2024.06.17- BCWPA Open Forum Slides.pptx
PPTX presentation 15 MB Posted
- Solicitation number
- W912EP24Z0036
About this file
The provided document is a Special Notice related to a federal contract opportunity for the Comprehensive Everglades Restoration Plan, Broward County Water Preserve Areas (BCWPA), Contract 2.1, C-11 Impoundment Land Clearing project in Broward County, Florida. The U.S. Army Corps of Engineers, Jacksonville District is holding a Site Visit/Industry Day event on June 17, 2024 to gauge interest and capabilities of potential contractors, including small businesses, for this requirement. The project consists of clearing and grubbing vegetation from the C-11 Impoundment area, with debris to be burned on-site or hauled off-site. Due to the organic muck soil conditions, specialized heavy equipment may be required. The contract also includes requirements for identifying and observing protected species. The estimated construction magnitude is between $10,000,000 and $25,000,000, with a small business size standard of $45 million. After work completion, all disturbed areas must be seeded.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024.06.17_FINAL - BCWPA Open Forum Slides.pptx | PPTX presentation |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CERP: Broward County Water Preserve Areas (BCWPA) project CNT 2, C-11 Impoundment and mitigation area a U.S. Army Corps of Engineers Jacksonville District
Agenda Welcome
Presentations Project Overview Engineering Procurement Strategy Small Business Opportunities Construction
Questions and Answers Event Schedule:
Day 1 – Site Visit and Presentation Meet at the Site Location: 10:00am - 12:30pm Travel and Lunch: 12:30pm – 2:30pm Overview Presentation: 2:30pm - 5:00pm Event Concludes: 5:00pm
Day 2 - Breakout Sessions Breakout Sessions (1 hour): 9:00am – 5:00pm Event Concludes: 5:00pm
Field Site Visit Location:
| Intersection: |
| SW 26th Street and Hwy 27 N |
| Weston, Florida |
Presentation and Breakout Session Location:
| SFWMD Field Station |
| Ft Lauderdale Joe Lopez Jr Conf Rm |
| 2535 Davie Access Rd |
| Plantation, FL 33317 |
Broward county water Preserve Areas Project overview Project Goals:
C-11 Impoundment is an ecosystem restoration project.
All three project features work together to reduce discharges of runoff from developed areas in western Broward County into Water Conservation Area 3 which flows to the Everglades National Park Reduce excessive seepage of water out of the Everglades to developed areas in western Broward County The project will improve fish and wildlife habitat including that of 5 federally listed species 563,000 acres in Water Conservation Area 3 and 200,000 acres in the greater Everglades will benefit from project implementation Project Key Information:
Chief’s Report – 21 May 2012 Authorized WRRDA 2014 PPA Signed August 2016
Broward County Water Preserve Areas C-11 Impoundment
Schedule Sources Sought: October 11, 2023 – November 3, 2023 Industry Day: November 7 – 8, 2023 Pre-Solicitation Conference: Spring 2024 Advertisement: April 2024 Construction Contract Award: September 2024
Impoundment Features 4,600 acre-ft area including the impoundment and mitigation areas 1,053 acres of above ground water storage, 4.7 ft above existing mean grade 400 acres of Mitigation Areas A 5 miles of Embankments
3.6 miles of Levee
6.5 miles of Canals 4,800 ft of Slurry Wall 12 Hydraulic Structures Environmentally Sensitive Area Avoidance Feature
Total cost of all C-44 construction features contract cost is $356M same as slide 6.
Broward County Water Preserve Areas Project location
BCWPA
C-11
IMPOUNDMENT
C-11 CANAL
MITIGATION AREA A
APPROXIMATE
LOCATION OF
CUT-OFF WALL
EMBANKMENT
APPROXIMATE
LOCATION OF
CUT-OFF WALL
SEEPAGE
CANAL
EMBANKMENT
SEEPAGE
CANAL
CULTURAL
RESOURCE
RING LEVEE
CULTURAL
RESOURCE
RING LEVEE
WCA
Tide
Total cost of all C-44 construction features contract cost is $356M same as slide 6.
