A22_W912EQ19R00090002.pdf

PDF 2 MB Posted

Attached to
Dragline Crane Federal contract opportunity
Solicitation number
W912EQ19R0009
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

Solicitation Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Dragline Crane, newest first.
File Type Posted
A22_W912EQ19R00090002_mod.pdf PDF
Existing_Sauerman_Buckets_15013__15014.pdf PDF
Existing_Drag_Rake_File_321-51_Dec1958.pdf PDF
A22_W912EQ19R0009.pdf PDF
A22_W912EQ19R0009.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912EQ19R0009

CODE

(Hour)

PAGE(S)

until 01:00 PM local time 22 May 2019

X

A X B X C X D

EX

X

G F 190 - 201

202 - 215 X H 216 - 223 kirk.a.middleton@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 223

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912EQ 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 2 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

167 N. Main St., Room 665 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

KIRK A MIDDLETON II 901-544-3710

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 - 33 34 - 35

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

36 - 39 40 - 42

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 43 - 44 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 45 - 55 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

56 - 177

PART II - CONTRACT CLAUSES

US ARMY ENGINEER DISTRICT, MEMPHIS

KIRK A. MIDDLETON 167 N MAIN ST

MEMPHIS TN 38103-1894

901-544-0786

901-544-3710FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

178 - 189

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

08 Apr 2019

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

Section B - Supplies or Services and Prices

SUBMITTAL

Design, construct, and test one Dragline Crane for the Corps of Engineers, Memphis District for use in support of its bank grading mission on the inland navigation system, in accordance with the attached specifications. In addition optional line items may be awarded for the storage of the crane.

ITEM UNIT TOTAL

NUMBER ITEM

QTY.

UNIT PRICE PRICE

0001 Dragline Crane 1 JOB

0001AA PLANNING, SCHEDULING, AND ENGINEERING (The submittals required for Planning, Scheduling, and Engineering are listed in contract Clause H02.). This item is initiated only by a Notice To Proceed issued by the Contracting Officer.

1 JOB XXXX $ _________

0001AB CONSTRUCT AND TEST the crane (The submittals for “Construct and Test” are listed in contract Clause H02.). This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.

1 JOB XXXX $_________

0001AC DELIVER the crane.

0001AD INSTALLATION, ASSEMBLY, BARGE TESTING,

TRAINING, AND FINAL ACCEPTANCE the crane. (The submittals for “Installation, Assembly, Barge Testing, Training, and Final Acceptance” are listed in contract Clause H02.). This item is initiated only by a Notice To Proceed issued by the Contracting Officer. The Contractor may not start this item until he receives a Notice To Proceed for this item.

TOTAL ITEM 0001 1 JOB $_________

0002 STORAGE (OPTION) for the crane, its components, materials, and spares as specified in Clause C024.

If the Government exercises the option line item (0002) the option will be exercised within 500 days from the date of contract award.

20 MONTHS $_____ $_________

TOTAL FOR DRAGLINE CRANE AND OPTION

INSERT LOCATION OF THE FACILITY WHERE THE WORK WILL BE PERFORMED:

The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

Refer to contract Section M for EVALUATION FACTORS FOR AWARD criteria.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Dragline Crane

FFP

Bank Grader Crane Barge to replace Memphis District Bank Grading Unit FOB: Destination

NET AMT

Section C - Descriptions and Specifications

DESCRIPTION AND SPECIFICATIONS

SECTION C – DESCRIPTIONS AND SPECIFICATIONS

C001. GENERAL

The Army Corps of Engineers is issuing this Request For Proposals (RFP), to acquire a new dragline crane to be mounted and operated on a barge platform that will be procured under a separate Contract. The completed vessel will be a new Crane Barge to be operated by the Corps of Engineers Memphis District.

C002. MISSION STATEMENT

The new Crane Barge will replace the existing Bank Grader Crane Barge. The existing Bank Grader Crane Barge is a non-self-propelled barge with a pedestal mounted Bucyrus Erie 9W dragline crane. Its mission is to grade the banks of the Mississippi River to create stability in preparation for the laying of concrete mattresses.

The Bank Grader Crane Barge is attached to a track along a long mooring barge which is used to position the crane barge. Together these barges make up the “Bank Grading Unit”. The mooring barge has winches with anchor lines that run out to bulldozers on the shore. These bulldozers help position the mooring barge.

The operating mission of the Bank Grader Crane Barge is to drag bank material down the bank slope to provide an acceptable bank grade. Typical finished bank grades range from 3:1 to 7:1 (horizontal:vertical). Sometimes to attain the desired slope it requires moving the material far from the river bank out into the river adjacent to the graded bank. In these cases, the Bank Grader will haul or spar itself out along the mooring barge to move further into the river to allow for the material to be dragged out into the desired displacement location. The Bank Grader barge has mooring winches on the deck which are used to haul the Bank Grader along the length of the mooring barge. The Bank Grader Crane will always be dragging material into the river and it will not have to pick up and place material.

The Bank Grader Crane Barge has sloped deck edges on the land and river side. The bucket is often dragged in close to the bank grader barge, and the sloped edges of the barge allow the dragline to move freely without obstruction when this occurs.

The crane’s primary operating area is the Mississippi River from below New Orleans, LA to Cairo, IL. The crane must be able to grade various materials along the river bank such as various types of soil (sand, silt, and clay), pieces of articulated concrete mattress, and some rocks on land and under water. The material is not lifted and moved, it is simply dragged down the bank.

Bulldozers on the river bank are used for digging and piling material to help the bank grader move material.

The bank grading work is performed primarily with a crescent style dragline bucket attachment. The bucket is often thrown/cast past the tip of the boom to reach a larger working radius on the bank. When required, a dragline rake attachment is utilized to put the finished grade on a slope or for hard to reach areas where the bulldozers cannot reach. The rake is thrown/cast past the boom tip similar to the bucket.

The new crane will perform essentially the same dragging operations as the existing crane, however a higher production rate is desired.

Along with handling the bucket or grade rake, the crane will have to lift and place 6,000 lbs anchors on the river banks to assist with positioning the barge and bank grading unit.

A video of the existing Bank Grader Unit working along the banks of the Mississippi River can be viewed at:

https://www.youtube.com/watch?v=O9l_C73MiAo

C003. SCOPE OF WORK

The contract consists of three phases:

Phase I Planning, Scheduling and Engineering Phase II Construct, Test, and Deliver Phase III Installation, Assembly, Barge Testing, Training and Final Acceptance

In accordance with the three phases and the contract specifications, it is intended for the Contractor to engineer, fabricate, test, and deliver a duty-cycle dragline machine, as well as obtain ABS classification and certification as required in the following sections. Should the Contractor determine at any time that he is unable to fulfill those responsibilities, he shall notify the COR immediately of the problem experienced and his proposed manner of correction.

For this contract, the Contractor shall include all costs to provide and deliver the following:

One duty-cycle dragline machine/crane in accordance with the specifications of this contract.

Testing for the items specified under this contract including the supporting structure (kingpost, pedestal, tub or ring), the crane, its components and materials.

Technical support and guidance to the barge Contractor for the assembly of the crane on the barge, the integration of the crane to the barge, and the start-up of the crane after installation on the barge at the barge manufacturer’s facility.

Technical support and guidance to the barge Contractor for operational performance testing and trials of the crane after integration on the barge at the barge manufacturer’s facility.

Final Acceptance and Demonstrations in conjunction with the barge Contractor at the Corps’ designated point of Final Acceptance of the completed floating crane barge.

Training to Corps personnel after delivery of the floating crane.

The crane Contractor shall attend a kickoff meeting at the barge Contractor’s facility. For bidding purposes, the Offeror shall assume that the kickoff meeting will require 2 personnel for a total of 4 days, including travel time at a location in the Gulf Coastal region of the United States.

The crane Contractor shall have representation onsite at the barge Contractor’s facility to ensure that the installation and assembly are executed properly (by the barge Contractor), and according to his (the crane Contractor’s) approved procedures and practices. For bidding purposes, the Offeror shall assume that the representative from the crane manufacturer shall make four trips for sixty days total including travel to the Gulf Coastal region of the United States.

Once the crane is assembled and installed on the barge, the crane Contractor shall provide the services of crane operators and other qualified personnel to demonstrate proper operation and proper performance of the crane. Prior to start of Phase III, the crane Contractor shall coordinate with the shipyard in order for the shipyard to provide suitable weights for testing as defined in Contract Clause E05 Section D.

Once the barge is delivered to the Final Delivery location, the crane Contractor shall provide personnel to perform final acceptance demonstrations. See Contract Clause E05, paragraph E.

Following the completion of the onsite training at the Final Delivery location, the crane Contractor shall provide personnel for training of USACE crane operators onsite for a period of 5 days (40 hours). See Contract Clause E08.

The crane Contractor is responsible for all costs associated with travel, lodging, and meals in addition to the labor for the travel identified in the paragraphs above.

C004. REGULATORY STANDARDS

The crane and its supporting structure (e.g. pedestal, tub, ringer, or kingpost) shall be provided with American Bureau of Shipping (ABS) Certification in accordance with the latest edition and interpretations of the ABS Guide for Certification of Lifting Appliances. The contractor shall bear all expenses associated with obtaining ABS Certification.

The barge, under separate contract, will be classed with the Crane Registry Certificate (CRC) Notation. The crane contractor shall ensure the crane delivered under this contract meet ABS Class and CRC requirements.

In addition to ABS, the crane and its supporting structure shall be designed and constructed in accordance with the latest edition and interpretations of one of the following alternatives:

Alternative 1

ASME B30.8 - Floating Cranes and Floating Derricks (for structural considerations).

SAE J67 – Shovel Dipper, Clam Bucket, and Dragline Rating

Alternative 2

EN 474-1 – Earth-Moving Machinery – Safety – Part 1: General Requirements EN 474-12 – Earth-Moving Machinery – Safety – Part: 12 Requirements for Cable Excavators

Alternative 3

API 2C – “Specification for Offshore Pedestal Mounted Cranes” (Excluding the free-fall winch/control system). The crane shall be provided with a permanent stainless steel nameplate, bearing the API Monogram, per API Specification 2C, section 13.

The contractor shall identify the alternative selected in his proposal. Along with ABS class for the machine, the contractor shall retain ABS to provide independent third party verification that the crane meets the selected standards identified in the proposal.

Furthermore, the crane and its supporting structure shall be designed and constructed in accordance with the latest edition and interpretations of the following rules and regulations:

National Electric Code (NEC)

Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE-45 – Recommended Practice for Electrical Installations on Shipboard.

U. S. Army Corps of Engineers Safety and Health Requirements Manual, EM385-1-1

Meet the requirements for load handling equipment defined in the U.S. Army Corps of Engineers, Publication number EM 385-1-1: “Safety and Health Requirements Manual”.

The crane and its supporting structure shall incorporate the following design parameters (based on API 2C):

Service - Ship and Barge in Calm Water Significant Wave Height - 1 foot maximum.

API Lift Type – Both on board and off board lifts.

Crane Off Lead and Side Lead Angles – vessel specific associated with 5 degree barge heel and 3 degrees barge trim API Design Method – Vessel specific method API Duty Cycle – Purchaser supplied: See Part C009 of this specification Operating Temperature Range – 120 degrees F to 0 degrees F.

Max Operating Wind Speed – 40 MPH Ice Load – None API Area Classification – not hazardous.

If the crane and its supporting structure are not being designed to API 2C, the contractor shall utilize equivalent parameters, where applicable, for the selected design standards.

All crane component certificates of tests shall be provided to the COR (see contract Clause H02). The certificates shall be organized in a 3 ring binder of durable material. Electronic copy shall also be provided.

This is a high production duty-cycle machine and the design for all maintenance requirements and intervals shall be suitable for the intended service and 6 month work period.

C005. DEFINITIONS

The following definitions are applicable to phrases and acronyms used throughout this contract:

ABS – American Bureau of Shipping API – American Petroleum Institute ASME – American Society of Mechanical Engineers COR - Contracting Officer’s Representative - a member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties. A copy of the COR’s authority letter is furnished to the contractor.

K.O. - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.

MDC – Acronym for the Marine Design Center.

QC - Quality Control - Quality Control is a function of the contractor. Refer to clause E03. Quality

Assurance (QA) is a function of the Government.

SAE – Society of Automotive Engineers USACE – Acronym for United States Army Corps of Engineers.

Crane Machine List: is the inclination of the crane perpendicular to the vertical plane containing the boom. The same angle can be measured between the axis of rotation of the crane (vertical when the crane is in the reference horizontal position) and the axis of rotation with an inclination to the left or to the right of vertical when looking at the boom tip from the cab. API terminology is “Sidelead”.

Crane Machine Trim: Is the inclination of the crane forward (boom down and load swinging out to a larger effective radius reach) or after (boom up), about the vertical axis of rotation when the crane is in the reference horizontal position. API terminology is “Offlead”.

C006. ARRANGEMENT

For the proposal, the Contractor shall provide a general Arrangement drawing of the crane to include plan and profile views of the crane in the operating configuration and in the stowed configuration, machinery compartment and control cab. The drawings shall include details on walkways, catwalks, handrails, ladders, doors, windows and hatches.

C007. DIMENSIONAL REQUIREMENTS

The crane shall comply with the following dimensional requirements:

A. Crane Tail Swing

The tail-swing of the crane shall not exceed a 35-ft radius from the center of rotation of the crane.

B. Crane Pedestal/Ring

The crane pedestal or ring diameter shall not be greater than 50 feet to allow adequate deck space for barge machinery as well as deck walking space around the pedestal.

C. Crane Swing Bottom Height

The bottom of the rotating part of the crane shall be at least 8 feet above the deck

D. Crane Height in Stowed Position The height of the crane shall not exceed 70 feet above the barge deck, when the crane is in the stowed position, to enable the crane barge to pass under bridges.

C008. CRANE SUPPORTING STRUCTURE

The crane shall be wire luffed with one of the following support methods:

Kingpost mounted Pedestal or swing bearing mounted Tub mounted Ring Mounted

The Contractor shall provide the crane kingpost, pedestal, tub or ring for welding to the barge. The supporting structure shall be designed to withstand the maximum crane loads and overturning moments in accordance with the regulatory design standards.

The barge will be approximately 130 x 70 x 12 feet in dimension. For a kingpost, pedestal, or tub designs, the bottom of the structure shall sit on the barge reinforced innerbottom top structure. As a result there shall be a large section of kingpost, pedestal or tub provided by the crane manufacturer for installation in the hull of the barge (approximately 9

ft. to 10 ft.) in addition to the extent of the kingpost or pedestal above the main deck level of the barge. For ring mounted designs, the ring structure shall be welded to the main deck of the barge.

The crane supporting structural member design, loads, moments and forces shall be provided to Government at the end of Phase I. The Government will incorporate this design and information into the barge structural design to ensure the design satisfies the ABS and regulatory class standards.

