W912EP25B0009_KBSBMDFY25_Abstract of Offers 1.pdf

PDF 160 KB Posted

Attached to
Naval Submarine Base Kings Bay Maintenance Dredging, Camden County, Georgia
Solicitation number
W912EP25B0009
Issued by

About this file

This document is an Abstract of Offers for a maintenance dredging project at Naval Submarine Base Kings Bay in Camden County, Georgia. The solicitation (W912EP25B0009) is a small business set-aside contract for unclassified excavation and maintenance dredging across multiple stations and ranges, with a total estimated value between $10-25 million. The project includes base work, three optional work phases (Option A for field-cut weir riser boards, Option B for secondary maintenance dredging, and Option C for additional mobilization/demobilization), and involves dredging various submarine base locations to specified depths ranging from 39 to 47 feet.

The bid includes line items for mobilization, excavation in different ranges, bird monitoring, standby time, and other related services. Two bidders (Southern Dredging Co, Inc. and Cottrell Contracting Corporation) submitted proposals, with total bid amounts around $9-13 million. The project has a 300-calendar day performance period, with 235 days allocated for base work and the remainder for optional phases. Bids were due on April 2, 2025, with the solicitation issued electronically through SAM.gov and bids to be submitted via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER: W912EP25B0009

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 BIDS

NO. 1 NO. 2 NO. 3 NO. 4 NO. 5

BIDDER: BIDDER: BIDDER: BIDDER: BIDDER:

B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY

(Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount) C. BUSINESS SIZE: Small C. BUSINESS SIZE: Small C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF AMENDMENTS ISSUED: 5 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN NO. 7B DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB 2,115,000.00$ $2,115,000.00 1,748,500.00$ $1,748,500.00 1,390,000.00$ $1,390,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0002AA

EXCAVATION, UNCLASSIFIED

RANGE H TO I AND UPPER TURNING BASIN STATION 43+300 TO

STATION 48+175 (ESTIMATED QUANTITY - SEE NOTE 2)

FROM 0 TO 100,000 CUBIC YARDS

100,000 CUBIC YARD 6.20$ $620,000.00 4.77$ $477,000.00 5.03$ $503,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0002AB

EXCAVATION, UNCLASSIFIED

RANGE H TO I AND UPPER TURNING BASIN STATION 43+300 TO

STATION 48+175 (ESTIMATED QUANTITY - SEE NOTE 2)

FROM 100,001 TO 295,000 CUBIC YARDS

195,000 CUBIC YARD 6.20$ $1,209,000.00 4.77$ $930,150.00 5.03$ $980,850.00 -$ $0.00 -$ $0.00 -$ $0.00

0003AA

EXCAVATION, UNCLASSIFIED

RANGE G TO H AND EXPLOSIVE HANDLING BASIN (EHB) STATION

39+141 TO STATION 43+300 (ESTIMATED QUANTITY - SEE NOTE 2)

FROM 0 TO 250,000 CUBIC YARDS

250,000 CUBIC YARD 6.25$ $1,562,500.00 3.88$ $970,000.00 3.90$ $975,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0003AB

EXCAVATION, UNCLASSIFIED

RANGE G TO H AND EXPLOSIVE HANDLING BASIN (EHB) STATION

39+141 TO STATION 43+300 (ESTIMATED QUANTITY - SEE NOTE 2)

FROM 250,001 TO 450,000 CUBIC YARDS

200,000 CUBIC YARD 6.25$ $1,250,000.00 3.88$ $776,000.00 3.90$ $780,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0004AA

EXCAVATION, UNCLASSIFIED

RANGE E TO G AND MAGNETIC SILENCING FACILITY (MSF) NORTH

STATION 31+800 TO STATION 39+141 (ESTIMATED QUANTITY - SEE

NOTE 2)

FROM 0 TO 80,000 CUBIC YARDS

80,000 CUBIC YARD 8.80$ $704,000.00 7.82$ $625,600.00 7.50$ $600,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0004AB

EXCAVATION, UNCLASSIFIED

RANGE E TO G AND MAGNETIC SILENCING FACILITY (MSF) NORTH

STATION 31+800 TO STATION 39+141 (ESTIMATED QUANTITY - SEE

NOTE 2)

FROM 80,001 TO 150,000 CUBIC YARDS

70,000 CUBIC YARD 8.80$ $616,000.00 4.00$ $280,000.00 7.50$ $525,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0005AA

