests solely with the contractor and its agent. The contractor and any subcontractors shall be responsible for documentation, reporting, assessment and remedial action requirements associated with such release and restoration of any damages.

1.7.4 Environmental Pollution Prevention: The contractor shall perform all work so as to minimize environmental pollution or degradation of natural / cultural resources. The contractor shall comply with all Federal, State, and local regulations and guidelines while on the installation to ensure safe working conditions for contractor personnel and a safe environment for the occupants of Army facilities.

1.7.4.1 Wisconsin DNR Storm Water Discharge Permit: Notice of Intent (NOI) – Storm Water Discharges Associated with Land Disturbing Construction Activities General Permit will need to be obtained and paid for by the contractor if ground disturbing activities are greater than one acre. The permit application will need to be submitted to the Fort McCoy Environmental Division for review and signature. The contractor shall implement best management practices per the site-specific erosion control and storm water management plans for the project. In addition, the contractor is responsible for implementing other BMPs, methods and devices as needed during the course of his work in order to reduce sediments or other pollutants from leaving the site, in accordance with the permit requirements. The contractor shall:

(1) Submit a storm water management plan with the NOI.

(2) Keep copies of the permit and erosion control plan on site at all times during earth-moving. The contractor is responsible for implementing the erosion control devices and methods as necessary during earth-moving and as situations arise, in order to meet the intent of the permit.

(3) File the Notice of Termination after the earth-moving site has undergone final stabilization. Final stabilization occurs when all stabilization methods are established and functioning properly. Do not file Notice of Termination until that time.

1.7.4.2 Submittals: The contractor shall submit the following documents associated with the permit:

(1) Letter of confirmation stating that the contractor has verified the permit requirements, including the Erosion Control and Storm Water Management Plans. No earthmoving activities may commence until the NOI has been approved by the DNR.

The standard processing time is 15 working days but on occasions may take longer.

(2) Inspection Reports: Weekly inspection reports for erosion and sediment controls, see paragraph 5.4.4.2.

(3) Notice of Termination.

1.7.5 Invasive Plant Control: The contractor must clean all off-road equipment prior to each entry on to Fort McCoy in order to prevent introduction or spread of invasive plants on the installation. “Off-road Equipment” includes all mowing, seeding, earth moving or other similar equipment and does not include pick-up trucks and cars. The off-road equipment shall be free of soil, seeds, vegetative matter, or other debris that can hold seeds. Approved seed mixtures are allowed in the seeding equipment. A list of invasive plants of concern to the Army is available at the forestry office in building 2168.

Fort McCoy will assist the contractor with cleaning off equipment as necessary when relocating to different areas on the installation or when leaving the installation if invasive plants were identified in the work area.

1.7.6 Endangered Species:

1.7.6.1 Karner Blue Butterfly: Portions of the firebreak include habitat for the Federally endangered Karner Blue Butterfly (KBB). Restrictions on the type of activity and/or time of year may be imposed where KBB habitat is identified:

1) Shredding and mowing are not allowed to occur within KBB habitat during the adult flight period (typically May 1 – August 30).

2) Mowing height within KBB habitat areas shall be a minimum of six inches.

3) Only a shredder can be used to remove trees in KBB habitat.

4) Stumps and debris cannot be piled on KBB habitat.

5) When repairing eroded areas, soil cannot be removed from KBB habitat.

Restrictions imposed in a specific segment will be determined during the post award conference.

6) Equipment and supplies cannot be parked or stored within the KBB habitat areas.

1.7.6.2 Northern Long-Eared Bat: The northern long-eared (NLEB)bat is proposed for listing as Federally endangered. When listed, there may be restrictions on the timing of tree removal. During the post-award conference meetings the contractor will be informed of the status and restrictions involving the NLEB.

1.7.7 Cultural Resources: Several segments contain protected archaeological sites.

These sites will be identified by the Government during the post award conference and the contractor must be protected these areas from any ground disturbance.

1.8 Safety and Health Standards: The contractor shall conform to the safety requirements contained in this contract for all activities related to the accomplishment of work to include, but not limited to skills training and certifications pertinent to their job duties, OSHA required training, emergency response, hearing conservation, electrical safety, personal protective equipment (PPE) and certified through a nationally recognized adult CPR, AED and first aid course. The contractor shall initiate and maintain programs to comply with all applicable Federal, State, local laws and regulations. The contractor shall submit a Safety Plan to the GPOC, COR, and Contracting Officer within 30 days of award and within five (5) business days of any changes. Areas of compliance include the provisions listed in Part 6.

