CONTRACTING DIVISION

USACE - ST. PAUL�

190 5TH STREET E

ST. PAUL MN 55101

651-290-5425 651-290-5706

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

W912ES-09-R-0032 12-Aug-2009

b. TELEPHONE NUMBER

651-290-5614

8. OFFER DUE DATE/LOCAL TIME

12:00 PM 02 Sep 2009

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS:

TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

W912ES

SIZE STD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE B6R0PS3 16. ADMINISTERED BY

MAINTENANCE & REPAIR SECTION

JAMES M. MAYBACH

MAINTENANCE & REPAIR SECTION

431 NORTH SHORE DRIVE

PO BOX 397

FOUNTAIN CITY WI 54629-0397

TEL: 608-687-8526 EXT. 2 FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LISA A DRAVES

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

333120

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81G6791962921

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

1 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO OFFERORS

A. GENERAL

1. Point of Contact for this solicitation is:

Lisa A. Draves Purchasing Agent Email: lisa.a.draves@usace.army.mil Phone: 651-290-5614

Alternative Point of Contact for this solicitation is:

Tina A. Guillot Contracting Officer Email: tina.a.guillot@usace.army.mil

2. Offers must be received by 02 September 2009, 12:00 PM (CST).

3. Offers may be submitted electronically to Lisa A. Draves at lisa.a.draves@usace.army.mil, by fascimile to

(651) 290-5706, or mailed to the U.S. Army Corps of Engineers, St. Paul District, attn: Lisa Draves, Contracting Division, 190 5th Street, Suite 401, St. Paul, MN 55101-1638.

4. Offerors shall submit one copy of the proposal for evaluation. The offeror shall address all elements or topics required and detailed in the provision at 52.212-2, the Statement of Work, and Addendum 1. The offeror is advised that each proposal submitted must be complete, and shall be in the format required with information organized as specified. This is necessary to facilitate and expedite an effective review.

5. The cost proposal section of the solicitation (SF 1449) must be filled in and included with the proposal to reflect the offered price. Cost Proposal page(s) and must be separate or separable from the rest of the proposal, to allow technical review by Government technical representatives without influence of cost.

Cost information shall only be displayed on the cost proposal page and shall not be included anywhere else within the proposal. Optional items being offered shall be priced separately from the crane. Each proposal must be clear as to the services and features to be furnished without contingency. Optional items, if offered, shall be described in the proposal. Any offeror, however, may send in more than one complete proposal as a way to propose alternative crane models.

6. Each offer must include completed copies of the provisions at FAR 52.212-3 (Alt 1) and 52.225-18 or indicate if representations and certifications have been completed electronically via the Online Representations and Certifications Application (ORCA) website at http://orca.bpn.gov.

7. Each offer must include completed copies of the provisions at DFARS 252.212-7000, 252.225-7000, and

252.247-7022.

8. The contractor selected for this award must be registered with the Central Contractor Registration Database (CCR) prior to issuance of award. Registration can be accomplished at www.ccr.gov.

9. As a department in the United States of America federal government, the United States Army Corps of

Engineers is a taxed-exempt entity. Its tax exempt status ID is 62-1642142.

B. REQUIRED TECHNICAL PROPOSAL SUBMITTALS

The offeror shall insure that the Technical Proposal completely and adequately addresses all of the requirements listed below, and that each element or topic is addressed and presented in the same order as contained herein.

As a minimum, the information listed below shall be included in each proposal submitted. Additional data which would serve to clarify the proposal should also be submitted.

The offerors may submit with their proposals, in addition to these minimum requirements, any content or description of features that may demonstrate enhanced safety, improved performance and reliability of the features incorporated in the proposed crane.

Any other information deemed necessary by the Contracting Officer for a clear understanding of the proposal shall be furnished upon request.

Offerors that submit proposals that are not complete, may or may not be given the opportunity to submit any additional material, and may be considered non-responsive. Completeness of the proposals will be verified against the following element requirements:

1. Crane type and descriptions

The offeror shall include a general arrangement drawing, cab drawing, machinery space drawing and description of the crane being proposed that is adequate to show compliance with the requirements of clause C210 of the specification. A photograph or brochure page that provides the desired information is an acceptable alternative to the cab and machinery space drawings.

2. Crane principal requirements

The offeror shall provide information that allows a reviewer to determine whether the proposed crane complies with the following requirements:

• Crawler undercarriage equipped with tracks capable of transporting and turning the crane assembly.

• Undercarriage width, including shoes, shall not exceed 28 feet, and length shall not exceed 32 feet.

• Lattice type boom of 180 feet length.

• Boom tip extension of approximately five foot additional length.

• A complete boom hoist system including all elements necessary to raise and lower the boom.

• Boom hoist drum pawl.

• Main load hoist and an auxiliary hoist. Both hoists shall be capable of operating in a power up and a power down mode.

• Free fall capability on both load hoists drums.

• 100 US ton 3 sheave quick reeve duplex hook block on the main hoist line. Supplier must be identified.

• 20 US ton hook ball and swivel on the auxiliary line.

• Supply of wire rope on all drums. Length of rope on each drum shall be specified.

• Acknowledgment of the requirement that the wire rope shall be manufactured in the United States by a firm that is a member of the American Wire Rope Fabricator's Assoc.

• An enclosed cab with adequate glass area to be able to see a hook load above the elevation of the cab.

