B.08 W912EP24R0008 (AMENDMENT 0003) 12APR2024.pdf
PDF 990 KB Posted
- Solicitation number
- W912EP24R0008
About this file
This document is an amendment to a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for design-build and general construction projects within the boundaries of the U.S. Army Corps of Engineers (USACE), South Atlantic Division. The purpose of this MATOC is to provide a readily available contract vehicle to support the Jacksonville District's construction, renovation, and repair requirements for civil works and military projects over the next five years.
Key details include:
- This is a two-phase procurement, with Phase I evaluating past performance and technical approach, and Phase II evaluating design technical/schedule and price.
- The government intends to award up to five IDIQ contracts as a result of this procurement.
- The scope includes new construction, demolition, renovation, and repairs for various facility types located on federal, state, municipal, and private lands, as well as within waterways and coastal zones.
- The total capacity of all task orders issued under the MATOC will not exceed $80 million.
- This is a 100% small business set-aside solicitation under NAICS code 236220.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B.08 W912EP24R0008 (AMENDMENT 0002) 10APR2024.pdf | ||
| B.08 W912EP24R0008 (AMENDMENT 0001) 22MAR2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Aw ard Task Order Contract (MATOC) For Design-Build and General Construction Projects Within the Boundaries of the U.S. Army Corps of Engineers (USACE), South Atlantic Division
A. See Continuation Sheet for Amendment details.
B. The proposal due remains unchanged.
C. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 45
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP24R0008
X 9B. DATED (SEE ITEM 11)
19-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Apr-2024
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EP24R0008 Amendment 0003
SF 30 CONTINUATION SHEET
INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD TASK ORDER CONTRACT
(MATOC) FOR DESIGN-BUILD AND GENERAL CONSTRUCTION PROJECTS WITHIN THE
BOUNDARIES OF THE U.S. ARMY CORPS OF ENGINEERS (USACE), SOUTH ATLANTIC DIVISION
Amendment 0003
SUMMARY OF CHANGES
1. GENERAL:
A. In Volume 1 sections, the text changes have been updated with additions noted by green colored text and deletions noted by line/cross-outs and/or red text and pertain only to changes made by this amendment. For certain sections, the entire section is replaced if there is any change.
B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.
2. SOLICITATION AND SPECIFICATIONS:
VOLUME 1 OF 2:
DELETE Section 00100A and REPLACE with the attached Section 00100A.
DELETE Section 00100B and REPLACE with the attached Section 00100B.
VOLUME 2 OF 2:
None
(End of Summary of Changes)
W912EP24R0008
W912EP24R0008 Amendment0003
Section 00100A – PHASE I
INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS
PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION
1. Overview
1.1. The purpose of this acquisition is to provide a readily available contract tool that will enable the Jacksonville District
Operations Department to proactively and responsively provide Design Build (DB) and General Construction, renovation, and repair requirements identified within the District. Task Orders placed under this MATOC include various types of construction, but not limited to new builds, demolition, renovation, and repairs related to civil works and military projects within U.S. Army Corps of Engineers (USACE), Jacksonville District (SAJ). The support for civil works projects will encompass all types of facilities such as commercial, industrial, military, logistical, or any other types where general construction trades and practices are typically used in the construction, renovation, expansion, and repairs. Facilities may be located within private lands, within federal, state, municipal, territorial/Indian Lands, within waterways and bodies of water, within the contiguous coastal zones to a depth of 12 feet, or on and around levees and water control features. The support for civil works projects will include environmental restoration, flood control, erosion control, bridges, paving and drainage, culvert work, grading, canals, levees and dams, industrial controls, waterway lock and spillway controls, geotechnical work to include piling and foundations, utility systems, and monitoring stations. Project sponsors may be military, other government agencies, organizations, or entities for whom USACE is assigned as the Construction Agent. Tasks may involve industrial process equipment, industrial ventilation systems, building and industrial controls, water control structures, and energy management systems. The Government intends to establish a Multiple Award Task Order Contract (MATOC) to a pool of contractors to provide General Construction and Design Build (DB) services as stated herein.
1.2. This contracting effort ensures that the Jacksonville District will be able to support its relevant construction needs over the next five (5) years. The Government will evaluate the proposals in accordance with the criteria described herein.
