Amendment_0004_Security_Fence.pdf

PDF 134 KB Posted

Attached to
Perimeter Security Fence Federal contract opportunity
Solicitation number
W912ER-17-R-0021
Issued by
Department of the Army Corps of Engineers Engineering District Middle East

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Perimeter Security Fence, newest first.
File Type Posted
Contract_Award_W912ER18C0020.pdf PDF
Amendment_0006_Proposal_Schedule.pdf PDF
Amendment_0006_Cost_Breakdown_Sheet.pdf PDF
Amendment_0006_Proposal_Schedule_and_Cost_Breakdown_Sheet.xlsx XLSX spreadsheet
SpecificationAM6.pdf PDF
Amendment_0006_to_W12ER-17-R-0021_Perimeter_Security_Fence,_Kuwait.pdf PDF
Amendment_0005_Security_Fence.pdf PDF
Arifjan_Fence_Proposal_Schedule.pdf PDF
Amendment_0004_Specifications.pdf PDF
Proposal_Schedule_and_Cost_Breakdown_Sheet.xlsx XLSX spreadsheet
Amendment_0004_Drawings.pdf PDF
Arifjan_Fence_Cost_Breakdown_Sheet.pdf PDF
W912ER-17-R-0021_Amendment_0003_Fence.pdf PDF
Amendment_0002.pdf PDF
Revised_Camp_Arifjan_Site_Visit_Data_.pdf PDF
Site_Visit_Copy_of_New_BIDS_blank.xlsx XLSX spreadsheet
ASG_KU_Access_Application_Form.pdf PDF
Camp_Arifjan_Site_Visit_Data_.pdf PDF
Correct_Drawings_Package.pdf PDF
Amendment_00001_to_Perimeter_Security_Fence.pdf PDF
ATTACHMENT_D.pdf PDF
ATTACHMENT_B.pdf PDF
ATTACHMENT_F_Arifjan_Fence_Proposal_Schedule.pdf PDF
ATTACHMENT_F_Arifjan_Fence_Cost_Breakdown_Sheet.pdf PDF
ATTACHMENT_A.pdf PDF
Drawings.pdf PDF
Solicitation_Perimeter_Security_Fence.pdf PDF
ATTACHMENT_C.pdf PDF
CDC_SPECIFICATIONS.pdf PDF
ATTACHMENT_E.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Project Title: Perimeter Security Fence, Camp Arif jan, Kuw ait

See continuation pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ER-17-R-0021

X 9B. DATED (SEE ITEM 11)

18-Jan-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Mar-2018

CODE

W912ER DISTRICT (TAM), USACE

MIDDLE EAST DISTRICT (CETAM-CT)

201 PRINCE FREDERICK DRIVE

WINCHESTER VA 22602

W912ER 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ER-17-R-0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

1. The purpose of this amendment is to revise the Specifications and Drawings, Cost Breakdown Sheet, Proposal Schedule and extend the proposal due date from 09 March 2018 to 14 March 2018, by 4:00pm, Eastern Standard Time (EST) to our Winchester, Virginia office.

2. Specifications: Revised sections are replaced in their entirety. Revisions to the specification pages are shown on the pages in the following manner: New text is underlined and deleted text is shown using strikeout. The amendment number appears in the bottom margin on all pages of the new or revised sections. The following have been revised:

Section 01 11 00 Paragraph 1.1, page 2

Section 01 15 00.12 10

Paragraph 1.22, pages 12 and 13

Section 32 31 13.53 Paragraph 1.1, page 3 Paragraph 2.5, page 7 Paragraph 2.6.1, page 7 Paragraph 3.1.3, page 9 Paragraph 3.1.4, page 9

3. Drawings: Delete the following drawings in their entirety and replace with the revised sheets of the same numbers, revisions dated 26 February 2018:

G-101 C-100 C-101 C-102 C-103 C-104 C-105 C-106 C-107 C-108 C-109 C-110 C-201

4. The revised Cost Breakdown Sheet and Proposal Schedule is incorporated as attachments to this amendment.

5. All other terms and conditions remain unchanged.

SUMMARY OF CHANGES

W912ER-17-R-0021

SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE

The required response date/time has changed from 09-Mar-2018 04:00 PM to 14-Mar-2018 04:00 PM.

(End of Summary of Changes)