AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Title: Unaccompanied Officer's Quarters, Camp Arif jan, Kuw ait
1. The purpose of this Amendment is to revise the Specifications and Draw ings.
2. All other terms and conditions remain unchanged.
Please see continuation pages.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ER18R0009
X 9B. DATED (SEE ITEM 11)
19-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jan-2018
CODE
W912ER DISTRICT (TAM), USACE
MIDDLE EAST DISTRICT (CETAM-CT)
201 PRINCE FREDERICK DRIVE
WINCHESTER VA 22602
W912ER 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ER18R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
1. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections.
The following have been revised/added:
Project Table of Contents – Replaced in its entirety Section 01 11 00
Paragraph 1 – page 2
Section 01 14 00 Paragraph 1.2.3 – page 2
Section 01 31 19.05 20 Paragraph 1.3.3 – page 3
Section 01 32 17.12 10 Paragraph 1.6.3 – page 9 Paragraph 1.7.2 - page 12
Section 01 33 00 Paragraph 1.2.4 – pages 6 and 7 Paragraph 1.3 – page 7 Submittal Register – Replaced in its entirety
Section 01 33 29 Paragraph 1.5.1.2 – page 4 Paragraph 3.2 – page 9 Attachment 1 HPSB Checklist – Added in its entirety
Section 01 35 26 Attachment A - A-02 Accident Prevention Plan Checklist – Added in its entirety
Section 08 39 53 – Added in its entirety
Section 09 62 38 – Added in its entirety
Section 09 65 00 – Added in its entirety
Section 10 44 16 Paragraph 2.1.1 - page 3
Section 11 31 13 – Added in its entirety
Section 21 13 13.00 10 Paragraph 1.2.1.4 – page 6 Paragraph 1.3 – page 7 Paragraph 1.4.1 – pages 7 and 8
Paragraph 3.6 – page 17
Section 28 31 64.00 10 – Deleted in its entirety
W912ER18R0009
Section 28 31 76 – Added in its entirety
2. Drawings: Revisions to the following drawings are identified by a triangle placed on the drawing near each revision and a "cloud" drawn around both the triangle and change.
General: G-011 and G-012
Site Design: C-111, XT-101, XT-501, XT-501.1 and XT-502
Facility A: A-001, A-002, A-101, A-102, A-103, A-201, A-401, A-501, A-601, A-602, A-603, I-104, I-105, I-106, I-602, I-603, I-604, F-002, F-601, F-602, M-001, M-002, M-101, M-102, M-103, M-301, M-401, M-601, M-602, E-001, E-104, E-105, E-106, E-107, E-401, E-601, E-603, E-604, T-001, T-401, T- 501, T-502, T-505, T-601 and T-602
Facility B: A-001, A-002, A-101, A-102, A-103, A-201, A-401, A-501, A-601, A-602, A-603, I-104, I-105, I-106, I-602, I-603, I-604, F-002, F-601, F-602, M-001, M-002, M-101, M-102, M-103, M-301, M-401, M-601, M-602, E-001, E-104, E-105, E-106, E-107, E-401, E-601, E-603, E-604, T-001, T-401, T- 501, T-502, T-505, T-601, T-602