This is a technical specifications document for an Industry Day event regarding the replacement of a steel sector gate with a Fiber Reinforced Polymer (FRP) sector gate at the Canaveral Lock in Brevard County, FL. The U.S. Army Corps of Engineers Jacksonville District seeks feedback from engineers and fabricators with experience in complex projects for the design, fabrication, delivery, and installation of the FRP gate. The Industry Day will be held via Webex on January 16, 2025, at 9:00 AM EST.

The project involves replacing the existing 183-kip steel sector gate with an FRP composite gate that must mate with existing steel hinge and pintle assemblies. Key technical requirements include a 100-year design life, ability to support a Manatee detection system, and accommodation for water flow through screened openings. The contractor must deliver a fully assembled gate and provide technical representation during installation. Interested parties must contact Brittany Jackson and Gerald Garvey by January 13, 2025, at 11:00 AM EST with capability statements and required company information. Feedback will be accepted until January 30, 2025, at 10:00 AM EST. The project location is 1000 Mullet Road, Cape Canaveral, FL 32920.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912EP25R0009

Jacksonville District

Canaveral Lock FRP Sector Gate Supply Project

Brevard County, Florida

Supply Solicitation and Specifications Volume 2 of 2

Industry Day k3enddjm Draft Print

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

CANAVERAL LOCK SECTOR GATE SUPPLY PROJECT

BREVARD COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE BID ITEMS

0001 FABRICATION 2 EACH $______________$_______________

0002 DELIVERY 2 EACH $______________$_______________

TOTAL BASE BID (LINE ITEMS 0001 THROUGH 0002) $_______________

OPTIONAL BID ITEMS

FURNISHMENT OF SPARE LOWER PINTLE AND

UPPER HINGE ASSEMBLIES (SEE NOTE 2) 2 EACH $______________$_______________

FURNISHMENT OF SPARE GATE SEALS (SEE

NOTE 2) 2 EACH $______________$_______________

0005 FURNISHMENT OF WIRE ROPE (SEE NOTE 2) 4 EACH $______________$_______________

FURNISHMENT OF SPARE MANATEE SCREENS

(SEE NOTE 2) JOB $_______________

0007 TRAINING (SEE NOTE 3) JOB $_______________

0008 DELIVERY DETENTION FEES (SEE NOTE 3) 150 DAYS $______________$_______________

TOTAL OPTION BID (LINE ITEMS 0003 THROUGH 0008) $_______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0008) $_______________

DEFINITIONS:

(1) CLIN = CONTRACT LINE ITEM NUMBER

NOTES:

(1) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101, AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE PARAGRAPH 999.214-4018 (SECTION 00100).

(2) IF EXERCISED, THIS CLIN WILL BE EXERCISED ALONG WITH THE INITIAL CONTRACT AWARD. DESIGN FOR THIS

CLIN IS REQUIRED UNDER CLIN 0001.

(3) THIS CLIN MAY BE EXERCISED UP TO 365 DAYS BEYOND THE INITIAL AWARD.

W912EP25R0009 00010A-1

Canaveral Lock Sector Gate Replacement

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 STATEMENT OF WORK

01 20 00 PRICE AND PAYMENT PROCEDURES

01 32 16 FABRICATION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 16 DESIGN DATA (DESIGN AFTER AWARD)

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 RESIDENT MANAGEMENT SYSTEM (RMS)

01 45 04 FABRICATOR QUALITY CONTROL

01 78 02 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 05 - METALS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 73 01 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING

06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE RAILINGS

06 90 00 FIBER-REINFORCED POLYMER (FRP) COMPOSITE STRUCTURE

DIVISION 09 - FINISHES

09 97 02 PAINTING: HYDRAULIC STRUCTURES

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 01 70.13 WIRE ROPE FOR GATE OPERATING DEVICES

35 20 16.39 HYDRAULIC SECTOR GATES

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1 W912EP25R0009 Industry Day

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00

STATEMENT OF WORK

PART 1 GENERAL

1.1 REFERENCES

1.2 PROJECT DESCRIPTION

1.2.1 Project Objectives

1.2.2 Optional Work

1.2.2.1 Furnishment of Spare Lower Pintle and Upper Hinge

Assemblies (Option Item)

1.2.2.2 Furnishment of Spare Gate Seals (Option Item)

1.2.2.3 Furnishment of Wire Rope (Option Item)

1.2.2.4 Furnishment of Spare Manatee Screens (Option Item)

1.2.2.5 Training (Option Item)

1.2.3 Location

1.2.4 Bridging Documents

1.2.5 Section Organization

1.3 DAMAGE TO WORK

1.4 EXISTING WORK

1.5 WORK HOURS

1.6 UNITS OF MEASURE

1.7 SCOPE

1.7.1 General

1.7.2 Site

1.8 GENERAL REQUIREMENTS

1.8.1 Design Requirements

1.8.2 Delivery, Storage, and Handling

1.8.2.1 On-Site Assembly

1.8.2.2 Barge Delivery

1.8.3 Architectural Requirements

1.8.4 Mechanical Requirements

1.8.5 Fire Protection

1.8.6 Manatee Warning System

1.8.7 Fabricator's Representation During Government Installation

1.9 APPLICABLE CRITERIA

1.9.1 Industry Criteria

1.9.2 Military Criteria

1.10 TECHNICAL REQUIREMENTS

1.10.1 Structural Design

1.10.1.1 Finite Element Analysis (FEA)

1.10.1.2 Loads and Load Combinations

1.10.1.3 Serviceability Requirements and Deflection

1.10.1.4 Thermal Expansion

1.10.1.5 Gate Seals

1.10.1.6 Framing

1.10.1.7 Pintles and Hinges

1.10.1.8 Gate Stops

1.10.1.9 Fender System

1.10.1.10 Lifting Supports

1.10.1.11 Lifting Points

SECTION 01 10 00 Page 1 W912EP25R0009 Industry Day

1.10.1.12 Walkways

1.10.1.13 Manatee Protection

1.10.2 Mechanical Design

1.10.2.1 Design Forces

1.10.2.2 Gate Bottom Seals

1.10.2.3 Lower Pintle Assembly

1.10.2.4 Upper Hinge

1.10.2.5 Machinery

1.10.2.5.1 Wire Rope Cable Guide Track

1.10.2.5.2 Limit Switches

1.11 ENGINEERING DURING INSTALLATION SUPPORT

1.11.1 Requests for Information (RFIs)

1.11.2 Meetings

1.11.3 Site Visits

1.11.4 Engineering Input/Recommendations

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

ATTACHMENTS:

Attachment A Bridging Plans

Attachment B Site Photos

Attachment C As-Built Drawings

Attachment D Design Loads

Attachment E Delivery Location

Attachment F Barge Hydrographic Survey

Attachment G Manatee Array

-- End of Section Table of Contents --

SECTION 01 10 00 Page 2 W912EP25R0009 Industry Day

SECTION 01 10 00

STATEMENT OF WORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN COMPOSITES MANUFACTURER'S ASSOCIATION (ACMA)

ACMA Code (2011) Code of Standard Practice: Industry Guidelines for Fabrication and Installation of Pultruded FRP Structures

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISI S100 (2012) North American Specification for the Design of Cold-Formed Steel Structural Members

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7-22 (2022; Supp 1 2023; Supp 2 2023) Minimum Design Loads and Associated Criteria for Buildings and Other Structures

ASCE 74-23 (2023) Load And Resistance Factor Design (LRFD) for Pultruded Fiber Reinforced Polymer (FRP) Structures

ASCE MOP 102 (2011) Design Guide for FRP Composite Connections

AMERICAN WELDING SOCIETY (AWS)

AWS-03 (2011) Welding Handbook, Volumes 1 thru 4

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME BTH-1 (2014) Design of Below-the-Hook Lifting Devices

ASTM INTERNATIONAL (ASTM)

ASTM D4956 (2013) Standard Specification for Retroreflective Sheeting for Traffic Control

ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials

SECTION 01 10 00 Page 3 W912EP25R0009 Industry Day

FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT)

FDOT Specifications (2023) Standard Specifications for Road and Bridge Construction

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 1100 (2005) Emerald Book IEEE Recommended Practice for Powering and Grounding Electronic Equipment

IEEE C2 (2023) National Electrical Safety Code

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2021) International Building Code

ICC IMC (2021) International Mechanical Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2023) National Electrical Code

NFPA 70E (2021) Standard for Electrical Safety in the Workplace

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-2610 (2013) Engineering and Design -- Mechanical and Electrical Design for Lock and Dam Operating Equipment

EM 1110-2-3200 (2016) Wire Rope for Civil Works Structures

EM 1110-2-3402 (2022) Barge Impact Forces For Hydraulic Structures

EM 1110-2-1424 (2016) Engineering and Design -- Lubricants and Hydraulic Fluids

EM 1110-2-1604 (2006) Hydraulic Design of Navigation Locks

EM 1110-2-2107 (2022) Design of Hydraulic Steel Structures

EM 1110-2-2602 (1995) Planning and Design of Navigation Locks

ER 1110-2-1086 (2016) Earthquake Design and Evaluation for Civil Works Projects

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 1-300-02 (2014; with Change 3, 2021) Unified Facilities Guide Specifications (UFGS) Format Standard

SECTION 01 10 00 Page 4 W912EP25R0009 Industry Day

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1926 Safety and Health Regulations for Construction

1.2 PROJECT DESCRIPTION

1.2.1 Project Objectives

This supply contract's objective is to design, fabricate, and deliver no later than 09 October 2026, a quantity of two Fiberglass Reinforced Polymer (FRP) sector gates for the Canaveral Lock. The eastern set of gates is known as the upper gates, the western set of gates is known as the lower gates. The set of upper gates are slightly taller than the lower set. This project is for fabrication of the two upper gates and appurtenances, the two lower gates are not included.

In addition to the gates, this contract also includes design and fabrication of gate appurtenances including both the lower pintle and upper hinge assemblies. The Contractor is responsible for delivering the gates to the project site via barge. The gates must assembled prior to delivery. Installation of the gate into the lock recess is not part of this contract and will be performed by others in January 2027.

Fabricate the entire gate out of FRP composites with the exception of the hinge, pintle, and lifting assemblies, and operating machinery connections.

It is the Government's objective that the gates have a 100 year useful life. The design and fabrication must provide an appropriate level of quality to ensure the continued use of the gates over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project owner.

Requirements stated in this contract are minimums.

1.2.2 Optional Work

Refer to Section 00010A LINE ITEMS AND PRICING SCHEDULE and Section 01 20 00 PRICE AND PAYMENT PROCEDURES for further information.

1.2.2.1 Furnishment of Spare Lower Pintle and Upper Hinge Assemblies (Option Item)

The base contract requires the Contractor design and fabricate the lower pintle and upper hinge assemblies, as stated in the paragraph above. This optional item includes additional costs which include Contractor fabrication and furnishment of additional spare components beyond the required quantities within the base items.

1.2.2.2 Furnishment of Spare Gate Seals (Option Item)

Provide an additional quantity of both lower and side seals for each gate.

1.2.2.3 Furnishment of Wire Rope (Option Item)

Provide an additional quantity of wire rope in accordance with Section

35 01 70.13 WIRE ROPE FOR GATE OPERATING DEVICES.

SECTION 01 10 00 Page 5 W912EP25R0009 Industry Day

1.2.2.4 Furnishment of Spare Manatee Screens (Option Item)

Provide spare manatee screens for a complete replacement within an entire sector gate. The screens must be cut to the arrangement and sizes depicted on the approved design.

1.2.2.5 Training (Option Item)

Conduct training as specified within Section 35 20 16.39 HYDRAULIC SECTOR GATES Paragraph TRAINING.

1.2.3 Location

The project site and delivery location is Canaveral Lock: 1000 Mullet Rd, Cape Canaveral, FL 32920.

1.2.4 Bridging Documents

Bridging documents are provided in Attachment A and within this set of specifications. CAD drawings and SpecsIntact SEC files will be provided to the Contractor after award.

These documents convey scope and technical requirements which present the project concept, and consist of plans and specifications. Concept drawings show gate elevations and sections, and a superstructure system consisting of fiberglass panels radiating from the hinge and pintle centerline to the skin gate, and trusses connecting between those. However, the Government may also be willing to accept an alternative system such as a truss-type system in lieu of the fiberglass panels radiating from the hinge and pintle centerline. This alternative system must be proposed within the Offeror's proposal for technical evaluation by the Government. Changing systems after contract award is contingent upon Government approval.

No matter the structural framing system chosen, the new gate weight in the dry must not exceed the current weight of 183 kips, which includes all appurtenances such as fendering, walkways, etc. The Contractor's design must follow the overall intent of the bridging plans. Specification sections beyond Division 01 which are included within this contract must be placed in the Contractor's design package with minimal edits, unless otherwise stated.

The following scope of work takes precedence over the bridging plans in the event of a conflict. Refer to paragraph ORDER OF PRECEDENCE in Section

01 33 16 DESIGN AFTER AWARD.

1.2.5 Section Organization

This Section is organized under 5 major "Paragraphs".

a. This paragraph, PROJECT DESCRIPTION, is intended to define the project objectives.

b. Paragraph SCOPE describes the scope of the project.

c. Paragraph TECHNICAL REQUIREMENTS provides the functional, operational, and specific design criteria for the project.

d. Paragraph APPLICABLE CRITERIA lists applicable industry and Government design criteria, unless otherwise indicated in the Section.

SECTION 01 10 00 Page 6 W912EP25R0009 Industry Day

It is not intended to be all-inclusive. Other industry and Government standards may also be used, where necessary to produce professional designs, unless they conflict with those listed.

e. Paragraph TECHNICAL REQUIREMENTS contains Army Standard Design Criteria, generally applicable to all facility types, unless otherwise indicated in the Section.

1.3 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work will be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and fabrication practices in the conduct of the work, make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable Contract unit or job prices as fixed and established in the Contract. If, in the opinion of the Contracting Officer, there are no contract unit or job prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or job prices. Except as herein provided, repair damage to all work, utilities, materials, equipment and plant to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

1.4 EXISTING WORK

In addition to FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during delivery operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 WORK HOURS

On-site work hours are between 0700 to 1730 Monday through Saturday, with the exception of federal holidays. Extended working hours, Sundays, and holiday work may be requested for consideration and approval by the Government.

1.6 UNITS OF MEASURE

The standard U.S. system must be utilized by the Contractor in the performance of work. Clearly denote which system of measure is being utilized, referenced or discussed on all survey records, official documentation, engineering data, and all correspondence, including any submittals and shop drawings. Any omission or inaccurate use of a unit of measure will not relieve the Contractor of their responsibilities under the Contract terms. The unit of measure used in this specification is the

SECTION 01 10 00 Page 7 W912EP25R0009 Industry Day standard U.S. system. The contract drawings denote both standard U.S.

system and metric system where appropriate. If no unit of measure is indicated on the drawing such as on ranges, stations, slope elevations, and distance numbers, then they are to be considered the standard U.S.

system.

1.7 SCOPE

1.7.1 General

This contract is broken into design, fabrication, and delivery of the east (upper) set of sector gates. No work is to be performed for the lower (western) set of gates. The differences between the east and west gates are minimal. The east gates are approximately 2 feet taller than the west due to higher hydraulic forces against them. Ensure while reviewing as-built drawings and other documentation provided for information only that the correct set of gates is being reviewed.

Required contract work is identified throughout this section. Work includes designing and fabricating two new FRP gates including pintle and split pintle bushing, upper hinge bracket, pin, and bushing, gate machinery connections, seals, fenders, walkways, etc. Any other supporting appurtenances which are required for installation of the gates by others must be included.

1.7.2 Site

Repair/replace damage to existing Government property, and along the Contractor's haul route resulting from the Contractor's delivery activities at no additional cost to the Government. Prior to delivery, the Contractor and Contracting Officer Representative shall perform an existing condition survey. At the completion of the work, the Contractor and Contracting Officer representative shall perform a final condition survey to determine repair/replacement requirements.

1.8 GENERAL REQUIREMENTS

1.8.1 Design Requirements

Design work includes all necessary disciplines, however is not limited to the following: structural and mechanical. All designers must be registered Professional Engineers by any state within the U.S. Design requirements and work products are identified in Section 01 33 16 DESIGN AFTER AWARD.

Design the new FRP sector gates to have performance similar to the existing steel sector gates. The dimensions of the FRP gates must be such that the gates join properly at the center of the lock when closed and fit into the existing lockwall recesses when opened. On the channel and recess faces, the surface areas (openings) must be designed in such way that the hydrodynamic loading exerted by operating forces (e.g., direct and reverse heads, friction from pintle, hinge, and seals), as well as unpredictable forces (e.g., silt, debris, wear, and wind) do not exceed the existing machinery's load capacity. Drainage must be provided where water may accumulate to ensure complete drainage when in service or dewatered.

Refer to the bridging plans in Attachment A for further details about the dimensions of the sector gates and lock structure.

SECTION 01 10 00 Page 8 W912EP25R0009 Industry Day

1.8.2 Delivery, Storage, and Handling

Delivery includes all costs related to hauling from the place of fabrication to the Canaveral Lock (FOB Destination), by waterway and barge. Delivery by land is not allowed. As there will be a schedule gap between delivery and installation, it is required to moore the barges on site for a length of time until the gates can be installed by the Government, which will be paid for as delivery detention fees. The Government is responsible for performing the lifts to remove the gates from the barges. After the gates are installed in January 2027, the Government will return the barges to any location requested by the Contractor. Refer to Attachment E for the site delivery location. Refer to Paragraph DAMAGE TO WORK above for any damage to the materials or Government property during delivery. Refer to Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS for all delivery and load handling requirements. The Contractor must submit an Accident Prevention Plan (APP) for Government approval prior to commencing any mobilization for delivery.

1.8.2.1 On-Site Assembly

Full gate assembly includes all structural and non-structural components which allows the Government to lift and drop the gate into the lock recess. Assembly includes but is not limited to, structure, pintle assembly, fenders, walkway, guardrail, and grating. Appurtenances such as seals, pintles, hinges, walkway grating, etc., may be provided separately for later Government installation. Ensure dimensional tolerances, fit, and function, prior to requesting the Government conduct an inspection of the completely assembled gates for final acceptance and payment.

1.8.2.2 Barge Delivery

All items must be delivered at the same time and must be fully assembled to the maximum extent practical prior to delivery, as the gates must arrive in a condition the Government can easily attach rigging and perform a lift, to prevent delays to other vessels within the federal navigation channel. Coordinate with the Government no sooner than 180 calendar days on the proposed delivery date as the Government will need to coordinate lifting equipment. As the Government is responsible and assumes liability for performing lifts, the gates will be fully inspected at delivery by the Government, prior to performing any lifts. A punch list will be performed and if there are any unacceptable items the Contractor must accept responsibility for those and correct prior to the Government performing the lifts in January 2027. Refer to Attachment F for a hydrographic survey of the federal channel. The Government will have a barge-mounted crane which will lift from the Contractor's barge and install the gates.

1.8.3 Architectural Requirements

FRP members must be colored gray with pigment during fabrication. Provide manufacturer's standard color choices to the Government for final selection.

1.8.4 Mechanical Requirements

For each gate, a new lower pintle assembly is required that supports the full gate design load. Include new pintle seals. A new upper hinge assembly is also required for each gate. The split pintle bushing which is recessed into the new gate must be installed at the fabricator's shop to check for fit and then removed for later reinstallation by the Government.

SECTION 01 10 00 Page 9 W912EP25R0009 Industry Day

1.8.5 Fire Protection

All structural components and systems must be in conformance with the applicable USACE EMs and code requirements, including fire resistive and other life-safety specifications to protect the public from injury or death resulting from structural collapse or from the spread of fire, smoke, or toxic products of combustion.

Provide FRP products that have a flame spread rating of 25 or less as specified in ASTM E84, Tunnel Test. The fabrication specifications must include this requirement and a test report submittal for approval.

1.8.6 Manatee Warning System

There is an existing manatee warning system which has been installed and is maintained by a third party contractor, Underwater Engineering Services, Inc. (UESI). In summary, the system has a collection of acoustic transmitters and receivers which sense if a manatee is within the gate area, and if so, automatically stop gate movement to prevent harm to manatees. This system will be removed and replaced under a separate contract action.

UESI will participate in review of designs submitted under this contract to ensure their system will be compatible with the new gates, as well as for assisting UESI in planning how they will re-install the system on the new gates.

Refer to Attachment G for further information.

1.8.7 Fabricator's Representation During Government Installation

Include costs within the base bid as directed within Section 01 20 00 PRICE AND PAYMENT PROCEDURES for costs associated with having the Fabricator's representative(s) on site during Government installation of gate. Schedule is expected weeks to months after the gates are delivered.

Include labor and travel costs for at minimum one individual competent in the gate fabrication process. The purpose of this site visit will be to answer questions by the Government installation crews. Personnel will not perform any manual labor, the role is only to observe, inform, and answer questions. Ensure personnel brings all applicable Personal Protective Equipment (PPE) for an active construction zone. Assume a full two 8-hour days on site.

1.9 APPLICABLE CRITERIA

If a standard or reference is included by name and not date, use criteria from the most current publication, including any applicable addenda, unless otherwise stated in the contract or task order, as of the date of the issuance of this solicitation. In the event of conflict between References and/or Applicable Military Criteria, apply the most stringent requirement, unless otherwise specifically noted in the contract.

1.9.1 Industry Criteria

Applicable design and fabrication criteria references are listed below.

This list is not intended to include all criteria that may apply or to restrict design and fabrication to only those references listed.

References cited herein are not necessarily incorporated in their

SECTION 01 10 00 Page 10 W912EP25R0009 Industry Day entirety. Refer to specific design requirements established in Paragraph GENERAL TECHNICAL REQUIREMENTS for applicability extents or limits. The most current version published at the time of award shall be used if no date is shown.

American Iron and Steel Institute (AISI)

AISI S100 North American Specification for the Design of Cold-Formed Steel Structural Members

American Society of Civil Engineers (ASCE)

ASCE 7-22 Minimum Design Loads for Buildings and Other Structures

ASCE 74-23 for Load & Resistance Factor Design (LRFD) of Pultruded Fiber Reinforced Polymer (FRP) Structures

ASCE MOP 102 Design Guide for FRP Composite Connections

American Composites Manufacturer's Association (ACMA)

ACMA Code Code of Standard Practice: Industry Guidelines for Fabrication and Installation of Pultruded FRP Structures

American Society of Mechanical Engineers (ASME)

ASME BTH-1 Design of Below-the-Hook Lifting Devices

American Welding Society (AWS)

AWS-03 WHB Welding Handbook, Ninth Edition Vol.1-4; Eighth Edition Vol. 3

Welding Codes and Specifications (As Applicable)

International Code Council (ICC)

ICC IBC International Building Code

ICC IMC International Mechanical Code

Institute of Electrical and Electronics Engineers (IEEE)

IEEE C2 National Electrical Safety Code

IEEE 1100 IEEE Emerald Book: IEEE Recommended Practice for Powering and Grounding Electronic Equipment

National Fire Protection Association (NFPA)

NFPA 70 National Electrical Code

NFPA 70E Standard for Electrical Safety in the Workplace

Occupational Safety and Health Administration (OSHA)

29 CFR 1926 Safety and Health Regulations for Construction

State & Local Regulations

SECTION 01 10 00 Page 11 W912EP25R0009 Industry Day

State Specific Environmental Control Requirements

1.9.2 Military Criteria

The project shall conform to the following criteria. Certain design impacts and features due to these criteria are noted for the benefit of the offeror; however, all requirements of the referenced criteria shall be applicable, whether noted or not, unless otherwise specified herein.

a. Unified Facilities Criteria (UFC)

UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard

b. U.S. Army Corps of Engineers (USACE)

Publications may be found at the following web address:

https://www.publications.usace.army.mil/

ER 1110-2-1086 Earthquake Design and Evaluation for Civil Works Projects

EM 1110-2-2107 Design of Hydraulic Steel Structures

EM 1110-2-2602 Planning and Design of Navigation Locks

EM 1110-2-2610 Mechanical and Electrical Design for Lock and Dam Operating Equipment

EM 1110-2-3402 Barge Impact Forces For Hydraulic Structures

EM 1110-2-1604 Hydraulic Design of Navigation Locks

EM 1110-2-1424 Lubricants and Hydraulic Fluids

1.10 TECHNICAL REQUIREMENTS

1.10.1 Structural Design

1.10.1.1 Finite Element Analysis (FEA)

Refer to Section 01 33 16 DESIGN DATA (DESIGN AFTER AWARD) Paragraph DESIGN ANALYSIS for further requirements.

