- Geotechnical Indefinite Delivery Indefinite Quantity (IDIQ) For Drilling & Testing Services Federal contract opportunity
- Solicitation number
- W912EQ23R0022
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 01:00 PM local time 06 Jun 2023
X
A X B X C
D
EX
X G F 96 - 105
106 - 108 X H 109 - 114
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 114
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912EQ 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
167 N. Main St. Room 665 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 14
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
15 - 46 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
47 - 48
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 50 - 51 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 52 - 85 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
86 - 95
PART II - CONTRACT CLAUSES
US ARMY ENGINEER DISTRICT, MEMPHIS
ROCHELLE ROSS
167 N. MAIN ST.
MEMPHIS TN 38103-1894 817-886-1050
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
04 May 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912EQ23R0022
Section B - Supplies or Services and Prices
BID SCHEDULE
CONTRACT BID SCHEDULE - BASE YEAR
LINE ITEM DESCRIPTION
ANNUAL
QUANTITY UNIT UNIT PRICE TOTAL PRICE
0001 Drill Rig Mobilization and Demobilization 0001AA Within 0 - 50 Miles 4 Each XXX.XX XXX.XX 0001AB Within 50 - 100 Miles 4 Each XXX.XX XXX.XX 0001AC Within 100 - 150 Miles 8 Each XXX.XX XXX.XX 0001AD Within 150 - 200 Miles 2 Each XXX.XX XXX.XX 0001AE Within 200 - 500 Miles 2 Each XXX.XX XXX.XX 0001AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
0002 CPT Rig Mobilization and Demobiliation 0002AA Within 0 - 50 Miles 1 Each XXX.XX XXX.XX 0002AB Within 50 - 100 Miles 1 Each XXX.XX XXX.XX 0002AC Within 100 - 150 Miles 2 Each XXX.XX XXX.XX 0002AD Within 150 - 200 Miles 1 Each XXX.XX XXX.XX 0002AE Within 200 - 500 Miles 1 Each XXX.XX XXX.XX 0002AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
0003 Special Equipment for Site Characterization & Access 0003AA Excavation Equipment (Mob/Demob) 2 Each XXX.XX XXX.XX 0003AB Excavation Equipment (Active) 4 Day XXX.XX XXX.XX 0003AC Excavation Equipment (Standby) 4 Day XXX.XX XXX.XX 0003AD Dozer (Mob/Demob) 6 Each XXX.XX XXX.XX 0003AE Dozer (Active) 12 Day XXX.XX XXX.XX 0003AF Dozer (Standby) 12 Day XXX.XX XXX.XX 0003AG Forestry Mulcher (Mob/Demob) 4 Each XXX.XX XXX.XX 0003AH Forestry Mulcher (Active) 8 Day XXX.XX XXX.XX 0003AJ Forestry Mulcher (Standby) 8 Day XXX.XX XXX.XX 0003AK ATV/UTV for Site Access 10 Day XXX.XX XXX.XX 0003AL Traffic Control Measures 5 Day XXX.XX XXX.XX
0004 Drilling w/ SPT Test and Disturbed Sampling 0004AA 0 - 30 ft Depth (Sampling at 2.5 ft Intervals) 10,798 Linear Foot 0004AB 30 - 60 ft Depth (Sampling at 5 ft Intervals) 4,760 Linear Foot 0004AC 60 - 100 ft Depth (Sampling at 10 ft Intervals) 2,407 Linear Foot 0004AD 100 - 150 ft Depth (Sampling at 10 ft Intervals) 2,027 Linear Foot 0004AE 150 - 200 ft Depth (Sampling at 10 ft Intervals) 827 Linear Foot
0005 Drilling w/ Undisturbed Sampling 0005AA 0 - 50 ft Depth 4,646 Linear Foot 0005AB 50 - 100 ft Depth 495 Linear Foot 0005AC 100 - 150 ft Depth 163 Linear Foot 0005AD 150 - 200 ft Depth 50 Linear Foot
0006 Drilling w/ No Sampling 0006AA 0 - 50 ft Depth 465 Linear Foot 0006AB 50 - 100 ft Depth 25 Linear Foot 0006AC 100 - 150 ft Depth 8 Linear Foot 0006AD 150 - 200 ft Depth 50 Linear Foot
0007 Additional SPT Tests and Disturbed Samples 0007AA 0 - 30 ft Depth 369 Each 0007AB 30 - 60 ft Depth 296 Each 0007AC 60 - 100 ft Depth 36 Each 0007AD 100 - 150 ft Depth 1 Each 0007AE 150 - 200 ft Depth 1 Each
0008 Hand Auger Drilling and Sampling 0008AA 0 - 10 ft Depth 10 Linear Foot 0008AB 10 - 20 ft Depth 10 Linear Foot
0009 Cone Penetration Testing (CPT) 0009AA 0 - 50 ft Depth (Incl. Piezocone Pore Pressure Measurements) 1,500 Linear Foot 0009AB 50 - 100 ft Depth (Incl. Piezocone Pore Pressure Measurement) 500 Linear Foot 0009AC 0 - 50 ft Depth (No Pore Pressure Measurement) 2,000 Linear Foot 0009AD 50 - 100 ft Depth (No Pore Pressure Measurement) 750 Linear Foot 0009AE Pore Pressure Dissipation Tests 100 Hour 0009AF Vane Shear Test 500 Each 0009AG CPT-Based Direct Push Soil Samples 500 Each
0010 Direct Push Soil Sampling 1 Day 0011 Grab Sampling 20 Each 0012 Borehole Backfill 25,688 Linear Foot 0013 Instrumentation
0013AA Piezometer Installation 20 Linear Foot XXX.XX XXX.XX 0013AB Piezometer Testing 1 Hour 0013AC Piezometer Data Collection 1 Day 0013AD Inclinometer Installation 150 Linear Foot XXX.XX XXX.XX 0013AE Guard Post Installation 12 Each XXX.XX XXX.XX
0014 Laboratory Testing 0014AA Natural Moisture Content Test 4,170 Each 0014AB Atterberg Limits Test 4,170 Each 0014AC Grain Size Distribution Test 27 Each 0014AD Wet Sieve Test 2,093 Each 0014AE Percent Finer Than No. 200 Sieve Test 1,316 Each 0014AF Hydrometer Test 6 Each 0014AG Unconfined Compressive Strength ("UC") Test 1,966 Each 0014AH Unconsolidated Undrained ("UU" or "Q") Triaxial Test 12 Each 0014AJ Consolidated Undrained ("CU" or "R") Triaxial Test 8 Each 0014AK Consolidated Drained ("CD" or "S") Triaxial Test 1 Each 0014AL Direct Shear Test 1 Each 0014AM Consolidation Test 45 Each
0014AN Standard Compaction Test 1 Each 0014AP Modified Compaction Test 1 Each 0014AQ Soil pH Test 1 Each 0014AR Soil Resistivity Test 1 Each
CONTRACT BID SCHEDULE - ORDERING PERIOD 1
LINE ITEM DESCRIPTION
ANNUAL
QUANTITY UNIT UNIT PRICE TOTAL PRICE
1001 Drill Rig Mobilization and Demobilization 1001AA Within 0 - 50 Miles 4 Each XXX.XX XXX.XX 1001AB Within 50 - 100 Miles 4 Each XXX.XX XXX.XX 1001AC Within 100 - 150 Miles 8 Each XXX.XX XXX.XX 1001AD Within 150 - 200 Miles 2 Each XXX.XX XXX.XX 1001AE Within 200 - 500 Miles 2 Each XXX.XX XXX.XX 1001AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
1002 CPT Rig Mobilization and Demobiliation 1002AA Within 0 - 50 Miles 1 Each XXX.XX XXX.XX 1002AB Within 50 - 100 Miles 1 Each XXX.XX XXX.XX 1002AC Within 100 - 150 Miles 2 Each XXX.XX XXX.XX 1002AD Within 150 - 200 Miles 1 Each XXX.XX XXX.XX 1002AE Within 200 - 500 Miles 1 Each XXX.XX XXX.XX 1002AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
1003 Special Equipment for Site Characterization & Access 1003AA Excavation Equipment (Mob/Demob) 2 Each XXX.XX XXX.XX 1003AB Excavation Equipment (Active) 4 Day XXX.XX XXX.XX 1003AC Excavation Equipment (Standby) 4 Day XXX.XX XXX.XX 1003AD Dozer (Mob/Demob) 6 Each XXX.XX XXX.XX 1003AE Dozer (Active) 12 Day XXX.XX XXX.XX 1003AF Dozer (Standby) 12 Day XXX.XX XXX.XX 1003AG Forestry Mulcher (Mob/Demob) 4 Each XXX.XX XXX.XX 1003AH Forestry Mulcher (Active) 8 Day XXX.XX XXX.XX 1003AJ Forestry Mulcher (Standby) 8 Day XXX.XX XXX.XX 1003AK ATV/UTV for Site Access 10 Day XXX.XX XXX.XX 1003AL Traffic Control Measures 5 Day XXX.XX XXX.XX
1004 Drilling w/ SPT Test and Disturbed Sampling 1004AA 0 - 30 ft Depth (Sampling at 2.5 ft Intervals) 10,798 Linear Foot 1004AB 30 - 60 ft Depth (Sampling at 5 ft Intervals) 4,760 Linear Foot 1004AC 60 - 100 ft Depth (Sampling at 10 ft Intervals) 2,407 Linear Foot 1004AD 100 - 150 ft Depth (Sampling at 10 ft Intervals) 2,027 Linear Foot 1004AE 150 - 200 ft Depth (Sampling at 10 ft Intervals) 827 Linear Foot
1005 Drilling w/ Undisturbed Sampling 1005AA 0 - 50 ft Depth 4,646 Linear Foot 1005AB 50 - 100 ft Depth 495 Linear Foot 1005AC 100 - 150 ft Depth 163 Linear Foot 1005AD 150 - 200 ft Depth 50 Linear Foot
1006 Drilling w/ No Sampling 1006AA 0 - 50 ft Depth 465 Linear Foot 1006AB 50 - 100 ft Depth 25 Linear Foot 1006AC 100 - 150 ft Depth 8 Linear Foot 1006AD 150 - 200 ft Depth 50 Linear Foot
1007 Additional SPT Tests and Disturbed Samples 1007AA 0 - 30 ft Depth 369 Each 1007AB 30 - 60 ft Depth 296 Each 1007AC 60 - 100 ft Depth 36 Each 1007AD 100 - 150 ft Depth 1 Each 1007AE 150 - 200 ft Depth 1 Each
1008 Hand Auger Drilling and Sampling 1008AA 0 - 10 ft Depth 10 Linear Foot 1008AB 10 - 20 ft Depth 10 Linear Foot
1009 Cone Penetration Testing (CPT) 1009AA 0 - 50 ft Depth (Incl. Piezocone Pore Pressure Measurements) 1,500 Linear Foot 1009AB 50 - 100 ft Depth (Incl. Piezocone Pore Pressure Measurement) 500 Linear Foot 1009AC 0 - 50 ft Depth (No Pore Pressure Measurement) 2,000 Linear Foot 1009AD 50 - 100 ft Depth (No Pore Pressure Measurement) 750 Linear Foot 1009AE Pore Pressure Dissipation Tests 100 Hour 1009AF Vane Shear Test 500 Each 1009AG CPT-Based Direct Push Soil Samples 500 Each
1010 Direct Push Soil Sampling 1 Day 1011 Grab Sampling 20 Each 1012 Borehole Backfill 25,688 Linear Foot 1013 Instrumentation
1013AA Piezometer Installation 20 Linear Foot XXX.XX XXX.XX 1013AB Piezometer Testing 1 Hour 1013AC Piezometer Data Collection 1 Day 1013AD Inclinometer Installation 150 Linear Foot XXX.XX XXX.XX 1013AE Guard Post Installation 12 Each XXX.XX XXX.XX
1014 Laboratory Testing 1014AA Natural Moisture Content Test 4,170 Each 1014AB Atterberg Limits Test 4,170 Each 1014AC Grain Size Distribution Test 27 Each 1014AD Wet Sieve Test 2,093 Each 1014AE Percent Finer Than No. 200 Sieve Test 1,316 Each 1014AF Hydrometer Test 6 Each 1014AG Unconfined Compressive Strength ("UC") Test 1,966 Each 1014AH Unconsolidated Undrained ("UU" or "Q") Triaxial Test 12 Each 1014AJ Consolidated Undrained ("CU" or "R") Triaxial Test 8 Each 1014AK Consolidated Drained ("CD" or "S") Triaxial Test 1 Each 1014AL Direct Shear Test 1 Each 1014AM Consolidation Test 45 Each 1014AN Standard Compaction Test 1 Each 1014AP Modified Compaction Test 1 Each 1014AQ Soil pH Test 1 Each 1014AR Soil Resistivity Test 1 Each
CONTRACT BID SCHEDULE - ORDERING PERIOD 2
ANNUAL
QUANTITY UNIT UNIT PRICE TOTAL PRICE
2001 Drill Rig Mobilization and Demobilization
2001AA Within 0 - 50 Miles 4 Each XXX.XX XXX.XX 2001AB Within 50 - 100 Miles 4 Each XXX.XX XXX.XX 2001AC Within 100 - 150 Miles 8 Each XXX.XX XXX.XX 2001AD Within 150 - 200 Miles 2 Each XXX.XX XXX.XX 2001AE Within 200 - 500 Miles 2 Each XXX.XX XXX.XX 2001AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
2002 CPT Rig Mobilization and Demobiliation
2002AA Within 0 - 50 Miles 1 Each XXX.XX XXX.XX 2002AB Within 50 - 100 Miles 1 Each XXX.XX XXX.XX 2002AC Within 100 - 150 Miles 2 Each XXX.XX XXX.XX 2002AD Within 150 - 200 Miles 1 Each XXX.XX XXX.XX 2002AE Within 200 - 500 Miles 1 Each XXX.XX XXX.XX 2002AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
2003 Special Equipment for Site Characterization & Access
2003AA Excavation Equipment (Mob/Demob) 2 Each XXX.XX XXX.XX 2003AB Excavation Equipment (Active) 4 Day XXX.XX XXX.XX 2003AC Excavation Equipment (Standby) 4 Day XXX.XX XXX.XX 2003AD Dozer (Mob/Demob) 6 Each XXX.XX XXX.XX 2003AE Dozer (Active) 12 Day XXX.XX XXX.XX 2003AF Dozer (Standby) 12 Day XXX.XX XXX.XX 2003AG Forestry Mulcher (Mob/Demob) 4 Each XXX.XX XXX.XX 2003AH Forestry Mulcher (Active) 8 Day XXX.XX XXX.XX 2003AJ Forestry Mulcher (Standby) 8 Day XXX.XX XXX.XX 2003AK ATV/UTV for Site Access 10 Day XXX.XX XXX.XX 2003AL Traffic Control Measures 5 Day XXX.XX XXX.XX
2004 Drilling w/ SPT Test and Disturbed Sampling
2004AA 0 - 30 ft Depth (Sampling at 2.5 ft Intervals) 10,798 Linear Foot
2004AB 30 - 60 ft Depth (Sampling at 5 ft Intervals) 4,760 Linear Foot
2004AC 60 - 100 ft Depth (Sampling at 10 ft Intervals) 2,407 Linear Foot
2004AD 100 - 150 ft Depth (Sampling at 10 ft Intervals) 2,027 Linear Foot
2004AE 150 - 200 ft Depth (Sampling at 10 ft Intervals) 827 Linear Foot
2005 Drilling w/ Undisturbed Sampling
2005AA 0 - 50 ft Depth 4,646 Linear Foot
2005AB 50 - 100 ft Depth 495 Linear Foot
2005AC 100 - 150 ft Depth 163 Linear Foot
2005AD 150 - 200 ft Depth 50 Linear Foot
2006 Drilling w/ No Sampling
2006AA 0 - 50 ft Depth 465 Linear Foot
2006AB 50 - 100 ft Depth 25 Linear Foot
2006AC 100 - 150 ft Depth 8 Linear Foot
2006AD 150 - 200 ft Depth 50 Linear Foot
2007 Additional SPT Tests and Disturbed Samples
2007AA 0 - 30 ft Depth 369 Each
2007AB 30 - 60 ft Depth 296 Each
2007AC 60 - 100 ft Depth 36 Each
2007AD 100 - 150 ft Depth 1 Each
2007AE 150 - 200 ft Depth 1 Each
2008 Hand Auger Drilling and Sampling
2008AA 0 - 10 ft Depth 10 Linear Foot
2008AB 10 - 20 ft Depth 10 Linear Foot
2009 Cone Penetration Testing (CPT)
2009AA 0 - 50 ft Depth (Incl. Piezocone Pore Pressure Measurements) 1,500 Linear Foot
2009AB 50 - 100 ft Depth (Incl. Piezocone Pore Pressure Measurement) 500 Linear Foot
2009AC 0 - 50 ft Depth (No Pore Pressure Measurement) 2,000 Linear Foot
2009AD 50 - 100 ft Depth (No Pore Pressure Measurement) 750 Linear Foot
2009AE Pore Pressure Dissipation Tests 100 Hour
2009AF Vane Shear Test 500 Each
2009AG CPT-Based Direct Push Soil Samples 500 Each
2010 Direct Push Soil Sampling 1 Day
2011 Grab Sampling 20 Each
2012 Borehole Backfill 25,688 Linear Foot
2013 Instrumentation
2013AA Piezometer Installation 20 Linear Foot XXX.XX XXX.XX 2013AB Piezometer Testing 1 Hour
2013AC Piezometer Data Collection 1 Day
2013AD Inclinometer Installation 150 Linear Foot XXX.XX XXX.XX 2013AE Guard Post Installation 12 Each XXX.XX XXX.XX
2014 Laboratory Testing
2014AA Natural Moisture Content Test 4,170 Each
2014AB Atterberg Limits Test 4,170 Each
2014AC Grain Size Distribution Test 27 Each
2014AD Wet Sieve Test 2,093 Each
2014AE Percent Finer Than No. 200 Sieve Test 1,316 Each
2014AF Hydrometer Test 6 Each
2014AG Unconfined Compressive Strength ("UC") Test 1,966 Each
2014AH Unconsolidated Undrained ("UU" or "Q") Triaxial Test 12 Each
2014AJ Consolidated Undrained ("CU" or "R") Triaxial Test 8 Each
2014AK Consolidated Drained ("CD" or "S") Triaxial Test 1 Each
2014AL Direct Shear Test 1 Each
2014AM Consolidation Test 45 Each
2014AN Standard Compaction Test 1 Each
2014AP Modified Compaction Test 1 Each
2014AQ Soil pH Test 1 Each
2014AR Soil Resistivity Test 1 Each
CONTRACT BID SCHEDULE - ORDERING PERIOD 3
ANNUAL
QUANTITY UNIT UNIT PRICE TOTAL PRICE
3001 Drill Rig Mobilization and Demobilization
3001AA Within 0 - 50 Miles 4 Each XXX.XX XXX.XX 3001AB Within 50 - 100 Miles 4 Each XXX.XX XXX.XX 3001AC Within 100 - 150 Miles 8 Each XXX.XX XXX.XX 3001AD Within 150 - 200 Miles 2 Each XXX.XX XXX.XX 3001AE Within 200 - 500 Miles 2 Each XXX.XX XXX.XX 3001AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
3002 CPT Rig Mobilization and Demobiliation
3002AA Within 0 - 50 Miles 1 Each XXX.XX XXX.XX 3002AB Within 50 - 100 Miles 1 Each XXX.XX XXX.XX 3002AC Within 100 - 150 Miles 2 Each XXX.XX XXX.XX 3002AD Within 150 - 200 Miles 1 Each XXX.XX XXX.XX 3002AE Within 200 - 500 Miles 1 Each XXX.XX XXX.XX 3002AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
