W912ER20R0016 KNB Marine Construction and Repair Capability Statement_FINAL.docx

DOCX document 57 KB Posted

Attached to
KNB Marine Construction and Repair
Solicitation number
W912ER20R0016
Issued by

About this file

This document provides details for a federal construction contract opportunity at Kuwait Naval Base in Kuwait. The U.S. Army Corps of Engineers seeks a design-build contractor to upgrade and repair the ship lift and rail transfer yard, including replacement of decking, rails, and utility infrastructure, with a project magnitude between $10-25 million. Interested contractors are required to submit capability statements by February 13th addressing experience with marine, railway, or ship transfer projects over $10 million as a prime contractor. The contract will be awarded on a best-value basis evaluating technical approach, past performance, financial surety, and price. The work must be performed in Kuwait from April 2020 to July 2022. Responses to the pre-solicitation notice are for information only.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912ER20R0016 Marine Construction and Repair Kuwait Naval Base, Kuwait Capability Statement

SECTION 1. GENERAL

1. Business Name: (Insert Business Name)

2. Business Address: (Insert Business Address)

3. Cage Code: (Insert Cage Code)

4. NAICS Codes: (Insert all applicable NAICS Codes)

5. Responsible Point of Contact:

Name:(Insert Name)
Telephone:(Insert Telephone Number) Email:(Insert Email Address)

6. Check All That Apply: Our firm is: Small business 8(a) small business Veteran-owned small business Service-disabled veteran-owned small business HUBZone small business Small disadvantaged business Women-owned small business concern. None of the above.

SECTION 2. CONTRACTOR ARRANGEMENT

1. Our firm will be proposing on this project as a: Sole contractor Prime contractor performing at least 50% of the work with subcontractor(s) Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted) Joint venture with (Insert business name, business size, and cage code).

(See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a) Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b). )

SECTION 3. CAPABILITY

1. If awarded a contract, the maximum capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds for any single contract is (Insert maximum capacity, in dollars, per task/delivery order annually).

2. Our firm has performed work in Kuwait:

Yes No

3. Our firm has the necessary documents/permits/certifications required to perform work in Kuwait:

Yes No

4. Our firm has constructed the following types/projects:

Check All That Apply
Construction Project
·
Design and construction of various construction, repairs, or upgrades to ship transfer or storage facilities
·
Design and construction of various construction, repairs, and or upgrades to rail-based transfer or storage yards
·
Design and construction of facilities on active military installations
·
Design and construction of maritime port facilities
·
construction of various construction, repairs, or upgrades to ship transfer or storage facilities
·
construction of various construction, repairs, and or upgrades to rail-based transfer or storage yards
·
construction of facilities on active military installations
·
construction of maritime port facilities

5. If awarded a contract, our firm is/ is not capable to perform at least 15% of the cost of the construction and related services.

6. Based on your previous experience, identify the percent work effort you would expect to subcontract.____%

7. Our firm is performing, or has successfully performed construction of facilities and associated services for the following US or Foreign military commands/facilities/projects: Provide name of project location, type of work performed, role of firm (prime, sub, team member), dollar value of work performed by your firm, percentage of total contract value performed by your firm, and date work was performed. Include no more than two single- spaced, 10 font, 8 1/2" x 11" pages containing this information.

8. Our firm is/ is not experienced in obtaining Defense Base Act (DBA) insurance for our personnel.

SECTION 4. RETURN INSTRUCTIONS

After you have completed all sections of the capability statement, please return the form to Shanda Weekes, Contract Specialist via email at Shanda.Weekes@usace.army.mil. Your response needs to be received no later than 1600hrs Eastern Time on 13 February 2020. Information presented is for market research purposes only.