This is a Pre-Bid Conference presentation for a federal construction contract solicitation issued by the U.S. Army Corps of Engineers, Jacksonville District.
Solicitation W912EP26BA010 seeks a contractor to perform beach renourishment work on approximately 5.5 miles of beach and dune along Anna Maria Island in Manatee County, Florida. The project includes a Base contract for renourishment of approximately 4.1 miles between FDEP Range monuments R-11.9 and R-33.4, and an Option for approximately 1.4 miles between monuments R-33.4 and R-41.3. Work scope includes dredging material from offshore borrow areas, beach tilling, screening, vibration control and monitoring, coastal vegetation planting, environmental and water quality monitoring, sea turtle trawl-sweeping for hopper dredges, and MEC Construction Support. The contracting method is FAR Part 14 Sealed Bidding (Invitation for Bid), unrestricted, with a Firm-Fixed Price contract type. The estimated contract magnitude is $25,000,000 to $35,000,000. Bids must be submitted electronically via PIEE by August 13, 2026, at 1:00 pm EDT, with bid opening scheduled for 2:00 pm EDT the same day via Microsoft Teams. The contractor must commence work within 60 calendar days of receiving the Notice to Proceed and complete all work within 240 calendar days. Liquidated damages are assessed at $2,245 per calendar day of delay. A bid guarantee of 20% of bid price or $3,000,000, whichever is less, must accompany the bid. The awardee must submit payment and performance bonds equal to the total bid price within 10 days of contract award. The applicable NAICS code is 237990, with a small business size standard of $37.0 million. Technical questions must be submitted via ProjNet by July 27, 2026, at 5:00 pm EDT using Bidder Inquiry Key PWBEPR-X5YYK3. Contracting Officer Timothy Humphrey and Contract Specialist Meredith Gonzalez are the primary government contacts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C.04.01_Bid_Abstract_ W912EP26BA010_Manatee County.pdf | ||
| 2026-07-22-Pre-Bid site visit signin sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Working Today to Build a Better Tomorrow
Pre-Bid Conference
Presented by:
Jacksonville District
July 23, 2026
SOLICITATION NO. W912EP26BA010
BEACH RENOURISHMENT ANNA MARIA ISLAND,
MANATEE COUNTY, FLORIDA
Thank you for joining, we will begin shortly.
Please mute your microphone.
PRE-BID CONFERENCE: AGENDA
• INTRODUCTION
• PROJECT OVERVIEW
• CONTRACTING OVERVIEW
• OTHER ADMINISTRATIVE ITEMS
• RESOURCES
• CLOSING REMARKS
PROJECT OVERVIEW
PRE-BID CONFERENCE: PROJECT OVERVIEW
SOLICITATION NUMBER: W912EP26BA010
PROJECT TITLE: BEACH RENOURISHMENT, ANNA MARIA ISLAND, MANATEE COUNTY, FL.
DESCRIPTION OF WORK: This project will renourish approximately 5.5 miles of beach and dune along Anna Maria Island, in Manatee County between Florida Department of Environmental Protection (FDEP) Range monuments R-11.9 and R-41.3. The project will include a Base and an Option. The Base will include the renourishment of approximately 4.1 miles of beach and dune between FDEP Range monuments R-11.9 and R-33.4. The Option will include renourishment of approximately 1.4 miles of beach between FDEP Range monuments R-33.4 and R-41.3. Planting of dune vegetation will take place following completion of constructed segments. Material for the project will be dredged from Borrow Areas I, II, and III, approximately 1 nautical mile offshore of Manatee County in State waters, and approximately 3.4 nautical miles from the borrow areas to the midpoint of the fill area. Project work also includes, but is not limited to, beach tilling, screening, vibration control and monitoring, coastal vegetation planting, environmental and water quality monitoring, sea turtle trawl-sweeping (hopper dredges only), and MEC Construction Support.
CONTRACTING OVERVIEW
Timothy Humphrey, Contracting Officer
Email: Timothy.G.Humphrey@usace.army.mil
Meredith Gonzalez, Contract Specialist Email: Meredith.C.Gonzalez@usace.army.mil mailto:Timothy.G.Humphrey@usace.army.mil mailto:Meredith.C.Gonzalez@usace.army.mil
PRE-BID CONFERENCE: ACQUISITION APPROACH
Solicitation No. W912EP26BA010
• Contracting Method: FAR Part 14 Sealed Bidding - Invitation for Bid (IFB), Unrestricted.
• Type of Contract: Firm-Fixed Price (FFP). (FAR clause 52.216-1)
• Transmission Method: Electronically via Procurement Integrated Enterprise Environment (PIEE). Bids must be received by the Government no later than August 13, 2026, at 1:00 pm (EDT). Please see Section 00 21 13 – Instruction to Bidders, Electronic Bids, for more details.
• ALL AMENDMENTS MUST BE ACKNOWLEDGED (IF ANY):
FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSION (SF 1442, SECTION 00 10 00, SECTION 00 45 00, AND BID BOND) COULD RENDER YOUR BID NON-RESPONSIVE.
• Bid Opening: August 13, 2026, at 2:00 pm (EDT) via Microsoft Teams. You must be registered in the system for award management (SAM) to receive an award from this solicitation.
PRE-BID CONFERENCE: GENERAL INFORMATION
• Estimated Magnitude of Construction: $25,000,000.00 - $35,000,000.00.
• Applicable North American Industry Classification System (NAICS): 237990 (Exception), Dredging and Surface Cleanup Activities. The Small Business Size Standard for dredging is $37.0 million.
• Estimated Period of Performance (FAR clause 52.211-10): The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
PRE-BID CONFERENCE: GENERAL INFORMATION
• Liquidated Damages: $2,245.00 for each calendar day of delay until the work is completed or accepted. (FAR clause 52.211-12)
• Bid Guarantee: electronic copy of the bid guarantee shall be submitted with the bid. The bid guarantee shall be 20% of bid price or $3,000,000.00, whichever is less. (FAR clause 52.228-1)
• Payment and Performance Bonds: awardee must submit payment and performance bonds equal to the total bid price within 10 days of contract award. (SF1442 block 12)
SITE VISIT:
• Held on July 22, 2026, at 10:00 am EDT.
TECHNICAL INQUIRIES AND QUESTIONS:
• ProjNet closes on July 27, 2026, at 5:00 pm, EDT.
• All Inquiries must be submitted via ProjNet for an official answer.
PRE-BID CONFERENCE: OTHER ADMINISTRATIVE ITEMS
PRE-BID CONFERENCE: RESOURCES
System for Award Management (SAM):
www.sam.gov
Procurement Integrated Enterprise Environment (PIEE):
https://piee.eb.mil/
ProjNet:
www.projnet.org http://www.sam.gov/ https://piee.eb.mil/ http://www.projnet.org/
PRE-BID CONFERENCE: QUESTIONS
Please submit any questions via ProjNet.
ProjNet closes on July 27, 2026, by 5PM EDT.
Solicitation Number is: W912EP26BA010 Bidder Inquiry Key is: PWBEPR-X5YYK3
PRE-BID CONFERENCE: CLOSING REMARKS
Thank you!
PRE-BID CONFERENCE: ATTENDANCE LIST
Emily Fuller - AIS Amy Parker - Weeks Marine Tanya Lukowiak - EarthBalance Corporation Bonnie Adams Brestelli - Callan Marine Colby Towle - Manson Morjana Signorin - Coastal Protection Engineering Steve Basset - Norfolk Dredging Company Tyler Staubbs - Marinex Construction Eric McDade – GLDD Kyle Bulleit – Sea Hawk Maritime Andrew Sanders – R&S Patriot Colby Towle Kristen Sanders Gray Cottrell Tom Pierro Campbell Peck Michael Kay
| ����Solicitation No. W912EP26BA010��BEACH RENOURISHMENT ANNA MARIA ISLAND, �Manatee County, Florida���� |
| PRE-Bid CONFERENCE: AGENDA |
| Slide Number 3 |
| ��PRE-bid CONFERENCE: PROJECT OVERVIEW�� |
| Slide Number 5 |
| PRE-bid CONFERENCE: Acquisition APPROACH |
| PRE-bid CONFERENCE: GENERAL INFORMATION |
| PRE-bid CONFERENCE: GENERAL INFORMATION |
| ��PRE-bid CONFERENCE: OTHER ADMINISTRATIVE ITEMS�� |
| ��PRE-bid CONFERENCE: resources�� |
| PRE-bid CONFERENCE: Questions |
| �PRE-bid CONFERENCE: CLOSING REMARKS� |
| �PRE-bid CONFERENCE: Attendance list� |
File details come from the government source that posted it. Updated .