3003 Special Equipment for Site Characterization & Access
3003AA Excavation Equipment (Mob/Demob) 2 Each XXX.XX XXX.XX 3003AB Excavation Equipment (Active) 4 Day XXX.XX XXX.XX 3003AC Excavation Equipment (Standby) 4 Day XXX.XX XXX.XX 3003AD Dozer (Mob/Demob) 6 Each XXX.XX XXX.XX 3003AE Dozer (Active) 12 Day XXX.XX XXX.XX 3003AF Dozer (Standby) 12 Day XXX.XX XXX.XX 3003AG Forestry Mulcher (Mob/Demob) 4 Each XXX.XX XXX.XX 3003AH Forestry Mulcher (Active) 8 Day XXX.XX XXX.XX 3003AJ Forestry Mulcher (Standby) 8 Day XXX.XX XXX.XX 3003AK ATV/UTV for Site Access 10 Day XXX.XX XXX.XX 3003AL Traffic Control Measures 5 Day XXX.XX XXX.XX
3004 Drilling w/ SPT Test and Disturbed Sampling
3004AA 0 - 30 ft Depth (Sampling at 2.5 ft Intervals) 10,798 Linear Foot
3004AB 30 - 60 ft Depth (Sampling at 5 ft Intervals) 4,760 Linear Foot
3004AC 60 - 100 ft Depth (Sampling at 10 ft Intervals) 2,407 Linear Foot
3004AD 100 - 150 ft Depth (Sampling at 10 ft Intervals) 2,027 Linear Foot
3004AE 150 - 200 ft Depth (Sampling at 10 ft Intervals) 827 Linear Foot
3005 Drilling w/ Undisturbed Sampling
3005AA 0 - 50 ft Depth 4,646 Linear Foot
3005AB 50 - 100 ft Depth 495 Linear Foot
3005AC 100 - 150 ft Depth 163 Linear Foot
3005AD 150 - 200 ft Depth 50 Linear Foot
3006 Drilling w/ No Sampling
3006AA 0 - 50 ft Depth 465 Linear Foot
3006AB 50 - 100 ft Depth 25 Linear Foot
3006AC 100 - 150 ft Depth 8 Linear Foot
3006AD 150 - 200 ft Depth 50 Linear Foot
3007 Additional SPT Tests and Disturbed Samples
3007AA 0 - 30 ft Depth 369 Each
3007AB 30 - 60 ft Depth 296 Each
3007AC 60 - 100 ft Depth 36 Each
3007AD 100 - 150 ft Depth 1 Each
3007AE 150 - 200 ft Depth 1 Each
3008 Hand Auger Drilling and Sampling
3008AA 0 - 10 ft Depth 10 Linear Foot
3008AB 10 - 20 ft Depth 10 Linear Foot
3009 Cone Penetration Testing (CPT)
3009AA 0 - 50 ft Depth (Incl. Piezocone Pore Pressure Measurements) 1,500 Linear Foot
3009AB 50 - 100 ft Depth (Incl. Piezocone Pore Pressure Measurement) 500 Linear Foot
3009AC 0 - 50 ft Depth (No Pore Pressure Measurement) 2,000 Linear Foot
3009AD 50 - 100 ft Depth (No Pore Pressure Measurement) 750 Linear Foot
3009AE Pore Pressure Dissipation Tests 100 Hour
3009AF Vane Shear Test 500 Each
3009AG CPT-Based Direct Push Soil Samples 500 Each
3010 Direct Push Soil Sampling 1 Day
3011 Grab Sampling 20 Each
3012 Borehole Backfill 25,688 Linear Foot
3013 Instrumentation
3013AA Piezometer Installation 20 Linear Foot XXX.XX XXX.XX 3013AB Piezometer Testing 1 Hour
3013AC Piezometer Data Collection 1 Day
3013AD Inclinometer Installation 150 Linear Foot XXX.XX XXX.XX 3013AE Guard Post Installation 12 Each XXX.XX XXX.XX
3014 Laboratory Testing
3014AA Natural Moisture Content Test 4,170 Each
3014AB Atterberg Limits Test 4,170 Each
3014AC Grain Size Distribution Test 27 Each
3014AD Wet Sieve Test 2,093 Each
3014AE Percent Finer Than No. 200 Sieve Test 1,316 Each
3014AF Hydrometer Test 6 Each
3014AG Unconfined Compressive Strength ("UC") Test 1,966 Each
3014AH Unconsolidated Undrained ("UU" or "Q") Triaxial Test 12 Each
3014AJ Consolidated Undrained ("CU" or "R") Triaxial Test 8 Each
3014AK Consolidated Drained ("CD" or "S") Triaxial Test 1 Each
3014AL Direct Shear Test 1 Each
3014AM Consolidation Test 45 Each
3014AN Standard Compaction Test 1 Each
3014AP Modified Compaction Test 1 Each
3014AQ Soil pH Test 1 Each
3014AR Soil Resistivity Test 1 Each
CONTRACT BID SCHEDULE - ORDERING PERIOD 4
ANNUAL
QUANTITY UNIT UNIT PRICE TOTAL PRICE
4001 Drill Rig Mobilization and Demobilization
4001AA Within 0 - 50 Miles 4 Each XXX.XX XXX.XX 4001AB Within 50 - 100 Miles 4 Each XXX.XX XXX.XX 4001AC Within 100 - 150 Miles 8 Each XXX.XX XXX.XX 4001AD Within 150 - 200 Miles 2 Each XXX.XX XXX.XX 4001AE Within 200 - 500 Miles 2 Each XXX.XX XXX.XX 4001AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
4002 CPT Rig Mobilization and Demobiliation
4002AA Within 0 - 50 Miles 1 Each XXX.XX XXX.XX 4002AB Within 50 - 100 Miles 1 Each XXX.XX XXX.XX 4002AC Within 100 - 150 Miles 2 Each XXX.XX XXX.XX 4002AD Within 150 - 200 Miles 1 Each XXX.XX XXX.XX 4002AE Within 200 - 500 Miles 1 Each XXX.XX XXX.XX 4002AF Greater Than 500 miles 1 Each XXX.XX XXX.XX
4003 Special Equipment for Site Characterization & Access
4003AA Excavation Equipment (Mob/Demob) 2 Each XXX.XX XXX.XX 4003AB Excavation Equipment (Active) 4 Day XXX.XX XXX.XX 4003AC Excavation Equipment (Standby) 4 Day XXX.XX XXX.XX 4003AD Dozer (Mob/Demob) 6 Each XXX.XX XXX.XX 4003AE Dozer (Active) 12 Day XXX.XX XXX.XX 4003AF Dozer (Standby) 12 Day XXX.XX XXX.XX 4003AG Forestry Mulcher (Mob/Demob) 4 Each XXX.XX XXX.XX 4003AH Forestry Mulcher (Active) 8 Day XXX.XX XXX.XX 4003AJ Forestry Mulcher (Standby) 8 Day XXX.XX XXX.XX 4003AK ATV/UTV for Site Access 10 Day XXX.XX XXX.XX 4003AL Traffic Control Measures 5 Day XXX.XX XXX.XX