1.8.1 Unexploded Ordnance: Military training involving live ammunition and explosives has occurred throughout Fort McCoy since 1909. Deliberate and comprehensive efforts have been conducted to clear the unexploded ordnance (UXO) hazard; however these items may occasionally still be encountered while on Fort McCoy.

(1) UXOs are often referred to as duds, bombs, munitions, ordnance, ammo, dummy rounds, or by other terms. Regardless of what they are called, they shall be considered extremely dangerous. They were designed to explode and may still have the capability to do so. Never touch, move, or disturb munitions. Even Civil War cannon balls and souvenir munitions that may have been handled for years can potentially detonate at any time.

(2) UXOs come in many shapes and sizes and may be visible on the surface or be buried. It can be exposed by erosion or fires, and may look new or old. UXOs may also be found alone or in groups; and can be whole or in parts.

(3) Anyone encountering or believing they may have encountered unexploded ordnance shall consider it extremely dangerous. The proper response to avoid injury to themselves and others is to follow the 3 Rs of explosives safety:

(a) Recognize - Recognizing when you may have encountered UXO is key to reducing the risk of injury or death. If you encounter or suspect you may have encountered UXO, consider it extremely dangerous. Remember, UXO is sometimes hard to identify.

(b) Retreat - If you encounter or suspect you may have encountered UXO, do not touch, move or disturb it, but immediately and carefully leave the area following the same path on which you entered. If you can, mark the general area, not the UXO, in some manner (e.g., with a hat, piece of cloth, or by tying something to a tree branch).

(c) Report - Notify Fort McCoy Public Safety Center at (608) 388-2000 of what you saw, where you saw it, and the type of marking, if you were able to mark the area. These actions will protect you and others who may encounter the same area.

The contractor will be working in areas that may have unexploded ordnance (UXO).

Prior to starting any work, all contractor personnel must attend a UXO safety brief. Any UXO found at the work site must be noted and reported to The Directorate of Plans, Training, Mobilization and Security (DPTMS) radio room ASAP.

Additional UXO safety information and a photo gallery of various types of UXO are available from the Department of Defense internet site at:

http://www.denix.osd.mil/uxo/SafetyTopics/UXO.cfm

PART 2

DEFINITIONS, ACRONYMS & ABBREVIATIONS

2.1 GENERAL DEFINITIONS:

a. Contractor. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

b. Contracting Officer (KO). The duly appointed Government agents authorized to award or administer contracts. The only people with the authority to enter into, administer, or terminate contracts and make determinations and findings.

Contracting Officers may bind the Government only to the extent of the authority delegated to them.

c. Contracting Officer’s Representative (COR). An employee of the U.S.

Government appointed by the contracting officer to help administer the contract.

Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

d. Defective Task. Work that does not meet the standard of performance associated with it in the scope of work.

e. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

f. Equipment. A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract.

Equipment is not intended for sale, and does not ordinarily lose its identity or become a component part of another article when put to use. Equipment does not include material, real property, special test equipment or special tooling.

g. Government Furnished Property. Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government-furnished property includes, but is not limited to: spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.

h. Government Property. All property owned or leased by the Government.

Government property includes both Government-furnished property and contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not necessarily include intellectual property and software.

i. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract.

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for performance of all subcontractors.

j. Loss of Government Property. Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:

(1) Items that cannot be found after a reasonable search;

(2) Theft:

(3) Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or

(4) Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair.

k. Material. Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.

l. Performance Objective. The work required by the Government stated in the scope of work.

m. Performance Plan. An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the contractor.

n. Performance Threshold. The specific standard required by the Government as stated in the scope of work.

o. Physical Security. Actions that prevent the loss or damage of Government property.

p. Property. All tangible property, both real and personal.

q. Quality Assurance. The government procedures to verify that work being performed by the contractor are performed according to acceptable standards.

r. Quality Assurance Surveillance Plan. An organized document written by the government specifying the surveillance methodology used for surveillance of contractor performance.

s. Quality Control. All necessary measures taken by the contractor to assure that the quality of an end product shall meet contract requirements.

t. Subcontractor. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

u. Tenant Organization. A government (federal, state, local) or nongovernment organization that occupies by lease or other agreement, land or buildings on Fort McCoy.

v. Work Day. The number of hours per day the contractor provides work in accordance with the contract.

w. Work Week. Monday through Friday, unless specified otherwise.

