B08 - Additional Questions and Answers.pdf
PDF 49 KB Posted
- Attached to
- Hardwood Railroad Cross-ties
- Solicitation number
- W912EQ20T0026
About this file
This document contains additional questions and answers related to federal contract solicitation W912EQ20T0026 for hardwood railroad crossties. The solicitation requires the delivery of 54,000 new oak and durable mixed hardwood crossties, borate/creosote dual pressure treated and measuring 7" x 9" x 8'6" with end plating, to be delivered by barge or truck to a location in Drummonds, TN between October 2020 and March 2021. The questions and answers clarify that shelter will be provided for unloading equipment, government personnel will be on site to direct offloading and stacking, borate treated ties not needing to be covered is acceptable, delivery can be in multiple trucks with an intended schedule to avoid times when the contractor is casting ties which usually begins in April, contractor equipment can be left on site at their own risk with gated but no security, ties will be inspected while banded and need to be re-banded if broken, and the unloading site has a concrete treated base.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912EQ20T0026 Additional Questions and Answers
1. If we are to unload and provide the unloading equipment (as answered in listing), Is there any shelter there for a forklift to be offloaded and parked under as opposed to being set out in weather?
There is shelter for forklift.
2. Is there ANY personnel on site on daily basis/ all day??? Anyone to direct where to unload and stack? Would the contractor be responsible for equipment on ground and offloading of trucks?
There will be government personnel on site to direct offload and stacking.
3. Per manufacturing, “borate treated ties are NOT covered following treatment. Industry standard has not required this for many years”. This is exception to c005d in your specifications. I have spoken with another manufacturer and am running into the same. Would this make our quote technically unacceptable?
No, that is fine, thank you for the clarification.
4. How many trucks/units per delivery? What is estimated delivery schedule?
Delivery needs to be October 2020 - March 2021. Object of delivery schedule is not to be delivering when contractor is casting, which usually begins in April.
5. Can my equipment (Loader) be left on site?
Yes, at your own risk. Gates but no onsite security.
6. What is the inspection process? Will ties have to be un-banded for inspection?
No, they will be inspected in banding.
7. Will ties need to be re-banded if broken?
Yes, need to be stacked in bands.
8. What type of offloading site conditions? Dirt, concrete, etc?
Consolidated Gravel. It is a concrete casting yard, so concrete treated base.