CERP BCWPA CNT 2, C-11 Impoundment and Mitigation Area A Engineering Presented by: Lisa Ingram, Lead Engineer
OVERALL SITE PLAN
BUILDING STRONG®
D-511 Impoundment Dam Embankment Section
D-511 Impoundment Dam Embankment Section
L-511 and L-512 Levees Mitigation Area “A” Sections
CONSTRUCTION
CONSIDERATIONS
LIMITED ACCESS AND STAGING
Public access must be maintained to the west
SITE BOUNDED BY MARSH AND SURFACE WATER
GEOTECHNICAL/SUBSURFACE CONDITIONS
- Muck/Unsuitable Soils Blasting Limestone Rock Cofferdams and Dewatering
SPILLWAY
S-334E Spillway includes two bays, vertical lift roller gates and service bridge
CERP BCWPA CNT 2, C-11 Impoundment and Mitigation Area A
PROCUREMENT
Presented by: Ligaya Lowe, Contract Specialist
CERP BCWPA CNT 2, C-11 Impoundment & Mitigation Area A Contracting team
William Wallace, Contracting Officer Email: William.J.Wallace@usace.army.mil
Manuela D. Voicu, Contracting Officer Email: Manuela.D.Voicu@usace.army.mil
Ligaya Lowe, Contract Specialist Email: Ligaya.M.Lowe@usace.army.mil
ACQUISITION METHOD
FAR Part 15 - Contracting by Negotiation FAR 15.002(b) - Competitive Acquisitions Best Value Continuum Tradeoff Process (FAR 15.101-1) Factor 1 – Technical Merit Factor 2 – Past Performance Factor 3 – Small Business Participation Factor 4 – Price
TECHNICAL MERIT
The Government anticipates requiring offerors submit a Technical Approach Plan.
The plan shall detail, in a narrative format, how the offeror intends to approach, sequence, and execute the work from commencement to completion. It must include a description of related activities and include coordination with major subcontractors, and any other means and methods the offeror believes will give the Government confidence in their understand of the requirement as well as their ability to successfully complete the requisite work.
Factors to be evaluated
PAST PERFORMANCE
Offerors may be required to provide a minimum of three but not more than five examples of completed projects to demonstrate that offerors and/or their major subcontractors (if applicable) have experience:
| (a) successfully constructing a zoned earth embankment dam; | |
| (b) successfully constructing a cementitious cutoff wall; | |
| (c) successfully managing surface and subsurface water within a construction site | |
| (d) successfully constructing reinforced, cast-in-place, concrete water control | structures with operable gates. |
SMALL BUSINESS PARTICIPATION
It is expected that this factor will consist of:
Proposed Small Business Participation Plan Past Utilization of Small Business Concerns
All offerors, both other than small business and small business shall complete a Proposed Small Business Participation Plan.
Offerors shall identify the extent to which Small Businesses (SBs) will be utilized in the performance of this contract, by proposing goals for the Small Business Participation Plan. These goals shall demonstrate their best effort for small business participation.
PRICE
The Price Factor is not rated. It is evaluated for reasonableness.
Offerors are advised that their business decision to submit a low-priced proposal can be considered in assessing their understanding or the risk associated with their proposal.
In accordance with FAR 19.1307, if applicable, the price evaluation preference for HUBZone small business concerns will be used for this acquisition.
MILESTONES (Dates are estimates):
Pre-Solicitation Notice – Spring 2024 Advertisement – April 2024 Proposals Due – May 2024 Award Date – September 2024
Milestones
CERP BCWPA CNT 2, C-11 Impoundment and Mitigation Area A small business Presented by: Nicole Batista-Cruz, Small Business Specialist small business opportunities
Kimberly Daniel Ray, Chief for Small Business Programs Kimberly.S.DanielRay@usace.army.mil
Nicole Batista-Cruz, Small Business Specialist Nicole.M.Batista-Cruz@usace.army.mil
JAX Small Business Website:
https://www.saj.usace.army.mil/SmallBusiness/ small business opportunities
FAR 19.201(a) - Government policy It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. Such concerns must also have the maximum practicable opportunity to participate as subcontractors in the contracts awarded by any executive agency, consistent with efficient contract performance.
Small Business Participation Subcontracting Plan (Large Business concerns only)
DFARS 215.304(c)(i) - Evaluation factors and significant subfactors In acquisitions that require use of the clause at FAR 52.219-9, Small Business Subcontracting Plan, other than those based on the lowest price technically acceptable source selection process (see FAR 15.101-2), the extent of participation of small businesses to include service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns in performance of the contract shall be addressed in source selection. The contracting officer shall evaluate the extent to which offerors identify and commit to small business performance of the contract, whether as a joint venture, teaming arrangement, or subcontractor.
IAW FAR 19.201 ... This policy allows opportunity to socio- economic categories to include: SB, WOSB, HUBZone, SDVOSB, SDB Which also allow availability to SBA & PTAC with any SB concerns. While monitoring the maximum practicability opportunity.
IAW DFARS 215.304 -----ID other than LPTA source selection process…. Small Business Subcontracting Plan….extends the participation of socoi-economic categories shall be addressed in source selection …….Note that the evaluation factors & commitment weather by teaming agreement or joint venture or subcontractor shall be determined by contracting officer.