In all cases, the barge contractor shall be responsible for ensuring the barge structural design is adequate for the maximum design loads and moments from the machine.

The supporting structure shall be constructed and shipped to the barge contractor NLT 360 days after Notice to Proceed for Phase I.

A. Maximum Weight and Moment

Based on the Naval Architectural analysis, with the crane on a horizontal platform and with the boom positioned to reach a radius of 160 feet from the center of rotation to the center of the boom tip sheaves:

The crane weight is defined as the weight of the support structure (kingpost, pedestal, tub or ring) (including the 10 ft. section below the main deck of the barge), the rotating works, counterweight, boom, hoists, and lines. The total crane weight in the completed condition without full operating fluids on board shall not exceed 1,400,000 lbs. or 625 LT. Less weight is better.

The overturning moment of the crane weight (NOT including the support structure), in a completed condition (no bucket or bucket load) shall be no less than 450,000 ft-lbs, applied towards the counterweight (to oppose the bucket load). More overturning moment is better up to 10,000,000 ft-lbs.

The vertical center of gravity of the crane weight (as defined in above in this section) above the deck of the barge shall be identified. A lower VCG is better.

The Contractor shall identify the total weight, vertical center of gravity and self-overturning moment in their proposal.

B. Gross Overload – Failure Mode Assessment

The contractor shall provide Failure Mode Calculations and Charts in accordance with API 2C, Seventh Edition, effective October 2012, Section 9.

The crane shall be designed such that, in the case of a gross overload, the crane operator’s station will remain attached on board the barge.

C009. HOIST OPERATIONAL REQUIREMENTS

The crane shall be designed with the appropriate number of drums and wire configurations to perform all dragging operations with the crane attachments specified in this specification. The contractor shall identify the number of hoists the crane is equipped with and which hoist is used during each operation.

All of the dragging operations shall be capable of being performed utilizing a fully revolving 3 degree crane list and 5 degree crane trim barge load chart.

The crane shall be designed as a full-time duty-cycle machine. The crane shall use two lines (hoist line and drag line) for bucket and rake work. The crane shall be designed to perform dragging operations with a crescent style bucket 95% of the time and a drag rake 5% of the time. The crane shall be capable of casting (swinging) the bucket out past the boom tip similar to the existing operation.

The crane shall be designed to be suitable for consecutive night and daytime operation during a 6 month season.

A duty-cycle dragline load chart shall be provided that is suitable for the out-of-level and environmental conditions identified in this specification.

In addition to duty-cycle operations, the hoist line may at time be used to perform minor lifts (e.g. mooring anchors, small equipment, etc.). The hoist line shall be capable of performing a 10,000 lbs., single part lift, at all radii. A lift chart that is suitable for the out-of-level and environmental conditions identified in this specification shall be provided.

A. Working Radius and Height

The crane shall be working on ungraded and graded river banks. The target finished bank grade slopes range between 3:1 to 7:1 (horizontal:vertical).

The crane shall, at a minimum, have a fully-revolving working radius of 160 feet from the center of rotation with the bucket at a height of 30 feet above the barge deck. The working radius is measured from the center of rotation to the boom tip. A maximum working radius with the provided bucket or rake longer than 160 feet is desirable.

Through adjusting the boom angle only (no change to boom length or pendants) the contractor shall also identify the minimum working radius for dragline work with the provided bucket or rake. This radius shall be as close as practical, but no further than 120 feet from the center of rotation. In addition, the machine must have the ability to work material with the bucket under the water at depths up to 50 feet below the waterline assuming the barge has a draft of 5 ft.

At times the river bank area that is being worked may have cliffs or areas that are as high as 80 feet above the working deck of the barge. The contractor shall identify the maximum working radius that the bucket can be placed 80 feet above the working deck and the drag cycle completed. A greater working radius is desirable.

It is also standard practice for the operators to throw/cast the bucket beyond the end of the boom tip to increase the working radius. Increased cast distance capability is highly desirable. All working radius, casting capabilities and production calculations will be evaluated working on a 5:1 slope.

At all radii, the crane shall be capable of handling the rake, placing or casting/throwing it on the bank at the respective reach radius, and dragging/raking the slope down to the river.

The crane shall be capable of stowing and picking the attachments from the deck of the barge (The attachments will need to be handled by the crane at a close radius).

The machine shall be capable of using the proposed bucket (at full load) and rake at all working radii.

B. Production Rate The production rate of the machine is critical to successful operations. The threshold for acceptable production rate (based on the calculations below) shall be 17,500 cubic yards per 10 hour shift, with the objective production rate of 25,000 cubic yards or more per 10 hour shift.

For the purpose of calculating production, the contractor shall determine a standard cycle time, multiplied by the bucket size and an efficiency factor. The following definitions, dimensions and formulas shall be used:

Step 1- Cycle Starting Location

Define the following:

Bucket Size in Cubic Yards (BC) Boom Length (BL) Pin Offset (PO) Pin Height (PH) Boom Angle (α) for 160 ft. Reach Radius Boom Tip Clearance to the Ground (J) Bucket Hang 1 (BH1) from the Boom Tip to 30’ above the waterline Estimated Throw Distance = 1/3 * J Hoist Line Speed (Light Bucket) Hoist Line Speed (Loaded Bucket)

Drag Line Speed (Light Bucket) Drag Line Speed (Loaded Bucket)

Step 2 – Lower the Bucket

Time to Lower the Bucket from 30’ Above Waterline to Bank (T1)

Step 3 – Drag the bucket down 5:1 slope to within 50’ of the crane center of rotation

Time to Drag the FULL/LOADED Bucket from 160 feet Reach to within 50 feet of Crane Center of Rotation on 5:1 (T2)

Step 4 Estimated Bucket Lift/Dump Time (T3): Assume 3 seconds

Step 5 – Return the Bucket to the Initial Starting Point (Step 1)

Time to bring the bucket back to 160 feet reach radius at 30 feet above the waterline (T4)

Total Cycle Time (TCT) = T1 + T2 + T3 (3 seconds) + T4 Production Calculations (Threshold 17,500 / Objective 25,000 or more cubic yards per shift) Cycles Per Hour (CPH) = 3600 (seconds/hour) / TCT Assume 85% Hourly Efficiency Factor Cubic Yards Per Hour (CYPH) = BC * CPH * 0.85 Shift Cubic Yards (SCY) = CYPH * 10 hours Please note that while additional distance is possible during the throw, for the purpose of calculating production it is not considered.

Example Slope 5:1

Bucket Size in Cubic Yards (BC) = 20 cubic yards Boom Length (BL) = 180 feet Pin Offset (PO) = 10 feet Pin Height (PH) = 18 feet Boom Angle (α) for 160’ Reach Radius = 33.56 degrees Boom Tip Clearance to the Ground (J) = 109.50 feet Bucket Hang 1 (BH1) from the Boom Tip to 30’ above the waterline = 79.50 feet Estimated Throw Distance = 1/3 * J = 36.50 feet Hoist Line Speed (Light Bucket) = 9 ft/sec Hoist Line Speed (Loaded Bucket) = 7 ft/sec Drag Line Speed (Light Bucket) = 9 ft/sec Drag Line Speed (Loaded Bucket) = 7 ft/sec T1 = 1.7 seconds T2 = 15.8 seconds T3 = 3.0 seconds T4 = 12.3 seconds TCT = 32.8 seconds

CPH = 109.8

CYPH = 1,866.6

SCY = 18,666 cubic yards

For the purpose of this evaluation, the contractor shall provide all of the variables listed in the definitions above, and the production calculations. In addition, the contractor shall identify the following for overall machine capability analysis:

Boom Angle at 120 feet Reach Radius Boom Angle at Minimum Operating Radius Maximum Reach Radius on a 5:1 Slope Boom Angle at Maximum Reach Radius on 5:1 Slope Estimated Throw Distance at Maximum Reach Radius (use the formula as previously identified).

This throw distance shall be achievable without slewing. Throw distance shall be provided for the bucket and rake if the estimated throw distance is different.

C010. WIRE ROPE

All wire rope shall be furnished with certificates stating its conformance to all of the standards referenced in this specification. Sufficient hoist spooling on all winch drums shall be provided on the drums, to reach 50 feet below the waterline (assuming the barge has a 5 foot draft) with the boom point at the highest elevation and leaving at least 5 wraps of cable on the drums.

The contractor shall provide the COR with a “Certificate of Examination and Test of Wire Rope Before Being Taken Into Use” (U.S. Department of Labor – Occupational Safety and Health Administration Form No. 5) for each continuous run of rope installed on the hoists. The certification shall be performed to the requirements of 29 CFR, part 1919 and be in accordance with the requirements of 29 CFR 1918.

The crane Contractor is responsible for installing and reeving the wire rope on the crane.

C012. CRANE ATTACHMENTS:

A. Reference Drawings Existing Sauerman Buckets 15013 & 15014

Existing Drag Rake (File 321-51_Dec1958) See Section J for the above reference drawings.

The Contractor shall provide the following two attachments:

B. Crescent Style Dragline Buckets Two identical crescent style dragline buckets similar in design to the existing Sauerman crescent style drag buckets shall be provided by the contractor (one as a spare). Minimum crescent bucket size shall be 15 cu

yd. with a target of 30 cu yd. Higher bucket capacity within this range is desirable.

The crescent style buckets shall incorporate removable teeth with bolted connections. The buckets shall have drag line and hoist line rigging connections similar to existing or better.

As a reference, the existing 15 cu yd. buckets each weigh approximately 15,000 lbs. (including the chains).

A drawing of the existing 15 cu yd. Sauerman crescent style drag bucket is included in this Contract as reference.

The bucket shall be non-perforated, medium to heavy duty type. The weight of the bucket shall provide ample downward force for dragging material (sand, silt, and clay, pieces of articulated concrete mattress, and some rocks on land and under water).One potential source for procuring the crescent style buckets is J.D. Dredging & Excavating Inc. Their point of contact info is listed below:

Jake Hoon

J.D. Dredging & Excavating Inc.

