The U.S. Army Corps of Engineers has a requirement for an Engine Overhaul and Generator End. Contractor is required to complete major overhaul on engine and procurement and installation of new 985KW generator. The unit will be rebuilt to Caterpillar manufactures specifications on all components with new parts.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912EQ18T0007 09-Feb-2018
b. TELEPHONE NUMBER
901-544-3356
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 16 Feb 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912EQ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
SYNEASE S MCARTHUR
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W38XGR80111495
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
SYNEASE S. MCARTHUR
167 N MAIN STREET
MEMPHIS TN 38103-1894
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE B1P0000 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
CONTRACTING DIV, NATL CTR ORG
167 NORTH MAIN ST B-202
MEMPHIS TN 38103-1894
TEL: (901) 544-3117 FAX: (901) 544-3142
FAX:
TEL: 901-544-3614 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$7,500,000
NAICS:
811310
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF66
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912EQ18T0007
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
MAJOR OVERHAUL - PARTS
FFP
This is a non-personnel services contract to provide for the major overhaul of a Caterpillar 3508B engine SN # 6PN00514 and procurement and installation of a new 985KW marathon generator end 743RSS4290 on the 3508B engine. The contractor shall provide all labor and materials needed to perform the overhaul of the engine. The contractor shall perform the overhaul according to the Caterpillar guidelines as given in the operations and maintenance manual. REFERENCE THE
SCOPE OF WORK.
FOB: Destination
MILSTRIP: W38XGR80111495
PURCHASE REQUEST NUMBER: W38XGR80111495
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Each
MAJOR OVERHAUL - LABOR
FFP
This is a non-personnel services contract to provide for the major overhaul of a Caterpillar 3508B engine SN # 6PN00514 and procurement and installation of a new 985KW marathon generator end 743RSS4290 on the 3508B engine. The contractor shall provide all labor and materials needed to perform the overhaul of the engine. The contractor shall perform the overhaul according to the Caterpillar guidelines as given in the operations and maintenance manual. REFERENCE THE
SCOPE OF WORK.
FOB: Destination
MILSTRIP: W38XGR80111495
PURCHASE REQUEST NUMBER: W38XGR80111495
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Each
SHOP SUPPLIES
FFP
This is a non-personnel services contract to provide for the major overhaul of a Caterpillar 3508B engine SN # 6PN00514 and procurement and installation of a new 985KW marathon generator end 743RSS4290 on the 3508B engine. The contractor shall provide all labor and materials needed to perform the overhaul.
The contractor shall perform the overhaul according to the Caterpillar guidelines as given in the operations and maintenance manual. REFERENCE THE SCOPE OF
WORK.
FOB: Destination
MILSTRIP: W38XGR80111495
PURCHASE REQUEST NUMBER: W38XGR80111495
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Each
985KW GENERATOR END GEN
FFP
This is a non-personnel services contract to provide for the major overhaul of a Caterpillar 3508B engine SN # 6PN00514 and procurement and installation of a new 985KW marathon generator end 743RSS4290 on the 3508B engine. The contractor shall provide all labor and materials needed to perform the overhaul of the engines. The contractor shall perform the overhaul according to the Caterpillar guidelines as given in the operations and maintenance manual. REFERENCE THE
SCOPE OF WORK.
FOB: Destination
MILSTRIP: W38XGR80111495
PURCHASE REQUEST NUMBER: W38XGR80111495
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 Job
MISCELLANEOUS REPAIR PARTS
FFP
“Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts .Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request in accordance with the agreed-to procedures. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work. See DFAR clause 252.217-7028 -Over and above work
NOTE: This limitation will be established at the award level by the Contracting Officer. This line item is strictly for miscellaneous repair parts discovered during the overhaul of the engine and submission quote is not intended.
FOB: Destination
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
3508B Engine Major Overhaul and new 985KW Marathon Generator End
Part 1
1. GENERAL: This is a non-personnel services contract to provide for the major overhaul of a Caterpillar 3508B engine SN # 6PN00514 and procurement and installation of a new 985KW marathon generator end 743RSS4290 on the 3508B engine. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, tools, materials, supervision, and other items and non-personal services necessary to perform the major overhaul defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The Bank Grading Unit Bucyrus Erie Crane was built in 1949, the crane went thru an upgrade in 2001 and currently has a Caterpillar 3508B engine and 910KW generator end that has failed. The crane and equipment is currently located at Ensley Engineer Yard, 2915 Riverport Road, Memphis, TN 38109.
1.3 Objectives: The Contractor shall perform the repair with new OEM parts or REMAN items with comparable warranty to new items and equipment to meet the specifications stated in the scope of work.
1.4 Scope: Complete major overhaul on engine and procurement and installation of new 985KW generator. Unit will be rebuilt to Caterpillar manufactures specifications on all components with new parts.
Period of Performance: The period of performance for this project is 60 calendar days from award date. Normal business hours at Ensley Engineer Yard are 0700 – 1530 Monday through Friday during daylight savings time and 0630-1700 Monday through Thursday the remainder of the year. If alternate hours are requested, this must be agreed upon by Contracting Officer’s Representative (COR) and contractor.
1.6 General Information
1.6.1 Quality Assurance: The government will perform visual and hands on inspection of repairs upon completion
1.6.1 Quality Assurance: QUALITY ASSURANCE SURVEILLANCE PLAN
For 3508B Engine Major Overhaul and new 985KW Marathon Generator End
This Quality Assurance Surveillance Plan (QASP) is provided for information on the major overhaul of a Caterpillar 3508B engine and a new 985KW marathon generator end , the level of performance expectations and how the designated government personnel will confirm the services provided are acceptable. The methods of surveillance and procedures may change after contract award based on acceptance of the contractor’s Quality Control Plan or a partnering agreement which establishes the metrics to be used, or improve contractor performance.
The contractor is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved. The following table is established to measure compliance of quality assurance:
Deliverable Performance Standard
Acceptable Quality Level
Method/Frequency Compliance Level
Contractor shall disassemble engine
Timeliness, Neatness, Professionalism
Full Government Acceptance
Final Inspection
Removal of components
Timeliness, Neatness, Professionalism
Full Government Acceptance.
Periodic
Inspection of housing, remaining components
Operational Neatness Quality
Full Government Acceptance
Final Inspection
Installation of new parts
Operational, Neatness
Full Government Acceptance
Final Inspection
Testing of new components to include Dynamometer after overhaul
Verify compliant within Manufacturers recommended specifications
100% Review Periodic
Installation of New 985KW generator end
Verify compliant within Manufacturers recommended specifications
100% Review Final Inspection
Verification of output voltage, wattage, Power factor
Operational Neatness
Final Inspection
Compliance Level and Date. This column is used to determine whether the deliverables required meet the Acceptable Quality Level on the QASP. It will be used to provide documentation for deficiencies requiring payment adjustment or other action from the contractor. The compliance block is filled out using a color code (Green, Yellow or Red):
Green = Deliverable required has been met in a satisfactory manner.
Yellow = Deliverable required is not being consistently met satisfactorily; attention is needed in certain areas.
Red = Deliverable is not being met.
1.6.2 Recognized Holidays: The service is required to be available during all holidays.
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.3 Hours of Operation: Normal business hours at Ensley Engineer Yard are 0630 - 1700 Monday through Thursday.
If alternate hours are requested, this must be agreed upon by Contracting Officer’s Representative (COR) and contractor.
1.6.4 Place of Performance: The work will be performed at the contractor’s facility. Contractor will be responsible for pickup and delivery of the Hydraulic Torque Converter from and to Ensley Engineer Yard, 2915 Riverport Road, Memphis, TN 38109.
1.6.6 Type of Contract: The government will award a Firm Fixed Price Purchase Order.
1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use, if needed.
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.6.7.2 Key Control N/A
1.6.7.2.1. N/A
1.6.7.2.2. N/A
1.6.7.3 N/A
1.6.8 Special Qualifications: None.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Technical Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10 Contracting Officer Representative (COR): April Branch will be the COR.
1.6.11 Key Personnel: The following personnel are considered key personnel by the government: Carl Hammitte (9015733928), Brandon Carmack (9013717497) and Matt Young (9014814470). The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.6.12 Identification of Contractor Employees: N/A
1.6.13 Contractor Travel: Contractor shall be responsible for all travel cost associated with this contract. Cost shall be incorporated into contractor’s price.
1.6.14 Other Direct Costs: None
1.6.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.
All documents and materials, to include the source codes of any software, produced under this contract shall be property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor having a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-physical things such as meeting minutes.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Is defined as Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation
CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial Off the Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: N/A
3.2 Facilities: N/A
3.3 Utilities: N/A
3.4 Equipment: The Government will provide pickup and return delivery of the Hydraulic Torque Converter if the contractor is within 200 miles of Ensley Engineer Yard 2915 Riverport Rd. Memphis, TN 38109.
3.5 Materials: N/A
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: Contractor is to provide all labor and material for the entire scope of work. No government equipment will be available for contractor use other than as specified herein. The contractor will be responsible for damages and repairs to any Corps of Engineers equipment associated with the project.
4.2 Secret Facility Clearance: N/A
4.3. Materials: Any “Or Equal” material proposed by the contractor will be submitted for prior approval by the Contracting Officer’s Representative.
4.4. Equipment: All contractor equipment will be removed immediately from government property at job completion.
PART 5
5. Specific Tasks:
5.1 Basic Services. The contractor shall during design phase/kick-off meeting visit the site and examine existing omega Drive. During removal stage remove components and notify Government of condition of remaining parts
5.2. Scope of Work. The Contractor shall provide all materials, parts, supplies, and equipment required to rebuild drive and also provide licensed technician support during installation on new equipment in accordance with Parts 1 and 3 of this PWS.
The scope of this work includes major overhauling of the Caterpillar 3508B engine which consists of the items listed below:
1. Replace main, thrust and rod bearings, cam bearings, front and rear crankshaft seals, remove and clean and reseal after cooler core, re-assemble engine with necessary gaskets and seals. Repair Duplex Oil Filter selector valve assembly.
2. Replace cylinder packs, cylinder heads, cylinder head spacer plates, cam lifters, water pump, oil pump, oil cooler core, fuel transfer pump, fuel injectors, injector wiring harness’, and turbo cartridges with REMAN parts. Install new temperature regulators in cooling system.
3. Remove and reseal front and rear covers, replace idler gear and accessory drive bearings as needed.
4. Reinstall existing control panel and wiring as needed.
5. Test run unit on Engine Dynamometer after overhaul is completed.
6. Install and align new generator end.
7. Paint entire Generator Set CAT yellow prior to delivery.
Installation of a new generator end described below.
985KW / 1589 KVA, .062 PF
600VAC
95F rise over 50F ambient Permanent Magnet Generator DVR2000E Digital Voltage Regulator 120vac Space Heaters IP22 Louvers Stator RTD’s SAE 00 / B 21 mounting adaptor and coupling Mounting foot plates to match existing Newage HCI17 frame.
. Unit will be rebuilt to twin disk manufactures specifications on all components with new parts.
5.3 SAFETY RELATED SPECIAL REQUIREMENTS. ALL WORK UNDER THIS CONTRACT SHALL
COMPLY WITH THE LATEST VERSION OF U.S. ARMY CORPS OF ENGINEERS SAFETY AND HEALTH
REQUIREMENTS MANUAL, EM 385-1-1, AND OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
STANDARDS IN EFFECT ON THE DATE OF THE SOLICITATION. THE MANUAL CAN BE ACCESSED
AT THE FOLLOWING LINK,
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf . NO
SEPARATE PAYMENT WILL BE MADE FOR COMPLIANCE WITH EM 385-1-1, NOR FOR COMPLIANCE
WITH ANY OF THE OTHER SAFETY-RELATED SPECIAL REQUIREMENTS.