4004 Drilling w/ SPT Test and Disturbed Sampling
4004AA 0 - 30 ft Depth (Sampling at 2.5 ft Intervals) 10,798 Linear Foot
4004AB 30 - 60 ft Depth (Sampling at 5 ft Intervals) 4,760 Linear Foot
4004AC 60 - 100 ft Depth (Sampling at 10 ft Intervals) 2,407 Linear Foot
4004AD 100 - 150 ft Depth (Sampling at 10 ft Intervals) 2,027 Linear Foot
4004AE 150 - 200 ft Depth (Sampling at 10 ft Intervals) 827 Linear Foot
4005 Drilling w/ Undisturbed Sampling
4005AA 0 - 50 ft Depth 4,646 Linear Foot
4005AB 50 - 100 ft Depth 495 Linear Foot
4005AC 100 - 150 ft Depth 163 Linear Foot
4005AD 150 - 200 ft Depth 50 Linear Foot
4006 Drilling w/ No Sampling
4006AA 0 - 50 ft Depth 465 Linear Foot
4006AB 50 - 100 ft Depth 25 Linear Foot
4006AC 100 - 150 ft Depth 8 Linear Foot
4006AD 150 - 200 ft Depth 50 Linear Foot
4007 Additional SPT Tests and Disturbed Samples
4007AA 0 - 30 ft Depth 369 Each
4007AB 30 - 60 ft Depth 296 Each
4007AC 60 - 100 ft Depth 36 Each
4007AD 100 - 150 ft Depth 1 Each
4007AE 150 - 200 ft Depth 1 Each
4008 Hand Auger Drilling and Sampling
4008AA 0 - 10 ft Depth 10 Linear Foot
4008AB 10 - 20 ft Depth 10 Linear Foot
4009 Cone Penetration Testing (CPT)
4009AA 0 - 50 ft Depth (Incl. Piezocone Pore Pressure Measurements) 1,500 Linear Foot
4009AB 50 - 100 ft Depth (Incl. Piezocone Pore Pressure Measurement) 500 Linear Foot
4009AC 0 - 50 ft Depth (No Pore Pressure Measurement) 2,000 Linear Foot
4009AD 50 - 100 ft Depth (No Pore Pressure Measurement) 750 Linear Foot
4009AE Pore Pressure Dissipation Tests 100 Hour
4009AF Vane Shear Test 500 Each
4009AG CPT-Based Direct Push Soil Samples 500 Each
4010 Direct Push Soil Sampling 1 Day
4011 Grab Sampling 20 Each
4012 Borehole Backfill 25,688 Linear Foot
4013 Instrumentation
4013AA Piezometer Installation 20 Linear Foot XXX.XX XXX.XX 4013AB Piezometer Testing 1 Hour
4013AC Piezometer Data Collection 1 Day
4013AD Inclinometer Installation 150 Linear Foot XXX.XX XXX.XX 4013AE Guard Post Installation 12 Each XXX.XX XXX.XX
4014 Laboratory Testing
4014AA Natural Moisture Content Test 4,170 Each
4014AB Atterberg Limits Test 4,170 Each
4014AC Grain Size Distribution Test 27 Each
4014AD Wet Sieve Test 2,093 Each
4014AE Percent Finer Than No. 200 Sieve Test 1,316 Each
4014AF Hydrometer Test 6 Each
4014AG Unconfined Compressive Strength ("UC") Test 1,966 Each
4014AH Unconsolidated Undrained ("UU" or "Q") Triaxial Test 12 Each
4014AJ Consolidated Undrained ("CU" or "R") Triaxial Test 8 Each
4014AK Consolidated Drained ("CD" or "S") Triaxial Test 1 Each
4014AL Direct Shear Test 1 Each
4014AM Consolidation Test 45 Each
4014AN Standard Compaction Test 1 Each
4014AP Modified Compaction Test 1 Each
4014AQ Soil pH Test 1 Each
4014AR Soil Resistivity Test 1 Each
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
BASE YEAR
FFP
Drill Rig Mobilization and Demobilization, CPT Rig Mobilization and Demobiliation, Special Equipment for Site Characterization & Access, Drilling w/ SPT Test and Disturbed Sampling, Drilling w/ Undisturbed Sampling, Drilling w/ No Sampling, Additional SPT Tests and Disturbed Samples, Hand Auger Drilling and Sampling, Cone Penetration Testing (CPT), Direct Push Soil Sampling, Grab Sampling, Borehole Backfill, Instrumentation AND Laboratory Testing.
Firm Fixed Price (FFP) Multiple Award Task Order Contract (MATOC) Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Drilling Services for use primarily within the U.S. Army Corps of Engineers (USACE).Memphis District's (CEMVM) Civil and Military Works Boundaries. The work will be performed at various sites within the continental United States but primarily in Illinois, Missouri, Kentucky, Arkansas, Tennessee, and Mississippi.
The contractor shall provide all labor, equipment, materials, and supplies necessary to drill borings, recover samples, conduct cone penetration tests (CPT and CPTu), perform pore pressure dissipation tests, vane shear tests, recover CPT-based direct push soil samples, test lab specimens, record test data, install and monitor piezometers, and install inclinometers in accordance with Section C, Statement of Work. Services will be further defined, and work accomplished by issuance of individual Task Orders.
The minimum guarantee is $10,000.00 FOB: Destination
PSC CD: H999
FOB: Destination
NET AMT
1001 1 Each Ordeing Period 1
FFP
Drill Rig Mobilization and Demobilization,CPT Rig Mobilization and Demobiliation, Special Equipment for Site Characterization & Access,Drilling w/ SPT Test and Disturbed Sampling,Drilling w/ Undisturbed Sampling,Drilling w/ No Sampling,Additional SPT Tests and Disturbed Samples,Hand Auger Drilling and Sampling,Cone Penetration Testing (CPT),Direct Push Soil Sampling,Grab Sampling,Borehole Backfill,Instrumentation AND Laboratory Testing.