PO Box 1389 Columbia Falls, MT 59912 Office: 1-715-778-5520 Cell: 915-490-5821 Fax: 1-715-778-5521 Website: jddredging.com

A photo of the existing 15 cu yd Sauerman crescent style dragline bucket is provided below:

C. Drag Rake One drag rake similar in design to the existing drag rake shall be provided by the contractor. Drag rake shall be approximately 18 feet wide by 14 feet deep with a blade size of approximately 10 inches. The Contractor shall coordinate with the Government for selection of blade size.

The exact weight of the existing drag rake is not known. The existing rake shall be assumed to weigh 25,000 lbs.

A drawing of the existing rake is provided as reference. This drawing is old and has not been verified by the Government for accuracy.

A photo of the existing drag rake is shown below:

The Contractor shall provide all rigging necessary for attaching the hoist line and drag line to the crescent bucket and drag rake. This includes pins, chains, spreader bars, clevises, etc.

The attachments shall be permanently marked with the following information:

Manufacturer’s name and address Part Number Weight (lbs) Capacity of attachment in cubic yards (for bucket only)

C013. MACHINE REQUIREMENTS

A. General Requirements All fluid fill and overflow points shall be located in areas that are easily accessible, and that are provided with fluid spill containment drip pan coamings to collect fluid spills for easy cleanup. All sheaves on the crane shall be anti-friction tapered bearing type mounted. Sheave guides shall be provided to prevent the wire rope from jumping the sheaves. All crane lubricating points shall be easily accessible from crane walkways or platforms without need to remove guards or other components.

B. Crane Power The crane shall be capable of operating completely independent on its own diesel power. The slewing, boom luffing and hoisting drives shall be independent. The crane shall be capable of slewing and hoisting at the same time as well as slewing and dragging at the same time.

C. Crane Swing Mechanism

Multiple swing drives shall be provided. The swing mechanism shall have sufficient power to rotate the crane with any of the required attachments and at any boom radius, including capability to swing uphill with the rated load, when the crane has a maximum adverse 3 degree crane list and 5 degree crane trim inclination (experienced concurrently).

The minimum crane slewing speed shall be one revolution in 90 seconds in both the clockwise and counterclockwise directions. The slewing shall have continuous variable speed control, with smooth start and stop. Positive swing locking capability in both directions. Upon return of the swing control lever to the center (neutral) position, the braking device shall not engage in a manner to abruptly arrest the swing motion; the automatic swing brake must be capable of controlled smooth deceleration to a stop.

Locking - The crane swing drive function shall incorporate an internal brake. The brake shall be able to lock the crane in any position.

D. Main Hoist Winch

The hoist line speed shall be determined based on the production requirements. The winch shall be capable of free-fall operation.

The main hoist speed (no load and full load) and line pull rating shall be identified in the proposal.

Hoist line load cells with data collection and data storage are desirable.

E. Dragline Winch The hoist line speed shall be determined based on the production requirements. The winch shall be capable of free-fall operation.

The dragline winch shall be capable of dragging a full bucket load down all expected slopes.

The drag speed (no load and full load) and line pull rating shall be identified in the proposal.

Drag line load cells with line pull data collection and data storage are desirable.

F. Dragline Fairlead

The crane shall have a dragline fairlead located on the front of the crane positioned with sufficient clearance from the deck level to prevent obstruction or snagging of the drag line.

The fairlead shall be easily accessible by the crew as necessary for routine maintenance.

G. Crane Winch Braking Systems:

The boom hoist, drag hoist, main hoist, and swing mechanism shall have dynamic brakes and parking brakes. Braking shall be designed properly in accordance with the design standards.

Braking shall be sized to safely operate in all machine out-of level conditions and environmental conditions as defined in this Contract.

The hoist and drag winch system brakes shall actuate immediately after releasing the lever or pedal controls. The braking system shall automatically act in case of loss of energy or force controlled lowering.

The crane shall have the capability of forced controlled operation as well as free-fall operation with the main hoist and drag hoist.

The braking systems for the main hoist and drag hoist shall be capable of holding the rated load indefinitely, without attention from the operator. The braking systems shall actuate automatically upon return of the control lever to the center (neutral) position. In the event of power failure or control failure, the hoist drums shall be provided with controlled lowering under all load conditions. The braking systems shall be configured properly and according to the applicable design standards.

H. Crane Safety Systems:

All applicable safety systems required by the standards shall be provided. In particular, the following shall be provided:

Anti two-block (upper limit) devices shall be provided on the main hoist line to prevent the hoisting blocks from any contact with the boom.

Mast or boom stops to prevent raising the boom too far shall be provided.

Load moment limiting device Limit switches for boom hoist system, drag hoist system, and main hoist system with ability for user defined limits (within the crane manufacturers allowed limits) to prevent collision of bucket with the barge or crane.

Main and drag winch speed indication in the cab Cameras displaying live video feed (in the cab) of crane winch drums and grader barge

I. Boom

The contractor shall provide only one fixed boom length to satisfy the reach and production requirements identified in this specification. The Government will not adjust the length of the boom (inserting or removing segments) to suit various operations. Fixed or variable boom angles during crane operation is acceptable.

