This document contains a capability statement template and details of a related federal contract opportunity for construction of a sewage treatment system expansion at Ali Al Salem Air Base in Kuwait.

The capability statement template requests information on the contractor's business details, arrangements for the opportunity, capabilities relevant to the work requirements, and experience on similar past projects. Contractors are asked to complete the template and submit it by July 9, 2019 to be considered for the related federal contract opportunity.

The federal contract opportunity involves construction of a sewage treatment plant expansion through a best value solicitation to increase treatment capacity from 313 to 939 cubic meters per day. The project scope includes installation of a lift station, effluent storage tank, and associated site utilities. The estimated value is between $1 million to $5 million with a 420-day period of performance. Four optional bid items will also be considered. Interested parties should complete the capability statement template and submit it to the Army Corps of Engineers contract specialist by the specified due date.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sewage Treatment System at Ali Al Salem Air Base (AASAB) Kuwait

Capability Statement

SECTION 1. GENERAL

1. Business Name: (Insert Business Name)

2. Business Address:

(Insert Business Address)

3. Cage Code: (Insert Cage Code)

4. NAICS Codes: (Insert all applicable NAICS Codes)

5. Responsible Point of Contact:

Name:

(Insert Name)

Telephone:

(Insert Telephone Number)

Email:

(Insert Email Address)

6. Check All That Apply: Our firm is:

FORMCHECKBOX

Small business

FORMCHECKBOX

8(a) small business

FORMCHECKBOX

Veteran-owned small business

FORMCHECKBOX

Service-disabled veteran-owned small business

FORMCHECKBOX

HUBZone small business

FORMCHECKBOX

Small disadvantaged business

FORMCHECKBOX

Women-owned small business concern.

FORMCHECKBOX

None of the above.

SECTION 2. CONTRACTOR ARRANGEMENT

1. Our firm will be proposing on this project as a:

FORMCHECKBOX

Sole contractor

FORMCHECKBOX

Prime contractor performing at least 50% of the work with subcontractor(s)

FORMCHECKBOX

Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted)

FORMCHECKBOX

Joint venture with (Insert business name, business size, and cage code).

(See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a) Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b). )

SECTION 3. CAPABILITY

1. If awarded a contract, the maximum capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds for any single task/delivery order is (Insert maximum capacity, in dollars, per task/delivery order annually).

2. If awarded a contract, the maximum aggregate contract capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds is (Insert total contract capacity, in dollars, your firm can perform annually).

3. Our firm has performed work in Kuwait:

Yes

No

4. Our firm has performed work on Ali Al Salem Air Base (AASAB) in Kuwait:

5. Our firm has the necessary documents/permits/certifications required to perform work in Kuwait:

6. Our firm has constructed the following facility types/projects:

Check All That Apply
Construction Project

FORMCHECKBOX

All of the below projects

FORMCHECKBOX

Housing/Barracks

FORMCHECKBOX

Operations Facility

FORMCHECKBOX

Administrative/Headquarters Facility

FORMCHECKBOX

Command and Control Facility

FORMCHECKBOX

Communications Center

FORMCHECKBOX

Training Facility

FORMCHECKBOX

Power Plant

FORMCHECKBOX

Utilities Infrastructure

FORMCHECKBOX

Entry/Access Control Points

FORMCHECKBOX

Electrical Work

7. If awarded a contract, our firm FORMCHECKBOX is/ FORMCHECKBOX is not capable to perform at least 20% of the cost of the construction and related services.

8. Based on your previous experience, identify the percent work effort you would expect to subcontract.

9. Our firm is performing, or has successfully performed construction of facilities and associated services for the following U.S. or Foreign military commands/facilities/projects:

(Provide name of project location, type of work performed, role of firm (prime, sub, team member), dollar value of work performed by your firm, percentage of total contract value performed by your firm, and date work was performed. Include no more than two single-spaced, 10 font, 8 1/2" x 11" pages containing this information).

10. Our firm FORMCHECKBOX is/ FORMCHECKBOX is not experienced in obtaining Defense Base Act (DBA) insurance for our personnel.

11. Our firm FORMCHECKBOX is/ FORMCHECKBOX is not experienced in constructing secure spaces in accordance with IC Tech Spec for ICD/ICS 705, “Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities”, dated 28 September 2017

SECTION 4. RETURN INSTRUCTIONS

After you have completed all sections of the capability statement, please return the form to the Contract Specialist via email at Elizabeth.C.Tedrow@usace.army.mil. Your response needs to be received no later than 4:00PM Eastern Standard Time on 9 July, 2019.

Information presented is for market research purposes only.

File details come from the government source that posted it. Updated .