2. Basis For Award
2.1. This is a two-phase procurement, and the basis of award is the Best Value Trade-Off Process. Potential offerors are invited to submit the information described in this section for review and evaluation by the Government. Following completion of the evaluation of Phase I, up to a maximum of five most highly qualified offerors will be selected to participate in Phase II. It is the intent of the Government to award a target of five base IDIQ contracts as a result of this procurement. The Government is not obligated to award an IDIQ contract to all Offerors competing in Phase II.
2.2. The selected offerors for Phase II will be invited to submit the information described in Section 00100B, Procedures for Submittal of Offers for Phase II, for review and evaluation by the Government. Site visit information (if held) will be provided during Phase II.
2.3. Following completion of the Phase II evaluation, the Contracting Officer intends to award five IDIQ contracts to the responsible offerors whose proposals conform to the solicitation, are fair and reasonable, and offers the best overall value to the Government, all factors considered. It is anticipated that a seed project will also be awarded as a result of this solicitation. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
3. Submittal of Offers
3.1. Who May Submit. Any legally organized Small Business Offeror qualified and eligible to receive an award under applicable laws and regulations.
3.1.1. Contractor Team Arrangements.
W912EP24R0008 AM0003
3.1.1.1. Recognition of Contractor Teams. In accordance with FAR subpart 9.6, it is Government policy to recognize the integrity and validity of contractor team arrangements. For a teaming arrangement to be recognized for purposes of source selection evaluation and the application of non-price factors and sub-factors, there must be full disclosure of the teaming arrangement and company relationships in the team's proposal. The proposal must include a narrative that explains the major or critical aspects of the work to be performed by each team member. For joint venture teams, the proposal must also include an agreement that has been or will be executed prior to award between/among all team members.
3.1.1.2. Joint Venture Team Agreement. The teaming agreement submitted with the proposal will govern the performance of the work by the joint venture. The agreement must address the following items:
identification of team members, a delineation of roles and responsibilities of team members, the duration of the agreement, and the percentages of the participants including the controlling party. The timely submission of the executed teaming agreement prior to award shall be a precondition to a finding of responsibility.
3.2. General Proposal Submission Requirements. To ensure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. The Offeror shall submit in the proposal all requested information specified in this section of the
Request for Proposal (RFP) solicitation at or before the exact time specified. Failure to meet a requirement will result in an offer being ineligible for award. Copies of the RFP are available by INTERNET ACCESS ONLY. All RFP documents will be made available for viewing at the Sam.gov website (https://sam.gov). All Solicitation Amendments will be made available for viewing in Sam.gov. It shall be the Offeror’s responsibility to check the website for any
Solicitation Amendments.
The Contracting Officer (KO or PCO) has determined there is a reasonable probability of adequate price competition in this acquisition. Upon examination of the initial offers, the KO will review this determination and if, in the KO's opinion, adequate price competition exists, no additional cost information will be requested and certification under
FAR 15.406-2 will not be required. However, if at any time during this competition, the KO determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the KO to determine the reasonableness and affordability of the price. The Government will evaluate all proposals pursuant to FAR 15.305. Offerors are advised that, pursuant to FAR 15.306, the Government reserves the right to eliminate any or all offers from consideration for award at any time prior to award of the contract. Therefore, each initial offer should contain the Offeror’s best terms from a technical and price standpoint. The Government reserves the right to discuss aspects of proposals with Offerors in the competitive range, if a competitive range is deemed necessary, upon completion of the evaluation. Offerors are advised that the Government may make award without discussions, clarifications or any contact concerning the proposals received. Offerors shall not assume that they will be contacted or afforded an opportunity to clarify, discuss or revise their proposals.
If an Offeror believes that the requirements in these instructions contain an error, omission or are otherwise unsound, the Offeror shall immediately notify the Contracting Division by submission through ProjNet with supporting rationale. Questions or other Requests for Information (RFI) shall be submitted via ProjNet (See Section 2.2.1).