The boom shall have a walkway or platform for access to the boom and boom tip. The weight of the walkway and impact on the load ratings shall be accounted for in the load chart(s).

The boom shall be designed to not require a boom rest.

Hoist Speed – The crane shall be capable of raising and lowering the boom from minimum to maximum elevations in less than 5 minutes. The ability to raise and lower the boom in less time is desirable.

J. Rigging Winch

One crane rigging winch shall be provided if necessary to stow the boom or mast.

K. Engine

The crane shall be powered by a diesel engine that meets the current EPA emissions tier. The engine shall be provided with a warm/cold weather range aid for operation between 0 to 110 degrees Fahrenheit. A 120 VAC (or higher voltage as necessary) engine block heater shall also be provided. The engine radiator and/or fan shall be mounted to move hot air out of the engine compartment or away from the engine. The crane shall have battery starting and a charging alternator.

L. Crane Cab and Access

The crane cab height above deck shall be a minimum of 16 feet to allow adequate visibility from the cab. The crane cab shall have windows on the top, front and sides. Medium tint shall be provided on all windows. Windshield wipers and defroster shall be installed on the cab front windows. The sides of the cab left and right of the operator, shall each have a window capable of opening and being held secure in the open position. Mylar sun shades shall be provided for the side and top windows in the cab.

Either a rear window or suitable rear view camera shall be provided.

A ladder(s) or inclined stairs for access from the barge deck to the crane is required, and shall be permanently installed on the crane. This ladder, when stowed for crane operation, shall be able to meet the deck clearance requirement of 8 ft. minimum. This ladder shall be retractable with spring assist.

The crane cab shall be sized to include the furnishings and equipment identified in this specification and shall provide adequate space for the operator for the purpose of entry and egress as well as to access, use, and maintain the equipment. The crane cab shall be large enough to comfortably allow a minimum of one additional person to be in the cab at the same time as the operator. A larger cab is desirable.

M. Lube Systems

The crane shall be provided with a complete lubrication system. Auto-lubrication systems in lieu of manual lubrication is desirable to reduce machine downtime due to lubrication needs.

N. Tanks

All tanks shall include a fluid level indicator. The fuel oil tank shall be of adequate capacity to provide for at least 24 hours of continued operation.

O. Fuel Oil System

The fill connection for the fuel oil tank shall be easily accessible, and the filler cap shall be self-closing. The fill and vent pipes shall be provided with flame arrester.

P. Cooling System(s)

All cooling systems for the crane shall be self-contained and air/radiated cooled. The barge will not be capable of providing a seawater cooling connection. All warm cooling air shall be directed to the outside.

Q. Engine Exhaust System The exhaust pipe and muffler shall be fabricated of stainless steel, insulated and jacketed, and provided with a rain flap cover that closes automatically when not in use (i.e. counterweight). The engine exhaust shall be located away from the crane operator's cab area, and bend to discharge in a direction opposite the cab.

Exhaust silencers shall be supplied in accordance with the noise requirements below.

R. Fire Detection and Extinguishing System One Portable fire extinguisher shall be provided in the vicinity of the cab door. One Portable fire extinguisher shall be provided in the machinery compartment.

The type and size of extinguishers shall meet ABS requirements for the area that they protect.

S. Noise and Vibration Control & Abatement There shall be an effective integrated noise and vibration control and transmission abatement program. The noise level inside the crane cab shall not exceed 75 dbA.

The noise pressure level shall be limited to 85 dbA on the main deck of the barge, outside a 20 feet radius from any part of the crane, with the crane operating at full power.

To accomplish this requirement, the contractor shall provide the necessary noise attenuation treatments.

Noise attenuation treatments may include vibration isolators, critical grade silencers, acoustic louver(s) and proper insulation in the machinery compartment(s) if necessary

T. Arc Flash Hazard Analysis If the machines electrical system is rated at 50 volts or above, the contractor shall provide a detailed incident energy arc flash hazard analysis for the entire machine electrical installation in accordance with ER 385-1-100. The analysis shall be completed for all electrical equipment and locations where the potential for an AFH exists as defined by ER 385-1-100. The detailed incident energy analysis shall be conducted using EasyPower and the IEEE 1584 method of calculation.

The arc flash hazard analysis shall be provided with a report to summarize the results and provide recommendations for mitigating hazards where alternative designs cannot bring the risk to an acceptable level. As a minimum, the report shall contain the following sections:

1. Executive Summary The executive summary shall include an overview of the current system, a listing of the number of devices in each hazard/risk category, and a summary of the results of the analysis.

2. Detailed Information The detailed portion of the report shall contain the following:

A matrix and explanation of all operating scenarios evaluated.

A list and explanation of assumptions made.

3. Results Summary A discussion of the results of the analysis.

4. Recommendations For equipment and locations with high incident energies, mitigation solutions shall be provided to reduce the hazard/risk category to Level 2, or less in accordance with ER 385-1-100, Chapter 5-3.b. These recommendations may include, but are not be limited to:

The use of alternative operating scenarios during periods of maintenance.