• Cab heating and air conditioning system as well as windshield wipers, defrosting and air circulation fans, safety glass windows, adjustable seat, fire extinguisher, hand and foot throttle, hand or foot travel controls, arm rest mounted controls, drum rotation indicators, a horn, and displays for vital system parameters and the load-moment system.

• A cab mounted monitor.

• A computer based load-moment sensing and limiting system.

• Anti two-block system on both the main hoist line and the auxiliary hoist line.

• Diesel engine and hydraulic pumps.

• Fuel tank and hydraulic tank.

• Anemometer

• Boom angle/radius reach indicator

• Emergency stop

• Auto lubrication system, if proposed

• The supply of all available counterweights.

• Supply of crane documentation in accordance with the Statement of Work, paragraph C220.

• Delivery of crane to Fountain City, WI.

• Assembly of crane at Fountain City

• Performance of testing

• Performance of optional load testing per EM 385-1-1, if proposed

• Performance of training

3. Crane Data The offeror shall provide the following information which will allow a reviewer to determine the relative merits of the proposed crane:

• Crane rated lifting capacity.

• Horsepower and rated speed of diesel engine

• A list of safety features included with the crane

• Name of manufacturer and model number of the proposed diesel engine

• A list of the items supplied with the cold weather starting aids package

• Whether a fuel level gauge is included and, if so, what type

• The pressure(s) at which the hydraulic system is rated

• The type of cooling provided for the hydraulic system

• Capacity of hydraulic tank(s)

• The number and type of hydraulic pumps used on the proposed crane

• The manufacturer(s) of the principal components of the load moment system

• The name and location of authorized providers of parts and service in Wisconsin, Minnesota, and Iowa

• The size of wire rope to be provided with boom hoist, main hoist, and auxiliary hoist

• The speed at which the boom can be raised

• The range of speeds at which hoist lines can be raised

• Total crane weight with counterweights, wire rope and blocks

• What walkways and ladders will be provided

• The number of points that require grease and the required frequency of greasing

• The number and frequency of periodic inspections that the crane manufacturer recommends be performed to insure safe, operable, crane condition.

• What points are covered by an autolub system, if quoted

• Whether a paint warranty per Paragraph C405 of the Statement of Work will be provided

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each

TAS::96 3135:: TAS ARRA: CRAWLER CRANE

FFP

ARRA: Lattice Boom Crawler Crane including delivery, assembly, testing, and instruction in accordance with the Scope of Work and Addendum E.

FOB: Destination

MILSTRIP: W81G6791962921

PURCHASE REQUEST NUMBER: W81G6791962921

NET AMT

0002 1 Lump Sum

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Crane Spare Parts: All parts and components recommended by the manufacturers of the crane's incorporated equipment items for 1000 hours of operation in accordance with the Scope of Work (C801).

FOB: Destination

0003 1 Each

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Auto-lubrication system for grease points in accordance with the Scope of Work (C635).

0004 1 Lump Sum

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Crane Spare Parts: Pumps in accordance with the Scope of Work (C801).

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Crane Spare Parts: Lights in accordance with the Scope of Work (C801).

0006 1 Lump Sum

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Crane Spare Parts: Filters in accordance with the Scope of Work (C801).

0007 1 Each

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Crane Spare Parts: Diesel Engine including one set of replacement injectors, one replacement water pump, and one replacement alternator in accordance with the Scope of Work (C801).

0008 1 Lump Sum

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Special Tools and Equipment: For each equipment type, make, and model that requires special tools for routine maintenance the Contractor shall provide one complete set of the manufacturer's special tools, maintenance tools, and special adjustment tools and monitoring equipment in accordance with the Scope of Work (C801).

0009 1 Lump Sum

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Crane Load Testing in accordance with Addendum 1 (E06).

0010 1 Each

TAS::96 3135:: TAS ARRA: OPTIONAL ITEM

FFP

ARRA: Paint warranty in accordance with Scope of Work (para. C405).

SCOPE OF WORK

INDEX

CLAUSE PAGE

C000 GENERAL

C001 MISSION STATEMENT

C003 STANDARDS

C100 SCIENTIFIC

C105 PRINCIPAL CHARACTERISTICS OF THE CRANE

C110 CRANE COUNTERWEIGHT

C115 CRANE DATA

C180 NOISE AND VIBRATION CONTROL & ABATEMENT

C200 PRODUCT DOCUMENTATION

C210 DOCUMENTATION TO BE SUPPLIED WITH PROPOSAL……………………..…………...…...14

C211 GENERAL ARRANGEMENT DRAWING……………………………………………………...….14

C212 CRANE CAB……………………………………..…………………………………………………

C213 MACHINERY SPACE……………………………………………………………………..…..…

C220 DOCUMENTATION TO BE SUPPLIED WITH CRANE……………………

C221 LOAD CHARTS…………………………………………………………….………….………..……14

C221 OPERATOR'S MANUALS…………………………………………….………….….………..…

C223 SERVICE MANUALS………………………………………………………….….…………….....…14

C224 PARTS MANUALS………………………………………………………….….….…………………14

C225 PARTS LISTS…………………………………………………………….…….….…………….…

C226 SPARE PARTS LIST……………………...………………………………………………………….14

C227 SAFETY MANUAL…………………………………………………….………………...………

C400 OUTFITTING

C402 CORROSION PREVENTION

C403 SURFACE PREPARATION

C405 PAINTING

C415 DOORS, WINDOWS, HATCHES & MANHOLES

C416 LOCKS AND KEYS

C437 CAB FURNITURE & FURNISHINGS

C600 MACHINERY

C601 GENERAL REQUIREMENTS

C625 DIESEL ENGINE

C626 ALTERNATOR

C630 FUEL OIL SYSTEM

C635 CRANE LUBRICATION

C640 COOLING SYSTEM(S)

