BIDDING_ABSTRACT_W912ES-15-B-0003.pdf
PDF 121 KB Posted
- Attached to
- Devils Lake Drainage Project Federal contract opportunity
- Solicitation number
- W912ES-15-B-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_1_Devils_Lake_Drainage.pdf | ||
| W912ES-15-B-0003_22X34_PLANS.pdf | ||
| W912ES-15-B-003_REF_DRAWINGS.pdf | ||
| W912ES-15-B-0003_11X17_PLANS.pdf | ||
| Best_Management_Practices_Half_Size.pdf | ||
| Best_Management_Practices_Full_Size.pdf | ||
| AccidentPreventionPlanChecklist2011Sep08.pdf | ||
| SOLICITATION_SPECIFICATION_15-B-0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Devils Lake Flood Risk Management Interior Drainage US Army Corps of Engineers. 180 5th Street East, Suite 700, St. Paul, MN 55101-1678
Contracting Officer: Dawn Linder Contract Specialist: Justin Rose
Government Estimate
Item Description Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Base 0001 Bonds (Performance and Payment) for Base Bid 1 JOB $23,121.00 $23,121.00 $33,000.00 $33,000.00 $50,000.00 $50,000.00 $15,000.00 $15,000.00 $200,000.00 $200,000.00 0002 Clearing and Grubbing 1 JOB $10,080.00 $10,080.00 $30,000.00 $30,000.00 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $300,000.00 $300,000.00 0003 Stripping 1 JOB $36,848.00 $36,848.00 $85,000.00 $85,000.00 $50,000.00 $50,000.00 $75,000.00 $75,000.00 $150,000.00 $150,000.00 0004 Topsoil and Seed 1 JOB $51,604.00 $51,604.00 $150,000.00 $150,000.00 $250,000.00 $250,000.00 $125,000.00 $125,000.00 $100,000.00 $100,000.00 0005 48" Trash Guard and Pipe Ties 1 JOB $4,760.00 $4,760.00 $6,000.00 $6,000.00 $25,000.00 $25,000.00 $20,000.00 $20,000.00 $15,000.00 $15,000.00 North Tieback Ditch 0006 Adjust Sanitary Manhole at STA A1+88 1 JOB $2,500.00 $2,500.00 $18,000.00 $18,000.00 $500.00 $500.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 0007 Water Main Cleanout to STA A1+00 1 JOB $2,500.00 $2,500.00 $30,000.00 $30,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 0008 32nd Street Up and Over and Cul de Sac 1 JOB $41,445.00 $41,445.00 $90,000.00 $90,000.00 $100,000.00 $100,000.00 $150,000.00 $150,000.00 $140,000.00 $140,000.00 0009 Gate and Signs 1 JOB $6,457.00 $6,457.00 $8,000.00 $8,000.00 $10,000.00 $10,000.00 $12,000.00 $12,000.00 $5,500.00 $5,500.00 0010 Ditch Excavation 0010AA Ditch Excav. First 800 800 CY $10.85 $8,680.00 $20.00 $16,000.00 $50.00 $40,000.00 $20.00 $16,000.00 $15.00 $12,000.00 0010AB Ditch Excav. Over 800 537 CY $8.30 $4,457.10 $25.00 $13,425.00 $40.00 $21,480.00 $20.00 $10,740.00 $15.00 $8,055.00 0011 18" RCP 97 LF $140.00 $13,580.00 $250.00 $24,250.00 $150.00 $14,550.00 $200.00 $19,400.00 $150.00 $14,550.00 0012 15" RCP 79 LF $130.00 $10,270.00 $240.00 $18,960.00 $125.00 $9,875.00 $150.00 $11,850.00 $200.00 $15,800.00 0013 Riprap Gradation 1 0013AA Riprap First 700 700 TONS $70.00 $49,000.00 $150.00 $105,000.00 $150.00 $105,000.00 $225.00 $157,500.00 $90.00 $63,000.00 0013AB Riprap Over 700 235 TONS $66.00 $15,510.00 $175.00 $41,125.00 $100.00 $23,500.00 $225.00 $52,875.00 $90.00 $21,150.00 0014 Bedding Gradation 1 0014AA Bedding First 100 100 TONS $55.00 $5,500.00 $140.00 $14,000.00 $100.00 $10,000.00 $300.00 $30,000.00 $105.00 $10,500.00 0014AB Bedding Over 100 116 TONS $52.00 $6,032.00 $145.00 $16,820.00 $75.00 $8,700.00 $300.00 $34,800.00 $105.00 $12,180.00 0015 Geotextile 176 SY $6.50 $1,144.00 $4.00 $704.00 $10.00 $1,760.00 $20.00 $3,520.00 $5.00 $880.00 0016 48" Manholes 2 EA $18,662.00 $37,324.00 $8,500.00 $17,000.00 $10,000.00 $20,000.00 $10,000.00 $20,000.00 $7,500.00 $15,000.00 Hwy 20 North Ditch 0017 Plug Existing Ditch 1 JOB $7,146.00 $7,146.00 $2,500.00 $2,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 0018 Hwy 20 Frontage Road Restoration 1 JOB $11,762.00 $11,762.00 $18,500.00 $18,500.00 $50,000.00 $50,000.00 $22,000.00 $22,000.00 $20,000.00 $20,000.00 0019 Ditch Excavation 0019AA Ditch Excav. First 6000 6,000 CY $13.00 $78,000.00 $20.00 $120,000.00 $50.00 $300,000.00 $20.00 $120,000.00 $15.00 $90,000.00 0019AB Ditch Excav. Over 6000 1,715 CY $13.00 $22,295.00 $25.00 $42,875.00 $40.00 $68,600.00 $20.00 $34,300.00 $15.00 $25,725.00 0020 36" RCP 318 LF $389.00 $123,702.00 $950.00 $302,100.00 $500.00 $159,000.00 $300.00 $95,400.00 $400.00 $127,200.00 0021 36" SWSP 270 LF $854.00 $230,580.00 $500.00 $135,000.00 $1,000.00 $270,000.00 $700.00 $189,000.00 $700.00 $189,000.00 0022 Riprap Gradation 1 20 TONS $78.00 $1,560.00 $150.00 $3,000.00 $150.00 $3,000.00 $225.00 $4,500.00 $90.00 $1,800.00 0023 Bedding Gradation 1 9 TONS $78.00 $702.00 $175.00 $1,575.00 $100.00 $900.00 $300.00 $2,700.00 $105.00 $945.00 0024 Geotextile 800 SY $4.90 $3,920.00 $4.00 $3,200.00 $10.00 $8,000.00 $10.00 $8,000.00 $5.00 $4,000.00 Hwy 20 Storm Sewer Pump Station 0025 Pump Station Structure 1 JOB $115,376.00 $115,376.00 $142,616.00 $142,616.00 $425,000.00 $425,000.00 $300,000.00 $300,000.00 $230,000.00 $230,000.00 0026 Pump Station Mechanical 1 JOB $78,633.00 $78,633.00 $42,247.00 $42,247.00 $360,000.00 $360,000.00 $50,000.00 $50,000.00 $150,000.00 $150,000.00 0027 Pump Station Electrical 1 JOB $47,223.00 $47,223.00 $30,800.00 $30,800.00 $125,000.00 $125,000.00 $50,000.00 $50,000.00 $125,000.00 $125,000.00 0028 18" RCP 481 LF $146.50 $70,466.50 $650.00 $312,650.00 $125.00 $60,125.00 $225.00 $108,225.00 $150.00 $72,150.00 0029 24" SWSP 278 LF $648.00 $180,144.00 $850.00 $236,300.00 $1,000.00 $278,000.00 $625.00 $173,750.00 $550.00 $152,900.00 0030 8" HDPE Forcemain 260 LF $105.00 $27,300.00 $150.00 $39,000.00 $75.00 $19,500.00 $125.00 $32,500.00 $150.00 $39,000.00 0031 48" Manholes 5 EA $14,079.00 $70,395.00 $9,000.00 $45,000.00 $7,500.00 $37,500.00 $10,000.00 $50,000.00 $6,000.00 $30,000.00 0032 Random Fill 0032AA Random Fill First 100 100 CY $17.00 $1,700.00 $50.00 $5,000.00 $100.00 $10,000.00 $75.00 $7,500.00 $20.00 $2,000.00 0032AB Random Fill Over 100 50 CY $14.50 $725.00 $50.00 $2,500.00 $50.00 $2,500.00 $75.00 $3,750.00 $20.00 $1,000.00 0033 Pumps 2 EA $29,587.00 $59,174.00 $46,000.00 $92,000.00 $25,000.00 $50,000.00 $85,000.00 $170,000.00 $115,000.00 $230,000.00 0034 Ditch Excavation 53 CY $34.00 $1,802.00 $20.00 $1,060.00 $100.00 $5,300.00 $50.00 $2,650.00 $15.00 $795.00 Ditch and Culvert East Ditch Pump Station 0035 18" RCP 76 LF $165.00 $12,540.00 $2,660.00 $202,160.00 $200.00 $15,200.00 $225.00 $17,100.00 $250.00 $19,000.00 0036 Ditch Excavation 0036AA Ditch Excavation First 400 400 CY $13.00 $5,200.00 $20.00 $8,000.00 $50.00 $20,000.00 $30.00 $12,000.00 $15.00 $6,000.00 0036AB Ditch Excavation Over 400 96 CY $13.00 $1,248.00 $25.00 $2,400.00 $40.00 $3,840.00 $30.00 $2,880.00 $15.00 $1,440.00 0037 Riprap Gradation 1 3 TONS $100.00 $300.00 $150.00 $450.00 $250.00 $750.00 $400.00 $1,200.00 $90.00 $270.00 0038 Geotextile 8 SY $6.50 $52.00 $400.00 $3,200.00 $10.00 $80.00 $30.00 $240.00 $5.00 $40.00 79th Avenue North West Ditch 0039 Ditch Excavation 0039AA Ditch Excavation First 1000 1,000 CY $13.00 $13,000.00 $20.00 $20,000.00 $50.00 $50,000.00 $20.00 $20,000.00 $15.00 $15,000.00 0039AB Ditch Excavation Over 1000 462 CY $13.00 $6,006.00 $25.00 $11,550.00 $40.00 $18,480.00 $20.00 $9,240.00 $15.00 $6,930.00 0040 Riprap Gradation 1 70 TONS $76.50 $5,355.00 $150.00 $10,500.00 $150.00 $10,500.00 $150.00 $10,500.00 $90.00 $6,300.00 0041 Geotextile 150 SY $6.80 $1,020.00 $4.00 $600.00 $10.00 $1,500.00 $10.00 $1,500.00 $5.00 $750.00 79th Avenue North East Ditch 0042 Ditch Excavation 0042AA Ditch Excavation First 3000 3,000 CY $13.00 $39,000.00 $20.00 $60,000.00 $50.00 $150,000.00 $20.00 $60,000.00 $15.00 $45,000.00 0042AB Ditch Excavation Over 3000 1,377 CY $13.00 $17,901.00 $25.00 $34,425.00 $40.00 $55,080.00 $20.00 $27,540.00 $15.00 $20,655.00 Cattail Removal and Drainage Swale 0043 Grading 1 JOB $2,967.00 $2,967.00 $7,500.00 $7,500.00 $20,000.00 $20,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 0044 Ditch Excavation 0044AA Ditch Excavation First 700 700 CY $13.00 $9,100.00 $20.00 $14,000.00 $50.00 $35,000.00 $30.00 $21,000.00 $15.00 $10,500.00 0044AB Ditch Excavation Over 700 29 CY $13.00 $377.00 $25.00 $725.00 $40.00 $1,160.00 $30.00 $870.00 $15.00 $435.00 0045 Random Fill 10 CY $52.00 $520.00 $50.00 $500.00 $100.00 $1,000.00 $200.00 $2,000.00 $20.00 $200.00 0046 Riprap Gradation 1 23 TONS $91.00 $2,093.00 $150.00 $3,450.00 $150.00 $3,450.00 $250.00 $5,750.00 $90.00 $2,070.00 0047 Geotextile 37 SY $6.50 $240.50 $4.00 $148.00 $10.00 $370.00 $10.00 $370.00 $5.00 $185.00 Riprap at Lakewood Pump Station Outlet 0048 Random Fill 20 CY $33.80 $676.00 $50.00 $1,000.00 $100.00 $2,000.00 $200.00 $4,000.00 $20.00 $400.00 0049 Riprap Gradation 3 178 TONS $72.00 $12,816.00 $200.00 $35,600.00 $150.00 $26,700.00 $125.00 $22,250.00 $90.00 $16,020.00 0050 Bedding Gradation 3 96 TONS $70.00 $6,720.00 $200.00 $19,200.00 $100.00 $9,600.00 $125.00 $12,000.00 $105.00 $10,080.00 Swale at Cul de Sac 0051 Ditch Excavation 84 CY $30.00 $2,520.00 $20.00 $1,680.00 $150.00 $12,600.00 $50.00 $4,200.00 $15.00 $1,260.00
TOTAL BASE BID * $1,603,069.10 * $2,732,295.00 $3,470,100.00 $2,477,600.00 $2,787,665.00
$1,603,074.30 $2,675,727.00
*Bid amount is different than that read at bid opening due to a mathematical error on the bid document (total base bid amount)
I certify that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
Dawn Linder Contracting Officer
Wagner Construction, Inc.
Dba Wagner Place 3151 Hwy 53 International
Falls, MN 56649
Bid Opening: 13 April 2015 @ 2:00 p.m.
RTS Shearing, LLC PO Box 1177
Jamestown, ND 58402
Kovilic Construction Co, Inc.
PO Box 939 Franklin
Park, IL 60131
Solicitation W912ES-15-B-0003
La Forge and Budd Construction Co, Inc. 2020
N. 21st Street Parsons, KS 67357
| 2015-04-14T17:16:52-0500 | |
| LINDER.DAWN.M.1231191654 |