AWARD SYNOPSIS
IAW FAR Part 5.207
(1) FSC Code: Y1PZ
(2) Date: 27 October 2016
(3) Year: 2016
(4) Contracting Office Zip Code: 22604
(5) NAICS Classification Code: 237990
(6) Contracting Office Address: U.S. Army Corps of Engineers Transatlantic Middle East District (TAM) P.O. Box 2250 Winchester, VA 22604
(7) Subject: Breakwater and Cargo Pier Repairs, Kuwait Naval Base (KNB), Kuwait
(8) Proposed Solicitation Number: W912ER-15-R-0027
(9) Closing Response Date: 11 November 2016
(10) Contact Point or Contracting Officer: Mr. Joe L. Libbey, email Joe.L.Libbey@usace.army.mil; or Mr. Tino Philip, at e-mail Tino.Philip@usace.army.mil.
(11) Contract Award Number: W912ER-17-C-0004
(12) Contract Award Dollar Amount: $47,460,000.00
(13) Contract Line Item Number: Base [CLIN’s 0001 through 0011], and all Options [CLIN’s 0012 through 0020].
(14) Contract Award Date: 27 October 2016
(15) Contractor: TOA CORPORATION GM: Takafumi Matsumura Kuwait Office Al-Ardiya 2–Bldg 3 P.O.Box 2220 Safat 13083 Kuwait State of Kuwait mailto:Joe.L.Libbey@usace.army.mil mailto:Tino.Philip@usace.army.mil
(16) Total Proposed Amount including all Options CLIN’s 0001 through 0020:
$47,460,000.00.
(17) Description: U.S. Army Corps of Engineers, Middle East District (TAM) has a requirement with a Two-Step Full and Open solicitation for the design and construction the Repair of the south breakwater and cargo pier at Kuwait Naval Base (KNB). KNB was originally constructed in the late 1970's and over the last 35 years the superstructure of the south breakwater and the cargo pier, which is accessed from the breakwater has fallen into disrepair. There are significant cracking and various types of damage to the concrete superstructure of the breakwater. The breakwater is approximately 1.0 kilometers in length and creates an artificial harbor for the portside operations of KNB. The breakwater supports a roadway allowing traffic to the head of the breakwater, as well as various utilities including fuel, water, fire water, communications, and electrical service etc.
(18) Place of Contract Performance: Kuwait
(19) Set-aside Status: N/A