C650 ENGINE EXHAUST SYSTEM

C685 HEATING AND VENTILATION

C700 ELECTRICAL

C730 LIGHTING

C800 SPARES

C801 SPARE PARTS AND TOOLS (OPTIONAL ITEM)

C900 DELIVERY, ASSEMBLY, TESTING, AND INSTRUCTION…………………...………..……….. 18

W912ES-09-R-0032

C000 GENERAL

The Army Corps of Engineers, St. Paul District, is issuing this Request For Proposals (RFP), to procure and contract all services (Construction, Testing, and Delivery) associated with the acquisition of a new crane to be used to provide dockside lifting services at its Fountain City Service Base in Fountain City, Wisconsin.

C001 MISSION STATEMENT

The St. Paul District plans to purchase a new lattice boom crawler crane to replace an existing Manitowoc 3900T crane that provides lifting services for materiel and vessels at its Service Base in Fountain City, WI. The crane shall be designed for use on land. It shall be the most current design in the model being proposed. The crane shall have “fail safe” provisions that automatically hold the loads in the event of a hydraulic failure or power loss. The crane shall be designed to meet OSHA requirements for personnel handling. The rated capacity of the crane shall be the maximum affordable within the budget available for the purchase. A capacity of 220 to 250 US tons is desired. The crane shall, to the maximum extent practical, be of a commercial off-the-shelf design. The source of funds is the American Recovery and Reinvestment Act (ARRA).

C003 STANDARDS

The crane shall be designed and fabricated in compliance with:

• ASME/ANSI B30.10 - Hooks.

• ASME/ANSI B30.19 - Cableways.

• National Electric Code (NEC).

• U. S. Army Corps of Engineers Safety and Health Requirements Manual, EM385-1-1.

• Fabrication of the crane must take place in a facility certified ISO 9000 or API.2C or higher.

C100 SCIENTIFIC

C105 PRINCIPAL CHARACTERISTICS OF THE CRANE

The crane must comply with the following requirements:

• CRANE MOUNT TYPE:

The crane shall be carried on a crawler undercarriage equipped with tracks capable of transporting and turning the crane assembly. Undercarriage width, including shoes, shall not exceed 28 feet, and length shall not exceed 32 feet.

• CRANE BOOM:

The crane shall be equipped with a lattice type boom. Boom length shall be 180 feet. A boom tip extension of approximately five feet additional length shall also be supplied to separate the whip line sheave(s) from the main hoist sheaves.

• CRANE BOOM HOIST SYSTEM:

The crane shall be equipped with a complete boom hoist system including all elements necessary to raise and lower the boom. This shall include, but not be limited to, a hoist, a live mast, sheaves, backstops, boom limit switch, and all necessary wire rope and pendants. The boom hoist drum shall be equipped with a pawl to prevent inadvertent drum pay-off motion.

• LOAD HOISTS

The crane shall be equipped with a main load hoist and an auxiliary hoist. Both hoists shall be capable of operating in a power up and a power down mode. Both load hoists shall be equipped with free fall capability.

• CRANE HOOK BLOCKS

The crane shall be equipped with a 100 US ton 3 sheave quick reeve duplex hook block on the main hoist line and a 20 US ton hook ball and swivel on the auxiliary line. The main hoist hook block shall be a Gunnebo-Johnson block, or equal. The supplier of the duplex hook block shall be identified in the offeror’s proposal. The buyer reserves the right of disapproval on the duplex block.

• WIRE ROPE

The crane shall be equipped with wire rope on all drums. Length of rope on the auxiliary hoist drum shall be at least 975 feet. Length of rope on the main hoist shall be adequate to safely achieve a main load hook elevation of 25 feet below ground elevation at the crane with the boom at its highest angle. The wire rope shall be manufactured in the United States by a firm that is a member of the American Wire Rope Fabricator's Assoc. A certificate from the rope manufacturer must be supplied with the crane attesting to the composition and location of manufacture of the rope.

• CRANE CAB

The crane shall be equipped with an enclosed cab. All cab seals shall be weathertight. Adequate glass area shall be provided to be able to see a hook load above the elevation of the cab. The cab shall be equipped with heating and air conditioning systems as well as windshield wipers, defrosting and air circulation fans, safety glass windows, adjustable seat, fire extinguisher, hand and foot throttle, hand or foot travel controls, arm rest mounted controls, drum rotation indicators, a horn, and displays for vital system parameters and the load-moment system. Vital system parameters to be displayed shall include, at a minimum, engine oil pressure, engine cooling system temperature, hydraulic oil temperature and electrical system voltage. A cab mounted monitor shall be provided that activates an alarm when engine oil pressure, engine oil temperature, hydraulic oil temperature, or hydraulic oil pressure is out of normal operating bounds. The monitor shall also indicate a need for service of filters.