Offerors are cautioned that “parroting” of the Technical requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
3.2.1. Inquiries.
3.2.1.1. Interested parties with technical inquiries shall submit their inquiries in writing via “Bidder Inquiry” in
ProjNet at https://www.projnet.org/projnet. The bidder inquiry key is WHYXAZ-Z3HNU4. The
Government reserves the right to decline addressing certain questions. Further, no questions, unless in the
Government’s interest, will be answered any later than 5:00 p.m. on the stated deadline for responses to this announcement. All questions and answers will be made via ProjNet. Official amendments to the RFP will be posted on Sam.Gov. All Offerors are encouraged to register on ProjNet for alerts to stay abreast of Q&A’s that are posted in reference to this solicitation. Only self-registered users on ProjNet can submit
& review inquiries.
3.2.2. Electronic Proposals.
The Offeror’s bid/proposal shall be submitted electronically in PDF format, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks in proposals are prohibited. The offeror’s proposal is due no later than the time specified in block 13 of the SF1442.
NOTE: The only authorized transmission method for offers in response to this solicitation is electronically via
Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. NO OTHER TRANSMISSION
METHODS (EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
As stated above, the Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall submit their proposals using the following link:
https://piee.eb.mil/
3.2.2.1. INSTRUCTIONS FOR SUBMITTING ELECTRONIC BIDS:
In an effort to reduce paperwork and cost, all bids shall be submitted electronically through the PIEE site.
Submission shall be in Adobe PDF format.
Electronic submission sent via facsimile will not be accepted. Hand carried delivery or USPS/UPS/Fedex delivery of hard copies and/or CD-ROMs is not authorized. Submissions that are received after the submission time requested will be considered late and as such will be processed in accordance with FAR
15.208.
3.2.2.2. INSTRUCTIONS TO FOLLOW TO GAIN ACCESS TO THE WEBSITE:
Web Based Training for registration and proposal submission is available as a separate portal on the main page of the site or by visiting:
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml.
Although you can search, review, and open non-restricted solicitations without logging in, you must establish a personal account in the system and register for the Proposal Manager role before you are able to submit a proposal. This account is activated by your Contractor Administrator (CAM).
Instructions for registering are as follows:
a. Navigate to https://piee.eb.mil/
b. Select Register [top right]
c. Select Vendor
d. Create a User ID and Password and follow the prompts [next]
e. Create Security Questions [next]
f. Complete your User Profile Information [next]
g. Complete your supervisor or Approving Official Information. This official will act as the
CAM who will ultimately approve your account. If you are unsure of who this is, please go to: https://piee.eb.mil/xhtml/unauth/lookup/gamLookup.xhtml to locate the CAM for your company for assistance. [next]
h. Complete Roles:
a. Step 1. Select SOL-Solicitation,
b. Step 2. Select Proposal Manager,
c. Step 3. Click Add Roles,
d. Step 4. Fill in your Location Code (CAGE Code) [next]
i. Provide a justification for your registration [next]
VERIFY ACCOUNT STATUS/CAPABILITIES. Once the Proposal Manager account has been approved, verify that your account is showing active under the profile page. Also, once you click on the specified solicitation, verify that the “Offer” tab is visible next to the “Solicitation” tab at the top of the page. The proposal will be submitted through the “Offer” tab. It is imperative that this is verified early in the process to mitigate any potential problems with the submission of your proposal.
3.2.2.3. INSTRUCTIONS TO FOLLOW ON THE PIEE WEBSITE FOR OFFER SUBMISSION:
In order to submit through the Solicitation Module in PIEE, you must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.
To upload the proposal in Solicitation module in PIEE:
a. Ensure you have an active role as with the Proposal Manager in PIEE.
b. Log into PIEE at https://piee.eb.mil/ to access the Solicitation Module.
c. Select Solicitation icon.
d. At the Home screen of the Solicitation Module, select the Search link to find the solicitation you intend to post an offer against.
e. In the Solicitation Search Criteria filter by entering the complete solicitation number and for
Status, select Open, then click Search.
f. When search results display, select the solicitation number link to open the solicitation.
g. The solicitation displays, with information as view only.
h. To post the offer, click the Offer tab.
i. Click the Add button to add an offer to the solicitation.
j. Select the applicable CAGE Code for which you are submitting the offer. The list is prefiltered based on the CAGEs in the Proposal Manager’s profile.
k. Click on the Choose Files link to upload attachments that comprise your offer.
l. Enter Signature Date and click Signature button after entering all necessary information.
m. Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and One Time
Password (OTP). Click the Sign and Submit button to continue.
n. After successfully adding the Offer a success message of the submission will be displayed providing confirmation of on-time/late proposal receipt.
