ABSTRACT.pdf

PDF 62 KB Posted

Attached to
PARCEL 5 CAIRO SLURRY TRENCH AND BERMS
Solicitation number
W912EQ12B0009
Issued by

About this file

ABSTRACT

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNOFFICIAL ABSTRACT

CEMVM 967 (REV. JAN 00)

ABSTRACT OF BIDS Page 1 of 5

I certify that I have opened and read all offers received in response to this solicitation and all offers have been recorded on this abstract. ___________________Judy Stallion, Bid Opening Officer

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QUANTITY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 LS XXX.XX 623,830.00 XXX.XX 837,600.00 XXX.XX 400,000.00 XXX.XX 598,000.00

0002 Utility - AT & T Telephone Line 1 LS XXX.XX 10,000.00 XXX.XX 10,000.00 XXX.XX 10,000.00 XXX.XX 10,000.00

0003 Utility - 4-Inch Water Line 1 LS XXX.XX 32,400.00 XXX.XX 66,461.00 XXX.XX 20,000.00 XXX.XX 19,699.19

0004 Clearing and Grubbing (31 acres) 1 LS XXX.XX 142,590.00 XXX.XX 156,240.00 XXX.XX 140,000.00 XXX.XX 182,787.04

0005 Deadmen Demolition & Removal 1 LS XXX.XX 2,650.00 XXX.XX 3,150.00 XXX.XX 15,000.00 XXX.XX 15,458.24

0006 Deadmen Installation and Extensions 1 LS XXX.XX 23,470.00 XXX.XX 3,150.00 XXX.XX 40,000.00 XXX.XX 45,398.35

0007 Removal of the Fire Hydrant 1 LS XXX.XX 1,570.00 XXX.XX 1,625.00 XXX.XX 5,000.00 XXX.XX 883.85

0008 Cistern Capping 1 LS XXX.XX 30,540.00 XXX.XX 3,150.00 XXX.XX 5,000.00 XXX.XX 39,565.68

0009 Environmental Protection 1 LS XXX.XX 34,290.00 XXX.XX 105,000.00 XXX.XX 95,000.00 XXX.XX 56,177.99

0010 Mowing of the Grass 1 LS XXX.XX 19,000.00 XXX.XX 42,000.00 XXX.XX 40,000.00 XXX.XX 25,535.94

0011 Establishment of Turf (76 acres) 1 LS XXX.XX 208,170.00 XXX.XX 135,660.00 XXX.XX 95,000.00 XXX.XX 145,202.33

0012 Slit Fence 1,850 LF 3.08 5,698.00

7.80 14,430.00

2.00 3,700.00

2.91 5,383.50

0013 Erosion Control Berms 14,840 LF 0.74 10,981.60 16.80 249,312.00 3.00 44,520.00 7.12 105,660.80

0014 Check Dams 120 LF 55.33 6,639.60 281.00 33,720.00 20.00 2,400.00 46.66 5,599.20

0015 Excavation 193,000 CY 3.01 580,930.00 2.50 482,500.00 2.90 559,700.00 3.17 611,810.00

211 1ST SOUTH SUITE E3935 LLOYDTOWN AURORA ROAD

KETTLEBY,ON L0G1J0

BIDDER #2

NUMBER OF AMENDMENTS: 0002

With HubZone Price Evaluation Preference

SMALL BUSINESS DETERMINATION: Unrestricted CANADA

US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS

SESSER, IL 62884

PO BOX 130

SIERRA BRAVO CONTRACTORS, LLC

BIDDER #3

MESQUITE, NV 39027

TRADE WEST CONSTRUCTION

INVITATION NO.: W912EQ-12-B-0009

TITLE: Parcel 5, Cairo Slurry Trench and Berms

Alexander County, Illinois

GOVT. ESTIMATE

BID OPENING DATE AND TIME: 08/30/2012 at 1:30 pm COST

ENGINEERING

MEMPHIS

DISTRICT

ADVANCED CONSTRUCTION TECH

BIDDER #1

0016 Soil Bentonite Slurry Trench XXXXXXX XXXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

0016AA Depths from 0 to 60 feet 225,000 SF 7.54 1,696,500.00 9.03 2,031,750.00 5.45 1,226,250.00 8.06 1,813,500.00

0016AB Depths from 60 to 95 feet 120,500 SF 9.87 1,189,335.00 11.02 1,327,910.00 7.15 861,575.00 10.37 1,249,585.00

0017 Backfill 419,000 CY 8.22 3,444,180.00 4.92 2,061,480.00 2.95 1,236,050.00 6.10 2,555,900.00

0018 Corrugated Metal Pipe - 48 Inch 124 LF 139.09 17,247.16 165.00 20,460.00 80.00 9,920.00 173.20 21,476.80

0019 Corrugated Metal Arch Pipe 35-in x 24-in 114 LF 104.12 11,869.68 127.00 14,478.00 90.00 10,260.00 128.88 14,692.32

0020 Geotextiles 16,500 SY 2.31 38,115.00 1.05 17,325.00 4.00 66,000.00 1.96 32,340.00

0021 Filter Material 4,350 TN 20.42 88,827.00 56.00 243,600.00 25.00 108,750.00 29.92 130,152.00

0022 Riprap: r-200 14,500 TN 23.20 336,400.00 26.40 382,800.00 40.00 580,000.00 37.02 536,790.00

0023 Existing Riprap, Concrete, Revt Removal 10,000 CY 24.11 241,100.00 3.00 30,000.00 20.00 200,000.00 12.01 120,100.00

0024 Removal of Other Debris Off Site 120 CY 9.50 1,140.00 10.00 1,200.00 40.00 4,800.00 37.87 4,544.40

0025 Aggregate Surface Course 8,400 TN 27.57 231,588.00 33.90 284,760.00 24.90 209,160.00 17.54 147,336.00

0026 Piezometer Installation 225 LF 55.05 12,386.25 159.00 35,775.00 225.00 50,625.00 209.00 47,025.00

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QUANTITY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 LS XXX.XX 588,575.41 XXX.XX 215,427.46 XXX.XX 1,388,889.00 XXX.XX 1,041,000.00

0002 Utility - AT & T Telephone Line 1 LS XXX.XX 10,000.00 XXX.XX 10,000.00 XXX.XX 10,000.00 XXX.XX 10,000.00

8,540,603.63 6,038,710.00 8,595,536.00 GRAND TOTAL ITEMS 0001 THRU 0026 9,041,447.29

-5.54%-33.21%-4.93%-------------------------->>VARIATION FROM GOVT. EST.---------------------

US ARMY, CORPS OF ENGINEERS - MEMPHIS DISTRICT ABSTRACT OF BIDS

INVITATION NO.: W912EQ-12-B-0009 BIDDER #4 BIDDER #5 BIDDER #6 BIDDER #7

TITLE: Parcel 5, Cairo Slurry Trench and Berms RANDY KINDER EXCAVATING, INC ESI CONTRACTING, CORP YOUNG'S GENERAL CONTRACTING, INC DONALD BOND CONSTRUCTION, INC

Alexander County, Illinois PO BOX 758 3001 E. 83RD STREET 5100 HWY PP 2956 STATE HWY AA

BID OPENING DATE AND TIME: 08/30/2012 at 1:30 pm DEXTER, MO 63841 KANSAS CITY, MO 64132 POPLAR BLUFF, MO 63901 SIKESTON, MO 63801

SMALL BUSINESS DETERMINATION: Unrestricted

With HubZone Price Evaluation Preference

NUMBER OF AMENDMENTS: 0002

ABSTRACT OF BIDS Page 3 of 5

0003 Utility - 4-Inch Water Line 1 LS XXX.XX 33,362.00 XXX.XX 49,055.22 XXX.XX 3,472.00 XXX.XX 60,708.00

0004 Clearing and Grubbing (31 acres) 1 LS XXX.XX 118,369.45 XXX.XX 547,181.42 XXX.XX 210,494.00 XXX.XX 150,000.00

0005 Deadmen Demolition & Removal 1 LS XXX.XX 6,865.19 XXX.XX 2,999.67 XXX.XX 3,472.00 XXX.XX 25,226.00

0006 Deadmen Installation and Extensions 1 LS XXX.XX 35,910.77 XXX.XX 39.810.09 XXX.XX 6,945.00 XXX.XX 54,866.00

0007 Removal of the Fire Hydrant 1 LS XXX.XX 2,375.79 XXX.XX 1,910.14 XXX.XX 3,472.00 XXX.XX 2,938.00

0008 Cistern Capping 1 LS XXX.XX 18,075.92 XXX.XX 48,452.40 XXX.XX 6,945.00 XXX.XX 85,280.00

0009 Environmental Protection 1 LS XXX.XX 60,719.85 XXX.XX 450,000.00 XXX.XX 34,722.00 XXX.XX 100,000.00

0010 Mowing of the Grass 1 LS XXX.XX 43,399.22 XXX.XX 37,448.62 XXX.XX 34,722.00 XXX.XX 25,000.00

0011 Establishment of Turf (76 acres) 1 LS XXX.XX 130,344.70 XXX.XX 120,282.69 XXX.XX 263,889.00 XXX.XX 156,000.00

0012 Slit Fence 1,850 LF 3.10 5,735.00

1.75 3,237.50

4.17 7,714.50

3.00 5,550.00

0013 Erosion Control Berms 14,840 LF 1.87 27,750.80 0.73 10,833.20 8.34 123,765.60 2.00 29,680.00

0014 Check Dams 120 LF 44.17 5,300.40 39.22 4,706.40 8.34 1,000.80 8.00 960.00

0015 Excavation 193,000 CY 3.54 683,220.00 2.43 468,990.00 6.95 1,341,350.00 3.00 579,000.00

0016 Soil Bentonite Slurry Trench XXXXXXX XXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXX

0016AA Depths from 0 to 60 feet 225,000 SF 6.55 1,473,750.00 8.69 1,955,250.00 10.18 2,290,500.00 6.80 1,530,000.00

0016AB Depths from 60 to 95 feet 120,500 SF 8.71 1,049,555.00 11.56 1,392,980.00 13.84 1,667,720.00 9.03 1,088,115.00

0017 Backfill 419,000 CY 7.38 3,092,220.00 5.47 2,291,930.00 6.95 2,912,050.00 5.00 2,095,000.00

0018 Corrugated Metal Pipe - 48 Inch 124 LF 197.64 24,507.36 240.24 29,789.76 347.23 43,056.52 402.00 49,848.00

0019 Corrugated Metal Arch Pipe 35-in x 24-in 114 LF 70.41 8,026.74 140.66 16,035.24 347.23 39,584.22 195.00 22,230.00

0020 Geotextiles 16,500 SY 3.59 59,235.00 3.31 54,615.00 4.19 69,135.00 3.00 49,500.00

0021 Filter Material 4,350 TN 18.20 79,170.00 20.25 88,087.50 55.56 241,686.00 28.00 121,800.00

0022 Riprap: r-200 14,500 TN 24.25 351,625.00 26.04 377,580.00 59.73 866,085.00 36.00 522,000.00

0023 Existing Riprap, Concrete, Revt Removal 10,000 CY 5.26 52,600.00 11.97 119,700.00 18.52 185,200.00 20.00 200,000.00

0024 Removal of Other Debris Off Site 120 CY 18.06 2,167.20 532.37 63,884.40 27.78 3,333.60 25.00 3,000.00

0025 Aggregate Surface Course 8,400 TN 16.14 135,576.00 17.00 142,800.00 48.62 408,408.00 21.00 176,400.00

0026 Piezometer Installation 225 LF 217.24 48,879.00 246.73 55,514.25 308.66 69,448.50 193.00 43,425.00

UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED UNIT EXTENDED

NO. DESCRIPTION QUANTITY U/M PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 Mobilization and Demobilization 1 LS XXX.XX 630,000.00 XXX.XX 1,057,188.00 XXX.XX XXX.XX

0002 Utility - AT & T Telephone Line 1 LS XXX.XX 10,000.00 XXX.XX 10,000.00 XXX.XX XXX.XX

0003 Utility - 4-Inch Water Line 1 LS XXX.XX 30,000.00 XXX.XX 53,354.00 XXX.XX XXX.XX

0004 Clearing and Grubbing (31 acres) 1 LS XXX.XX 175,000.00 XXX.XX 157,861.00 XXX.XX XXX.XX

0005 Deadmen Demolition & Removal 1 LS XXX.XX 5,600.00 XXX.XX 9,314.00 XXX.XX XXX.XX

0006 Deadmen Installation and Extensions 1 LS XXX.XX 68,000.00 XXX.XX 54,172.00 XXX.XX XXX.XX

0007 Removal of the Fire Hydrant 1 LS XXX.XX 1,900.00 XXX.XX 1,306.00 XXX.XX XXX.XX

0008 Cistern Capping 1 LS XXX.XX 16,000.00 XXX.XX 31,032.00 XXX.XX XXX.XX

0009 Environmental Protection 1 LS XXX.XX 3,000.00 XXX.XX 37,523.00 XXX.XX XXX.XX

0010 Mowing of the Grass 1 LS XXX.XX 5,500.00 XXX.XX 33,907.00 XXX.XX XXX.XX

NUMBER OF AMENDMENTS: 0002

With HubZone Price Evaluation Preference

SMALL BUSINESS DETERMINATION: Unrestricted

BID OPENING DATE AND TIME: 08/30/2012 at 1:30 pm POPLAR BLUFF, MO 63902 POPLAR BLUFF, MO 63902

Alexander County, Illinois PO BOX 3938 PO BOX 48

TITLE: Parcel 5, Cairo Slurry Trench and Berms R.L. PERSONS CONSTRUCTION HUFFMAN CONSTRUCTION, LLC

INVITATION NO.: W912EQ-12-B-0009 BIDDER #8 BIDDER #9

VARIATION FROM GOVT. EST.--------------------- -9.89% 5.05% 50.20% 0.98%

GRAND TOTAL ITEMS 0001 THRU 0026 8,147,315.80 8,558,690.87 12,237,059.74 8,227,526.00

ABSTRACT OF BIDS Page 5 of 5

0011 Establishment of Turf (76 acres) 1 LS XXX.XX 125,000.00 XXX.XX 148,394.00 XXX.XX XXX.XX

0012 Slit Fence 1,850 LF 5.00 9,250.00 8.76 16,206.00

0013 Erosion Control Berms 14,840 LF 1.90 28,196.00 3.63 53,869.20

0014 Check Dams 120 LF 6.00 720.00 10.20 1,224.00

0015 Excavation 193,000 CY 3.05 588,650.00 3.57 689,010.00

0016 Soil Bentonite Slurry Trench XXXXXXX XXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXX

0016AA Depths from 0 to 60 feet 225,000 SF 7.55 1,698,750.00 7.65 1,721,250.00

0016AB Depths from 60 to 95 feet 120,500 SF 10.00 1,205,000.00 10.15 1,223,075.00

0017 Backfill 419,000 CY 4.80 2,011,200.00 6.41 2,685,790.00

0018 Corrugated Metal Pipe - 48 Inch 124 LF 170.00 21,080.00 295.74 36,671.76

0019 Corrugated Metal Arch Pipe 35-in x 24-in 114 LF 120.00 13,680.00 10.32 1,176.48

0020 Geotextiles 16,500 SY 3.15 51,975.00 4.21 69,465.00

0021 Filter Material 4,350 TN 31.00 134,850.00 28.73 124,975.50

0022 Riprap: r-200 14,500 TN 40.00 580,000.00 34.63 502,135.00

0023 Existing Riprap, Concrete, Revt Removal 10,000 CY 18.00 180,000.00 16.21 162,100.00

0024 Removal of Other Debris Off Site 120 CY 45.00 5,400.00 72.84 8,740.80

0025 Aggregate Surface Course 8,400 TN 23.00 193,200.00 33.08 277,872.00

0026 Piezometer Installation 225 LF 112.00 25,200.00 150.13 33,779.25

VARIATION FROM GOVT. EST.--------------------- -13.54% 17.71% -100.00% -100.00%

GRAND TOTAL ITEMS 0001 THRU 0026 7,817,151.00 9,201,390.99

Sheet1

File details come from the government source that posted it. Updated .