Bid_Abstract_Elk_Chute__.pdf

PDF 134 KB Posted

Attached to
Elk Chutes Set-Back Levee
Solicitation number
W912EQ19B0006
Issued by

About this file

BID Abstract _Elk Chute

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_00001.pdf PDF
ElkChuteAmendmentDrawingSet.pdf PDF
W912EQ19B0006.pdf PDF
Plans_for_Solicitation_Part2.pdf PDF
Plans_for_Solicitation_Part1.pdf PDF
Specifications_for_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNOFFICIAL ABSTRACT

I certify that I have opened and read all offers received in response to this solicitation and all offers have been recorded on this abstract Kimberly Daniel-Ray , Bid Opening Officer

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JA XXXX 132,715.00$ XXX 371,250.00$ XXX 990,000.00$ XXX $680,000.00 0002 Environmental Protection 1 JA XXXX 15,089.00$ XXX 18,562.50$ XXX 10,400.00$ XXX 7,500.00$ 0003 Traffic Control and Signage 1 JA XXXX 66,224.00$ XXX 6,187.50$ XXX 9,100.00$ XXX $5,000.00 0004 Demolition of Culverts 1 JA XXXX 398,557.00$ XXX 99,000.00$ XXX 156,000.00$ XXX 628,864.00$ 0005 Storm Water Pollution Prevention

0005AA Write and Amend SWPPP 1 JA XXXX 7,142.00$ XXX 6,187.50$ XXX 3,150.00$ XXX 5,000.00$ 0005AB Silt Fence 26,800 LF 2.94$ 78,792.00$ 2.48$ 66,464.00$ 2.60$ 69,680.00$ $2.75 73,700.00$ 0005AC Check Dams 45 EA 298.44$ 13,429.08$ 12,347.50$ 55,687.50$ 588.00$ 26,460.00$ $2,500.00 112,500.00$ 0005AD Temporary Environmental Seeding 200 AC 1,141.39$ 228,278.00$ 618.75$ 123,750.00$ 1,508.00$ 301,600.00$ $1,200.00 240,000.00$ 0005AE Construction Vehicle Egress 3 EA 7,089.00$ 21,267.00$ 928.13$ 2,784.39$ 1,560.00$ 4,680.00$ $2,750.00 8,250.00$ 0005AF Concrete Washout 1 EA 14,724.00$ 14,724.00$ 2,475.00$ 2,475.00$ 10,500.00$ 10,500.00$ $8,000.00 8,000.00$