2.2 TECHNICAL DEFINITIONS:

a. Berm: A barrier constructed with soil to prevent unauthorized vehicle access to the boundary firebreak.

b. Diameter at Breast Height: The diameter of a tree measured at 4.5 feet above the ground.

c. Disk: To turn over the soil and bury existing vegetation to create a mineral soil firebreak. A heavy-duty agriculture disk or other type of equipment may be used that can create the same effect.

d. Erosion: The wearing away of the land surface by rain, running water, wind, ice, gravity, or other natural or anthropogenic agents.

e. Firebreak: Any natural or constructed discontinuity in potential fuels that segregates, stops, and controls the spread of fire or provides a control line from which to control a fire. See TM 5-630 Natural Resources – Land Management, Chapter 10-2.4 and The Fort McCoy Integrated Wildland Fire Management Plan paragraph 2.2.3.1 for more information.

f. Forb: A broad-leafed herbaceous plant.

g. Gully Erosion: The removal of soil by water running in narrow channels which may be eroded to depths ranging from 1 to 2 ft to as much as 75 to 100 ft. in length.

h. Herbaceous: A class of vegetation dominated by nonwoody plants such as grasses, ferns and forbs.

i. Hydroseeding: A planting process that uses a slurry of seed and mulch which temporarily protects exposed soils from erosion by water and wind.

j. Invasive Weeds: Any plant species that is not native to that ecosystem and whose introduction does, or is likely to cause economic or environmental harm or harm to human health.

k. Level Ground: Sections of firebreak that have a slope of 10% or less and have a lower occurrence of soil erosion.

l. Mineral Soil: A soil consisting predominantly of, and having properties determined predominantly by mineral matter.

m. Mulch: A loose covering on the surface of the soil used mainly to conserve moisture. It may consist of straw or other organic material.

n. Oak Wilt: A disease that infects oak trees caused by the fungus Ceratocystis fagacearum that invades the water-conducting vessels and induces the formation of balloon-like projections which plugs the vessels. As the water movement within the tree is slowed, the leaves wilt and drop off the tree.

o. Prescribed Burn: To deliberately burn wildland fuels in either their natural or their modified state and under specified environmental conditions, which allows the fire to be confined to a predetermined area and produces the fireline intensity and rate of spread required to attain planned resource management objectives.

p. Pruning: The removal, close to the branch collar, of side branches (live or dead) from a standing tree.

q. Scarify / Scarification: Mechanical removal of vegetation or a disturbance of the soil surface to expose the mineral soil.

r. Seeding: The distribution of seed by hand or machine.

s. Slash: The residue, tree tops and branches, left on the ground after logging.

t. Steep Slopes: Sections of firebreak that have slopes of 11% or greater and are subject to more occurrences of soil erosion. Firebreak maintenance on steep slopes may require moving eroded soil upslope to fill in gullies or other types of soil erosion.

u. UXO: Unexploded ordnance are munitions that have been prepared for action by priming or arming, have been fired, dropped, launched or placed in such a manner to constitute a hazard to personnel or material, and remain unexploded either by malfunction, design or any other case.

v. Water Bar: A shallow channel or raised barrier of soil laid diagonally across the firebreak to lead water off the firebreak and prevent soil erosion.

w. Wildfire: Any nonstructure fire, other than prescribed fire, occurring on wildland.

x. Wildland: Land other than dedicated for uses such as agriculture, urban, mining, or parks.

y. Windrowed: Woody debris concentrated along a line using a machine to clear the intervening ground.

2.3 ACRONYMS:

ACOR Alternate Contracting Officer's Representative ACR Acquisition Resource Center AED Automated External Defibrillator AFARS Army Federal Acquisition Regulation Supplement ANSI American National Standards Institute AQL Acceptable Quality Level(s) AR Army Regulation AT Anti-Terrorism ATO Anti-Terrorism Officer CAP Contractor Acquired Property CDL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .