Attahcment_2_AM_4_01_80_00.12_10_DRAWINGS_28_Jul_17.pdf
PDF 3 MB Posted
- Attached to
- Runway 13/31 Repairs MSAB Jordan
- Solicitation number
- W912ER17R0024
About this file
Attachment 2 Amendment 4 Drawings
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET ID
X
Middle East District of Engineers
US Army Corps
U S A rm y C o rp s o f
E n g in e e rs
M id d le E a s t
D is tr ic t
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
/2
/2
IP
P
W P :d
\J
R -4
B -1
P
N .d g n
:0
N
E
C T
D B
/2
/2
S
IT
E D
E S
IG
N
M S
A B D
E V
E L
O P
M E
N T M
S A
B R
U N
W A
Y R
E P
A
IR
J O
R D
A N
GRAPHIC SCALE
DIM. NOTE & NORTH
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
NN
1:750
10 0 402010 30 50
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
T O
U C
H D
O W
N
C h ie f, S it e B ld g D e s ig n S e c
J E
F F
R E
Y P
R A
N E
Y
B-101
D M
B
D M
B
G L
H
E X
IS
T
IN
G J
O
IN
T L
A Y
O U
T P
L A
N
75 M45 M
BE MILLED AND OVERLAYED
45 METER RUNWAY 13/31 TO
THEN SEALED AND SPRAYED
OVERRUN 13 TO BE REPAIRED
INSTALLED PER AF-ETL 04-4
NEW ELECTRICAL DUCT BANKS
13 RIGID PAVEMENTS
EXISTING 300 METER TOUCHDOWN
TO BE REPAIRE THEN SEALED AND SPRAYED
15 METER ASPHALT SHOULDERS
CONTRACTOR'S EXPENSE.
LIGHTING OR SIGNAGE SHALL BE REPAIRED IMMEDIATELY AT THE
BY THE BASE DURING CONSTRUCTION ACTIVITIES ANY DAMAGE TO
REPAIR ACTIVITIES. RUNWAY LIGHTS WILL BE TURNED OFF
4. RUNWAY LIGHTING AND SIGNAGE SHALL BE PROTECTED DURING
SPECIFICATIONS.
REPAIRED IN ACCORDANCE WITH UFC 3-270-01 AND CONTRACT
AS POTHOLES AND FATIGUE ("ALLIGATOR") CRACKING SHALL BE
WITH CONTRACT SPECIFICATIONS. PAVEMENT DISTRESSES SUCH
3. SEAL AND SPRAY SHOULDERS AND OVERRUNS IN ACCORDANCE
NEW BACKER ROD AND SEALANT.
TO CLEAN OUT LOOSE MATERIAL (DEBRIS) PRIOR TO INSTALLING
REPRESENTATIVE (COR). ALL JOINTS SHALL BE POWERWASHED
SHALL BE APPROVED BY THE CONTRACTING OFFICER
SHALL ALIGN WITH THE EXISTING JOINTS. JOINT REPAIR AREAS
B-501 AND CONTRACT SPECIFICATIONS. ALL REPAIRED JOINTS
ALL RIGID JOINTS IN ACCORDANCE WITH THE DETAILS ON SHEET
2. PRIOR TO REPLACEMENT OF EXISTING JOINT SEALANTS, REPAIR
B-502 AND CONTRACT SPECIFICATION.
SEALANT IN TOUCHDOWN 13 IAW DETAILS ON SHEET
SPECIFICATIONs. REMOVE AND REPLACE EXISTING JOINT
1. REMOVE RUBBER IN ACCORDANCE WITH (IAW) CONTRACT
J R -4
B -1
P
N .d g n
A D
D E
D W
O R
D
E X
IS
T
IN
G
J
U L
Y
W912ER-17-R-0024 Amendment 0004
X
Middle East District of Engineers
US Army Corps
U S A rm y C o rp s o f
E n g in e e rs
M id d le E a s t
D is tr ic t
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
IP
P W
P d J
R
B
P N .d g n
N
E C
T D
B
/2
/2
IT
E D
E S
IG
N
M S
A B D
E V
E L
O P
M E
N T M
S A
B R
U N
W A
Y R
E P
A
IR
J O
R D
A N
C h ie f, S it e B ld g D e s ig n S e c
J E
F F
R E
Y P
R A
N E
Y
B-102
D M
B
D M
B
G L
H
B-301
GRAPHIC SCALE
DIM. NOTE & NORTH
KEY PLAN
GENERAL SHEET NOTES
NN
SHEET KEYNOTES
RIGID TOUCHDOWN - FLEXIBLE RUNWAY INTERFACE
1:5000
100 200 300 400
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
TOUCHDOWN 13 TOUCHDOWN 31
B-301
B-301
45 M
B -302
B -3
B -3
E X
IS
T
IN
G A
S P
H A
L T R
U N
W A
Y S
E C
T
IO
N
OVERRUNS NOT SHOWN
2,400 METER RUNWAY 13/31 ASPHALT PAVEMENT
BE REPAIRED THEN SEALED AND SPRAYED
15 METER ASPHALT SHOULDERS TO
TO BE MILLED AND OVERLAYED
TAXIWAY LIMA 4: 19.5 METER WIDTH
IMMEDIATELY AT THE CONTRACTOR'S EXPENSE.
DAMAGE TO LIGHTING AND SIGNAGE SHALL BE REPAIRED
OFF BY BASE DURING CONSTRUCTION ACTIVITIES AND ANY
REPAIR ACTIVITIES . RUNWAY LIGHTS WILL BE TURNED
5. RUNWAY LIGHTING AND SIGNAGE SHALL BE PROTECTED DURING
COR.
WHERE POSSIBLE AND SUBJECT TO THE APPROVAL OF THE
ADJUSTED TO MATCH THE REQUIREMENTS LISTED IN UFC 3-260-01
PROFILE AND CROSS SECTIONS OF NEW PAVEMENT SHALL BE
EXISTING ADJACENT EDGE OF THE SAW CUT PAVEMENT. THE
CONTRACTOR SHALL MATCH /TIE INTO THE ELEVATIONS OF
GRADING AND PROFILE OF THE SURFACES TO BE REPLACED. THE
4. THE TOPOGRAPHIC SURVEY SHALL BE USED IN DESIGNING THE
PERFORMED ON A 10 METER X 10 METER GRID PATTERN.
SPECFICIATIONS. SURVEY MEASUREMENTS SHALL BE
HORIZONTAL AND VERTICAL DATUMS PER CONTRACT
EXISTING AIRFIELD SURVEY MONUMENTS AND PROPER
SURVEY MEASUREMENTS (X, Y, Z) SHALL BE REFERENCED TO
13-31 FOR FULL WIDTH (45 METERS) AND LENGTH (2,400 METERS).
3. PRIOR TO AND AFTER MILLING OPERATIONS, SURVEY RUNWAY
3-270-01 AND THE CONTRACT SPECIFICATIONS.
FATIGUE ("ALLIGATOR") CRACKING SHALL BE REPAIRED IAW UFC
SPECIFICATIONS. PAVEMENT DISTRESS SUCH AS POTHOLES AND
2. SEAL AND SPRAY SHOULDERS AND OVERRUNS IAW CONTRACT
CONTRACT SPECIFICATIONS.
INTERFACES SHALL BE CONSTRUCTED IAW SHEET B-301 AND
IAW CONTRACT SPECIFICATIONS. ASPHALT TO RIGID TOUCHDOWN
SURFACE WITH 125 MILLIMETERS OF NEW HOT MIXED ASPHALT
SHEET B-301 AND CONTACT SPECIFICATIONS. REPLACE MILLED
MILLED PAVEMENT SHALL BE SEALED IN ACCORDANCE WITH (IAW)
RUNWAY 13/31 TO A DEPTH OF 125 MILLIMETERS. CRACKS IN
1. MILL TOTAL WIDTH (45 METERS) AND LENGTH (2,400 METERS) OF
TO BE MILLED AND OVERLAYED
TAXIWAY LIMA 5: 23 METER WIDTH
ACCORDANCE WITH ETL 4-04.
TECHNOLOGY IN
PAVEMENT VIA TRENCHLESS
CONDUITS UNDER THE
FOUR (4) COMMUNICATION
TO BE MILLED AND OVERLAYED
TAXIWAY ALPHA 2: 30 METER WIDTH
J R -4
B -1
P
N .d g n
C O
R R
E C
T E
D M
IS
P
E L L E
D W
O R
D J
U L
Y
X
Middle East District of Engineers
US Army Corps
U S A rm y C o rp s o f
E n g in e e rs
M id d le E a s t
D is tr ic t
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
/2
/2
IP
P
W P :d
\J
R -4
B -1
P
N .d g n
:3
N
E
C T
D B
/2
/2
IT
E D
E S
IG
N
M S
A B D
E V
E L
O P
M E
N T M
S A
B R
U N
W A
Y R
E P
A
IR
J O
R D
A N
C h ie f, S it e B ld g D e s ig n S e c
J E
F F
R E
Y P
R A
N E
Y
B-103
D M
B
D M
B
G L
H
GRAPHIC SCALE
DIM. NOTE & NORTH
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
NN
1:750
10 0 402010 30 50
B-303
B-304
B-305
E X
IS
T
IN
G J
O
IN
T L
A Y
O U
T P
L A
N
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
T O
U C
H D
O W
N
20 M
22.5 M 45 M
145 METER PORTION 155 METER PORTION
3 JOINT PATTERN CHANGES. SEE DETAIL 1 SHEET B-305
RUNWAY 13/31 TO BE MILLED AND OVERLAYED
1 REPAIRED THEN SEALED AND SPRAYED
15 METER ASPHALT SHOULDERS TO BE
THEN SEALED AND SPRAYED
OVERRUN 31 TO BE REPAIRED
TOUCHDOWN 31 RIGID PAVEMENT
EXISTING 300 METER
NEW JOINTS SHALL BE SEALED IAW DETAILS ON SHEET B-502.
TOUCHDOWN 31 WILL HAVE NEW DIMENSION OF 5M X 5.625M. ALL
DIMENSIONS OF 5M X 5M . THE 155 METER PORTION OF
METER PORTION OF TOUCHDOWN 31. SLABS HAVE A TYPICAL
6. RE-ESTABLISH EXISITNG SLAB LAYOUT/DIMENSIONS FOR 145
COR.
WHERE POSSIBLE AND SUBJECT TO THE APPROVAL OF THE
ADJUSTED TO MATCH THE REQUIREMENTS LISTED IN UFC 3-260-01
PROFILE AND CROSS SECTIONS OF NEW PAVEMENT SHALL BE
EXISTING ADJACENT EDGE OF THE SAW CUT PAVEMENT. THE
CONTRACTOR SHALL MATCH /TIE INTO THE ELEVATIONS OF
GRADING AND PROFILE OF THE SURFACES TO BE REPLACED. THE
5. THE TOPOGRAPHIC SURVEY SHALL BE USED IN DESIGNING THE
KEYWAYS SHALL BE PATCHED PER THE SPECIFICATIONS.
DOWELS OR MALE KEYWAYS SHALL BE REMOVED. FEMALE
DESCRIBED IN SPECIFICATION 32 13 11 PART 3.10. EXISTING
ALONG LONGITUDINAL JOINTS DURING SLAB REMOVAL AS
4. THE CONTRACTOR SHALL UTILIZE THE DOUBLE SAWCUT METHOD
IN WRITING TO THE COR.WITHIN 24 HOURS AFTER THE SURVEY.
IDENTIFY ANY EXISTING DAMAGE AND REPORT ANY DISCREPANCIES
SURVEY AT ALL SLAB JOINT CORNERS. THE CONTRACTOR SHALL
AND VERTICAL DATUMS PER THE CONTRACT SPECIFICATIONS.
AIRFIELD SURVEY MONUMENTATION AND PROPER HORIZONTAL
MEASUREMENTS (X,Y,Z) SHALL BE REFERENCED TO EXISTING
DEMOLITION AND AFTER CONSTRUCTION. SURVEY
3. SURVEY THE ENTIRE EXISTING PCC KEEL SECTION PRIOR TO
AND SEALANT.
MATERIAL (DEBRIS) PRIOR TO INSTALLING NEW BACKER ROD
JOINTS SHALL BE POWERWASHED TO CLEAN OUT LOOSE
THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). ALL
EXISTING JOINTS. JOINT REPAIR AREAS SHALL BE APPROVED BY
SPECIFICATIONS. ALL REPAIRED JOINTS SHALL ALIGN WITH THE
JOINTS IAW THE DETAILS ON SHEET B-501 AND THE CONTRACT
2. PRIOR TO PLACEMENT OF JOINT SEALANTS, REPAIR ALL RIGID
RUBBER OUTSIDE KEEL IAW CONTRACT SPECIFICATIONS.
SHEET B-502 AND THE CONTRACT SPECIFICATIONS. REMOVE
OUTSIDE KEEL SECTION IN ACCORDANCE WITH (IAW) DETAILS ON
1. REMOVE AND REPLACE EXISTING JOINT SEALANTS FOR ALL SLABS
J R -4
B -1
P
N .d g n
T
E X
T R
E V
IS
E D
J
U L
Y
X
Middle East District of Engineers
US Army Corps
U S A rm y C o rp s o f
E n g in e e rs
M id d le E a s t
D is tr ic t
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
/2
/2
IP
P
W P :d
\J
R -4
B -1
P
N .d g n
:4
N
E
C T
D B
/2
/2
IT
E D
E S
IG
N
M S
A B D
E V
E L
O P
M E
N T M
S A
B R
U N
W A
Y R
E P
A
IR
J O
R D
A N
C h ie f, S it e B ld g D e s ig n S e c
J E
F F
R E
Y P
R A
N E
Y
B-104
D M
B
D M
B
G L
H
DIMENSIONS SHOWN ARE IN MILLIMETERS.
UNLESS OTHERWISE NOTED, LINEAR
GRAPHIC SCALE
DIM. NOTE & NORTH
KEY PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
NN
1:750
10 0 402010 30 50
B-305
N E
W J
O
IN
T L
A Y
O U
T P
L A
N
THICKENED EDGE EXPANSION JOINT
2 JOINT PATTERN CHANGE
T O
U C
H D
O W
N
NEW 300 METER TOUCHDOWN 31 PCC PAVEMENT
145 METER PORTION 155 METER PORTION
20 M
22.5 M 45 M
1 15 METER SHOULDERS TO BE SEALED AND SPRAYED
MILLED AND OVERLAYED
RUNWAY 13/31 TO BE
SEALED AND SPRAYED
OVERRUN 31 TO BE
B-303
B-304
ACCORDANCE WITH ETL 4-04.
TECHNOLOGY IN
PAVEMENT VIA TRENCHLESS
CONDUITS UNDER THE
FOUR (4) COMMUNICATION
IAW WITH CONTRACT SPECFICATIONS.
BY THE CORE. NEW JOINTS SHALL BE CONSTRUCTED AND SEALED
HIGH POINTS OR SETTLED SLABS) AS NECESSARY AND APPROVED
CORRECT ANY MINOR GRADE DEFICIENCIES (ISOLATED LOW OR
SURFACE GRADES/ELEVATIONS. THE CONTRACTOR SHALL
5. CONSTRUCT RIGID KEEL SECTION TO RE-ESTABLISH EXISTING
KEYWAYS SHALL BE PATCHED PER THE SPECIFICATIONS.
DOWELS OR MALE KEYWAYS SHALL BE REMOVED. FEMALE
DESCRIBED IN SPECIFICATION 32 13 11 PART 3.10. EXISTING
ALONG LONGITUDINAL JOINTS DURING SLAB REMOVAL AS
4. THE CONTRACTOR SHALL UTILIZE THE DOUBLE SAWCUT METHOD
WITHIN 24 HOURS AFTER THE SURVEY TO THE CORE.
DISCREPANCIES CONCERNING THE KEEL SECTION IN WRITING
SHALL IDENTIFY ANY EXISTING DAMAGE AND REPORT ANY
SURVEY AT ALL SLAB JOINT CORNERS. THE CONTRACTOR
AND VERTICAL DATUMS PER THE CONTRACT SPECIFICATIONS.
AIRFIELD SURVEY MONUMENTATION AND PROPER HORIZONTAL
MEASUREMENTS (X,Y,Z) SHALL BE REFERENCED TO EXISTING
DEMOLITION AND AFTER CONSTRUCTION. SURVEY
3. SURVEY THE ENTIRE EXISTING RIGID KEEL SECTION PRIOR TO
SEALANT.
MATERIAL (DEBRIS) PRIOR TO INSTALLING NEW BACKER ROD AND
(COR). JOINTS SHALL BE POWERWASHED TO CLEAN OUT LOOSE
APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE
JOINTS SHALL ALIGN WITH THE EXISTING JOINTS AND BE
SHEET B-501 AND THE CONTRACT SPECIFICATIONS. ALL REPAIRED
ALL RIGID JOINTS REPAIR ALL RIGID JOINTS IAW THE DETAILS ON
2. PRIOR TO REPLACEMENT OF EXISTING JOINT SEALANT, REPAIR
SHEET B-502 AND THE CONTRACT SPECIFICATIONS.
OUTSIDE KEEL SECTION IN ACCORDANCE WITH (IAW) DETAILS ON
1. REMOVE AND REPLACE EXISTING JOINT SEALANT FOR ALL SLABS
5.625 METERS X 5 METERS
155 M PORTION JOINT PATTERN
J R -4
B -1
P
N .d g n
T
E X
T R
E V
IS
E D
J
U L
Y
X
Middle East District of Engineers
US Army Corps
U S A rm y C o rp s o f
E n g in e e rs
M id d le E a s t
D is tr ic t
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
IP
P W
P d J
R
B
S E .d g n
N
E C
T D
B
/2
/2
IT
E D
E S
IG
N
M S
A B D
E V
E L
O P
M E
N T M
S A
B R
U N
W A
Y R
E P
A
IR
J O
R D
A N
C h ie f, S it e B ld g D e s ig n S e c
J E
F F
R E
Y P
R A
N E
Y
P A
V E
M E
N T S
E C
T
IO
N S
D M
B
D M
B
G L
H
B-303
GENERAL SHEET NOTES
SHEET KEYNOTES
EXISTING PCC EXISTING PCC
EXISTING PCC EXISTING PCC
2 2 2
EXISTING BASE MATERIAL
EXISTING SUB-BASE / SUBGRADE EXISTING BASE TO BE REMOVED
REMOVED WITHIN KEEL
CONCRETE TO BE
WITHIN KEEL
BASE TO BE REMOVED
200 MM EXISTING
1 1
EXISTING KEEL PCC TO BE REMOVED
4 56 6
SEE DETAILS SHEET B-502
NEW DOWEL (TYP)
NEW 400 MM PORTLAND CEMENT CONCRETE
LAB DENSITY (ASTM D 1557)
COMPACTED 100% OF MAX
AGGREGATE BASE COURSE
NEW 150 MM GRADED-CRUSHED
400 MM
150 MM
2 2 2
5 5 5 56 6
SEAL AND SPRAY EXISTING ASPHALT SHOULDER
REMOVE EXISTING JOINT SEALANT
SEALED AND SPRAYED ASPHALT SHOULDER
REPLACE JOINT SEALANT PER DETAIL 6 SHEET B-502
CONSTRUCT NEW JOINT PER DETAIL 2 SHEET B-502
NEW GABC
NEW PCC
BASE TO REMOVED
PCC DEMO
LEGEND
DIMENSION NOTE
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
45 METERS (FULL WIDTH)15 M 15 M
SEE DETAILS SHEET B-502
NEW DOWEL (TYP)
45 METER (FULL WIDTH)15 M 15 M
B-104
NEW PCC SECTION (145 METER SECTION)
SCALE = NOT TO SCALE
VERIFY DESIGN MODULUS OF REACTION 50 KPA / MM
ACCORDANCE WITH ASTM CRD-C 655-95 TO
KTR SHALL PERFORM PLATE LOAD TESTING IN
TOUCHDOWN 31
TOUCHDOWN 31
SLAB CAN BE PLACED.
EXISTING PAVEMENT FROM UNDERMINING SO FULL THICKNESS
6. CONTRACTOR SHALL PROVIDE PLAN TO PROTECT THE
JOINTS SHALL BE DOWELED.
AT THE END OF CONSTRUCTION LANES. ALL CONSTRUCTION
5. TRANSVERSE CONSTRUCTION JOINTS SHALL ONLY BE USED
HAVE THICKENED EDGE EXPANSION JOINTS.
4. INTERFACE FROM 145 METER SECTION TO 155 METER SHALL
EXISTING SLABS ARE NOT DISTURBED OR NOT UNDERMINED.
TO ENSURE THE ADJACENT COMPACTED BASE MATERIAL AND
CONTRACTOR SHALL TAKE MEASURES DURING EXCAVATION
3. FOLLOWING THE REMOVAL OF THE KEEL SECTION SLABS,THE
CONCRETE ON WET MATERIAL.
SAWING OPERATIONS. DO NOT PLACE BASE COURSE OR
2. EXISTING BASE MATERIAL SHALL BE ALLOWED TO DRY AFTER
KEYWAYS SHALL BE PATCHED PER SPECIFICATION.
DOWELS OR MALE KEYWAYS SHALL BE REMOVED. FEMALE
DESCRIBED IN SPECIFICATION 32 13 11 PART 3.10. EXISTING
LONGITUDINAL JOINTS DURING SLAB REMOVAL AS
1. KTR SHALL UTILIZE DOUBLE SAW CUT METHOD ALONG
C-105
B-103, EXISTING SECTION (145 METER SECTION)
SCALE = NOT TO SCALE
J R -4
B -3
S
E .d g n
C
O R
R E
C T
E D S
H E
E T R
E F
E R
E N
C E
J
U L
Y
X
Middle East District of Engineers
US Army Corps
U S A rm y C o rp s o f
E n g in e e rs
M id d le E a s t
D is tr ic t
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
IP
P W
P d J
R
B
S E .d g n
N
E C
T D
B
/2
/2
IT
E D
E S
IG
N
M S
A B D
E V
E L
O P
M E
N T M
S A
B R
U N
W A
Y R
E P
A
IR
J O
R D
A N
GENERAL SHEET NOTES
SHEET KEYNOTES
EXISTING PCC EXISTING PCC
EXISTING PCC EXISTING PCC
2 2 2 2
EXISTING BASE MATERIAL
EXISTING SUB-BASE / SUBGRADE EXISTING BASE TO BE REMOVED
REMOVED WITHIN KEEL
CONCRETE TO BE
WITHIN KEEL
BASE TO BE REMOVED
200 MM EXISTING
1 1
EXISTING KEEL PCC TO BE REMOVED
4 56 6
SEE DETAILS SHEET B-502
NEW DOWEL (TYP)
NEW 400 MM PORTLAND CEMENT CONCRETE
LAB DENSITY (ASTM D 1557)
COMPACTED 100% OF MAX
AGGREGATE BASE COURSE
NEW 150 MM GRADED-CRUSHED
400 MM
150 MM
SEAL AND SPRAY EXISTING ASPHALT SHOULDER
REMOVE EXISTING JOINT SEALANT
SEALED AND SPRAYED ASPHALT SHOULDER
REPLACE JOINT SEALANT PER DETAIL 6 SHEET B-502
CONSTRUCT NEW JOINT PER DETAIL 2 SHEET B-502
DIMENSION NOTE
NEW GABC
NEW PCC
BASE TO REMOVED
PCC DEMO
LEGEND
VERIFY DESIGN MODULUS OF REACTION
ACCORDANCE WITH ASTM CRD-C 655-95 TO
KTR SHALL PERFORM PLATE LOAD TESTING IN
6 6
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
C h ie f, S it e B ld g D e s ig n S e c
J E
F F
R E
Y P
R A
N E
Y
D M
B
D M
B
G L
H
B-304
R
IG
ID
P
A V
E M
E N
T S
E C
T
IO
N S
15 M 45 METER (FULL WIDTH)
15 M 45 METER (FULL WIDTH) 15 M
B-104
NEW PCC SECTION (155 METER SECTION)
SCALE = NOT TO SCALE
SEE DETAILS SHEET B-502
NEW DOWEL (TYP)
TOUCHDOWN 31
TOUCHDOWN 31
SLAB CAN BE PLACED.
EXISTING PAVEMENT FROM UNDERMINING SO FULL THICKNESS
6. CONTRACTOR SHALL PROVIDE PLAN TO PROTECT THE
JOINTS SHALL BE DOWELED.
AT THE END OF CONSTRUCTION LANES. ALL CONSTRUCTION
5. TRANSVERSE CONSTRUCTION JOINTS SHALL ONLY BE USED
HAVE THICKENED EDGE EXPANSION JOINTS.
4. INTERFACE FROM 145 METER SECTION TO 155 METER SHALL
EXISTING SLABS ARE NOT DISTURBED OR NOT UNDERMINED.
TO ENSURE THE ADJACENT COMPACTED BASE MATERIAL AND
CONTRACTOR SHALL TAKE MEASURES DURING EXCAVATION
3. FOLLOWING THE REMOVAL OF THE KEEL SECTION SLABS,THE
CONCRETE ON WET MATERIAL.
SAWING OPERATIONS. DO NOT PLACE BASE COURSE OR
2. EXISTING BASE MATERIAL SHALL BE ALLOWED TO DRY AFTER
KEYWAYS SHALL BE PATCHED PER SPECIFICATION.
DOWELS OR MALE KEYWAYS SHALL BE REMOVED. FEMALE
DESCRIBED IN SPECIFICATION 32 13 11 PART 3.10. EXISTING
LONGITUDINAL JOINTS DURING SLAB REMOVAL AS
1. KTR SHALL UTILIZE DOUBLE SAW CUT METHOD ALONG
B-103
EXISTING SECTION (155 METER SECTION)
SCALE = NOT TO SCALE
J R -4
B -3
S
E .d g n
C
O R
R E
C T
E D S
H E
E T R
E F
E R
E N
C E
J
U L
Y
X
Middle East District of Engineers
US Army Corps
U S A rm y C o rp s o f
E n g in e e rs
M id d le E a s t
D is tr ic t
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
A P
P R
IP
P W
P d J
R
B
S E .d g n
N
E C
T D
B
/2
/2
IT
E D
E S
IG
N
M S
A B D
E V
E L
O P
M E
N T M
S A
B R
U N
W A
Y R
E P
A
IR
J O
R D
A N
B-305
GENERAL SHEET NOTES
SHEET KEYNOTES
NEW 155 METER PORTION TOUCHDOWN 31NEW 145 METER PORTION TOUCHDOWN 31
EXISTING 145 METER PORTION TOUCHDOWN 31 EXISTING 155 METER PORTION TOUCHDOWN 31
500 MM
400 MM
3 3 3
EXISTING TRANVERSE JOINTS TYP 5.0 METERS WIDE
NEW TRANVERSE CONTRACTION JOINTS 5.0 METERS WIDE
EXISTING JOINT MISMATCH
MISMATCH INTERFACE. SEE DETAIL 3 SHEET B-502
NEW THICKENED EDGE EXPANSION JOINT AT JOINT
DIMENSION NOTE
C h ie f, S it e B ld g D e s ig n S e c
J E
F F
R E
Y P
R A
N E
Y
T O
U C
H D
O W
N
J
O
IN
T M
IS
M
A T
C H I
N T
E R
F A
C E
D M
B
D M
B
G L
H
ASPHALT OVERRUN 31
RUNWAY 13/31 225 MM THICK
NEW HOT MIXED ASPHALT
OVERRUN 13 SEALED AND SPRAYED
AT ASPHALT INTERFACE. SEE DETAIL 3 SHEET B-502
NEW THICKENED EDGE JOINT WITH TACK COAT
500 MM 500 MM
DIMENSIONS SHOWN ARE IN METERS.
UNLESS OTHERWISE NOTED, LINEAR
B-103
EXISTING RUNWAY / TOUCHDOWN 31 / OVERRUN 31 INTERFACE SECTION
SCALE = NOT TO SCALE
B-104
NEW TOUCHDOWN JOINT MISMATCH INTERFACE SECTION
SCALE = NOT TO SCALE
TO BE MILLED AND OVERLAYED
EXISTING ASPHALT RUNWAY 13/31
ASPHALT FOR AIRFIELDS SECTION 3.10.3.
IAW CONTRACT SPECIFICATION 32 12 15.13 HOT MIXED
INTERFACE. CONSTRUCT ASPHALT-RIGID INTERFACES
SEE DETAIL 2 SHEET B-301 FOR ASPHALT-RIGID PAVEMENT
1 1
3 3
JOINTS SHALL BE DOWELED.
AT THE END OF CONSTRUCTION LANES. ALL CONSTRUCTION
7. TRANSVERSE CONSTRUCTION JOINTS SHALL ONLY BE USED
HAVE THICKENED EDGE EXPANSION JOINTS.
6. INTERFACE FROM 145 METER SECTION TO 155 METER SHALL
EXISTING SLABS ARE NOT DISTURBED OR NOT UNDERMINED.
TO ENSURE THE ADJACENT COMPACTED BASE MATERIAL AND
CONTRACTOR SHALL TAKE MEASURES DURING EXCAVATION
5. FOLLOWING THE REMOVAL OF THE KEEL SECTION SLABS,THE
CONCRETE ON WET MATERIAL.
SAWING OPERATIONS. DO NOT PLACE BASE COURSE OR
4. EXISTING BASE MATERIAL SHALL BE ALLOWED TO DRY AFTER
KEYWAYS SHALL BE PATCHED PER SPECIFICATION.
DOWELS OR MALE KEYWAYS SHALL BE REMOVED. FEMALE
DESCRIBED IN SPECIFICATION 32 13 11 PART 3.10. EXISTING
LONGITUDINAL JOINTS DURING SLAB REMOVAL AS
3. KTR SHALL UTILIZE DOUBLE SAW CUT METHOD ALONG
ALL CONSTRUCTION JOINTS SHALL BE DOWELED.
SHALL ONLY BE USED AT THE END OF CONSTRUCTION LANES.
SPECIFICATIONS. TRANSVERSE CONSTRUCTION JOINTS
CUT IN ACCORDANCE WITH (IAW) THE CONTRACTION
CONSTRUCTIONS JOINTS. CONTRACTION JOINTS SHALL BE SAW
2. TRANVERSE JOINTS SHALL BE EITHER CONTRACTION OR
MATCH EXISTING RIGID PAVEMENT JOINT PATTERN.
1. NEW RIGID KEEL (BOTH SECTIONS) TRAVERSE JOINTS SHALL
J R -4
B -3
S
E .d g n
T E
X T R
E V
IS
E D
J
U L
Y
J
U L
Y
C O
R R
E C
T E
D S
H E
E T R
E F
E R
E N
C E
| JR-463233--B-101PN |
| References |
| Sheet Standards, PW_WORKDIR:dms48248 |
| 2012_drawing template.dgn |
| JR-463233--B-101PN.dgn, Model |
| Ref, JR-463233--B-101PN.dgn, Model |
| JR-463233--B-305SE04.pdf |
| JR-463233--B-305SE |
| References |
| JR-463233--B-305SE.dgn, Model |
| JR-463233--B-304SE04.pdf |
| JR-463233--B-304SE |
| References |
| JR-463233--B-304SE.dgn, Model |
| JR-463233--B-303SE04.pdf |
| JR-463233--B-303SE |
| References |
| JR-463233--B-303SE.dgn, Model |
| JR-463233--B-104PN04.pdf |
| JR-463233--B-104PN |
| References |
| PW_WORKDIR:d0675025 |
| JR-463233--B-101PN.dgn, Model |
JR-463233--B-104PN.dgn, Model
| JR-463233--B-103PN04.pdf |
| JR-463233--B-103PN |
| References |
| PW_WORKDIR:d0675025 |
| JR-463233--B-101PN.dgn, Model |
JR-463233--B-103PN.dgn, Model
| JR-463233--B-102PN04.pdf |
| JR-463233--B-102PN |
| References |
| PW_WORKDIR:d0675025 |
| JR-463233--B-101PN.dgn, Model |
JR-463233--B-102PN.dgn, Model
File details come from the government source that posted it. Updated .