5.4 CERTIFICATES OF COMPLIANCE. Any certificates required for demonstrating proof of compliance of material with specification requirements shall be executed in three (3) copies. Each certificate shall be signed by an official of the manufacturing company and shall contain the name and address of the Contractor, the project name and location, and the quantity and date or dates of shipment or delivery to which the certificates apply.
5.5 The responsibility for damage to any part of the work caused by the Contractor’s neglect shall be paid for by the contractor. However, if, in the judgment of the Contracting Officer, any part of the work performed by the Contractor is damaged by flood, tornado, or earthquake, which damage is not due to the failure of the Contrac-tor to take reasonable precautions or to exercise reasonable precautions to secure equipment in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract units or lump sum prices applicable to any part of such work, an equitable adjustment will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense regardless of the cause of such damage.
5.6 NOTIFICATION BEFORE BEGINNING WORK. At least 5 calendar days before beginning work, the Contractor shall notify Matt Young, Supervisor Revetment Section at 2915 Riverport Rd, Memphis, TN 38109, Phone: (901) 481-4470.
5.7 COMMERCIAL WARRANTY
The Contractor agrees that the overhaul and generator end and any parts or materials associated with the work that was furnished by the contractor under this contract shall be covered by the most favorable commercial warranty the Contractor gives to any customer for such products and that the rights and remedies provided herein are in addition to and do not limit any rights afforded to the Government by any other clause of this contract. The warranty will take effect immediately upon the day of acceptance, by the Government, of the completed work.
5.8 PROTECTION OF MATERIALS AND WORK
The Contractor shall at all times protect and preserve all materials, supplies, and equipment of every description (including property which may be Government-furnished or owned) and all work performed. All reasonable requests of the Contracting Officer to enclose or specially protect such property shall be complied with.
If, as determined by the Contracting Officer, material, equipment, supplies, and work performed are not adequately protected by the Contractor, such property may be protected by the Government and the cost thereof may be charged to the Contractor or deducted from any payments due to him.
5.9 DESIGN AND INSTALLATION REQUIREMENTS
A. The contractor is required to read and understand this document prior to submitting the project proposal.
B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for a complete and appropriate execution of the contract documents and sections of this PWS.
C. Unless otherwise stated, all materials for this project shall be new. Asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB) shall not be used in this project.
D. Use all means and precautions necessary to insure the safety of the occupants and protection to the existing structures.
F. All work shall be in strict accordance with manufacturer's instructions and specifications. All work shall be grounded in accordance to NFPA 70 (National Fire Protection Association).
5.10 SALVAGE MATERIAL AND EQUIPMENT. Items designated by the Contracting Officer to be salvaged shall remain the property of the Government, until release by Contracting Officer. Contractor shall maintain property control records for material or equipment
NOTICE TO OFFERORS
NOTICE TO OFFERORS
A. The following documentation must be submitted with your quote for evaluation.
1. SF 1449, Solicitation, Offer and Award; include your signature, name, title, date, include prompt payment terms, remittance address, Tax Identification Number, DUNS number, and Cage Code.
2. Schedule of prices
3. Representations and Certifications. (FAR Clauses 52.212-3)
4. All amendments must be acknowledged
5. Review and submit the required information from FAR clauses 52.212-2
B. Offerors ADDRESS - Prospective Offerors should indicate in the offer, the address to which payment and/or correspondence should be mailed, if such address is different from that shown for the offeror on Standard Form 1449 Block 17a.
C. System for Award Management - By submission of a quote, the Offeror acknowledges the requirement that prospective awardee must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from this quote. Lack of registration in the SAM database will make an Offeror ineligible for award. Contractors may obtain information on registration and annual confirmation requirements by calling 1-888-227-2423, or at: http://www.sam.gov.
D. Basis of Award - The Government intends to award a award (1) Firm Fixed Price Purchase Order from this solicitation.to the responsible contractor whose offer conforming to the solicitation will be most advantageous to the Government based on Technical Capability, Price, and Past Performance. See Performance Work Statement, and Evaluation Criteria specified in FAR 52.212-2 of this solicitation.
E. How to submit questions: Questions should be emailed to synease.s.mcarthur@usace.army.mil and a response will be provided.
F. How to submit Proposal: Contractor may submit an electronic offer to the following email addresses no later than the stated due date and time in block 8 of the SF 1449. Submit and electronic offer to synease.s.mcarthur@usace.army.mil. You may also deliver hand carried offers to 167 N. Main Street, Memphis TN 38103 and must be time stamped no later than the stated due date in block 8 of the SF 1449. Submission of offers via fax will not be accepted.
G. Delivery Times - The following delivery times are established for contactors:
0700-4:00pm, M-F (Monday thru Friday) 0700-3:00pm, Friday
(UNLESS OTHERWISE INSTRUCTED)
No deliveries will be accepted on Federal holidays.
LOCAL PROVISIONS
0010 CONTRACTING OFFICER AUTHORITY
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
0020 CUSTOMER INSTRUCTIONS
The customer is responsible for forwarding proof of delivery (SF 1449/DD FORM 1155 or DD 250 or electronic equivalent) signed by a government official to the address located in block 18a.
Failure to do so may cause a delay in payment to the contractor. If any items delivered are not in accordance with the contract or purchase order, notify the contracting officer in writing.
0030 CONTRACTING OFFICE E-MAIL ADDRESS/PHONE/FAX NUMBER(S)
Synease.S.McArthur@usace.army.mil – 901-544-3614 (PH) - Contract Specialist Monica.A.Moody@usace.army.mil 901-544-0838 (PH) – Contracting Officer
0040 CONTRACT ADMINISTRATION
All contract inquiries, after award of this contract, shall be directed to the Contracting Officer:
NAME: Synease McArthur LOCATION: 167 North Main, Rm A-665
TELEPHONE NO.: 901-544-3614
E-MAIL ADDRESS: Synease.S.McArthur@usace.army.mil
b. The authorized representatives of the Government during the performance period are as follows:
(1) The Contracting Officer’s Representative (COR) will be designated, by letter of appointment, by the Contracting Officer and will represent the Contracting Officer in the technical phases of the work, but will not be authorized to change any of the terms and conditions of the contract.
The COR is responsible for monitoring performance and the technical management of the effort required hereunder, and should be contacted regarding questions or problems of a technical nature.
(2) The designated Contract Specialist will be the Administrative Contracting Officer's representative on all other contract administrative matters. The Contract Specialist should be contacted regarding all matters pertaining to the contract or task orders.
0060 BLOCK 18a OF SF 1449, PAYMENT WILL BE MADE BY:
USACE FINANCE CENTER
5722 INTEGRITY DRIVE
BLDG S-787
MILLINGTON TN 38054-5005
0070 BLOCK 18b OF SF 1449, SUBMIT INVOICES:
DESIGNATED BILLING OFFICE:
USACE FINANCE CENTER
5722 INTEGRITY DRIVE
BLDG S-787
MILLINGTON TN 38054-5005
CEFC.B1invoices@usace.army.mil
AND
USING ACTIVITY
US ARMY ENGINEER DISTRICT, MEMPHIS
ENSLEY ENGINEERING YARD (EEY) – BGU CRANE
2915 RIVERPORT ROAD
MEMPHIS, TN 38109
POC: MATTHEW YOUNG
PHONE: (901) 481-4470
TO EXPEDITE PAYMENT (Preferred): Please email your invoice to:
CEFC.B1invoices@usace.army.mil (Designated Billing Office)
Invoice(s) must include:
(1) Name and address of the Contractor;
(2) Invoice date;
(3) Contract number, contract line item number and, if applicable, the order number;
(4) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(5) Shipping number and date of shipment including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(6) Terms of any prompt payment discount offered;
(7) Name and address of official to whom payment is to be sent; and
(8) Name, title, and phone number of person to be notified in event of defective invoice.
