A153_Amendment_01_to_W912ER18R0030.pdf
PDF 144 KB Posted
- Attached to
- Two (2) 20MW Switching Stations Federal contract opportunity
- Solicitation number
- W912ER18R0030
About this file
Amendment 01 to Solicitation # W912ER18R0030
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Contract_Award_W912ER19C0007_20MW.pdf | ||
| Amendment_0003_20_MW_Switching_Stations.pdf | ||
| ASG_KU_Access_Application_Form.pdf | ||
| Amendment_0002_20_MW_Switching_Station.pdf | ||
| CDC_SPECIFICATIONS.pdf | ||
| ATTACHMENT_A.pdf | ||
| 01_11_00_Attachment_2_MEP_General_Specifications.pdf | ||
| Proposal_Schedule__Cost_Breakdown__.pdf | ||
| ATTACHMENT_C.pdf | ||
| ATTACHMENT_D.pdf | ||
| ATTACHMENT_B.pdf | ||
| A153_Final_Solicitation_W912ER18R0030.pdf | ||
| A153_Final_Solicitation_W912ER18R0030.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Title: Tw o (2) 20 Megaw att (MW) Sw itching Stations, Camp Arif jan, Kuw ait
The text of the RFP is revised as indicated below
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jun-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ER18R0030
X 9B. DATED (SEE ITEM 11)
06-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jun-2018
CODE
US ARMY CORPS OF ENGINEERS-CETAM-CT
MIDDLE EAST DISTRICT, CETAM-CT
PO BOX 2250
WINCHESTER VA 22604-1450
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ER18R0030
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT
The Section entitled SUBMISSION REQUIREMENTS AND EVALUATION under Phase One, FACTOR 1:
CONSTRUCTION EXPERIENCE is revised as follows with material deleted struck through and material added underlined:
The Construction Experience portion of an offeror’s proposal will be limited to fifteen (15) pages in length. Any pages beyond fifteen (15) will not be evaluated and will be ignored.
Each offeror’s experience will be examined for breadth and depth of relevant work performed in design-build and construction projects ($10-$20 million in value) in Kuwait, United Arab Emirates (UAE), Oman, Qatar, Saudi Arabia, Bahrain, or Iraq, as stated in this solicitation. The successful offeror will possess demonstrated experience performing design-build construction projects similar to the requirements of this solicitation. For this purpose, relevant types of project experience include design, construction, and connection of electrical feeders and switchgear systems. Projects performed in Kuwait will be considered more relevant than projects performed in other countries included in the list above. A separate project relevancy analysis will be completed under the Past Performance factor at Phase Two.
At a minimum, an offeror should address its experience in the following:
a. Hiring qualified laborers and maintaining a qualified workforce.
b. Procurement of long lead items.
c. Obtaining access to work locations, such as base access.
Offerors shall provide information about projects, delineating the project name, major features (building, runway, road, etc.), overall contract value (in U.S. dollars), overall contract value the entity was responsible for (dollars or percent), location of project site (country, nearest city), contract duration (calendar days) and year in which it was completed, or its current completion date. If any offeror has multiple divisions or units, limit the project examples to those performed by the division or unit submitting the offer. The experience of either coventurer in a joint venture offeror may be submitted as the experience of the offeror, and experience of major subcontractors will be considered the experience of the offeror, provided that the letter of commitment requirement set forth above is met. Projects cited shall, at the time of issuance of the solicitation, be well underway (fully designed and at least 75% construction progress completed) or have been completed within five (5) years preceding the date of this solicitation. The offeror shall submit a completed Construction Experience Overview Sheet (Attachment B) capturing all projects being submitted for evaluation, as well as Construction Experience Information Sheets (Attachment C) for no more than five (5) projects that have been completed by the offeror within the past five (5) years or are currently being performed and well underway in Kuwait, UAE, Oman, Qatar, Saudi Arabia, Bahrain, or Iraq.
At least one (1) of the projects submitted must have a construction value greater than $5 million but less than $100 million. At least two (2) relevant projects shallshould have been performed in Kuwait. Projects valued at less than $5 million will be given little weight and may not be considered. If more than five (5) projects are submitted for this factor, only the first five (5) will be evaluated.
The text of 52.228-1 BID GUARANTEE (SEP 1996) is revised as follows with material deleted struck through and material added underlined:
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
W912ER18R0030
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 1020 percent of the bid price or $3,000,000, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
File details come from the government source that posted it.