A02_Scope_of_work.pdf
PDF 98 KB Posted
- Attached to
- Jet Pump Impeller
- Solicitation number
- W912EQ-18-Q-0013
About this file
Impeller Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A02_Scope_of_work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specifications
Dredge Hurley
Jet Pump Impellor for a Gould Model 3175L, 14 X 14 -22 serial # 202C421 2
Scope of Work
The Dredge Hurley requires a new impellor for one of it’s Gould Model 3175L, 14 X 14-22 jet pumps. The dredge has two of these pumps, which are used on the dredge. The serial numbers are 202C421 2 and 202Ca21 1. The jet Pump produces 8862 Gal/min, ET HD 185. The impellor diameter is 22.125 inches and shall be made of 316 Stainless Steel. The Impellor shall be an OEM part, an aftermarket Impellor is not acceptable. Price should include shipping.
Delivery
The Impellor will be delivered to Ensley Engineering Yard 2915 Riverport Rd Memphis TN 38109
Deficiencies The Government will monitor the Contractor's performance under this contract using the following deficiency definitions or such other procedures as may be necessary to ascertain Contractor compliance with this contract.
Failure to complete work during contract period is a deficiency.
Damage to or loss of government property in the Contractor's possession is a deficiency.
Damage to or loss of government property in the area where services are being performed is a deficiency.
Damage to government facilities is a deficiency.
Payment for this contract will be made upon the successful completion of work.
Full payment will not be made for unsatisfactory performance. The Contracting Officer’s
Representative will determine whether performance is satisfactory.
Payment adjustments for performance deficiencies to the invoice may be based on actual Government costs for correcting deficiencies when the contractor cannot satisfy the terms of the contract.
Performance Period
The performance period will be 2 weeks from time of award.
Sustainability Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit http://www.epa.gov/epawaste/conserve/tools/cpg/products for a complete list of designated products and the associated recommended content levels. Offerors must be able to demonstrate that each offered product meets minimum content levels upon request.
File details come from the government source that posted it.