3.2.3. File Size Limitations. Offerors are advised if needed, to break the files down into smaller sections in order to upload and email. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
3.2.4. File Names. To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention: Each filename shall begin with the solicitation number, followed by the word “RESPONSE”, followed by your firm’s name, and finally a brief file description.
EXAMPLES:
“W912EP24R0008 RESPONSE Firm’s Name Phase I Volume I.pdf”
“W912EP24R0008 RESPONSE Firm’s Name Phase I Volume II.pdf”
“W912EP24R0008 RESPONSE Firm’s Name Phase II Volume I.pdf”
“W912EP24R0008 RESPONSE Firm’s Name Phase II Volume II.pdf”
3.2.5. File Organization, Formatting, and other instructions. Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 12 or larger. Pages shall be letter sized--larger page sizes (such as 11x17 foldouts, etc.) will be counted as two pages. Offerors shall prepare proposals in the English language. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor. Electronic files shall be in their native format (i.e., doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. If the electronic files are of a size at which they must be compressed (zipped), they shall be compressed into one zipped folder using WinZip version 6.2 or later. Self- extracting exe files will not be accepted.
3.2.6. Upload Completion & Deadline. For the purposes of establishing whether a bid submission is considered timely, the government considers the date and time the submission is completely uploaded into the PIEE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.
The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive bids. Offerors are responsible for ensuring that bids are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the bid to be received in accordance with the instructions provided.
4. General Proposal Format for Phase I
The Government is using a two-phase procurement approach for this design/build project. For Phase I, offerors are required to submit a proposal consisting of the information identified in paragraphs below. Proposal sections should parallel the submission requirements identified herein.
4.1. Volume I for Phase I shall include the following information:
PHASE I – VOLUME I
Location Description Page Limit
Title Page Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
Table Contents 1
Tab A Standard Form 1442; The SF1442 shall be completed and signed, including acknowledgement of all amendments, by authorized individual of the Offeror. Offers submitted in the name of a Joint
Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
No Limit
Tab B Proposal Data Sheet (Attachment 1) 1
Tab C Section 00101 Representations and
Certifications
No Limit
Tab D Teaming/Joint Venture Agreements
(if applicable)
No Limit
Tab E Evidence of Ability to Obtain
Bonding & Proof of Financial
Ability:
No Limit
➢ Submit proof of Financial
Ability (Most recent financial statement covering assets and liabilities).
Include the name, address, and telephone number of the offeror’s banking institution. If the offeror is a joint venture, submit this information for each joint venture member.
➢ Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
➢ The offeror is not required to submit a bid bond in
Phase I, but is required to submit a letter, from the contractor’s surety validating the Offeror’s bonding capability and a power of attorney if applicable. Any letter found to be insufficient may affect an Offeror’s responsibility determination.
PHASE I – VOLUME II
Title Page Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
Table of Contents 1
Tab F Teaming/Joint Venture Agreements
(Duplicate of Volume I if applicable)
No Limit
Tab G FACTOR 1 – Past Performance for
Prime Contractor and A/E Firm of
Record
23 (PPQs and supporting CPARS are not included in the page count)
Tab H FACTOR 2 – Technical Approach for Design/Build
NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted which exceeds the specified limit will not be evaluated. If an applicable tab is not submitted the proposal will not be evaluated.
5. PHASE I – VOLUME II – Tab G – FACTOR 1: Past Performance for Prime Contractor and A/E Firm of Record
5.1. Submission Requirements
5.1.1. The Offeror shall demonstrate a record of construction performance and experience on recent and relevant projects using the Past Performance Questionnaire Summary Sheet, Attachment 2, and the Past Performance
Questionnaire (PPQ), Attachment 3 at the end of this section. PPQ is provided for the Offeror to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients to ensure timely submittal of completed questionnaires. If the offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ and submit it with the proposal. Please note that, at a minimum, this first page of the PPQ must contain sufficient information for the government to determine the relevancy of the project. In addition, this will provide contract and client information for the respective project(s). The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available.
Offerors are cautioned that the information submitted pertaining to a project shall be limited to the
PPQ form and an additional page referenced below and shall contain enough information to determine the recency and relevancy of a project. Likewise, Project Information submitted in a format other than or in lieu of the PPQ format (to include CCASS /ACASS/CPARS) will not be considered. If available, an
Offeror may include a completed CPARS in addition to the PPQ but not in lieu of. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other solicitations.
Offerors may submit PPQs submitted on other procurements provided they are on the NAVFAC/USACE
Past Performance Questionnaire Form.
Offerors may attach one (1) additional single-sided page (per PPQ) to further describe how the project is relevant to the RFP requirements. The following items shall be able to be derived from either the PPQ or the additional page:
a) Project Title, Contract Number, and Location.
b) Current percentage of construction complete and when it was or will be completed. If project is not yet complete, provide a description of work remaining to be completed.
c) Scope of the project, to include purpose/use of facility.
d) Size of the project (sq ft). Differentiate square footage of new construction versus renovation if the project includes both.
e) Role of firm; provide a description of type of work performed and percentage of work self-performed.
f) Dollar value of the project. List award and final including explanations for cost increases over 10%.
g) Award date, original Construction Completion Date (CCD) and explanations for schedule growth over 10%.
h) Whether the project was design/build (indicate designer of record) or design/bid/build.
i) Customer Primary Point of Contact and alternate POC (name, relationship to project, agency/firm affiliation, city, state, current and correct phone number, and current and correct email address).
In addition to the PPQ, the Offeror’s proposal shall include the Past Performance Questionnaire Summary
Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet shall include information for all columns.
If the offeror is a joint venture, the submitted projects may have been performed by the joint venture itself or by a member of the joint venture, subject to the requirements found in Sections 4.1.5 and 4.1.6.
Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer.
Ensure that the PPQs submitted for this Factor clearly describe the relevant characteristics of the project.
5.1.2. Submission Requirements for the Prime Offeror (Construction Offeror):
5.1.2.1. The Prime/Construction Offeror must submit a minimum of five (5), but no more than seven (7), substantially complete or completed projects as the prime contractor within the last seven (7) years which are relevant to the work described in the scope of this contract. These projects must be submitted using the Company Specialized Experience Form (Attachment 9). Additional consideration will be given for projects that were design-build. If an Offeror submits more than seven (7) total project examples, only the first seven (7) will be evaluated. (See following paragraphs.) The
Prime/Construction Offeror must demonstrate that they have experience with accomplishing the following (offerors may not rely on the experience of the subcontractors proposed for this contract):
At least three (3) projects demonstrating vertical construction of buildings in high velocity wind zones.
Additional consideration given towards ICC 500 storm shelter design and construction experience.
OR
At least three (3) projects demonstration civil works construction of water control structures.
The remaining projects submitted can be of the Offeror’s choice; provided they demonstrate strong experience with the types of projects described above.
5.1.2.2. Recency. All projects submitted for the Prime/Construction Offeror must be substantially completed within the last seven (7) calendar years prior to the issuance of this solicitation.
5.1.2.3. Relevancy. Projects submitted for the construction contractor shall have an awarded value of at least
$3,000,000 and be for new construction or renovation/construction with minimal incidental or associated work.
5.1.3. Submission Requirements for the A-E Firm of Record:
5.1.3.1. The A-E Firm of Record shall submit a minimum of five (5), but no more than seven (7), substantially complete (100% design progress completed and at least 50% construction completed) projects within the last seven (7) years which are relevant to the work described in the scope of this contract. Do not include
Company Specialized Experience Form (Attachment 9) for consultants. These projects must be submitted using the Company Specialized Experience Form (Attachment 9). If an Offeror submits more than seven
(7) total project examples, only the first seven (7) will be evaluated. The proposed A/E firm must have been the Firm of Record on the submitted project. (See following paragraphs.)
At least three (3) projects demonstrating vertical construction of buildings in high velocity wind zones.
Additional consideration given towards ICC 500 storm shelter design and construction experience.
