ABSTRACT.pdf

PDF 36 KB Posted

Attached to
LITTLE RIVER FLOODWAY DITCHES 66 & 251 Federal contract opportunity
Solicitation number
W912EQ-13-B-0011
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

ABSTRACT

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNOFFICIAL ABSTRACT

CEMVM 967 (REV. JAN 00)

ABSTRACT OF BIDS Page 1 of 2

I certify that I have read all offers received in response to this solicitation and all offers have been recorded on this abstract Judy Stallion, Bid Opening Officer

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 LS XXX 298,130.00$ XXX 216,640.61$ XXX 275,000.00$ XXX 220,000.00$

0002 ENVIRONMENTAL PROTECTION 1 LS XXX 11,150.00$ XXX 71,747.31$ XXX 5,000.00$ XXX 50,000.00$

0003 STORM WATER POLLUTION PREVENTION XXXXX XXX XXX XXXXX XXX XXX XXX XXXX XXX XXXX

0003AA EROSION CONTROL BERM 59,000 LF 1.33$ 78,470.00$ 1.10$ 64,900.00$ 1.50$ 88,500.00$ 18.00$ 1,062,000.00$

0004 CLEARING AND SNAGGING XXXXX XXX XXX XXXXX XXX XXX XXX XXXX XXX XXXX

0004AA CLEARING AND SNAGGING (DITCH 66) CONTROL LINE STATIONS 204+30-

HWY 164 159 HL 1,925.58$ 306,167.22$ 1,636.89$ 260,265.51$ 1,381.00$ 219,579.00$ 3,000.00$ 477,000.00$

0004AB CLEARING AND SNAGGING (DITCH 251) CONTROL LINE STATIONS 204+30-

HWY 164 159 LF 1,925.29$ 306,121.11$ 1,763.93$ 280,464.87$ 1,381.00$ 219,579.00$ 3,000.00$ 477,000.00$

0004AC CLEARING AND SNAGGING (DITCH 251) HWY 412 CONTROL LINE STATION

1104+50 86 HL 1,821.21$ 156,624.06$ 1,982.67$ 170,509.62$ 1,381.00$ 118,766.00$ 3,000.00$ 258,000.00$

0004D CLEARING AND SNAGGING (DITCH 251) CONTROL LINE STATIONS 1104+50 -

1260+00 153 HL 1,827.10$ 279,546.30$ 1,810.74$ 277,043.22$ 1,381.00$ 211,293.00$ 3,000.00$ 459,000.00$

0005 SHAPING 53,800 CY 2.35$ 126,430.00$ 1.22$ 65,636.00$ 2.50$ 134,500.00$ 12.00$ 645,600.00$

0006 EXCAVATION XXXXX XXX XXX XXXXX XXX XXX XXX XXXX XXX XXXX

0006AA EXCAVATION (DITCH 66) CONTROL LINE STATIONS 204+30-HWY 164 159 HL 1,253.82$ 199,357.38$ 987.07$ 156,944.13$ 900.00$ 143,100.00$ 3,734.00$ 593,706.00$

0006AB EXCAVATION (DITCH 251) CONTROL LINE STATIONS 204+30-HWY 164 159 HL 1,445.10$ 229,770.90$ 987.07$ 156,944.13$ 900.00$ 143,100.00$ 3,734.00$ 593,706.00$

0006AC EXCAVATION (DITCH 251) CONTROL LINE STATIONS 1104+50 -1260+00 153 HL 261.07$ 39,943.71$ 1,002.98$ 153,455.94$ 900.00$ 137,700.00$ 3,734.00$ 571,302.00$

0007 SEEDING AND MULCHING XXXXX XXX XXX XXXXX XXX XXX XXX XXXX XXX XXXX

0007AA SEEDING AND MULCHING (DITCH 66) CONTROL LINE STATIONS 204+30-HWY

164 159 HL 309.15$ 49,154.85$ 221.16$ 35,164.44$ 210.00$ 33,390.00$ 675.00$ 107,325.00$

0007AB SEEDING AND MULCHING (DITCH 251) CONTROL LINE STATIONS 204+30-

HWY 164 159 HL 309.15$ 49,154.85$ 513.71$ 81,679.89$ 210.00$ 33,390.00$ 675.00$ 107,325.00$

0007AC SEEDING AND MULCHING (DITCH 251) HWY 412- CONTROL LINE STATION

1104+50 86 HL 206.12$ 17,726.32$ 111.52$ 9,590.72$ 210.00$ 18,060.00$ 675.00$ 58,050.00$

0007AD SEEDING AND MULCHING (DITCH 251) CONTROL LINE STATIONS 1104+50 -

1260+00 153 HL 418.93$ 64,096.29$ 440.87$ 67,453.11$ 210.00$ 32,130.00$ 675.00$ 103,275.00$

0008 SPECIFIED DEMOLITION (ABANDONED BRIDGE PIER REMOVAL) 1 LS XXX 78,800.00$ XXX 27,522.78$ XXX 5,000.00$ 43,750.00$ 43,750.00$

-69%9%

TOTAL LINES ITEMS 0001 THRU 0008 2,290,642.99$ 1,818,087.00$ 5,827,039.00$

15%

2,095,962.28$

VARIATION FROM GOVT. EST.----------------------------------------------------------------->>

US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS

NUMBER OF AMENDMENTS: TWO

SMALL BUSINESS DETERMINATION: UNRESTRICTED W/HUBZONE PRICE EVALUATION ENGINEERING

BIDDER #1

Randy Kinder Excavating Inc.

12965 Carrier Lane Dexter, MO 63841-9158

TITLE: DITCHES LITTLE RIVER FLOODWAY DITCHES 66&251

BIDDER #3INVITATION NO.: W912EQ-13-B-0011 GOVT. ESTIMATE

MEMPHIS

DISTRICT

BID OPENING DATE AND TIME: 09/06/2013 AT 3:00 PM COST

Harding Enterprises

BIDDER #2

252 TN Hwy. 140 East2312 Orr Road Poplar Bluff, MO 63901-2538 Puryear, TN 38251

Claunch Construction

CEMVM 967 (REV. JAN 00)

ABSTRACT OF BIDS Page 2 of 2

I certify that I have read all offers received in response to this solicitation and all offers have been recorded on this abstract Judy Stallion, Bid Opening Officer

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QTY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 MOBILIZATION AND DEMOBILIZATION 1 LS XXX 250,000.00$ XXX XXX XXX

0002 ENVIRONMENTAL PROTECTION 1 LS XXX 58,000.00$ XXX XXX XXX

0003 STORM WATER PREVENTION XXXXX XXX XXX XXXXX XXX XXX XXX XXXX XXX XXXX

0003A EROSION CONTROL BERM 59,000 LF 1.75$ 103,250.00$

0004 CLEARING AND SNAGGING XXXXX XXX XXX XXXXX XXX XXX XXX XXXX XXX XXXX

0004A CLEARING AND SNAGGING (DITCH 66) CONTROL LINE STATIONS 204+30-

HWY 164 159 HL 1,000.00$ 159,000.00$

0004B CLEARING AND SNAGGING (DITCH 251) CONTROL LINE STATIONS 204+30-

HWY 164 159 LF 930.00$ 147,870.00$

0004C CLEARING AND SNAGGING (DITCH 251) HWY 412 CONTROL LINE STATION

1104+50 86 HL 930.00$ 79,980.00$

0004D CLEARING AND SNAGGING (DITCH 251) CONTROL LINE STATIONS 1104+50 -

1260+00 153 HL 930.00$ 142,290.00$

0005 SHAPING 53,800 CY 1.00$ 53,800.00$

0006 EXCAVATION XXXXX XXX XXX XXX XXX XXX XXXX XXX XXXX

0006A EXCAVATION (DITCH 66) CONTROL LINE STATIONS 204+30-HWY 164 159 HL 875.00$ 139,125.00$

0006B EXCAVATION (DITCH 251) CONTROL LINE STATIONS 204+30-HWY 164 159 HL 875.00$ 139,125.00$

0006C EXCAVATION (DITCH 251) CONTROL LINE STATIONS 1104+50 - 1260+00 153 HL 875.00$ 133,875.00$

0007 SEEDING AND MULCHING XXXXX XXX XXX XXX XXX XXX XXXX XXX XXXX

0007A SEEDING AND MULCHING (DITCH 66) CONTROL LINE STATIONS 204+30-HWY

164 159 HL 600.00$ 95,400.00$

0007B SEEDING AND MULCHING (DITCH 251) CONTROL LINE STATIONS 204+30-

HWY 164 159 HL 600.00$ 95,400.00$

0007C SEEDING AND MULCHING (DITCH 251) HWY 412- CONTROL LINE STATION

1104+50 86 HL 600.00$ 51,600.00$

0007D SEEDING AND MULCHING (DITCH 251) CONTROL LINE STATIONS 1104+50 -

1260+00 153 HL 600.00$ 91,800.00$

0008 SPECIFIED DEMOLITION (ABANDONED BRIDGE PIER REMOVAL) 1 LS XXX 35,000.00$

UNOFFICIAL ABSTRACT

US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS

INVITATION NO.: W912EQ-13-B-0011 BIDDER #4 BIDDER #5 BIDDER #6 BIDDER #7

TITLE: DITCHES LITTLE RIVER FLOODWAY DITCHES 66&251 Donald Bond Construction, Inc.

339 Charleston Street BID OPENING DATE AND TIME: 09/06/2013 AT 3:00 PM Benton, Missouri 63736

SMALL BUSINESS DETERMINATION: UNRESTRICTED W/HUBZONE PRICE EVALUATION

NUMBER OF AMENDMENTS: TWO

TOTAL LINES ITEMS 0001 THRU 0008 1,775,515.00$

VARIATION FROM GOVT. EST.----------------------------------------------------------------->> -22%

Sheet1

File details come from the government source that posted it. Updated .