0006 Single 6' x 8' CIP Box Culvert 138 LF 2,792.77$ 385,392.60$ 4,083.75$ 563,557.50$ 3,300.00$ 455,400.00$ $3,941.00 543,858.00$ 0007 Double 6' x 8' CIP Box Culvert 276 LF 4,467.44$ 1,233,134.88$ 6,806.25$ 1,878,525.00$ 5,300.00$ 1,462,800.00$ $6,511.00 1,797,036.00$ 0008 Triple 6' x 8' CIP Box Culvert 138 LF 6,134.75$ 84,595.50$ 9,652.50$ 1,332,045.00$ 7,400.00$ 1,021,200.00$ $8,563.00 1,181,694.00$ 0009 36" CMP Culvert 110 LF 242.92$ 26,721.20$ 136.13$ 14,974.30$ 120.00$ 13,200.00$ $132.00 14,520.00$ 0010 48" CMP Culvert 500 LF 295.20$ 147,600.00$ 160.88$ 80,440.00$ 173.00$ 86,500.00$ $220.00 110,000.00$ 0011 30" NRCS Steel Pipe 825 LF 400.49$ 330,404.24$ 154.69$ 127,619.25$ 141.00$ 116,325.00$ $156.00 128,700.00$ 0012 Clearing 60 AC 750.70$ 45,042.00$ 3,612.50$ 222,750.00$ 1,456.00$ 87,360.00$ $200.00 12,000.00$ 0013 Grubbing 60 AC 750.70$ 45,042.00$ 618.75$ 37,125.00$ 832.00$ 49,920.00$ $200.00 12,000.00$ 0014 Excavation 960,000 CY 1.57$ 1,507,200.00$ 2.78$ 2,668,800.00$ 2.34$ 2,246,400.00$ $0.50 480,000.00$ 0015 Embankment 715,000 CY 4.19$ 2,995,850.00$ 3.90$ 2,788,500.00$ 3.28$ 2,345,200.00$ $2.84 2,030,600.00$ 0016 Geotextile 89,000 SY 2.76$ 245,640.00$ 1.55$ 137,950.00$ 1.82$ 161,980.00$ $1.40 124,600.00$ 0017 48" Flared End Section 14 EA 3,051.00$ 42,714.00$ 2,475.00$ 34,650.00$ 3,800.00$ 53,200.00$ $2,500.00 35,000.00$ 0018 36" Flared End Section 2 EA 2,002.00$ 4,004.00$ 1,423.13$ 2,846.26$ 3,000.00$ 6,000.00$ $1,700.00 3,400.00$ 0019 Single 6'x8' CIP Headwall Outlets 1 EA 292,391.00$ 292,391.00$ 253,687.50$ 253,687.50$ 263,000.00$ 263,000.00$ $176,000.00 176,000.00$ 0020 Double 6'x8' CIP Headwall Outlets 2 EA 328,707.00$ 657,414.00$ 297,000.00$ 594,000.00$ 294,000.00$ 588,000.00$ $278,000.00 556,000.00$ 0021 Triple 6'x8' CIP Headwall Outlets 1 EA 374,343.00$ 374,343.00$ 358,875.00$ 358,875.00$ 412,000.00$ 412,000.00$ $388,000.00 388,000.00$ 0022 Single 6'x8' CIP Headwall Inlets 1 EA 59,461.00$ 59,461.00$ 89,718.75$ 89,718.75$ 120,000.00$ 120,000.00$ $115,000.00 115,000.00$ 0023 Double 6'x8' CIP Headwall Inlets 2 EA 77,200.00$ 154,400.00$ 126,843.75$ 253,687.50$ 166,000.00$ 332,000.00$ $180,000.00 360,000.00$ 0024 Triple 6'x8' CIP Headwall Inlets 1 EA 102,006.00$ 102,006.00$ 170,156.25$ 170,156.25$ 207,000.00$ 207,000.00$ $256,000.00 256,000.00$ 0025 48" Flap Gates 2 EA 7,609.00$ 15,218.00$ 51,997.50$ 10,395.00$ 18,000.00$ 36,000.00$ $5,700.00 11,400.00$ 0026 36" Flap Gates 2 EA 5,466.00$ 10,932.00$ 4,083.75$ 8,167.50$ 17,000.00$ 34,000.00$ $4,800.00 9,600.00$ 0027 6'x8' Sluice Gates 8 EA 132,860.00$ 1,062,880.00$ 148,500.00$ 1,188,000.00$ 150,000.00$ 1,200,000.00$ $241,130.00 1,929,040.00$ 0028 Bedding Material 1,400 TN 36.35$ 50,890.00$ 32.18$ 45,052.00$ 38.00$ 53,200.00$ $30.85 43,190.00$ 0029 Aggregate Surfacing 34,000 TN 58.24$ 1,980,160.00$ 31.56$ 1,073,040.00$ 33.80$ 1,149,200.00$ $30.85 1,048,900.00$ 0030 R-200 Riprap 2,400 TN 56.13$ 134,712.00$ 39.60$ 95,040.00$ 45.00$ 108,000.00$ $43.00 103,200.00$ 0031 R-650 Riprap 4,500 TN 59.11$ 265,995.00$ 42.08$ 189,360.00$ 48.00$ 216,000.00$ $43.00 193,500.00$ 0032 Cofferdams 4 EA 124,728.00$ 498,912.00$ 30,937.50$ 123,750.00$ 35,250.00$ 141,000.00$ $137,532.50 550,130.00$ 0033 Dewatering 4 EA 71,854.00$ 287,416.00$ 12,375.00$ 49,500.00$ 48,000.00$ 192,000.00$ $103,150.00 412,600.00$ 0034 Establishment of Turf 200 AC 2,154.29$ 430,858.00$ 1,732.50$ 346,500.00$ 2,500.00$ 500,000.00$ $1,600.00 320,000.00$

5100 HWY PP 777 Alloy Drive 3221 State HWY 77

US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS

Benton, MO 63736

DUMEY CONTRACINGSOUTHERN CONTRACTING LLCYOUNGS GENERAL CONTRACTING

Newbern, TN 38059

INVITATION NO.: W912EQ19B0006

TITLE: Elk Chute Levee Setback

BID OPENING DATE AND TIME: 08/06/2016 1:30 P.M. COST

DISTRICT Poplar Bluff, MO 63901

GOVT. ESTIMATE

MEMPHIS

SMALL BUSINESS DETERMINATION: Small Buiness Set-Aside

$14,714,782.00GRAND TOTAL ITEMS 0001 THRU 0034 15,209,537.23$ 15,491,060.20$ 15,238,455.00$

NUMBER OF AMENDMENTS: 3

ENGINEERING

-3.25%VARIATION FROM GOVT. EST 1.85% 0.19%

CEMVM 967 (REV. JAN 00)

ABSTRACT OF BIDS Page 1 of 3

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JA XXXX 132,715.00$ XXX 1,895,795.00$ XXX 1,225,000.00$ XXX 1,611,900.00$ 0002 Environmental Protection 1 JA XXXX 15,089.00$ XXX 146,000.00$ XXX 35,000.00$ XXX 550,000.00$ 0003 Traffic Control and Signage 1 JA XXXX 66,224.00$ XXX 180,000.00$ XXX 15,000.00$ XXX 6,000.00$ 0004 Demolition of Culverts 1 JA XXXX 398,557.00$ XXX 31,050.00$ XXX 180,000.00$ XXX 47,000.00 0005 Storm Water Pollution Prevention

0005AA Write and Amend SWPPP 1 JA XXXX 7,142.00$ XXX 150,000.00$ XXX 15,000.00$ XXX 8,400.00$ 0005AB Silt Fence 26,800 LF 2.94$ 78,792.00$ 2.15$ 57,620.00$ 2.50$ 67,000.00$ $2.48 66,464.00$ 0005AC Check Dams 45 EA 298.44$ 13,429.08$ 8,980.00$ 404,100.00$ 1,625.00$ 73,125.00$ $2,900.00 130,500.00$ 0005AD Temporary Environmental Seeding 200 AC 1,141.39$ 228,278.00$ 65.75$ 13,150.00$ 800.00$ 160,000.00$ $1,560.00 312,000.00$ 0005AE Construction Vehicle Egress 3 EA 7,089.00$ 21,267.00$ 1,539.00$ 4,617.00$ 5,425.00$ 16,275.00$ $2,370.00 7,110.00$ 0005AF Concrete Washout 1 EA 14,724.00$ 14,724.00$ 2,875.00$ 2,875.00$ 3,500.00$ 3,500.00$ $8,800.00 8,800.00$

0006 Single 6' x 8' CIP Box Culvert 138 LF 2,792.77$ 385,392.60$ 7,525.00$ 1,038,450.00$ 3,224.00$ 444,912.00$ $4,416.00 609,408.00$ 0007 Double 6' x 8' CIP Box Culvert 276 LF 4,467.44$ 1,233,134.88$ 10,365.00$ 2,860,740.00$ 4,968.00$ 1,371,168.00$ $7,272.00 2,007,072.00$ 0008 Triple 6' x 8' CIP Box Culvert 138 LF 6,134.75$ 84,595.50$ 14,785.00$ 2,040,330.00$ 7,388.00$ 1,019,544.00$ $9,570.00 1,320,660.00$ 0009 36" CMP Culvert 110 LF 242.92$ 26,721.20$ 167.00$ 18,370.00$ 121.00$ 13,310.00$ $108.00 11,880.00$ 0010 48" CMP Culvert 500 LF 295.20$ 147,600.00$ 114.00$ 57,000.00$ 93.00$ 46,500.00$ $162.50 81,250.00$ 0011 30" NRCS Steel Pipe 825 LF 400.49$ 330,404.24$ 175.00$ 144,375.00$ 111.00$ 91,575.00$ $141.40 116,655.00$ 0012 Clearing 60 AC 750.70$ 45,042.00$ 1,438.00$ 86,280.00$ 6,000.00$ 360,000.00$ $562.00 33,720.00$ 0013 Grubbing 60 AC 750.70$ 45,042.00$ 1,438.00$ 86,280.00$ 1,500.00$ 90,000.00$ $562.00 33,720.00$ 0014 Excavation 960,000 CY 1.57$ 1,507,200.00$ 1.15$ 1,104,000.00$ 3.75$ 3,600,000.00$ $1.97 1,891,200.00$ 0015 Embankment 715,000 CY 4.19$ 2,995,850.00$ 3.22$ 2,302,300.00$ 4.85$ 3,467,750.00$ $2.45 1,751,750.00$ 0016 Geotextile 89,000 SY 2.76$ 245,640.00$ 2.40$ 213,600.00$ 1.10$ 97,900.00$ $2.68 238,520.00$ 0017 48" Flared End Section 14 EA 3,051.00$ 42,714.00$ 2,315.00$ 32,410.00$ 1,820.00$ 25,480.00$ $2,315.00 32,410.00$ 0018 36" Flared End Section 2 EA 2,002.00$ 4,004.00$ 1,786.00$ 3,572.00$ 900.00$ 1,800.00$ $1,330.00 2,660.00$ 0019 Single 6'x8' CIP Headwall Outlets 1 EA 292,391.00$ 292,391.00$ 325,000.00$ 325,000.00$ 249,600.00$ 249,600.00$ $218,600.00 218,600.00$ 0020 Double 6'x8' CIP Headwall Outlets 2 EA 328,707.00$ 657,414.00$ 413,000.00$ 826,000.00$ 215,000.00$ 430,000.00$ $335,700.00 671,400.00$ 0021 Triple 6'x8' CIP Headwall Outlets 1 EA 374,343.00$ 374,343.00$ 519,500.00$ 519,500.00$ 305,000.00$ 305,000.00$ $461,700.00 461,700.00$ 0022 Single 6'x8' CIP Headwall Inlets 1 EA 59,461.00$ 59,461.00$ 125,400.00$ 125,400.00$ 65,000.00$ 65,000.00$ $129,100.00 129,100.00$ 0023 Double 6'x8' CIP Headwall Inlets 2 EA 77,200.00$ 154,400.00$ 175,000.00$ 350,000.00$ 86,000.00$ 172,000.00$ $200,600.00 401,200.00$ 0024 Triple 6'x8' CIP Headwall Inlets 1 EA 102,006.00$ 102,006.00$ 245,000.00$ 245,000.00$ 95,000.00$ 95,000.00$ $285,800.00 285,800.00$ 0025 48" Flap Gates 2 EA 7,609.00$ 15,218.00$ 21,250.00$ 42,500.00$ 4,750.00$ 9,500.00$ $6,360.00 12,720.00$ 0026 36" Flap Gates 2 EA 5,466.00$ 10,932.00$ 19,500.00$ 39,000.00$ 3,650.00$ 7,300.00$ $5,260.00 10,520.00$ 0027 6'x8' Sluice Gates 8 EA 132,860.00$ 1,062,880.00$ 175,000.00$ 1,400,000.00$ 160,000.00$ 1,280,000.00$ $296,350.00 2,370,800.00$ 0028 Bedding Material 1,400 TN 36.35$ 50,890.00$ 32.75$ 45,850.00$ 52.00$ 72,800.00$ $35.04 49,056.00$ 0029 Aggregate Surfacing 34,000 TN 58.24$ 1,980,160.00$ 33.40$ 1,135,600.00$ 38.30$ 1,302,200.00$ $30.16 1,025,440.00$ 0030 R-200 Riprap 2,400 TN 56.13$ 134,712.00$ 40.25$ 96,600.00$ 52.00$ 124,800.00$ $37.25 89,400.00$ 0031 R-650 Riprap 4,500 TN 59.11$ 265,995.00$ 43.75$ 196,875.00$ 62.50$ 281,250.00$ $39.36 177,120.00$ 0032 Cofferdams 4 EA 124,728.00$ 498,912.00$ 42,700.00$ 170,800.00$ 160,000.00$ 640,000.00$ $47,500.00 190,000.00$ 0033 Dewatering 4 EA 71,854.00$ 287,416.00$ 52,250.00$ 209,000.00$ 70,000.00$ 280,000.00$ $27,200.00 108,800.00$ 0034 Establishment of Turf 200 AC 2,154.29$ 430,858.00$ 1,965.00$ 393,000.00$ 1,550.00$ 310,000.00$ 2,020.00 404,000.00

18,044,289.00$

739 S. Clark St. 1909 S. Westwood Blvd. 12965 Carrier Lane Dexter, MO 63841

ROBERTSON CONTRACTINGINVITATION NO.: W912EQ19B0006 GOVT. ESTIMATE RANDY KINDER EXCA

BID OPENING DATE AND TIME: 08/06/2016 1:30 P.M. COST

TITLE: Elk Chute Levee Setback MEMPHIS

PONCHATRAIN PARTNERS

DISTRICT New Orleans, LA 70119 Poplar Bluff, MO 63901

18,993,039.00$

SMALL BUSINESS DETERMINATION: Small Buiness Set-Aside ENGINEERING

VARIATION FROM GOVT. EST 31.46% 24.90% 21.02%

17,484,735.00 GRAND TOTAL ITEMS 0001 THRU 0034 14,447,545.50$

ABSTRACT OF BIDS Page 2 of 3

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 JA XXXX 132,715.00$ XXX 990,000.00$ XXX XXX 0002 Environmental Protection 1 JA XXXX 15,089.00$ XXX 28,225.00$ XXX XXX 0003 Traffic Control and Signage 1 JA XXXX 66,224.00$ XXX 9,000.00$ XXX XXX 0004 Demolition of Culverts 1 JA XXXX 398,557.00$ XXX 225,000.00$ XXX XXX 0005 Storm Water Pollution Prevention

0005AA Write and Amend SWPPP 1 JA XXXX 7,142.00$ XXX 5,900.00$ XXX XXX 0005AB Silt Fence 26,800 LF 2.94$ 78,792.00$ 2.10$ 56,280.00$ 0005AC Check Dams 45 EA 298.44$ 13,429.08$ 4,300.00$ 193,500.00$ 0005AD Temporary Environmental Seeding 200 AC 1,141.39$ 228,278.00$ 600.00$ 120,000.00$ 0005AE Construction Vehicle Egress 3 EA 7,089.00$ 21,267.00$ 2,900.00$ 8,700.00$ 0005AF Concrete Washout 1 EA 14,724.00$ 14,724.00$ 5,500.00$ 5,500.00$