• LOAD MOMENT INDICATOR

The crane shall be equipped with a computer based load-moment sensing and limiting system with full time display of load on the hook and load moment on a cab readout. The system shall be able to be programmed for various crane configurations through the readout and shall be switchable to read loads on the main hoist line or the auxiliary line at the operator’s choice. The system should have the capability to be programmed for at least four load curves.

• ANTI-TWO-BLOCK SYSTEM

The crane shall be equipped with mechanisms on both the main hoist line and the auxiliary hoist line that prevents the load block from coming in contact with a boom sheave. The system shall prevent the operator from being able to continue to hoist when a two-block condition is imminent.

• POWER PLANT

The crane shall be powered by a diesel engine of adequate power to handle all loads that can reasonably be expected to occur simultaneously in lifting operations. Power to the winch drums shall be delivered by hydraulic pumps.

• TANKS

A fuel tank of a size sufficient to allow 10 hours of operation at 75% power without consuming more than 80% of the tank capacity shall be supplied. Hydraulic tank(s) shall be provided in a size adequate to allow for supply and return of hydraulic fluid to all loads in all positions and adequate for separation of air from the fluid.

• OTHER FEATURES

The crane shall be equipped with an anemometer with a cab display of wind speed.

The crane shall be equipped with a boom angle / radius reach indicator.

The crane shall have a free swing mode in which swing drive and brake are decoupled.

The crane shall be equipped with an emergency stop.

• OPTIONAL EQUIPMENT

If an automatic lubrication system is available for any parts of the crane it should be quoted as an optional addition to the crane.

C110 CRANE COUNTERWEIGHTS

A full set of counterweights which allow the crane to operate at full rated capacity shall be supplied with and mounted to the crane during assembly.

C115 CRANE DATA

The following information is requested with the bidder’s proposal to enable evaluation of the product being offered:

• The rated lifting capacity of the crane

• A list of safety features included with the crane

• Horsepower and rated speed of diesel engine

• Name of manufacturer and model number of the proposed engine

• A list of the items supplied in the cold weather starting aids package

• Whether a fuel level gauge is included and, if so, what type

• The pressure(s) at which the hydraulic system is rated

• The type of cooling provided for the hydraulic system

• Capacity of hydraulic tank(s)

• The number and type of hydraulic pumps used on the proposed model

• The manufacturer(s) of the principal components of the load moment system

• The name and location of authorized providers of parts and service in Wisconsin, Minnesota, and Iowa

• The size of wire rope to be provided on the boom hoist, main hoist, and auxiliary hoist

• The speed at which the boom can be raised

• The range of speeds at which hoist lines can be raised

• Total crane weight with counterweights, wire rope and blocks

• What walkways and ladders will be provided

• The number of points that require grease and the required frequency of greasing

• What points are covered by an autolub system, if quoted

See also Notes to Offerors of this solicitation for instructions on proposal preparation and content.

C180 NOISE AND VIBRATION CONTROL & ABATEMENT

The design of the operator’s compartment shall incorporate the results of an effective integrated noise and vibration control and transmission abatement program. The noise level inside the crane cab shall not exceed 75 dbA. The noise pressure level shall be limited to 80 dbA at ground level, at a 50 ft radius around the crane, with the crane operating at full power.

C200 PRODUCT DOCUMENTATION

C210 DOCUMENTATION TO BE SUPPLIED WITH PROPOSAL

C211 GENERAL ARRANGEMENT DRAWING

A General Arrangement drawing of the crane shall be provided in the proposal, to include plan and profile views of the crane in an operating configuration. All principal dimensions shall be indicated.

C212 CRANE CAB DRAWING

A drawing or photograph representing the location of controls and instrumentation with respect to the operator's chair shall be provided.

C213 MACHINERY SPACE DRAWING

A drawing or photograph representing the arrangement of the machinery spaces of the crane shall be provided.

C220 DOCUMENTATION TO BE SUPPLIED WITH CRANE

The subparagraphs of this section list specific documentation that shall be supplied with the crane. The following information shall also be supplied, although it does not need to be in a separate document:

Hoist line reeving instructions Operational limits recommended by the manufacturer for windy or cold weather

C221 LOAD CHARTS

Three copies of the load chart for the delivered configuration of the crane shall be supplied with the crane.

C222 OPERATOR’S MANUALS

Three paper copies of the operator’s manual shall be supplied with the crane.

C223 SERVICE MANUALS

Three paper copies of the lubrication manual and three paper copies of the service manual shall be supplied with the crane. In addition, either a CD or DVD copy of the service manual for the crane shall be provided.

C224 PARTS MANUALS

Three paper copies of the parts manual shall be supplied with the crane. In addition, either a CD or DVD copy of the parts manual or access to an on-line parts database for the crane shall be provided.

C225 PARTS LIST

The crane manufacturer, (Contractor), shall provide a parts list. The parts list shall identify and describe all system equipment components, indicating the equipment manufacturer, the description and the designation (model, series etc).

C226 SPARE PARTS LIST

The Contractor shall provide a list of spare parts to include critical spare parts, start-up spare parts, and maintenance spare parts to enable the crane to operate for 1000 hours without lost time awaiting parts. The list of spare parts shall be developed with consideration given to the spare parts recommended by the equipment manufacturers, and shall include a complete priced parts list.

C227 SAFETY MANULAL

One copy of the vendor’s safety manual for the crane shall be supplied with the crane.

C400 OUTFITTING

C402 CORROSION PREVENTION

The choice of materials, the fabrication procedures and the coating systems to be used in the crane, shall evidence that careful consideration was given by the Contractor to improve corrosion resistance and life expectancy of the paint system.

As an example, the structure shall be designed and fabricated to avoid corrosion, by effectively:

• preventing the entrapment of water, avoiding pockets where water can accumulate and facilitating drainage.

• facilitating the application of paint coatings.

• insulating the contact surfaces between two dissimilar metals against galvanic corrosion.

C403 SURFACE PREPARATION

The paint systems shall be applied to surfaces clean of weld spatter, dirt, oil and grease.

Surface preparation shall be accomplished in accordance with Steel Structures Painting Council Standards, to meet or exceed the surface preparation requirements of the paint system manufacturer.

All heat affected areas, as well as any areas in which the paint has deteriorated, shall be cleaned of weld slag and spatter, and re-painted.

C405 PAINTING

Mandatory requirements The interior and exterior paint systems shall be heavy duty equipment paint, providing good chemical resistance, good abrasion resistance and good impact resistance.

The paint colors shall be the standard colors provided by the manufacturer for the model supplied. The last coat shall have a glossy finish with excellent resistance to chemical cleaning agents.

All paints shall be free of lead and chrome.

Prior to packaging for shipping, all interior and exterior painting shall be thoroughly inspected. Any defects in the coating shall be repaired by the Contractor, as necessary, to restore the integrity of the paint system.

The Contractor is responsible for delivering the crane with all painted surfaces in good condition.

Optional requirements The above requirements are mandatory. The requirements that are listed below are optional but will improve the technical rating of a proposal that states optional requirements will be met.

The paint system shall be recommended and certified by the paint manufacturer to have a life expectancy of at least

5 years.

The Contractor is required to provide the dry film thickness recommended by the paint manufacturer. The thickness applied per coat may not exceed the paint manufacturer's recommended maximum thickness.

The crane manufacturer shall provide a PAINT WARRANTY DECLARATION obtained from the paint manufacturer. The declaration shall be in the form of a document, signed by the paint manufacturer, clearly stating that the surface preparation, environmental conditions, coating application procedure, and thickness for each area meets the manufacturer's requirements for the coatings used, and that under normal service conditions, the coating system will maintain its integrity for a period of at least 5 years.

C415 DOORS, WINDOWS, HATCHES & MANHOLES

The crane cab door shall be weathertight with a large fixed window.

All crane cab windows shall be clear safety or tempered glass, and provide good visibility to the boom point and the hook at all times. Windshield wipers and defroster shall be installed on the cab front windows. The sides of the cab left and right of the operator shall each have a window.

C416 LOCKS AND KEYS

The exterior doors to the machinery space and to the cab shall be fitted with suitable locks.

Two keys and two blank keys shall be furnished for each door lock. The keys shall be equal so that the same key can open all doors.

C437 CAB FURNITURE & FURNISHINGS

One (1) padded chair for the cab operator shall be provided with height and inclination adjustments.

Suitable storage for the crane operation's manual, the crane log book, and the crane load rating charts, shall be provided in the cab, within reach of the operator when seated.

C600 MACHINERY

C601 GENERAL REQUIREMENTS

All fluid fill and overflow points shall be located in areas that are easily accessible.

C625 DIESEL ENGINE

The diesel engine shall be battery started from the cab. The diesel shall be a 4 stroke cycle, self contained unit, air cooled radiator, mounted to the foundation in the Machinery space. The engine shall be of a modern design and must meet Tier III emissions requirements. The engine shall be equipped with cold weather starting aids recommended for starting at -20 degrees F.

The engine shall be provided with positive shut off of the air intake to control runaway.

C626 ALTERNATOR

The crane shall be equipped with an engine driven alternator adequate to provide the power to handle all direct current electric loads on the crane.

C630 FUEL OIL SYSTEM

The fill connection for the fuel oil tank shall be easily accessible, and the filler cap shall be self-closing.

C635 CRANE LUBRICATION

All crane lubricating points shall be easily accessible from crane walkways or platforms without need to remove guards or other components. If available, an auto-lubrication system for grease points shall be quoted as an optional extra.

C640 COOLING SYSTEMS

The engine shall be radiator cooled with the engine fan directing the warm air to the outside of the machinery space.

The hydraulic fluid shall be radiator cooled with the warm air directed to the outside of the machinery space. It is preferred that the hydraulic fluid cooling is a separate system, without sharing any component with the engine cooling system.

C650 ENGINE EXHAUST SYSTEM

The engine exhaust system shall be provided with high attenuation, residential type spark-arresting muffler. The exhaust pipe and muffler shall be insulated and jacketed, and provided with a rain flap cover that closes automatically when not in use (i.e. counterweight).

The engine exhaust shall be located away from the crane operator's cab area, and bend to discharge in a direction opposite the cab.

C685 HEATING AND VENTILATION

Electric heat, air-conditioning and mechanical ventilation is required in the cab. The system shall be thermostatically controlled, and sized to maintain 68oF when in use, with the outside air temperature from 0 degrees F to 100 degrees F.

C700 ELECTRICAL

C730 LIGHTING

Interior lighting in the cab shall be provided which is suitable for operation at night, and shall include dimmer control.

Interior lighting of the machinery space shall be provided.

Lighting of crane walkways per the requirements of C003 is required.

C800 SPARES

C801 SPARE PARTS AND TOOLS (Optional item ) A price shall be provided for the supply, at the option of the Gov’t, of the following spare parts and tools with the crane:

A. CRANE SPARE PARTS

All parts and components recommended by the manufacturers of the crane’s incorporated equipment items for 1000 hours of operation.

In addition, the following shall be provided:

1. PUMPS

For each pump group of the same type and capacity, provide one pump assembly.

2. LIGHTS

Provide two replacement bulbs for each light fixture.

3. FILTERS

For each type and size of filter element or cartridge, provide 10 elements or 1 case whichever is greater.

4. DIESEL ENGINE

one set of replacement injectors one replacement water pump one replacement alternator

B. SPECIAL TOOLS AND EQUIPMENT

For each equipment type, make, and model that requires special tools for routine maintenance the Contractor shall provide one complete set of the manufacturer’s special tools, maintenance tools, and special adjustment tools and monitoring equipment.

C900 DELIVERY, ASSEMBLY, TESTING, AND INSTRUCTION

The crane shall be delivered to 431 North Shore Drive, Fountain City, Wisconsin. The cost of delivery shall be included in the price of the crane. Assistance with unloading crane parts will be provided by the Government at no charge if requested by the contractor. Assistance is available in the form of crane and forklift services.

The crane shall be completely assembled by the contractor.

Crane testing shall be performed in accordance with Addendum 1, Inspection and Acceptance, of this solicitation.

Instruction of up to 5 Government operators shall be provided by the contractor. Assume that the operators are certified crane operators. Instruction shall include discussion of the following topics:

Crane features and controls Safe operation of the crane

Proper operator response to crane emergencies

Recommended pre-start and periodic checks Review of crane load charts

LMI programming instructions Monitor information and interrogation

Instruction shall consist of both classroom training and hands-on training. Classroom facilities will be provided on-site by the Government.

ADDENDUM 1

In accordance with FAR 12.302(d), Inspection and Acceptance, as listed in FAR 52.212-4(a) is tailored as follows:

ADDENDUM 1

INSPECTION AND ACCEPTANCE

INDEX

CLAUSE PAGE

E01 INSPECTION………………………………………………………………………………….21

E02 NOT USED…………………………………………………………………………….……….21

E03 ASSEMBLY INSPECTIONS…………………...…………………………………………….21

E04 NOT USED………………………………………………………………………………….….21

E05 FIELD ASSEMBLY AND TESTING…………………………………………………………21

A. ASSEMBLY………………………………………………………………………………...21

B. TESTING…………………………………………………………………………………...22

CRANE CAB WEATHERTIGHTNESS………………………………………..……22

PRINCIPAL DIMENSIONS………………………………………………….……...22

HEATING, VENTILATION, & AIR CONDITIONING…………………….………22

ELECTRICAL SYSTEMS………………………………………………….………..22

DIESEL ENGINE………………………………………………………………….…22

ANTI TWO-BLOCK SYSTEM…………………………………………….……..…23

INSTRUMENTS AND ALARMS…………………………………………….……..23

CRANE TESTS AND MANEUVERS…………………………………………….…23

UNLOADED OPERATION………………………………..………………23

RIGGING RADIUS……………………………………………..………….23

MAIN HOIST PROOF TEST………………………………….…….……..24

BOOMING MANEUVER……………………………………….…........…24

AUXILIARY HOIST PROOF TEST…………………………..…………...24

CRANE LOAD TESTING (OPTIONAL ITEM)……………..…………….24

E06 LOAD TESTING PER CORPS SAFETY MANUAL (OPTIONAL ITEM………………25

E07 FINAL INSPECTION……………………………………………………..………………

E08 FINAL ACCEPTANCE……………………………………………………………………….25

E09 COMMERCIAL WARRANTY OF SUPPLIES…………………………………………….25

E01 INSPECTION

The contract will be managed by a Contracting Officer in the St. Paul District, U.S. Army Corps of Engineers (USACE), and is subject to inspections by its appointed representatives to insure strict compliance with the terms of the contract. No Government representative, except the Contracting Officer, is authorized to change any provision of the specifications or contract, nor shall the presence or absence of an inspector relieve the contractor from any requirements of the contract.

After contract award, the services subject to inspection to be provided by the crane contractor shall be structured in two phases as follows:

Phase I - Construction inspections Phase II - Assembly, Testing, and Final Acceptance

During all phases of this Contract, including testing, the Contractor is authorized to use sub-Contractors performing under his direction and supervision; however, the Contractor shall assume full responsibility for their work.

The Contractor shall provide all labor, services, tools, materials, equipment, fuels, fluids, lubricants, and testing media, and perform tests on all equipment, machinery, and systems to verify that they are performing in accordance with the Scope of Work.

E02 NOT USED

E03 ASSEMBLY INSPECTIONS

During Phase I the contractor shall perform all usual and customary inspections of material, processes, and products that are part of their existing quality control and quality assurance programs. Vendor and manufacturing inspections and tests shall be designed to insure proper construction, performance and/or installation of equipment, piping and electrical systems, tanks, and exterior and interior fabrication of the crane. The contractor shall review the mandatory requirements of the Scope of Work, Paragraphs C402, C403, and C405 for quality assurance requirements for corrosion prevention, surface preparation, and painting, and determine whether these requirements are met by the contractor’s current controls. If current controls do not meet the optional requirements of Paragraph C405, and the contractor chooses to commit to the optional requirements, the contractor shall implement new controls and procedures as necessary to meet the requirements associated with this procurement.

E04 NOT USED

E05 FIELD ASSEMBLY AND TESTING

Field assembly and testing shall be performed at the Corps’ Fountain City, Wisconsin, yard.

A. Assembly

The contractor shall maintain oversight of the assembly of the crane at the Government yard and assure that all processes and completed operations meet the crane manufacturer’s standards. The Contracting Officer’s Representative (COR) shall have the right to review the contractor’s controls on assembly processes and procedures at any time.

B. Testing

The following tests shall be performed by the contractor on the completed crane assembly:

Crane Cab Weather tightness:

Test the doors and windows, any exterior gaskets or seals, and all hose or pipe penetrations into the cab using a water hose directed downward or horizontally (not upwardly). Water shall not be able to pass to the interior of the crane. Should any seal prove defective, the crane Contractor shall replace the seal with another one that will pass the test.

Principal Dimensions - Verification:

The contractor shall verify that the crane does comply with the following principal characteristics:

• CRANE WIDTH – the width shall not exceed 28 feet. Verify crane width.

• CRANE LENGTH - the length of the undercarriage at the point that it meets the ground shall not exceed

32 feet. Verify crane length.

• BOOM LENGTH - from the heel pins to the main hoist sheave the boom length should be 180 feet, +/- 2 feet. Verify boom length.

• BOOM TIP EXTENSION – the length of the extension from the main hoist sheave to the extension sheave should be 5 feet, +/- 1 foot. Verify tip extension length.

Heat Ventilation and Air Conditioning - HVAC:

Demonstrate the proper functioning of the heating, ventilation and air conditioning systems in the crane cab.

Electrical System:

In order to demonstrate the operation of the electrical system as an integrated system use the power provided by the engine mounted alternator, in combination with starting batteries, to demonstrate powered and unpowered conditions under load at the following points:

• All circuit breakers in the main switchboard.

• Instruments, including engine and hydraulic system parameter displays, monitors, anemometer, LMI, and anti two-block system.

• All electrical controls in the cab.

• All interior and exterior lights and lighting switches.

• Emergency lights, if any.

• Charging voltage at starting batteries

Crane Diesel Engine:

Confirm the proper operation of the diesel engine as follows:

• Demonstrate cold starting, stability of engine speed at rated idle and maximum load speeds, sudden loading and unloading, and emergency push button stopping. All engine controls, alarms, and instrumentation, will be demonstrated from the local panel in the machinery space, and also in the crane cab.

Anti Two-Block System:

The Contractor shall demonstrate, in an operating mode, the ability of the anti two-block systems to prevent the main hoist and auxiliary hoist drums from continuing to rotate when an imminent two-block condition is present on each line.

Instruments and Alarms

The Contractor shall demonstrate that all instruments and alarms are operating properly.

Crane Tests and Maneuvers

As a minimum, the following Crane Tests and Maneuvers must be performed:

• Unloaded Operation

• Rigging Radius Maneuver

• Main Hoist Proof Load Test

• Booming Maneuver

• Auxiliary Hoist Proof Load Test

Unloaded Operation:

Demonstrate the operation of the crane raising the boom from a boom rest. Raise and lower the boom, and verify the full limits of boom travel with no load on the hook.

Rotate the crane and hoist and lower the load blocks.

Verify that the free swing mode works.

Verify that the crane operates on its own power, and the slewing, booming and hoisting drives operate independently. Verify that the crane is capable to slew, boom and hoist at the same time.

Verify that both main and auxiliary drums can be lowered in a free-fall mode.

Demonstrate all safety devices (i.e. anti two-block and boom kick-out).

Verify sufficient main hoist spooling to 25 feet below ground elevation with the boom point at the highest elevation.

Five (5) wraps of wire rope shall remain in the drums.

Rigging Radius:

This is the verification of proper calibration of the radius indicator, which shall be conducted with the boom on centerline forward, and the crane on level ground. Marks shall be made on the ground at 50 feet, 75 feet and 100 feet from the crane’s center of rotation.

The crane operator shall boom out or in until the radius indicator in the cab reads the radius marked on the ground with the main load block freely suspended near the ground.

The radius indicator shall be adjusted to the mark on the ground if required.

Main Hoist Proof Load Test:

Verify that the main hoist has a duplex hook block rated at 100 US tons working load.

The main hoist proof load test shall be a fair weather demonstration of adequate crane strength.

Test the crane main hoist to a proof load 10% in excess of the SWL (Safe Working Load) at 65' radius reach.

Measure the main hoist speed with the load suspended.

Demonstrate power down capability.

Raise and lower the test load, and smoothly stop and start hoist movement at least two times to demonstrate satisfactory operation of the hoisting system.

Booming Maneuver:

With the proof load on centerline, the operator shall boom in to the maximum permissible boom angle, (minimum radius).

During this maneuver, the operator shall smoothly stop and hold the load at least two times.

Auxiliary Hoist Proof Load Test:

Verify that the auxiliary hoist has a standard swivel hook with 20 US tons working load capacity.

Test the crane auxiliary hoist to a proof load 25% in excess of the SWL at all radiuses.

Measure and record the auxiliary hoist speed with the proof load suspended.

Demonstrate power down capability.

Raise and lower the test load, and smoothly stop and start hoist movement at least two times to demonstrate satisfactory operation of the hoisting system.

NOTE: LOADS FOR TESTS CONDUCTED IN ACCORDANCE WITH SECTION E05 SHALL BE

CALIBRATED TO THE SATISFACTION OF THE CRANE CONTRACTOR AND THE GOVERNMENT

REPRESENTATIVE, AND WILL BE PROVIDED BY THE GOVERNMENT.

When all work and testing has been satisfactorily completed the Contractor and the Government Representative(s) shall make a complete physical inspection and inventory of the crane, against all Contract requirements.

A "punch list" of deficiencies (if any), will be developed and presented to the Contractor for corrective action.

E06 LOAD TESTING PER CORPS SAFETY MANUAL (OPTIONAL ITEM)

Corps of Engineers regulations require that a crane be load tested before being put in service. The requirements are defined in Section 16F of the U. S. Army Corps of Engineers Safety and Health Manual, Publication EM 385-1-1.

An electronic copy of the publication can be found at http://www.usace.army.mil/CESO/Pages/EM385-1- 1,2008NEW!.aspx. The requirement may be more restrictive than commercial practice for new crane setups. For example, more tests are required by Section 16F than by Paragraph E05 above, and a written test report is required by Section 16F, but not by E05. Contractors have the option of bidding or not bidding on performance of load testing per 385-1-1 without prejudice to their evaluation of responsiveness to the solicitation. If load testing is proposed under this paragraph it shall be performed in accordance with the requirements of Section 16F of the U. S.

Army Corps of Engineers Safety and Health Manual, Publication EM 385-1-1. Supply of calibrated weights shall be the responsibility of the contractor if load testing per EM 385-1-1 is performed by the contractor. Load testing performed by the contractor under this paragraph will eliminate the need to perform main hoist and auxiliary proof load tests that would otherwise be performed under paragraph E05 above.

E07 FINAL INSPECTION

All corrective action necessary to eliminate the "punch list" shall be completed by the Contractor.

Prior to any re-inspection, the crane and all its equipment shall be thoroughly cleaned and all painting and finishes put in first class condition, as specified by the Scope of Work (para. C405) of this Solicitation. Final inspection shall consist of verifying correction of “punch list” items, if any; review of the optional signed paint warranty for compliance with the Scope of Work, Paragraph C405, if supplied; review of crane documentation for compliance with the Scope of Work, Paragraphs C221 through C227; review of wire rope certification for compliance with the Scope of Work, Paragraph C105; review of load test report per EM 385-1-1 if required by the contract; and conducting an inventory of supplied spare parts and tools, if any, required by the contract.

E08 FINAL ACCEPTANCE

Final Acceptance will be made upon delivery of the Crane "Ready for Service".

"Ready for Service" is defined as clean inside and out; all trash, dunnage, lashings, and delivery related material disposed of; loose items of outfit in place; all electrical and mechanical systems operational; equipment properly adjusted; instruments and electronics calibrated or aligned, hydraulic and coolant tanks filled, and paint damaged during transportation touched up.

E09 COMMERCIAL WARRANTY OF SUPPLIES

The Contractor shall assign, in writing, all commercial warranties for equipment provided under this Contract to the Government.

THE EFFECTIVE DATE OF ALL COMMERCIAL WARRANTIES SHALL BE THE DATE OF FINAL

ACCEPTANCE.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government 0010 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 28-MAY-2010 1 MAINTENANCE & REPAIR SECTION

JAMES M. MAYBACH

MAINTENANCE & REPAIR SECTION

431 NORTH SHORE DRIVE

PO BOX 397

FOUNTAIN CITY WI 54629-0397

608-687-8526 EXT. 2

B6R0PS3

0002 28-MAY-2020 1 (SAME AS PREVIOUS LOCATION)

0003 28-MAY-2010 1 (SAME AS PREVIOUS LOCATION)

0004 28-MAY-2010 1 (SAME AS PREVIOUS LOCATION)

0005 28-MAY-2010 (SAME AS PREVIOUS LOCATION)

0006 28-MAY-2010 1 (SAME AS PREVIOUS LOCATION)

0007 28-MAY-2010 1 (SAME AS PREVIOUS LOCATION)

0008 28-MAY-2010 1 (SAME AS PREVIOUS LOCATION)

0009 28-MAY-2009 1 (SAME AS PREVIOUS LOCATION)

0010 28-MAY-2009 1 (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY FULL TEXT

52.202-1 DEFINITIONS (JUL 2004)

(a) When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR 2.101 in effect at the time the solicitation was issued, unless--

(1) The solicitation, or amended solicitation, provides a different definition;

(2) The contracting parties agree to a different definition;

(3) The part, subpart, or section of the FAR where the provision or clause is prescribed provides a different meaning; or

(4) The word or term is defined in FAR Part 31, for use in the cost principles and procedures.

(b) The FAR Index is a guide to words and terms the FAR defines and shows where each definition is located. The FAR Index is available via the Internet at http://www.acqnet.gov at the end of the FAR, after the FAR Appendix.

(End of clause)

52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (SEP 2007)

(a) Definitions. As used in this provision--``Lobbying contact'' has the meaning provided at 2 U.S.C. 1602(8).