SMALL BUSINESS PARTICIPATION PLAN VS. SUBCONTRACTING PLAN
NOTE: Both are contractually binding.
These are two separate documents
Comply w/ the requirement in the solicitation which is in attachment #4 SBPP template
If you follow the template provided you will be in good standing
Subcontracting Plan again will only be utilized if you are a large business and not require your firm to refer back to the goals.
CERP BCWPA CNT 2, C-11 Impoundment & Mitigation Area A Small business / subcontracting
WHAT DOES MAXIMUM PRACTICABLE OPPORTUNITY (MPO) LOOK LIKE?
Breaking out contract work requirements Performing market research Solicit early and allow sufficient time to respond Mentor-protege program Advertising subcontracting opportunities on subnet Davis-Bacon prevailing wage rates is a FAR (contract) requirement Reach out to Procurement Technical Assistance Center (PTAC), SBA state, and Federal small business offices for assistance
Small business / subcontracting Trucking (hauling) Earthwork (GPS based Excavation) Earthwork (Processing & Screening) Dewatering (Surface & Sub-Surface Water Management) Clearing & Grubbing (Tractors & Bushhogs, etc.)
Concrete & Rebar Welding
Metal Fabrication Electrical work (Electricians) General Laborers (Skilled & Unskilled) Heavy equipment operators (crane, dozers, excavators, etc.)
Site Security Environmental Monitoring Material Testing
POTENTIAL OPPORTUNITIES EXIST:
Small business / subcontracting
MARKET RESEARCH - SAM.gov:
How can small businesses search for subcontracting opportunities?
Interested Vendors List
Contracts Awarded
PROCUREMENT ASSISTANCE
SBA Resources Business Opportunity Specialist Procurement Center Representative
Marketing Resources Contract Opportunities on SAM.gov Contract Data on SAM.gov System for Award Management Dynamic Small Business Search System Subcontracting Networking System (SubNet)
Other Resources USASpending GSA Subcontracting Directory DoD Prime Contracting Directory
CERP BCWPA CNT 2, C-11 Impoundment and Mitigation Area A Construction Presented by: Nestor Rivera, Miami Area Engineer
Contract will require compliance with the EM 385-1-1 Safety and Health Requirements Manual and contract section 01 35 26 Governmental Safety Requirements Qualified Site Safety Health Officers with demonstrated safety experience Accident Prevention Plan Work is not allowed to start until plans are approved and the 3-phase system for associated definable feature of work (DFOW) has been conducted Activity Hazards Analysis for each DFOW and other major activities must be submitted and approved prior to start work Traffic Control and Hauling Plans Project site has shared roads for project access Mandatory weekly toolboxes and Monthly Supervisors Safety meetings Safety to be documented daily Mandatory use of Deficiency tracking system for Safety
Safety requirements
Contract will include section 01 45 04 Contractor Quality Control and 01 45 00 Resident Management System and 01 45 08 Data Management and Data Requirements.
Contractor Quality Control Plan Accident Prevention Plan Work is not allowed to start until plans are approved and the 3-phase system for associated definable feature of work (DFOW) has been conducted Qualified Quality Control Manager with CQM-C certification and demonstrated experience.
Three Phase Control System USACE Validated laboratory for QC Testing QC documentation and daily reports
Quality requirements
Contract duration is established in Contract clause 52.211-10, Commencement, Prosecution, and Completion of Work Contract duration will commence once NTP is issued Contract includes section 01 32 01 Project Schedule Qualified Project scheduler must be submitted for approval Submit Preliminary Project Schedule (PPS) for the first 90 days within 15 days after NTP Submit Initial Project Schedule (IPS) within 42 days after NTP IPS must be developed utilizing Standard Data Exchange Format (SDEF) codes for Resident Management System (RMS) transfers Submit Schedule of Values (SOV) along with the IPS Work cannot start until key preconstruction submittals are approved Monthly Periodic Schedule Updates
Schedule requirements
Administrative procedures are outlined in contract section 01 30 00 Preconstruction conference Preconstruction conference submittals Submittal Register Coordination Meeting Weekly Progress Meetings Coordination with other contracts Do not anticipate starting work without having preconstruction submittals approved and 3-phase control system started
ADMINISTRATIVE PROCEDURES
DRAFT
image4.png image5.png image11.png image12.png image13.png image14.svg C - 11 Impoundment Seepage Management Area (SMA) C - 9 Impoundment image15.jpeg image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.jpeg image28.png image29.png image30.png image31.png image32.png image35.png image36.jpg image33.png image34.png image37.jpg image38.png image39.png image40.png image41.jpg image42.png image1.png image2.png image3.png image9.png image10.png
File details come from the government source that posted it. Updated .