EXCAVATION, UNCLASSIFIED,

SITE SIX NORTH (SS-N) STATION 36+850 TO STATION 38+800

(ESTIMATED QUANTITY - SEE NOTE 2)

FROM 0 TO 35,000 CUBIC YARDS

35,000 CUBIC YARD 7.65$ $267,750.00 4.06$ $142,100.00 4.90$ $171,500.00 -$ $0.00 -$ $0.00 -$ $0.00

0005AB

EXCAVATION, UNCLASSIFIED,

SITE SIX NORTH (SS-N) STATION 36+850 TO STATION 38+800

(ESTIMATED QUANTITY - SEE NOTE 2)

FROM 35,001 TO 50,000 CUBIC YARDS

15,000 CUBIC YARD 7.65$ $114,750.00 4.06$ $60,900.00 4.90$ $73,500.00 -$ $0.00 -$ $0.00 -$ $0.00

0006AA

EXCAVATION, UNCLASSIFIED,

SITE SIX SOUTH (SS-S) AND ARDM YOKE; STATION 34+233.1 TO STATION 36+548;

(ESTIMATED QUANTITY - SEE NOTE 2)

FROM 0 TO 6,000 CUBIC YARDS

6,000 CUBIC YARD 14.00$ $84,000.00 13.81$ $82,860.00 12.00$ $72,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0006AB

EXCAVATION, UNCLASSIFIED,

SITE SIX SOUTH (SS-S) AND ARDM YOKE; STATION 34+233.1 TO STATION 36+548;

(ESTIMATED QUANTITY - SEE NOTE 2)

FROM 6,001 TO 20,000 CUBIC YARDS

14,000 CUBIC YARD 14.00$ $196,000.00 13.81$ $193,340.00 12.00$ $168,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0007AA

EXCAVATION, UNCLASSIFIED,

EXPLOSIVE HANDLING WHARVES (EHW) STATION 41+420 TO STATION

43+320 (ESTIMATED QUANTITY - SEE NOTE 2)

FROM 0 TO 30,000 CUBIC YARDS

30,000 CUBIC YARD 13.25$ $397,500.00 13.03$ $390,900.00 11.00$ $330,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0007AB

EXCAVATION, UNCLASSIFIED,

EXPLOSIVE HANDLING WHARVES (EHW) STATION 41+420 TO STATION

43+320 (ESTIMATED QUANTITY - SEE NOTE 2)

FROM 30,001 TO 45,000 CUBIC YARDS

15,000 CUBIC YARD 13.25$ $198,750.00 13.03$ $195,450.00 11.00$ $165,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0008AA

REFIT WHARVES STATION 45+850.4 TO STATION 48+175 (ESTIMATED

QUANTITY - SEE NOTE 2)

FROM 0 TO 20,000 CUBIC YARDS

20,000 CUBIC YARD 13.20$ $264,000.00 8.86$ $177,200.00 11.00$ $220,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0008AB

REFIT WHARVES STATION 45+850.4 TO STATION 48+175 (ESTIMATED

QUANTITY - SEE NOTE 2)

FROM 20,001 TO 35,000 CUBIC YARDS

15,000 CUBIC YARD 13.20$ $198,000.00 8.86$ $132,900.00 11.00$ $165,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED

DRY DOCK CAISSON GATE SILL AND DRY DOCK CAISSON GATE

MOORING FACILITY

1 JOB 46,800.00$ $46,800.00 30,000.00$ $30,000.00 40,000.00$ $40,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0010 BIRD MONITORING 1 JOB 87,000.00$ $87,000.00 5,000.00$ $5,000.00 20,000.00$ $20,000.00 -$ $0.00 -$ $0.00 -$ $0.00 0011 STANDBY TIME (SEE NOTE 3) 120 HOURS 1,800.00$ $216,000.00 2,000.00$ $240,000.00 2,000.00$ $240,000.00 -$ $0.00 -$ $0.00 -$ $0.00 0012 PARTNERING REGROUP 1 EACH 8,000.00$ $8,000.00 5,000.00$ $5,000.00 5,000.00$ $5,000.00 -$ $0.00 -$ $0.00 -$ $0.00

TOTAL BASE (LINE ITEMS 0001 THROUGH 0012) $10,155,050.00 $7,462,900.00 $7,423,850.00 $0.00 $0.00 $0.00

OPTION A

0013 FIELD-CUT WEIR RISER BOARDS (ESTIMATED QUANTITY) 200 EACH 39.00$ $7,800.00 25.00$ $5,000.00 10.00$ $2,000.00 -$ $0.00 -$ $0.00 -$ $0.00

TOTAL OPTION A (LINE ITEM 0013) $7,800.00 $5,000.00 $2,000.00 $0.00 $0.00 $0.00

OPTION B

SECONDARY MAINTENANCE DREDGING - EXCAVATION, UNCLASSIFIED;

SITE SIX SOUTH (SS-S) AND ARDM YOKE STATION 34+233.1 TO STATION 36+548

(ESTIMATED QUANTITY - SEE NOTE 2)

15,000 CUBIC YARD $ 14.00 $210,000.00 12.40$ $186,000.00 12.00$ $180,000.00 -$ $0.00 -$ $0.00 -$ $0.00

SECONDARY MAINTENANCE DREDGING - EXCAVATION, UNCLASSIFIED;

SITE SIX NORTH (SS-N) STATION 36+850 TO STATION 38+800

(ESTIMATED QUANTITY - SEE NOTE 2)

35,000 CUBIC YARD $ 7.65 $267,750.00 4.18$ $146,300.00 4.90$ $171,500.00 -$ $0.00 -$ $0.00 -$ $0.00

SECONDARY MAINTENANCE DREDGING - EXCAVATION, UNCLASSIFIED;

EXPLOSIVE HANDLING WHARVES (EHW) STATION 41+420 TO STATION 43+320

(ESTIMATED QUANTITY - SEE NOTE 2)

20,000 CUBIC YARD $ 13.30 $266,000.00 13.95$ $279,000.00 11.00$ $220,000.00 -$ $0.00 -$ $0.00 -$ $0.00

SECONDARY MAINTENANCE DREDGING - EXCAVATION, UNCLASSIFIED;

REFIT WHARVES STATION 45+850.4 TO STATION 48+175

(ESTIMATED QUANTITY - SEE NOTE 2)

20,000 CUBIC YARD $ 13.20 $264,000.00 9.30$ $186,000.00 11.00$ $220,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0018 SECONDARY MAINTENANCE DREDGING - EXCAVATION, UNCLASSIFIED;

DRY DOCK CAISSON GATE SILL AND DRY DOCK CAISSON GATE MOORING FACILITY 1 JOB $ 46,800.00 $46,800.00 30,000.00$ $30,000.00 40,000.00$ $40,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0019 SECONDARY MAINTENANCE DREDGING - BIRD MONITORING 1 JOB $ 15,000.00 $15,000.00 2,500.00$ $2,500.00 5,400.00$ $5,400.00 -$ $0.00 -$ $0.00 -$ $0.00

0020 SECONDARY MAINTENANCE DREDGING - STANDBY TIME (SEE NOTE 3) 24 HOURS $ 1,800.00 $43,200.00 2,000.00$ $48,000.00 2,000.00$ $48,000.00 -$ $0.00 -$ $0.00 -$ $0.00

TOTAL OPTION B (LINE ITEMS 0014 THROUGH 0020) $1,112,750.00 $877,800.00 $884,900.00 $0.00 $0.00 $0.00

OPTION C

0021 MOBILIZATION AND DEMOBILIZATION (SEE NOTE 4) 1 JOB $ 2,115,000.00 $2,115,000.00 800,000.00$ $800,000.00 800,000.00$ $800,000.00 -$ $0.00 -$ $0.00 -$ $0.00

TOTAL OPTION C (LINE ITEM 0021) $2,115,000.00 $800,000.00 $800,000.00 $0.00 $0.00 $0.00

TOTAL BID (LINE ITEMS 0001 THROUGH 0021) 13,390,600.00$ 9,145,700.00$ 9,110,750.00$ -$ -$ -$

ABSTRACT OF OFFERS DATE ISSUED DATE CLOSED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation: ->

ISSUING OFFICE

February 11, 2025 April 2, 2025

NAVAL SUBMARINE BASE KINGS BAY MAINTENANCE DREDGING

CAMDEN COUNTY, GEORGIA

Independent Government Estimate

PROJECT TITLE

IGE BIDS (Continued)

Southern Dredging Co, Inc. Cottrell Contracting Corporation

20%

Yes Yes

Yes

NAME AND TITLE OF CERTIFYING OFFICIAL:

Manuela D. Voicu

Signature

BIDSBIDS (Continued)

2025-04-02T15:08:01-0400