Temporary settings to be used during periods of maintenance.

Change in work practices and/or system configurations.

The computer model used to perform the analysis shall be based on the actual equipment selected for installation and operational requirements; including the settings from the protective device coordination study, and using the result of the fault current analysis.

All data files used to perform the analysis shall be provided in the electronic format necessary to easily update the Government’s computer model. The system model shall be provided in EasyPower *.dez file format. Additional files to be provided are the report and the following EasyPower computer outputs:

One-line diagram of the existing system (base case).

One-line diagrams for all analyzed scenarios with AF results.

Arc flash worst-case scenario report.

Arc flash full scenario report.

All electrical equipment where the potential for an AFH exists shall have arc flash warning labels affixed and clearly visible. Labels shall contain at a minimum the following:

Arc Flash Boundary Incident Energy at 18 inches Hazard/Risk Category Level Working Distance Nominal System Voltage Equipment ID Date

C014. OUTFITTING REQUIRMENTS

A. Corrosion Prevention

The choice of materials, the fabrication procedures and the coating systems to be used in the crane, shall evidence that careful consideration was given by the Contractor to improve corrosion resistance and life expectancy of the paint system.

As an example, the structure shall be designed and fabricated to avoid corrosion, by effectively:

1. Preventing the entrapment of water, avoiding pockets where water can accumulate and facilitating drainage.

2. Facilitating the application of paint coatings, (i.e. not using intermittent welding -must use double continuous welding throughout).

3. Insulating the contact surfaces between two dissimilar metals against galvanic corrosion.

B. Surface Preparation

The paint systems shall be applied to surfaces clean of weld spatter, dirt, oil and grease. Surface preparation shall be accomplished in accordance with Steel Structures Painting Council Standards, to meet or exceed the surface preparation requirements of the paint system manufacturer. All heat affected areas, as well as any areas in which the paint has deteriorated, shall be cleaned of weld slag and spatter, and re-painted.

C. Painting

The interior and exterior paint systems shall be heavy duty marine paint, providing good chemical resistance, good abrasion resistance and good impact resistance. The last coat shall have a glossy finish with excellent resistance to chemical cleaning agents. All paints shall be free of lead and chrome. The paint system shall be recommended and certified by the paint manufacturer to have a life expectancy of 5 years.

The Contractor is required to provide the DFT recommended by the paint manufacturer. The thickness applied per coat may not exceed the paint manufacturer's recommended maximum thickness.

The following areas shall not be painted:

1. Brass, rubber seals and gaskets

2. Stainless steel

3. Electrical cables

Prior to packaging for shipping, all interior and exterior painting shall be thoroughly inspected.

Any defects in the coating shall be repaired by the Contractor, as necessary, to restore the integrity of the paint system. The Contractor is responsible for delivering the crane with all painted surfaces in good condition, and for obtaining THE PAINT WARRANTY DECLARATION from the paint manufacturer.

PAINT WARRANTY DECLARATION - The Contractor shall provide a written signed document, obtained from the paint manufacturer, clearly stating that the surface preparation, environmental conditions, coating application procedure and thickness for each area meets the manufacturer's requirements for the coatings used, and that under normal service conditions, the undamaged coating system will maintain its integrity for a period of 5 years.

The Contractor shall properly package for transportation, all items to be delivered by truck to the barge construction yard. At the barge construction yard, all interior and exterior painting will be re-inspected. Any damaged areas of the coatings due to damage in shipment or handling shall be repaired by the crane Contractor per the paint manufacturer’s repair process to restore the integrity of the paint system. Any damaged areas of the coatings due to installation or assembly will be repaired by the barge manufacturer per the paint manufacturer’s repair process to restore the integrity of the paint system. Major areas may have to be repainted entirely by the barge Contractor to provide uniform color to the last coating.

D. Doors & Windows

The crane cab door shall be weather-tight, and fabricated of stainless steel, with a large fixed window. All crane cab windows shall be medium tint safety glass, and provide good visibility to the boom point and the load at all times. Windshield wipers and defroster shall be installed on the cab front, side and overhead windows.

E. Locks and Keys The door to the cab shall be fitted with a suitable lock. All locks shall be lever type and suitable for marine service. Two keys and two blank keys shall be furnished for the door lock.

F. Insulation The machinery and the operator cab shall be insulated to meet the noise abatement requirements of Contract Clause C013, paragraph S of this specification. Piping, shall be insulated to prevent condensation. The exhaust pipe from the engine, and any pipe that may present a temperature hazard shall be insulated.

G. Cab Furniture & Furnishings One (1) padded chair for the cab operator shall be provided with height and inclination adjustments. Suitable storage for the crane operation's manual, crane log book, crane load rating charts, and hydrographic survey charts shall be provided in the cab, within reach of the operator when seated. An adjustable stand for holding and displaying 11 inch x 17 inch paper hydrographic survey charts to the operator in the cab chair shall be provided.

Two additional duplex electrical receptacles in the cab shall be provided.

H. Nameplates, Notices and Markings The Contractor shall…