OR
At least three (3) projects demonstration civil works construction of water control structures.
The remaining projects submitted can be of the Offeror’s choice; provided they demonstrate strong experience with the types of projects described above.
5.1.3.2. Recency. All projects submitted for the A-E Firm of Record must be substantially completed within the last seven (7) calendar years prior to the issuance of this solicitation.
5.1.3.3. Relevancy. Projects submitted for the A-E Firm of Record shall have an awarded value of at least
$150,000 and be for new construction or renovation/construction with minimal incidental or associated work.
The proposed A/E firm must have been the Firm of Record on the submitted projects. The role and responsibilities as the Firm of Record must be identified for each project. Identification of more than one
(1) design firm will result in an evaluation based on the least qualified firm. Indicate any previous working relationship with the prime contractor. All PPQ's or CPARS submitted for the Firm of Record must be for that entity and describe / evaluate their performance on that project.
Projects shall demonstrate the same or similar type of work and complexity to those described in this solicitation. Projects completed outside the Continental United States (OCONUS) must also demonstrate similar construction techniques and standards as CONUS projects.
5.1.4. Projects with an award value less than the values stated herein will not be considered. It is the Offeror’s responsibility to provide sufficient detail to clearly demonstrate the relevancy of all submitted projects.
5.1.5. For recognized contractor team arrangements, Offerors shall submit at a minimum:
• A minimum of one relevant projects from each member of the joint venture.
NOTE: Offerors remain responsible to adhere to the minimum and maximum number of projects stated herein. The Government will review projects in the order they appear in the proposal, and those projects submitted beyond the maximum limitations specified in this factor will not be evaluated.
5.1.6. Mentor-Protégé Joint Ventures and Service-Disabled Veteran-Owned Joint Ventures: Offerors submitting a proposal as a Mentor-Protégé Joint Venture must demonstrate the partners to the joint venture in the aggregate have the ability to meet all minimum requirements set forth in the solicitation. All members of joint ventures submitting proposal portions must adhere to all requirements set forth in this factor including those in sections 4.1.1 and 4.1.5. However, if submitting a project for a Protégé and Service-Disabled Veteran members of approved joint ventures the following project relevancy requirements are in effect:
Projects submitted for the construction contractor (if a protégé firm) shall have an awarded value of at least $3,000,000 and meet all other requirements stated herein.
Projects submitted for the AE/DOR Firm of Record (if a protégé firm) must have an awarded value of at least $150,000 and meet all other requirements stated herein.
5.1.7. Additional consideration may be given for projects that demonstrate experience with any of the following elements:
a) Design/Build projects. For the seed task order, vertical construction and ICC 500 storm shelter design experience is desired.
b) Established, working relationship with the proposed DOR Firm of Record (or Prime /
Construction Offeror in the case of the A-E DOR Firm of Record) on prior Design/Build projects.
c) Above Satisfactory Performance Record on Very Relevant projects
d) Relevant experience with Federal (e.g., DoD, VA, USACE) Design/Build Criteria (i.e., AT/FP, UFC, Specs Intact, United Facilities Guide Specifications)
e) Additional consideration may be given to offerors who self-perform.
5.1.8. Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance and experience. These other sources may include but are not limited to, past performance and experience information retrieved through the Past Performance
Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System
(CPARS), using all CAGE/UEI numbers identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
5.1.9. While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
5.1.10. The Government will only consider past performance of affiliates of the Offeror and those entities in a teaming agreement, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors if the resources of those affiliates will have a direct impact on the performance of this contract. If relying on affiliate past performance, it is the Offeror’s responsibility to clearly demonstrate any such direct impact on performance. For the Past Performance factor only, the Government will consider projects submitted for the DOR Firm of Record if a letter of commitment (Attachment 7), or teaming arrangement, is provided with the proposal.
5.2. Evaluation Criteria
5.2.1. Past Performance Evaluation: The past performance and experience evaluation results in an assessment of the
Government’s confidence in the ability of the Offeror to meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance and experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the
Offeror’s recent past performance and experience, focusing on performance and experience that is relevant to the contract requirements.