1.10.1.2 Loads and Load Combinations

The design requirements must be developed using relevant USACE Engineer Manuals (EMs) identified within Paragraph APPLICABLE CRITERIA above. Sound engineering judgement may be required in areas where there is not clear guidance. Refer to Section 06 90 00 FIBER-REINFORCED POLYMER (FRP) COMPOSITE STRUCTURE for material requirements.

A summary of the hydraulic loads in accordance with EM 1110-2-2107 are included in Attachment D. Consider as minimum the load combinations included in Attachment D.

Submit proposed load cases and load combinations including all factors for approval before design commences. This information must be included within

SECTION 01 10 00 Page 12 W912EP25R0009 Industry Day the Design Analysis as well. A submittal for this item can be found within

01 33 16 DESIGN AFTER AWARD.

1.10.1.3 Serviceability Requirements and Deflection

Design the new FRP gates including all individual members, connections, and connectors such that they do not impair operability or performance under service loads. Limit the deflection of the gates, and do not exceed 1 inch, so that maximum allowable strains are not exceeded, that gate seal contact surfaces are maintained within acceptable tolerances, and design assumptions are not compromised. The allowable deflection must not reduce the gate's bottom clearance of 1 inch.

1.10.1.4 Thermal Expansion

Thermal effects must be considered when designing the FRP sector gates to ensure that any contraction or expansion is accommodated. Similarly, seals must also be designed to allow for thermal expansion and contraction. The overall dimensions of an assembled structural unit must be within the tolerances indicated on the drawings or as specified for the item of work.

1.10.1.5 Gate Seals

Match and align the gate bottom seal to the center of the bottom seal beam plate. Consider following EM 1110-2-2107 Plate 16.4, with modifications, as appropriate for the bottom seal design.

Match and align the gate vertical side seals to the existing embeds and pre-sets at each recess slot. For the corner, where the bottom seal meets the vertical seal at the miter point, both seals should be fabricated integrally. Follow EM 1110-2-2107 Paragraph 16.2.7 for all seals presets.

Make all the seals adjustable (± 7/16 inch) and replaceable to allow for future maintenance and replacement. Provide UNS S32205 stainless steel for all hardware and shims. Lock washers must be used.

1.10.1.6 Framing

The geometry of the structural members must be designed to optimize the water flow in order to reduce operating forces required during opening of the sector gate under reversed head. Refer to EM 1110-2-2107 Paragraph

16.2.3.1 for details/geometry where applicable. Panel or plate framing may be used in lieu of truss framing.

1.10.1.7 Pintles and Hinges

Design the pintle and hinge assembly (hinge bracket, bushing, and pin) so it can be use with existing pintle support casting and hinge bracket casting, respectively. Refer to as-built drawings provided in Attachment C, for informational use only. Embedded metals in FRP are allowed for these applications. Ensure that alloys and fabrication methods chosen are able to withstand salt-water immersion corrosion and that no dissimilar metals are used which may result in galvanic corrosion. Alloys chosen must be suitable without the use of cathodic protection. The split pintle bushing embedded in the gate must allow removal and replacement without structural modification of the gate components, e.g. it must be installed by means of a press fit or through-bolt. Consideration must be taken over the 100 year service life of these gates that the pintles may need to be replaced several times, and will need to be done with only disconnecting the top hinge and machinery connection and jacking up the gate in place.

SECTION 01 10 00 Page 13 W912EP25R0009 Industry Day

1.10.1.8 Gate Stops

Rubber bumpers must be provided to prevent damage to the gate by it being forced against the wall of the recess and at the center of the lock where the two gates meet. Bumpers should be placed on the center line of the respective to structural members. Recess bumpers mounted on the gate must align with the respective existing accompanying bumper located on the face of recess wall. Make all the bumpers adjustable using shims as necessary to properly make contact with companion bumper and replaceable to allow for future maintenance and replacement. All hardware must be UNS S32205 stainless steel. Provide rubber bumpers specifically for a marine environment.

1.10.1.9 Fender System

Design and fabricate the fenders from a thermoplastic matrix reinforced with chopped fiberglass filaments and embedded continuous FRP reinforcing bars. The thermoset FRP fender supporting frame including wales must be structurally continuous across a minimum of two spans and provide adequate creep resistance to prevent loosening of attachments over time and, at a minimum, meet the requirements of FDOT Specifications Section 973-5. The location of the new FRP fender system must match the existing one. At a minimum, the dimensions of the new FRP fender system (wales, caution fender, and spacer-blocks) must match the existing, while providing at least the same energy absorption requirements as the existing fender system. There is no known information on the existing fenders, however the same size/configuration may be provided. A material test may be used to determine the rubber composition and durometer. Fenders must be attached to the framing utilizing UNS S32205 stainless steel bolted fasteners (bolts, nuts, and washers) to facilitate the removal and replacement of damaged components and slotted holes to accommodate thermal expansion. All hardware must be recessed. Provide black wales unless otherwise shown in the Plans. "Caution Fenders" must be manufactured in yellow with black caution stripes along their entire length (12 feet). Black caution stripes (1 foot wide at 45 degree angle spaced at 1 foot) must be made of self-adhesive, weather-resistant, retroreflective tape conforming to

ASTM D4956.

1.10.1.10 Lifting Supports

Provide a minimum of four jacking pads on the bottom of each gate as lifting supports so that the full weight of the gate can be supported by the pads while maintaining the gate in a stable position. A jacking plan must be submitted that includes complete instructions and the sequence to be followed when performing maintenance (e.g., pintle inspection and gate removal).