Failure to mail/email your invoice(s) to the above addresses or to provide all responsive information may delay payment.
Section G - Contract Administration Data
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.204-13 System for Award Management Maintenance OCT 2016 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.211-6 Brand Name or Equal AUG 1999 52.212-1 Instructions to Offerors--Commercial Items JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.213-3 Notice to Suppliers APR 1984 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
252.203-7000 Requirements Relating to Compensation of Former DoD Officials
SEP 2011
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.204-7013 Limitations on the Use or Disclosure of Information by Litigation Support Offerors
MAY 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System--Statistical Reporting in Past Performance Evaluations
JUN 2015
252.215-7007 Notice of Intent to Resolicit JUN 2012 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Dec 2017)
DEC 2017
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7003 Notification of Potential Safety Issues JUN 2013 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.204-17 OWNERSHIP OR CONTROL OF OFFEROR (JUL 2016)
(a) Definitions. As used in this provision--
Commercial and Government Entity (CAGE) code means—
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity;
or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
Highest-level owner means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
Immediate owner means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
(b) The Offeror represents that it [ ___ ] has or [ ___ ] does not have an immediate owner. If the Offeror has more than one immediate owner (such as a joint venture), then the Offeror shall respond to paragraph (c) and if applicable, paragraph (d) of this provision for each participant in the joint venture.
(c) If the Offeror indicates ``has'' in paragraph (b) of this provision, enter the following information:
Immediate owner CAGE code:
Immediate owner legal name: ___
(Do not use a ``doing business as'' name)
Is the immediate owner owned or controlled by another entity?:
[ ___ ] Yes or [ ___ ] No.
(d) If the Offeror indicates ``yes'' in paragraph (c) of this provision, indicating that the immediate owner is owned or controlled by another entity, then enter the following information:
Highest-level owner CAGE code:
Highest-level owner legal name:
(Do not use a ``doing business as'' name)
(End of provision)
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
All quotes submitted will be evaluated for (1) Technical Acceptability, (2) Satisfactory Past Performance, and (3) Price. Award will be made to the offeror whose proposal is determined to represent the Best Value to the Government which presents the most advantageous solution to the US Army Corps of Engineers, Memphis District.
Submittals:
It is incumbent upon the offeror to submit sufficient information for the Government to make a determination of your technical acceptability, satisfactory past performance and price. Failure to submit sufficient information for the government to determine your technical acceptability, satisfactory past performance or price may be cause for rejection of your quote.
Technical acceptability and past performance, when combined, are approximately equal to price.
(1) Technical Acceptability - to be determined technically acceptably offerors shall submit for evaluation, documentation of their capability to provide the specified services in accordance with the project Scope-of- Work, including but not limited to, the capability to provide the services specified, and in accordance with the specified delivery schedule.
Capability and Experience of Key Personnel: The Government will evaluate the Offeror’s experience for Key Personnel based on relevant experience and performance on repairing Caterpillar Machinery Engines similar to those required to successfully achieve the operational expectations of the Performance Work Statement. Offerors must provide a copy of the proposed licensed technician support certification.
(2) Satisfactory Past Performance - to demonstrate satisfactory past performance the offeror shall provide documentation of satisfactory performance on past or current contracts of a similar type, size, scope and complexity, as well as, provide references, including names and contact information of references who can verify their past performance. Past performance information of key personnel and crew may be provided if the company has limited or no past performance. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror will be evaluated as neutral on Past Performance, providing the offeror supplies a certified statement with their offer that no past performance information is available.
The Government’s approach to evaluating past performance is to check the references provided by the contractor to verify satisfactory past performance as well as data obtained from other sources available i.e. government database, past contract files, etc. The offeror is cautioned that while the Government will consider data from other sources, the burden of demonstrating satisfactory past performance rests with the offeror.
It is incumbent upon the offeror to submit sufficient documentation and information for the Government to determine technical acceptability, satisfactory past performance and proposed price. Failure to submit sufficient information for the government to determine technical acceptability, past performance or price may be cause for rejection of your quote.
(3) Price - Price quotes will be examined to determine the extent to which proposed prices are comparable with the Government estimates, and previous procurement history and a determination made of Price Reasonableness. The Government may reject any quote that is determined to be Not Fair and Reasonable, unrealistically high or low in price when compared to Government estimates, or are unbalanced, such that the quote is deemed to reflect an inherent lack of competence or failure to comprehend the requirements. All quotes will be evaluated and a determination made to the offerors whose considered the Best Value, from prices presented on the Bidding Schedule, based on the Total of all line items.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2017)
The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) Web site located at https://www.sam.gov/portal. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (u) of this provision.
(a) Definitions. As used in this provision --
“Economically disadvantaged women-owned small business (EDWOSB) Concern” means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business eligible under the WOSB Program.
"Forced or indentured child labor" means all work or service-
(1) Exacted from any person under the age of 18 under the menace of any penalty for its nonperformance and for which the worker does not offer himself voluntarily; or
(2) Performed by any person under the age of 18 pursuant to a contract the enforcement of which can be accomplished by process or penalties.
“Highest-level owner” means the entity that owns or controls an immediate owner of the offeror, or that owns or controls one or more entities that control an immediate owner of the offeror. No entity owns or exercises control of the highest level owner.
“Immediate owner” means an entity, other than the offeror, that has direct control of the offeror. Indicators of control include, but are not limited to, one or more of the following: Ownership or interlocking management, identity of interests among family members, shared facilities and equipment, and the common use of employees.
“Inverted domestic corporation” means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
“Manufactured end product” means any end product in product and service codes (PSCs) 1000-9999, except--
(1) PSC 5510, Lumber and Related Basic Wood Materials;
(2) Product or Service Group (PSG) 87, Agricultural Supplies;
(3) PSG 88, Live Animals;
(4) PSG 89, Subsistence;
(5) PSC 9410, Crude Grades of Plant Materials;
(6) PSC 9430, Miscellaneous Crude Animal Products, Inedible;
(7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products;
(8) PSC 9610, Ores;
(9) PSC 9620, Minerals, Natural and Synthetic; and
(10) PSC 9630, Additive Metal Materials.
“Place of manufacture” means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the finished product that is to be provided to the Government. If a product is disassembled and reassembled, the place of reassembly is not the place of manufacture.
“Predecessor” means an entity that is replaced by a successor and includes any predecessors of the predecessor.
“Restricted business operations” means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate--
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted pursuant to specific authorization from the Office of Foreign Assets Control in the Department of the Treasury, or are expressly exempted under Federal law from the requirement to be conducted under such authorization;
(3) Consist of providing goods or services to marginalized populations of Sudan;
(4) Consist of providing goods or services to an internationally recognized peacekeeping force or humanitarian organization;
(5) Consist of providing goods or services that are used only to promote health or education; or
(6) Have been voluntarily suspended.
“Sensitive technology”--
(1) Means hardware, software, telecommunications equipment, or any other technology that is to be used specifically--
(i) To restrict the free flow of unbiased information in Iran; or
(ii) To disrupt, monitor, or otherwise restrict speech of the people of Iran; and
(2) Does not include information or informational materials the export of which the President does not have the authority to regulate or prohibit pursuant to section 203(b)(3) of the International Emergency Economic Powers Act (50 U.S.C. 1702(b)(3)).
“Service-disabled veteran-owned small business concern”--
(1) Means a small business concern--
(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and
(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.
(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.