0006 Single 6' x 8' CIP Box Culvert 138 LF 2,792.77$ 385,392.60$ 5,590.00$ 771,420.00$ 0007 Double 6' x 8' CIP Box Culvert 276 LF 4,467.44$ 1,233,134.88$ 7,890.00$ 2,177,640.00$ 0008 Triple 6' x 8' CIP Box Culvert 138 LF 6,134.75$ 84,595.50$ 11,050.00$ 1,524,900.00$ 0009 36" CMP Culvert 110 LF 242.92$ 26,721.20$ 220.00$ 24,200.00$ 0010 48" CMP Culvert 500 LF 295.20$ 147,600.00$ 250.00$ 125,000.00$ 0011 30" NRCS Steel Pipe 825 LF 400.49$ 330,404.24$ 165.00$ 136,125.00$ 0012 Clearing 60 AC 750.70$ 45,042.00$ 3,500.00$ 210,000.00$ 0013 Grubbing 60 AC 750.70$ 45,042.00$ 3,500.00$ 210,000.00$ 0014 Excavation 960,000 CY 1.57$ 1,507,200.00$ 2.80$ 2,688,000.00$ 0015 Embankment 715,000 CY 4.19$ 2,995,850.00$ 1.20$ 858,000.00$ 0016 Geotextile 89,000 SY 2.76$ 245,640.00$ 1.38$ 122,820.00$ 0017 48" Flared End Section 14 EA 3,051.00$ 42,714.00$ 3,650.00$ 51,100.00$ 0018 36" Flared End Section 2 EA 2,002.00$ 4,004.00$ 2,950.00$ 5,900.00$ 0019 Single 6'x8' CIP Headwall Outlets 1 EA 292,391.00$ 292,391.00$ 375,000.00$ 375,000.00$ 0020 Double 6'x8' CIP Headwall Outlets 2 EA 328,707.00$ 657,414.00$ 425,000.00$ 850,000.00$ 0021 Triple 6'x8' CIP Headwall Outlets 1 EA 374,343.00$ 374,343.00$ 455,000.00$ 455,000.00$ 0022 Single 6'x8' CIP Headwall Inlets 1 EA 59,461.00$ 59,461.00$ 125,000.00$ 125,000.00$ 0023 Double 6'x8' CIP Headwall Inlets 2 EA 77,200.00$ 154,400.00$ 155,000.00$ 310,000.00$ 0024 Triple 6'x8' CIP Headwall Inlets 1 EA 102,006.00$ 102,006.00$ 200,000.00$ 200,000.00$ 0025 48" Flap Gates 2 EA 7,609.00$ 15,218.00$ 6,550.00$ 13,100.00$ 0026 36" Flap Gates 2 EA 5,466.00$ 10,932.00$ 5,575.00$ 11,150.00$ 0027 6'x8' Sluice Gates 8 EA 132,860.00$ 1,062,880.00$ 170,000.00$ 1,360,000.00$ 0028 Bedding Material 1,400 TN 36.35$ 50,890.00$ 36.00$ 50,400.00$ 0029 Aggregate Surfacing 34,000 TN 58.24$ 1,980,160.00$ 35.10$ 1,193,400.00$ 0030 R-200 Riprap 2,400 TN 56.13$ 134,712.00$ 50.35$ 120,840.00$ 0031 R-650 Riprap 4,500 TN 59.11$ 265,995.00$ 55.00$ 247,500.00$ 0032 Cofferdams 4 EA 124,728.00$ 498,912.00$ 240,000.00$ 960,000.00$ 0033 Dewatering 4 EA 71,854.00$ 287,416.00$ 150,000.00$ 600,000.00$ 0034 Establishment of Turf 200 AC 2,154.29$ 430,858.00$ 1,570.00$ 314,000.00$

17,732,600.00$

BID OPENING DATE AND TIME: 08/06/2016 1:30 P.M. COST

TITLE: Elk Chute Levee Setback MEMPHIS P.O. Box 300

GRAND TOTAL ITEMS 0001 THRU 0034 14,447,545.50$

SMALL BUSINESS DETERMINATION: Small Buiness Set-Aside ENGINEERING

VARIATION FROM GOVT. EST 22.74%

INVITATION NO.: W912EQ19B0006 GOVT. ESTIMATE HAROLD COFFEY CONTRACTING

DISTRICT Hickman, KY 42050

ABSTRACT OF BIDS Page 3 of 3

File details come from the government source that posted it.