Capability Statement for CMY and PDPF, State of Qatar.docx
DOCX document 32 KB Posted
- Attached to
- Cargo Marshalling Yard and Personnel Deployment Processing Facility Consolidation Project Federal contract opportunity
- Solicitation number
- W912ER20R0010
About this file
This document is a sources sought notice for two military construction projects at Al Udeid Air Base in Qatar. The U.S. Army Corps of Engineers is considering consolidating a Cargo Marshalling Yard project and a Personnel Deployment Processing Facility project into a single solicitation and contract. The Cargo Marshalling Yard project includes an air freight terminal, air mobility control center, and cargo marshalling yard. The Personnel Deployment Processing Facility will be a one-story airside and two-story landside terminal. Interested firms should complete a capability statement and project experience template providing up to three similar construction project examples by December 27, 2019. The response is to determine market interest and firm capabilities. The notice does not restrict the government's acquisition approach. NAICS code 236220 for Commercial and Institutional Building Construction applies. The consolidated contract value is estimated between $25-100 million with a 720-day period of performance.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 1. GENERAL
1. Business Name: (Insert Business Name)
2. Business Address: (Insert Business Address)
3. Cage Code: (Insert Cage Code)
4. NAICS Codes: (Insert all applicable NAICS Codes)
5. Responsible Point of Contact:
| Name: | (Insert Name) | |
| Telephone: | (Insert Telephone Number) | |
| Email: | (Insert Email Address) |
6. Check All That Apply: Our firm is:
|_| Small business |_| 8(a) small business |_| Veteran-owned small business |_| Service-disabled veteran-owned small business |_| HUBZone small business |_| Small disadvantaged business |_| Women-owned small business concern.
|_| None of the above.
SECTION 2. CONTRACTOR ARRANGEMENT
1. Our firm will be proposing on this project as a:
|_| Sole contractor |_| Prime contractor performing at least 50% of the work with subcontractor(s) |_| Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted) |_| Joint venture with (Insert business name, business size, and cage code).
[See Federal Acquisition Regulation (FAR) subpart 9.6 for government policy on teaming arrangements, as well as 8(a) Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b).]
SECTION 3. CAPABILITY
1. If awarded a contract, the maximum bonding capacity our firm can adequately provide a surety in the form of a:
| Bank Letter of Guaranty (BLG) | |_| Yes | |_| Capable | |_| No | |
| Defense Base Act (DBA) Insurance | |_| Yes | |_| Capable | |_| No |
Synchronized Predeployment and Operation Tracker |_| Yes |_| Capable |_| No
BONDING CAPACITY
Type:
| Amount per contract: |
| $ |
| $ |
| Aggregate amount: |
| $ |
| $ |
2. If solicited, our firm is capable of providing Bid Guarantee in accordance with FAR provision 52.228-1.
|_| Yes |_| Capable |_| No
3. Our firm has necessary State of Qatar business license and ability to obtain the necessary badging at Al Udeid Air Base, in the State of Qatar.
| |_| Yes | |_| Capable | |_| No |
| |_| Yes | |_| Capable | |_| No |
4. Our firm is capable of handling numerous construction contracts simultaneously at |_|1, |_|2-5, |_|6-10, |_|11-15, |_|16-20, geographically diverse locations.
5. Our firm has performed work in the following locations:
|_| QATAR |_| CENTCOM AOR
6. Our firm has constructed the following facility types/projects:
Check All That Apply
Construction Projects
| |_| |
| Two or more story facilities with reinforced concrete frames and CMU walls |
| |_| |
| One or more story facilities with structural steel frames and CMU walls |
| |_| |
| Concrete and asphalt paving |
Area lighting systems Utilities, site development, and other infrastructure development Installation of fire suppression systems
7. Our firm |_| does/ |_| does not have the above capabilities, qualifications, and experience to perform design-bid-build (D-B-B) projects in an overseas environment, to include construction management and logistical support for personnel, materials, and equipment, in areas, including subcontractors and suppliers.
8. If awarded a contract, our firm |_| is/ |_| is not financially capable to perform the cost of the construction and related services.
9. Based on our previous experience, the percent of work effort our firm would expect to subcontract is: (Insert the percentage)
10. Our firm |_| is/ |_| is not successfully performing the construction of facilities and associated services for the following U.S. or foreign military commands in Qatar or CENTCOM area of responsibility (AOR).
11. State your preference for either separate projects (two solicitations and two contracts) or consolidating both projects into a single solicitation and contract:
|_| Prefer separate projects |_| Prefer a consolidated project
12. If your firm’s preference is for separate projects, indicate the project that you are most likely to propose on:
|_| CMY
|_| PDPF
Explain your preference:________________________________________________
13. If your firm’s preference is for separate projects, explain the benefits of separate projects to your firm and the government:
14. If your firm’s preference is for consolidating the projects, explain the benefits of consolidation to your firm and the government:
CAPABILITY STATEMENT
Solicitation No. W912ER20R0010 Cargo Marshalling Yard (CMY) and Personnel Deployment Processing Facility (PDPF) Al Udeid Air Base, State of Qatar
CONSTRUCTION OF SIMILAR SIZE SCOPE PROJECTS
PROJECT EXPERIENCE TEMPLATE
(Make additional copies as needed but not more than five pages)
Project title:
Location:
Address of work site:
Contract number:
Task order number:
| Dates of performance: |
| From |
To
| Total Contract Value: |
| $ |
| Total Value to date: |
| $ |
Procuring activity:
Procurement point of contact:
Phone:
| Type of agency: |
| Fed Govt |
State Govt
Municipality
Private
Other (describe)
| Performed as: |
| Prime Contractor |
Subcontractor
Other (describe)
General description of work:
Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:
MINIMUM ONE OR MAXIMUM THREE PROJECT EXPERIENCES ARE ALLOWED FOR SUBMISSION