5.2.2. Recency and Relevancy Evaluation: In assessing recency and relevancy, the SSA will first determine whether the project was completed within five seven years of the date of the solicitation. If it is, the project will be considered recent. In assessing relevance, the SSA will compare the scope, magnitude, and complexity of the submitted projects against that of the scope of work in this statement of work. The SSA will assign a rating of either Very Relevant, Relevant, Somewhat Relevant, or Not Relevant, to each project, according to the definitions in Table 1, below.
Table 1. Past Performance Relevancy Method
Adjectival Rating Description
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
5.2.2.1. Offerors may increase the Source Selection Evaluation Board’s (SSEB) level of confidence by demonstrating previous projects where the Offeror and the design firm(s) proposed in this factor worked together to complete a project with at least satisfactory results.
5.2.3. Confidence Assessment:
5.2.3.1. After assessing the recency and relevancy of the offeror’s submitted projects, the SSA will evaluate the quality of the Offeror’s performance on those projects. It will do this via multiple methods, including verifying the performance ratings on the submitted PPQs; reviewing information contained in the CPARs and other Government Databases, and utilizing any other source of information about the offerors performance that is permitted by this solicitation.
5.2.3.2. A combined assessment of the recency, relevance, and quality of the offeror’s submitted projects will result in a performance confidence rating according to the definitions noted in Table 2 below.
5.2.3.3. Offerors may increase the SSEB’s level of confidence if they are able to demonstrate successful performance in a wide variety of work as described in this RFP. Conversely, the SSEB may have a decreased level of confidence in Offerors whose past performance is limited amongst the project types described in this RFP. Offerors may increase the SSEB’s level of confidence if they submit more than three Design-Build projects.
5.2.3.4. The Government will evaluate the Offeror's past performance and experience using the sources available to it including, but not limited to, the example projects identified by the Offeror and submitted on the
PPQs and any additional information received from references and CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the
Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.
5.2.3.5. If no recent/relevant performance record is available or the Offeror’s performance record and experience is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Unknown Confidence” (Neutral).
Table 2. Past Performance Confidence Ratings
Adjectival Rating Description
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
6. Phase I – VOLUME II – Tab H – FACTOR 2: Technical Approach for Design Build
6.1. Submission Requirements
6.1.1. Provide a narrative that describes the offeror’s philosophy and intended technical approach for executing design-build projects. Increased consideration is given for design-build, ICC 500 storm shelter design and construction, and industrial system design and construction. Clearly and concisely describe the offeror’s Design-Build team, and how the team will work collaboratively to ensure timely, quality completion of the project. The Technical
Approach narrative shall address the information described in paragraphs 6.1.1.1. & 6.1.1.2. below:
6.1.1.1. Roles and Responsibilities: Describe the roles and responsibilities of the offeror’s Design-Build team and how their resources will be utilized in order to deliver a design-build project. Describe the proposed management structure for the Design-Build team (i.e., key members), explaining how the design and construction process will be managed throughout the entirety of the project life cycle (e.g., Design -
Review Process, Fast Track, etc.), Construction – Subcontractor Management, Commissioning, etc., Close-out – As Built, O&M Manuals, etc.
6.1.1.2. Communication Plan: Describe interactions and communications both within the Design-Build team and with the Corps of Engineers throughout the entirety of the project life cycle.
NOTE: There is a page limit of twenty (20) single-sided, 8.5” x 11” pages, using a minimum font size of 12 and a minimum margin of one-half inch on all sides, for the Technical Approach for Design/Build Factor.
6.2. Evaluation Criteria:
6.2.1. The Government will review and identify the strengths, weaknesses, and any deficiencies in the proposal. The
Government will evaluate the proposal based on the offeror’s understanding of the USACE Design/Build process and how well it has demonstrated its ability to successfully execute design-build projects. Offerors are encouraged to tailor their proposal to demonstrate their approach for successfully completing work under this
MATOC.
6.2.2. The Government will evaluate the offeror’s understanding of the design process and the roles of the designers of record, construction firm, and the Government reviewers. The evaluation will be based on how well the offeror demonstrates their organizational (i.e., the structure and staffing) ability to execute design/build projects, to include the integration of the design and construction firms during design and construction. Proposals demonstrating that construction personnel will be actively involved in the design process may be viewed more favorably by the SSEB. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including its key roles during construction.