1.10.1.11 Lifting Points

The design must accommodate no less than four lifting lugs on each gate to facilitate installation and future removal from the lock (considering the total weight of the gate to include marine life and silt). Locate the lifting lugs (considering the center of gravity) so that the gate is level to within +/- 1-inch when lifted. Do not exceed a total gate weight of 183 kips including all appurtenances.

SECTION 01 10 00 Page 14 W912EP25R0009 Industry Day

1.10.1.12 Walkways

Each gate must have an upper walkway with guardrails. The upper walkway and guardrails must be designed and fabricated from FRP. The walkway path must be removable for routine maintenance and be provided on all sides of the top of the sector gate, similar to the existing. The framing of the platform must be fabricated from pultruded structural profiles in accordance with ASCE 74-23 and assembled using Type 316 stainless steel bolted connections. The structural members, connections, and floor/deck plate must be designed to support a 100 psf (with applicable load factors) vertical live load applied over the entire surface. With a 150 psf unfactored service load, limit maximum deflection to L/180, where "L" is the unsupported length in inches. The walkway must be 4 feet wide and provide a non-slip FRP deck/floor surface primarily of grating type which does not allow ponding of water. Solid plates must be provided at the hinge and miter location when the gate is in the closed position as depicted in EM 1110-2-2107 Plate 16.6. The walkway and guardrail color must be gray in color. Design the the FRP grating and railing in accordance with Sections 06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) GRATING and 06 82 14 FIBERGLASS REINFORCED PLASTIC (FRP) PIPE AND TUBE

RAILINGS.

1.10.1.13 Manatee Protection

All openings on the channel face and any exposed area that may potentially come in contact with a manatee must be screened to prevent a manatee from entering. The screen system must be made of FRP grating and removable to allow for future maintenance and replacement. Grates must be arranged such that a 6 inch sphere cannot pass through, and may be installed diagonally, horizontally, or vertically. The design loads must represent the maximum differential head, assuming the openings are blocked by debris. Where the design allows, provide a removable section for personnel access from the concrete floor (channel side) to the interior of the sector gate with minimum dimensions of 3 feet by 4 feet.

1.10.2 Mechanical Design

Comply with EM 1110-2-2610 and EM 1110-2-3200 .

1.10.2.1 Design Forces

The mechanical equipment is capable of exerting a maximum 150 ft-kips on the gates. The existing pintles were designed to see a maximum load of 485 kips. The existing hinges were designed to see a maximum load of 280 kips.

If the new gate is lighter than the existing gate, the new components only need to support the design forces calculated.

1.10.2.2 Gate Bottom Seals

Provide rubber seals that are fluorocarbon-clad of the molded type only.

Refer to Paragraph RUBBER SEALS within Section 35 20 16.39 HYDRAULIC SECTOR GATES for further requirements.

1.10.2.3 Lower Pintle Assembly

The pintle assembly consists of a pintle support (anchor), pintle socket seal retainer ring assembly, pintle, and split pintle bushing which are integral components of each gate. The existing pintle support at the lock will be reused for which the new pintle fabricated under this contract

SECTION 01 10 00 Page 15 W912EP25R0009 Industry Day will be pressed into.

Refer to Section 35 20 16.39 HYDRAULIC SECTOR GATES for further requirements.

Include replacement of the two seals located inside the pintle casting which mate to the pintle neck. Refer to Detail C of as-built drawing #32 within Attachment C.

Fabricate the pintle neck with a sleeve which will allow for easier transportation for machining to tolerance once the existing pintle is removed and the bore can be measured, which will be performed by others when the gate is installed. Ensure the sleeve is oversized from the dimensions shown in the as-builts.

Design the pintle to be compatible with grease which meets Environmentally Acceptable Lubricant (EAL) requirements. Refer to EM 1110-2-1424 Lubricants and Hydraulic Fluids, chapter 13, and related appendices.

Protect grease supply lines from damage by mounting in structural tubes, using flexible hose connections where needed, and equipping all exposed piping and hose with structural guards to protect from debris. Grease lines must be installed by the fabricator and fittings must be above the high water level and reachable by maintenance personnel during routine maintenance.

1.10.2.4 Upper Hinge

The hinge assembly consists of hinge bracket support frame, hinge bracket support, hinge bracket, and hinge pin. The existing hinge bracket support frame and hinge bracket support will be reused.

Refer to Section 35 20 16.39 HYDRAULIC SECTOR GATES for further requirements.

Use the same dimensions of the hinge and bushing as shown on the reference drawings in Attachment C.

Design the hinge to be compatible with grease which meets Environmentally Acceptable Lubricant (EAL) requirements. Refer to EM 1110-2-1424 Lubricants and Hydraulic Fluids, chapter 13, and related appendices.

1.10.2.5 Machinery

The operating machinery for the lock consists of drums, wire ropes, sheaves, hydraulic power unit (electric motor, hydraulic motor, hydraulic pump), reduction gears, limit switches, and other associated mechanical components. In summary, the gates operate by way of tension on two sets of wire ropes which open and close the gates. The ropes are connected to the gates above the waterline.

1.10.2.5.1 Wire Rope Cable Guide Track

With the skin plate face of the gate having curvature, as the wire rope operates it lays against the face in what is defined as a 'cable guide track' on the bridging plans. This curved track wears over time as the rope contacts it and so the track must be removeable and replaceable. Use a commercially available off the shelf metal component which can be easily purchased on the open market in the future, such a C-channel made of weathering steel. Coatings are not allowed as they will wear off.

SECTION 01 10 00 Page 16 W912EP25R0009 Industry Day

1.10.2.5.2 Limit Switches

The existing limit switches are mounted to the concrete lock wall. When plates attached to the gate contact the limit switches, the machinery either goes into a slower speed or stops. These gate design must have provisions for actuating the switches.

1.11 ENGINEERING DURING INSTALLATION SUPPORT

Performance for engineering during installation support effort is expected to begin in January 2027 and continuing through April 2027.

1.11.1 Requests for Information (RFIs)

RFIs will be forwarded from the installation contractor to the Contractor by the Government. Review and provide comments to the Government in writing via email within three business days following receipt. In accordance with FAR 52.236-23, RFIs due to deficiencies in the project’s plans and specifications produced by the Contractor will not count toward the number of compensable requests. The Government will identify all RFIs that the Contractor is required to address. Responses must include comprehensible written RFI responses, with applicable contract document citations and attachments, when applicable. One RFI is defined as up to three questions about a single topic submitted by the installation contractor. This task does not include discussion between the Designers/Fabricator and installation contractor. If any discussions are required, those will be paid for under meetings.

Deliverables: Up to a total of 30 RFI responses.

1.11.2 Meetings

Participate in teleconference meetings. The intent of the meetings is to provide an exchange between the installation contractor, Government, fabricator, and designers. In general, teleconference meetings will be conducted as needed and are considered deliverables.

Deliverables: Up to a total of 40 hours of teleconference meetings.

Meeting participation, assume each teleconference meeting will require participation for up to 2 senior staff members.

1.11.3 Site Visits

Participate in site visits during the installation phase at the project location. The site visits will be requested at the discretion of the Government for the purpose of observing ongoing or completed installation activities. Assume the site visits will occur during any point of installation, up to and including completion. Assume one site visit will be requested for one attendee. The Government will request what design professionals are necessary per visit. The Contractor and designer will be given notification of no less than seven calendar days prior to a site visit. The site visit will take one full day on-site. Following the site visit, prepare and submit a Trip Report by email within 3 calendar days.

The trip report for each site visit must provide a summary of the site observations and discussion during the time on site.

Deliverables: Each site visit and the corresponding trip report are considered a deliverable. Participate in up to 4 site visits during the

SECTION 01 10 00 Page 17 W912EP25R0009 Industry Day installation phase and 4 trip reports.

1.11.4 Engineering Input/Recommendations

Provide engineering advice in connection with the design, plans, specifications, and Government installation. Respond to requests for additional engineering assistance as requested by the Government. The purpose of this task is to provide engineering support that falls outside the scope of the other EDC tasks defined herein. The scope of the work within this task is expected to be for minor efforts. The designer's input/recommendations must include the appropriate contract document references/citations with detailed descriptions, summaries, interpretations, and supplemental sketches/details. Engineering input/recommendations may include minor design, engineering, and/or drafting efforts, if necessary. Submit to the Government any electronic file created in support of the deliverables cited herein. Engineering input/recommendations required due to errors or omissions in the gate design and fabrication will not be considered for compensation. Design work products, such as drawings, plates, figures, tables, and sketches prepared to illustrate details and results of an engineering input/recommendation may require electronic submittals and/or design authentication at the discretion of the Government, to be accepted by the Government.

Deliverables: Written engineering input/recommendation and supporting work products. Up to a total of 40 work hours for engineering input/recommendations.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

Attachment A Bridging Plans

Attachment B Site Photos

Attachment C As-Built Drawings

Attachment D Design Loads

Attachment E Delivery Location

Attachment F Barge Hydrographic Survey

Attachment G Manatee Array

-- End of Section --

SECTION 01 10 00 Page 18 W912EP25R0009 Industry Day

ATTACHMENT A - BRIDGING PLANS

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

JACKSONVILLE DISTRICT

CANAVERAL LOCK FRP SECTOR GATE

W912EP25R0009

US Army Corps of Engineers ®

ATLANTIC O

CEAN

GULF OF MEXICO

LAKE OKEECHOBEE

WEST PALM BEACH

MIAMI

KEY WEST

JACKSONVILLE

GEORGIA

ALABAMA

PENSACOLA

TAMPA

ORLANDO

LOCATION MAP

LOCATION

OF WORK

SUPPLY PROJECT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

C

KS

O

N

VI

LL

E

D

IS

TR

IC

T

SA

N M

AR

C

O B

LV

D

JA

C

KS

O

N

VI

LL

E

FL

, 3

+X

XX

XX

X-

XX

-X

-X

XX

X

JA

N

U

AR

Y

PL

O

T D

AT

E:

FI

LE

N

AM

E:

AN

SI

D

W

2E P2

5R

C

AN

AV

ER

AL

H

AR

BO

R , F

LO

R

ID

A

C

AN

AV

ER

AL

L

O C

K C

AN

AV

ER

AL

L O

C K

SE

C

TO

R

G

AT

E R

EP

LA

C

EM

EN

T

BR

EV

AR

D

C O

U N

TY

, F

LO

R

ID

A

AT

R

/B C

O

ES

R

EV

IE

W

C :\U

SE

R

S\ K3

EN

D

G R

9\

SA

JP

W

\D

7\ G

-0

.D W

G

AE

C _B

&W .S

TB

R

O D

R

IG

U

EZ

, G O

N

ZA

LO

C

IV

(U

SA

JA

N

U

AR

Y

, 2

G -0

.D

W G

G . R

O D

R

IG

U

EZ

C . M

O R

AL

ES

D . M

AS

TR

IA

N

O C

O

VE

R S

H

EE

T

G-001

SHEET ID SHEET TITLE

G-001 COVER SHEET

G-002 GENERAL NOTES & ABBREVIATIONS

G-003 CONTROL DIMENSIONS

S-101 EAST GATE - TOP VIEW & ELEVATION

S-201 EAST GATE - FENDER SYSTEM

S-301 SECTIONS AND DETAILS

M-001 MECHANICAL PINTLE DETAILS

M-002 MECHANICAL HINGE DETAILS

M-003 MECHANICAL MISC DETAILS

R-001 SITE PLAN

R-002 GENERAL PLAN AND SECTIONS

R-003 MASONRY BASE SLAB

R-004 MASONRY PLAN AT TOP OF LOCK

R-005 METAL WALL PROTECTION-LAYOUT

R-006 METAL WALL PROTECTION-DETAILS NO 1.

R-007 METAL WALL PROTECTION-DETAILS NO 2.

R-008 METAL SECTOR GATE EMBEDDED SEALS

R-009 METAL NEEDLE DAM EMBEDDED SEALS

R-010 METAL HANDRAIL-LAYOUT

R-011 METAL HANDRAIL AND DEPTH GAGE DETAILS

R-012 METAL COVER PLATES AND JUNCTION BOXES

R-013 SECTOR GATES UPPER FRAME PLANS

R-014 SECTOR GATES MIDDLE AND LOWER FRAME PLAN

R-015 SECTOR GATES SECTIONS AND DETAILS

R-016 SECTOR GATES CANAL SIDE TRUSS ELEVATION

R-017 SECTOR GATES RECESS SIDE TRUSS ELEVATION

R-018 SECTOR GATES SKINPLATE DETAILS-EAST GATES

R-019 SECTOR GATES SKINPLATE DETAILS-WEST GATES

R-020 SECTOR GATES PINTLE DETAILS

R-021 SECTOR GATES HINGE DETAILS

R-022 SECTOR GATES RUBBER SEALS

R-023 SECTOR GATES PLAN OF BOTTOM SEALS

R-024 SECTOR GATES CABLE CONNECTIONS AND RECESS BUMPER

R-025 MACHINERY GATE OPERATING MACHINERY-DETAILS NO 1

R-026 MACHINERY GATE OPERATING MACHINERY-DETAILS NO 2

R-027 SECTOR GATES FENDERS

R-028 SECTOR GATES WALKWAY

R-029 SECTOR GATES WALKWAY HANDRAIL

R-030 MACHINERY GATE OPERATING MACHINERY-GENERAL ARRANGEMENT

R-031 SECTOR GATES MANATEE PROTECTION SCREENS LOWER FRAME PLAN

R-032 SECTOR GATES MANATEE PROTECTION SCREENS CANAL SIDE ELEV

R-033 SECTOR GATES MANATEE PROTECTION SCREENS DETAILS

R-034 ELECTRICAL CATHODIC PROTECTION-FRAMES

R-035 MECHANICAL MANATEE PROTECTION SYSTEM SENSOR LOCATION

R-036 MECHANICAL MANATEE PROTECTION SYSTEM BRACKET AND SENSOR DETAILS

R-037 MECHANICAL MANATEE PROTECTION SYSTEM SENSOR DETAILS

R-038 MECHANICAL MANATEE PROTECTION SYSTEM MECHANICAL DETAILS

R-039 MECHANICAL MANATEE PROTECTION SYSTEM PLAN AND INTERCONNECTION DIAGRAM

R-040 TIMBERSIDE CHANNEL BRACKET

R-041 SENSOR CHANNEL - NORTH

R-042 DRILL TEMPLATE LAYOUT GATE 1 & 3

R-043 SKINSIDE TRANSITION COVER GATE 1 & 2

R-044 SKINSIDE TRANSITION COVER GATE 3 & 4

BREVARD COUNTY, FL

JA

N

U

AR

Y

, 2

G -0

.D

W G

G . R

O D

R

IG

U

EZ

C . M

O R

AL

ES

D . M

AS

TR

IA

N

O

AB

BR

EV

IA

TI

O

N S

G

EN

ER

AL

N O

TE

S

ST

R

U C

TU

R

AL

G-002

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

JA

C

KS

O

N

VI

LL

E

D

IS

TR

IC

T

SA

N M

AR

C

O B

LV

D

JA

C

KS

O

N

VI

LL

E

FL

, 3

JA

N

U

AR

Y

PL

O

T D

AT

E:

FI

LE

N

AM

E:

AN

SI

D

W

2E P2

5R

C

AN

AV

ER

AL

H

AR

BO

R , F

LO

R

ID

A

C

AN

AV

ER

AL

L

O C

K C

AN

AV

ER

AL

L O

C K

SE

C

TO

R

G

AT

E R

EP

LA

C

EM

EN

T

BR

EV

AR

D

C O

U N

TY

, F

LO

R

ID

A

AT

R

/B C

O

ES

R

EV

IE

W

C :\U

SE

R

S\ K3

EN

D

G R

9\

SA

JP

W

\D

7\ G

-0

.D W

G

AE

C _B

&W .S

TB

R

O D

R

IG

U

EZ

, G O

N

ZA

LO

C

IV

(U

SA

GENERAL NOTES

1. BRIDGING PLANS HAVE BEEN CREATED FROM AVAILABLE

AS-BUILT DRAWINGS AND ARE INTENDED TO CONVEY

PROJECT SCOPE AND TECHNICAL REQUIREMENTS. THE

DESIGN MUST FOLLOW THE INTENT OF THESE DRAWINGS.

NOT ALL CONDITIONS, ARRANGEMENTS, DIMENSIONS, AND

APPLICATION HAVE BEEN VERIFIED BY THE GOVERNMENT.

PERFORM FIELD INSPECTIONS AND VERIFICATIONS IN THE

DESIGN PHASE.

2. FABRICATE THE ENTIRE GATE USING FIBER REINFORCED

POLYMER COMPOSITES EXCEPT THE HINGE ASSEMBLY,

PINTLE ASSEMBLY, LIFTING ASSEMBLIES, AND OPERATING

MACHINERY CONNECTIONS.

3. REPORT DISCREPANCIES IN DIMENSIONS BETWEEN THESE

DRAWINGS AND ACTUAL FIELD CONDITIONS DRAWINGS TO

THE CONTRACTING OFFICER PRIOR TO BEGINNING THE

AFFECTED WORK.

4. DETAILS TITLE OR NOTED AS “TYPICAL” APPLY NOT ONLY

WHERE SPECIFICALLY INDICATED OR REFERENCED BUT

ALSO IN ALL OTHER CASES WHERE THE NATURE OF THE

FABRICATION REQUIRES THEIR USE. DETERMINE

APPLICABILITY OF TYPICAL DETAILS FROM DESCRIPTIVE

TITLES OR FROM THE SIMILARITY OF A FABRICATION

CONDITION TO ANOTHER CONDITION WHERE THE DETAIL

IS SPECIFICALLY INDICATED OR REFERENCED.

5. NOTIFY THE CONTRACTING OFFICER OF ANY

DISCREPANCIES OF UNDOCUMENTED CONDITIONS THAT

MAY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .