09-B-0007 Ashtabula.pdf

PDF 62 KB Posted

Attached to
RECOVERY--Z--RECOVERYLake Ashtabula Asphalt Road Project.
Solicitation number
W912ES09B0007
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
Amedment2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6791567646

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

The purpose of this amendment is to add the w age rates, reference General Decision Number ND080015 02/20/2009 ND15.

The date has been changed for receipt of offer from 2:00PM Thursday, September 17, 2009, to 2:00PM Thursday September 24, 2009.

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-09-B-0007

X 9B. DATED (SEE ITEM 11)

05-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Sep-2009

CODE

CONTRACTING DIVISION

USACE - ST. PAUL�

190 5TH STREET E

ST. PAUL MN 55101

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-09-B-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 11-Sep-2009 02:00 PM to 24-Sep-2009 02:00 PM.

The following have been added by full text:

WAGE RATES

General Decision Number: ND080015 02/20/2009 ND15

Superseded General Decision Number: ND20070015

State: North Dakota

Construction Type: Heavy

Counties: Adams, Barnes, Benson, Billings, Bottineau, Bowman, Burke, Cavalier, Dickey, Divide, Dunn, Eddy, Emmons, Foster, Golden Valley, Grant, Griggs, Hettinger, Kidder, La Moure, Logan, McHenry, McIntosh, McKenzie, McLean, Mercer, Mountrail, Nelson, Oliver, Pembina, Pierce, Ramsey, Ransom, Renville, Richland, Rolette, Sargent, Sheridan, Sioux, Slope, Stark, Steele, Stutsman, Towner, Traill, Walsh, Ward, Wells and Williams Counties in North Dakota.

HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line Construction & Drainage Projects and Excluding Industrial and Processing Plants and Refineries)

Modification Number Publication Date 0 02/08/2008 1 05/02/2008 2 05/09/2008 3 10/31/2008 4 02/20/2009

ELEC0714-009 10/01/2007

Rates Fringes

ELECTRICIAN

Cable Splicer...............$ 28.76 4.75+28% Groundman...................$ 17.26 4.75+28% Line Equipment Operator.....$ 25.88 4.75+28% Lineman.....................$ 28.76 4.75+28%

ELEC1426-012 06/01/2007

BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRIGGS, KIDDER,

LAMOURE, LOGAN, MCINTOSH, NELSON, PEMBINA, RAMSEY, RANSOM,

RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER, TRAILL, WALSH, &

WELLS COUNTIES:

Rates Fringes

ELECTRICIAN

CABLE SPLICER...............$ 23.90 7.46+12%

ELECTRICIAN.................$ 22.76 7.46+12%

ENGI0049-037 10/01/2008

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 21.50 11.85

GROUP 2.....................$ 20.60 11.85

GROUP 3.....................$ 20.35 11.85

GROUP 4.....................$ 20.20 11.85

GROUP 5.....................$ 19.35 11.85

POWER EQUIPMENT OPERATORS CLASSIFICATIONS:

GROUP 1: All Terrain Vehicle Cranes 80 tons and over, Hydro, Cranes, 80 Tons and over, Crane Operator with 135' boom and Over, Gantry Crane Operator, & Traveling Tower Crane.

GROUP 2: All Terrain Vehicle Cranes over 20 tons and up to 80 tons, Hydro Cranes 20 tons up to 80 tons, Creter Crane, & Crane Operator up to 135' Boom.

GROUP 3: All Terrain Vehicle Cranes thru 20 tons, Hydro Cranes thru 20 tons, Tractor with boom attachment.

GROUP 4: Push Tractor Roller

GROUP 5: Tractor pulling Compaction or Areating Equipment

SUND2000-007 05/04/2000

Rates Fringes

CARPENTER

CARPENTER (Including Form building & Concrete Forms).$ 13.98

Concrete Finisher/Cement Mason...$ 14.37 3.67

Ironworker

REINFORCING.................$ 17.03

Laborers:

Common......................$ 9.96 Pipelayers..................$ 10.48

PAINTER (Brush and Spray)........$ 18.14

Power equipment operators:

Backhoes....................$ 14.00 3.74 Bobcat......................$ 12.82 2.35 Bulldozer...................$ 14.06 4.00 Excavator...................$ 12.05 Front End Loader............$ 13.15 3.17 Mechanic....................$ 15.16 5.31 Motor Grader................$ 14.74 4.51 Scraper.....................$ 13.85 4.25 Self Propelled Packer.......$ 11.55 4.25 Sheepsfoot..................$ 12.57 3.23 Skidster....................$ 11.06 2.05

TRUCK DRIVER

Dump........................$ 11.39 3.60 Semi........................$ 11.52 .23 Tandem......................$ 11.14 1.63

* TEAM0638-001 11/01/2008

Rates Fringes

TRUCK DRIVER

Euclid Driver-Over 20 yards.$ 21.22 9.20 Single Axle Trucks..........$ 20.02 9.20 Tandem Tri/Axle Semi, Low Boy and Off Road Heavy Duty End Dumps-20 yards and under...................$ 20.45 9.20 Tandem TRi/Axle Truck.......$ 20.14 9.20

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .