W81G6791353807

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment is to replace the Bid Schedule w ith a new Bid Schedule that eliminates all references to Options (See SF30 Block 14 Continuation Page for details).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-10-B-0003

X 9B. DATED (SEE ITEM 11)

12-Apr-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-May-2010

CODE

CONTRACTING DIVISION

USACE - ST. PAUL�

190 5TH STREET E

ST. PAUL MN 55101

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-10-B-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been modified:

BID SCHEDULE

ENVIRONMENTAL MANAGEMENT PROGRAM

MISSISSIPPI RIVER - POOL 8

VERNON COUNTY, WISCONSIN AND HOUSTON COUNTY, MINNESOTA

POOL 8 ISLANDS PHASE III STAGE 3B

Unit Item Description Quantity Unit Price Amount

ITEMS - CENTRAL ISLANDS C6 & C7 (CLINS 0001 - 0008)

0001 Mobilization and Demoblization 1 LS

0002 Island Construction – Granular Fill 0002AA First 42,000 Cubic Yards 42,000 CY 0002AB Over 42,000 Cubic Yards 10,632 CY

0003 Island Construction - Fine Fill 0003AA First 2,500 Cubic Yards 2,500 CY 0003AB Over 2,500 Cubic Yards 946 CY

0004 Rock Groins 544 TN

0005 Riprap End Protection 1,681 TN

0006 Turf - Seed Mix 1 3 AC

0007 Plantings - Willows 1 LS

0008 Wildlife Loafing Structures - Type 1 8 EA

ITEMS - CENTRAL ISLAND C8 (CLINS 1001 - 1010)

1001 Island Construction - Granular Fill 1001AA First 89,000 Cubic Yards 89,000 CY 1001AB Over 89,000 Cubic Yards 22,082 CY

1002 Island Construction - Fine Fill 1002AA First 9,800 Cubic Yards 9,800 CY 1002AB Over 9,800 Cubic Yards 2,941 CY

1003 Rock Vanes 1,882 TN

1004 Rock J-Hook Vanes 220 TN

W912ES-10-B-0003

1005 Riprap End Protection 3,354 TN

1006 Island C8 Rock Sill 15,751 TN

1007 Island C8 Rock Sill Chinking Stone 732 TN

1008 Turf - Seed Mix 1 9 AC

1009 Plantings - Willows 1 LS

1010 Wildlife Loafing Structures - Type 1 15 EA

TOTAL AMOUNT (CLINS 0001 - 0008 and 1001 - 1010)

(End of Summary of Changes)