Enclosure 3 -Cost breakdown Sheet.pdf

PDF 263 KB Posted

Attached to
AMD 0002 Air Mobility Command Freight Terminal Repairs Cairo East Air Force Base Cairo, Egypt
Solicitation number
W912ER22R0031
Issued by

About this file

This cost breakdown sheet and solicitation are for repairs to an air freight terminal at Cairo East Air Base in Egypt. The cost breakdown sheet includes line items for mobilization, selective removal work, and repair work for various areas of the terminal including passenger lounges, fitness rooms, wash rooms, bathrooms, corridors, the main bay, and operation and change rooms. The solicitation from the U.S. Army Corps of Engineers seeks a lowest price technically acceptable contractor to complete the repair work on a firm fixed price basis with award being made without discussions. Site visits will not be conducted and offerors should visit the listed website for additional details on the procurement.

View the file

Other files

File Type Posted
RFP W912ER22R0031.pdf PDF
Enclosure 1 - AMC Freight Terminal SOW Drawings.pdf PDF
Enclosure 2 -Bid Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP:

PROJECT: P2 -- 494001 PROPOSER:

LOCATION:

TBD

AMC Freight Terminal Repairs

Cairo East Air Base, Egypt DATE:

ITEM DESCRIPTION DIRECT LABOR

COST

DIRECT

EQUIPMENT COST

DIRECT

MATERIALS COST

DIRECT SUB

CONTRACTOR

COST

TOTAL

DIRECT

COST

JOB OFFICE

OVERHEAD (JOOH)

HOME OFFICE

OVERHEAD

(HOOH)

BOND

TOTAL

OVERHEAD/

INDIRECT COST

PROFIT TOTAL PROPOSED

COST

0001 Mobilization and Demobilization in accordance with contract documents

0001AA Mobilization and Demobilization

Selective Building Material/ Equipment Removal Work in accordance with contract documents

0002AA Demolition

0003 Repair Work in accordance with contract documents

0003AA Passenger Lounge Room

0003AB Fitness Room

0003AC Wash Room

0003AD Men's and Women's bathrooms

0003AE Corridor

0003AF Main Bay

0003AG Chief's Office

0003AH Operation Room

0003AJ Change Room

TOTAL CONTRACT COST (CLIN 0001 - 0003)

COST BREAKDOWN

BASE CONTRACT

Total Price (Items 0003AA-0003AJ)

EXHIBIT 1 Page 2 of 2

Enclosure 3 - Cost Breakdown Worksheet

Proposal Schedule
Cost Breakdown Sheet