Firm Fixed Price (FFP) Multiple Award Task Order Contract (MATOC) Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Drilling Services for use primarily within the U.S. Army Corps of Engineers (USACE).Memphis District's (CEMVM) Civil and Military Works Boundaries. The work will be performed at various sites within the continental United States but primarily in Illinois, Missouri, Kentucky, Arkansas, Tennessee, and Mississippi.
The contractor shall provide all labor, equipment, materials, and supplies necessary to drill borings, recover samples, conduct cone penetration tests (CPT and CPTu), perform pore pressure dissipation tests, vane shear tests, recover CPT-based direct push soil samples, test lab specimens, record test data, install and monitor piezometers, and install inclinometers in accordance with Section C, Statement of Work. Services will be further defined, and work accomplished by issuance of individual Task Orders.
The minimum guarantee is $10,000.00 FOB: Destination
2001 1 Each Ordeing Period 2
FFP
Drill Rig Mobilization and Demobilization,CPT Rig Mobilization and Demobiliation, Special Equipment for Site Characterization & Access,Drilling w/ SPT Test and Disturbed Sampling,Drilling w/ Undisturbed Sampling,Drilling w/ No Sampling,Additional SPT Tests and Disturbed Samples,Hand Auger Drilling and Sampling,Cone Penetration Testing (CPT),Direct Push Soil Sampling,Grab Sampling,Borehole Backfill,Instrumentation AND Laboratory Testing.
Firm Fixed Price (FFP) Multiple Award Task Order Contract (MATOC) Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Drilling Services for use primarily within the U.S. Army Corps of Engineers (USACE).Memphis District's (CEMVM) Civil and Military Works Boundaries. The work will be performed at various sites within the continental United States but primarily in Illinois, Missouri, Kentucky, Arkansas, Tennessee, and Mississippi.
The contractor shall provide all labor, equipment, materials, and supplies necessary to drill borings, recover samples, conduct cone penetration tests (CPT and CPTu), perform pore pressure dissipation tests, vane shear tests, recover CPT-based direct push soil samples, test lab specimens, record test data, install and monitor piezometers, and install inclinometers in accordance with Section C, Statement of Work. Services will be further defined, and work accomplished by issuance of individual Task Orders.
The minimum guarantee is $10,000.00 FOB: Destination
3001 1 Each Ordeing Period 3
FFP
Drill Rig Mobilization and Demobilization,CPT Rig Mobilization and Demobiliation, Special Equipment for Site Characterization & Access,Drilling w/ SPT Test and Disturbed Sampling,Drilling w/ Undisturbed Sampling,Drilling w/ No Sampling,Additional SPT Tests and Disturbed Samples,Hand Auger Drilling and Sampling,Cone Penetration Testing (CPT),Direct Push Soil Sampling,Grab Sampling,Borehole Backfill,Instrumentation AND Laboratory Testing.
Firm Fixed Price (FFP) Multiple Award Task Order Contract (MATOC) Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Drilling Services for use primarily within the U.S. Army Corps of Engineers (USACE).Memphis District's (CEMVM) Civil and Military Works Boundaries. The work will be performed at various sites within the continental United States but primarily in Illinois, Missouri, Kentucky, Arkansas, Tennessee, and Mississippi.
The contractor shall provide all labor, equipment, materials, and supplies necessary to drill borings, recover samples, conduct cone penetration tests (CPT and CPTu), perform pore pressure dissipation tests, vane shear tests, recover CPT-based direct push soil samples, test lab specimens, record test data, install and monitor piezometers, and install inclinometers in accordance with Section C, Statement of Work. Services will be further defined, and work accomplished by issuance of individual Task Orders.
The minimum guarantee is $10,000.00 FOB: Destination
4001 1 Each Ordeing Period 4
FFP
Drill Rig Mobilization and Demobilization,CPT Rig Mobilization and Demobiliation, Special Equipment for Site Characterization & Access,Drilling w/ SPT Test and Disturbed Sampling,Drilling w/ Undisturbed Sampling,Drilling w/ No Sampling,Additional SPT Tests and Disturbed Samples,Hand Auger Drilling and Sampling,Cone Penetration Testing (CPT),Direct Push Soil Sampling,Grab Sampling,Borehole Backfill,Instrumentation AND Laboratory Testing.
Firm Fixed Price (FFP) Multiple Award Task Order Contract (MATOC) Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Drilling Services for use primarily within the U.S. Army Corps of Engineers (USACE).Memphis District's (CEMVM) Civil and Military Works Boundaries. The work will be performed at various sites within the continental United States but primarily in Illinois, Missouri, Kentucky, Arkansas, Tennessee, and Mississippi.
The contractor shall provide all labor, equipment, materials, and supplies necessary to drill borings, recover samples, conduct cone penetration tests (CPT and CPTu), perform pore pressure dissipation tests, vane shear tests, recover CPT-based direct push soil samples, test lab specimens, record test data, install and monitor piezometers, and install inclinometers in accordance with Section C, Statement of Work. Services will be further defined, and work accomplished by issuance of individual Task Orders.
The minimum guarantee is $10,000.00 FOB: Destination
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$2,500.00 $20,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$1,000.00 $1,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
MEMPHIS DISTRICT
GEOTECHNICAL DRILLING AND TESTING SERVICES
CONTRACT # W912EQ-23-X-XXXX
1. General. The work performed under this contract will provide geotechnical data to inform our geotechnical analyses and designs. The integrity of the engineering design work is dependent on the accuracy and completeness of the geotechnical data obtained under this contract. The work will be performed at various sites within the continental U.S., but primarily in Illinois, Missouri, Kentucky, Arkansas, Tennessee, and Mississippi. The work shall consist of furnishing all plant, labor, equipment, materials, and supplies necessary to drill borings, recover samples, conduct cone penetration tests (CPT and CPTu), perform pore pressure dissipation tests, vane shear tests, recover CPT-based direct push soil samples, test lab specimens, record test data, install and monitor piezometers, and install inclinometers in accordance with this contract. The exact quantities associated with drilling, sampling, testing, and other Contract Line Items will be governed by conditions and materials encountered at each work site and will not be fully known until after the work has been performed. The Government will estimate the approximate cost of each task order based on the best available information, and the Contractor shall invoice each Contract Line Item according to the actual quantities supplied or performed. The Contracting Officer reserves the right to direct the sequence of work.
2. References. The Contractor shall perform all drilling, sampling, testing, and other work in accordance with the applicable standards and references listed below, unless specifically directed otherwise in this contract.
2.1. Department of the Army, Corps of Engineers, Engineer Manuals.
EM 385-1-1 Safety and Health Requirements Manual
2.2. U.S. Department of Labor, Occupational Safety, and Health Administration (OSHA).
29 CFR 1926.652 Requirements for Protective Systems.
2.3. Canadian Geotechnical Journal – Vol. 20, No. 4
Interpretation of Cone Penetration Tests, Robertson and Campanella, et al (1983)
2.4. Gregg Drilling, Guide to Cone Penetration Testing for Geotechnical Engineering, Robertson and Cabal, 6th Edition (2015)
2.5. American Society for Testing and Materials (ASTM).
D 6151 Standard Practice for Using Hollow-Stem Augers for Geotechnical
Exploration and Soil Sampling
D 5783 Standard Guide for Using of Direct Rotary Drilling with Water- Based Drilling Fluid for Geoenvironmental Exploration and Installation of Subsurface Water-Quality Monitoring Devices
D 1587 Standard Practice for Thin-Walled Tube Sampling of Fine-Grained Soils for Geotechnical Purposes
D 6519 Standard Practice for Sampling of Soil Using Hydraulically Operated Stationary Piston Sampler
D 1586 Method for Penetration Test and Split-Barrel Sampling of Soils D 4633 Standard Test Method for energy Measurement for Dynamic
Penetrometers D 1452 Practice for Soil Investigation and Sampling by Auger Borings D 4220 Standard Practice for Preserving and Transporting Soil Samples D 5778 Standard Test Method for Electronic Friction Cone and Piezocone
Penetration Testing of Soils D 2487 Classification of Soils for Engineering Purposes D 2488 Test Method for Description and Identification of Soils (Visual-
Manual Procedures) D 2216 Test Method for Laboratory Determination of Water Content of
Soil and Rock D 4318 Test Method for Liquid Limit, Plastic Limit and Plasticity Index of
Soils D 6067 Standard Practice for Using the Electronic Piezocone Penetrometer
Tests for Environmental Site Characterization and Estimation of Hydraulic Conductivity
D 2573 Standard Test Method for Field Vane Shear Test in Saturated Fine- Grained Soils
D 6282 Standard Guide for Direct Push Soil Sampling for Environmental Site Characterization
D 6913 Standard Test Methods for Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis
D 1140 Standard Test Methods for Amount of Material in Soils Finer Than the No. 200 (75-Micrometer) Sieve
D 422 Particle-Size Analysis of Soils D 2166 Standard Test Method for Unconfined Compressive Strength of
Cohesive Soil D 2850 Standard Test Method for Unconsolidated, Undrained Triaxial
Compression Test on Cohesive Soils D 4767 Standard Test Method for Consolidated Undrained Triaxial
Compression Test for Cohesive Soils D 7181 Standard Test Method for Consolidated Drained Triaxial
Compression Test for Soils D 3080 Standard Test Method for Direct Shear Test of Soils under
Consolidated Drained Conditions D 2435 Standard Test Method for One-Dimensional Consolidation
Properties of Soils
D 698 Laboratory Compaction Characteristics of Soil Using Standard Effort
D 1557 Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort
D 6282 Standard Guide for Direct-Push Soil Sampling for Environmental Site Characterizations
D 6001 Standard Guide for Direct-Push Groundwater Sampling for Environmental Site Characterization
C 33 Standard Specification for Concrete Aggregates D 4044 Field Procedure for Instantaneous Change in Head (Slug) Tests for
Determining Hydraulic Properties of Aquifers D 7263 Standard Test Methods for Laboratory Determination of Density
(Unit Weight) of Soil Specimens D 4972 Standard Test Method for pH of Soils G 187-12a Standard Test Method for Measurement of Soil Resistivity Using the Two-Electrode Soil Box Method
3. Scope of Work. The work performed under this contract shall include geotechnical drilling, sampling, grouting of boreholes, creation and management of drilling records, laboratory testing, creation and management of laboratory testing records, cone penetration testing (CPT), CPT-based in-situ soil tests, direct push soil sampling, piezometer installation, piezometer monitoring, inclinometer installation, and guard post installation. The Government will issue task orders based on the requirements set forth in this contract. The Contractor shall perform the work in accordance with this contract and submit invoices to the Government according to the agreed upon unit price for each Contract Line Item.
3.1. Boring Location. The Government will provide the Contractor with a general map, aerial photograph, and project drawing showing the project location and proposed boring locations. Additionally, the Government will identify each boring location in the field with survey flagging and a stake marked with the boring number. Minor deviation (field adjustments) in the proposed boring location as shown on the drawings or as staked in the field shall be allowed without Government approval. However, changes of 20 ft or more from the staked location must be approved in advance by the Government. The borings shall be numbered on the field logs as indicated in the task order and on the wooden stakes in the field. The Contractor shall measure the latitude and longitude of each boring location as drilled in the field using a dedicated GPS device and record these coordinates on the field logs for each boring in decimal degree format. Latitude and longitude coordinates noted on the field logs shall be accurate to within 20 ft. The Contractor shall be responsible for requesting utility location services for each boring from the appropriate state or local agency.
3.2. Drilling. The boring shall be drilled using hollow stem augers, mud rotary, or a combination of the two methods. The following procedures shall be used by the Contractor depending on the selected method of drilling:
3.2.1. Hollow Stem Augers. Drilling and sampling using a hollow stem auger shall be performed in accordance with ASTM D6151, unless specifically directed otherwise in this contract. Drilling and sampling may be advanced using hollow stem augers when drilling above the in-situ groundwater level. Below this depth, mud rotary drilling shall be used. When advancing the boring through strata above the in-situ groundwater table, if soil heaves upward into the auger stem, the Contractor may attempt to fill the auger stem with water or drilling mud to offset the uplift forces;
however, if this proves unsuccessful (i.e. soils heave into the hollow stem auger), the Contractor shall switch over to mud rotary drilling before proceeding with the boring. Any use of fluid in the hollow stem auger, including the associated depths, shall be clearly recorded on the field logs. If any soil heaves into the hollow stem auger during drilling operations, the depths to bottom of the auger and the top of the heaved soil shall be clearly recorded on the field logs. The borehole shall be cleaned to the sampling elevation exercising caution to ensure that the material to be sampled is not disturbed by the cleanout operation and that there are minimal cutting at the base of the borehole.
3.2.2. Mud Rotary. Drilling and sampling using the mud rotary method shall be performed in accordance with ASTM D5783, unless specifically directed otherwise in this contract. Drilling and sampling may be advanced using mud rotary drilling method either above or below the in-situ groundwater level. Bentonite-based drilling fluid additives are acceptable, except in boreholes for piezometer installation, relief well pilot holes, or when specifically directed otherwise in the task order. Side-discharge or top-discharge fishtail or roller cone bits are acceptable. Any type of bottom-discharge bits will be considered unacceptable. The borehole shall be cleaned to the sampling elevation exercising caution to ensure that the material to be sampled is not disturbed by the cleanout operation and that there are minimal cutting at the base of the borehole. The depth at which mud rotary drilling is initiated shall be clearly recorded on the field logs along with any drilling methods used prior to switching to mud rotary.
3.3. Sampling. The Contractor shall drill each boring to the depth specified for that boring in the task order. Each task order will include one or more tables showing required sampling types and intervals for each boring or boring type. The Contractor shall exercise care to maximize recovery and minimize disturbance for each sample.
3.3.1. Undisturbed Sampling. Undisturbed samples shall be obtained in accordance with
ASTM D1587, unless specifically directed otherwise in this contract, using a fixed-piston type sampler in accordance with ASTM D6519 to recover undisturbed samples below the natural groundwater table. Unless directed otherwise by the task order, undisturbed samples shall be taken continuously, the bottom depth of one sample identical to the top depth of the subsequent sample. Unless directed otherwise by the task order, undisturbed samples shall be obtained using 5-inch diameter thin-walled (Shelby) tubes as described in ASTM D1587. One recovered, the tube ends shall be cleaned of any disturbed or excess material and capped with an air-tight seal in the field as soon as they are extracted. Each extruded undisturbed sample shall be tested with a pocket penetrometer and torvane in addition to any other laboratory tests assigned by the Government.
3.3.2. Disturbed Sampling. Disturbed samples shall be obtained in accordance with ASTM D1586 unless specifically directed otherwise in this contract. Soil samples recovered using the split spoon method of sampling shall use the standard (1-3/8 inch I.D., 2 inch O.D.) split spoon drive sampler without an interior liner. With the split spoon sampler resting at the bottom of the hole, it shall be driven through undisturbed soil 18 inches, or to refusal, using an approved auto-hammer that has been calibrated at least annually according to ASTM D4633. The Contractor shall provide proof of annual calibration of each auto-hammer used for obtaining split spoon samples under this contract. The manufacturer and model of the hammer shall be recorded on the field log. Refusal is defined as penetration of less than 6 inches for 50 blows. In the event that the Contractor opens the split spoon sampler and finds two different materials inside so as to indicate a change in soil strata between the top and bottom depths of the sample, the Contractor shall place the two distinct materials in separate jars with sample numbers and depths labeled appropriately.
3.3.3. Hand Auger Sampling. Hand auger samples shall be obtained in accordance with ASTM D1452 unless specifically directed otherwise in this contract. Hand auger samples shall be obtained using augers at least 2 inches in diameter, either barrel, Dutch, or Iwan type, at 12-inch intervals and/or at strata changes. Field boring logs, as described in Section 3.6 below, shall be completed for each boring. For the purposes of transportation and storage, hand auger samples shall be considered disturbed samples.
3.3.4. Grab Sampling. Grab samples shall be obtained from auger flights, inspection trenches, test pits, or other excavations from each depth identified in the task order.
Field boring logs, as described in Section 3.6 below, shall be completed for each boring, inspection trench, or test pit. For the purposes of transportation and storage, grab samples shall be considered disturbed samples.
3.3.5. Sample Containers and Care. All soil samples recovered as part of this contract shall be preserved, stored, and transported in accordance with ASTM D4220.
Shipping samples to a laboratory outside the Memphis, TN Metropolitan Statistical Area will be allowed provided the Contractor can demonstrate a satisfactory packaging and handling process that meets or exceeds all of the requirements of ASTM D4220 in order to ensure that all samples arrive at their destination in the same condition as when they were visually classified. For any samples shipped by means of a 3rd party courier service (such as FedEx, UPS, DHL, US Postal Service, etc), a tracking number shall be provided to the Contracting Officer within 48 hrs of shipment. Lost, damaged, or otherwise disturbed samples shall be promptly redrilled and replaced by the Contractor at no additional cost to the Government.
Unless specifically directed otherwise in the task order, undisturbed samples, such as those obtained using a Shelby tube sampler, shall be considered as falling under
Group D. Disturbed samples, such as those obtained from a split spoon sampler, hand auger, auger flights, inspection trench, or test pit shall be considered as falling under Group B. Upon completion of work for each task order, all soil samples from that task order shall be sealed, placed in suitable containers, and stacked neatly and securely on standard freight pallets to a height not greater than 36 inches above the pallet. Labels or signs listing the names of all the projects included on each pallet shall be affixed to at least 2 perpendicular sides of each pallet, and the pallets shall be delivered to Bldg. 17 at Ensley Engineering Yard, 2915 Riverport Rd, Memphis, TN 38109. The Contractor shall provide at least 7 days’ notice prior to delivering soil samples.
3.3.5.1. Disturbed Samples. Disturbed samples shall be placed 1-pint capacity, transparent sample jars and sealed with moisture-tight threaded lids. The mouth of each jar shall be at least 2.25 inches in diameter. At a minimum, each jar shall be clearly and legibly identified in permanent ink with the following information:
(1) Boring number or designation (as it appears on wooden stake)
(2) Sample number
(3) Top and bottom depth of sample
(4) Date sample recovered
Sample jars shall be labeled on site as soon as the sample is placed in the jar. Sample jars shall be sealed tightly to minimize losses of natural moisture during sample transport and storage. Sample jars shall be placed in partitioned boxes suitable for shipping and long-term storage. Each box shall completely enclose and protect all jars and be clearly and legibly labeled on one end (not on top or bottom) with the following information:
(1) Project name and task order number
(2) Boring name(s) or designation(s) contained within
(3) Sample numbers contained within
If a single boring requires more than one box, the boxes shall be sequentially numbered. The Contractor shall furnish all sample jars and boxes. The Government will furnish all jar labels. Upon final receipt, the sample jars and boxes shall become property of the Government.
3.3.5.2. Undisturbed Samples. Undisturbed samples shall be kept sealed and undisturbed in their sample tubes or containers at the Contractor’s laboratory until the Government can personally oversee the unsealing and extrusion of the samples. All Undisturbed samples shall be clearly and legibly identified in permanent ink with the flowing information:
(1) Boring number of designation (as it appears on wooden stake)
(2) Sample number
(3) Top and bottom depth of sample
(4) Date sample recovered
The Contractor shall exercise care to ensure undisturbed samples are stored upright (i.e.