6.2.3. The Government will evaluate the offeror’s capabilities and understanding of the contractually required quality control processes for both design and construction, as well as the strength of the offeror’s proposed approach to control and track revisions to the design. The Government places value upon continued participation by the designers of record during the construction quality control process.
Table 3: Technical Approach for Design/Build Rating Method:
Technical Assessment Ratings
Color Rating
Adjectival
Rating
Description
Blue Outstanding
Proposal demonstrates an exceptional approach and understanding of the requirements, contains multiple strengths and/or at least one significant strength.
Purple Good
Proposal demonstrates a thorough approach and understanding of the requirements and contains at least one strength or significant strength.
Green Acceptable
Proposal demonstrates an adequate approach and understanding of the requirements.
Yellow Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements.
Red Unacceptable
Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is un-awardable.
SECTION 00100B – PHASE II
***SECTION 00100B IS ISSUED FOR INFORMATION PURPOSES ONLY AND IS SUBJECT TO
CHANGE***
INSTRUCTIONS, CONDITIONS, AND NOTICE TO OFFERORS
PHASE II SOLICITATION PROVISIONS
NOTES:
• PHASE II IS NOT REQUIRED UNDER PHASE I OR THE INITIAL PROPOSAL. SUBMISSION
OF PHASE II IS ONLY FOR THE OFFERORS SHORT LISTED ON PHASE I. THE OFFERORS
WHO ARE SHORT LISTED UNDER PHASE I WILL BE NOTIFIED BY THE CONTRACTING
OFFICER TO SUBMIT PROPOSALS FOR PHASE II.
• THE PHASE II CRITERIA MAY BE SUBJECT TO CHANGE PRIOR TO THE SUBMISSION OF
THE PHASE II SOLICITATION.
1. Submittal of Offers:
Who May Submit: Those Offerors short-listed in Phase I are invited to submit a Phase II proposal, as indicated below. The Phase II evaluation will be conducted in accordance with FAR Part 15. The
Government will evaluate the proposals for Phase II based on the Tradeoff process, developed in accordance with FAR Part 15.101-1.
2. Packaging the proposal for Phase II
The Offeror will submit the Phase II Proposal through PIEE as detailed in Section 00100A, Paragraph 2.2 above.
3. General Proposal Format for Phase II
The Government is using a two-phase procurement approach for this design/build project. For Phase II, offerors are required to submit a proposal consisting of the information identified in paragraphs below.
Proposal sections should parallel the submission requirements identified herein.
3.1. Submissions for Phase II shall include the following information:
PHASE II – VOLUME 1
File Electronic Submission
Requirements
Page Limit
Title Page Include the title of the solicitation, solicitation number, offeror name, and date of the submittal
Table of Contents 1
Tab A Standard Form 1442; The
SF1442 shall be completed and signed, including acknowledgement of all amendments, by authorized individuals(s) of the Offeror.
No Limit
Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
Tab B FACTOR 4: Line Items and
Pricing Schedule, Section
00100A
No Limit
Tab C Proposal Data Sheet
(Attachment 1, above)
Tab D Teaming/Joint Venture
Agreements (if applicable)
No Limit
Tab E Bid Bond No Limit
Tab F Determination of Responsibility
(Attachment 4)
No Limit
PHASE II – VOLUME II
Title Page Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
Table of Contents 1
FACTOR 3 Design Technical and Schedule for Seed Project
Tab G Element 1: Organization And
Technical Approach
10 (resumes do not count against page limit)
Tab H Element 2: Design Analysis and
Construction Approach
Tab I Element 3: Proposed Project
Summary Schedule
4. PHASE II – VOLUME II – FACTOR 3: DESIGN TECHNICAL AND SCHEDULE FOR SEED
PROJECT
4.1 GENERAL: The design-technical Factor consists of conceptual level presentation drawings, technical approach narratives and information regarding material and system quality. It must clearly define the proposed scope and quality levels that the design-build team is offering to the Government in enough detail for the
Government and the Offeror to mutually understand whether the proposal meets or exceeds the minimum
Solicitation requirements. Fully developed drawings, details, or specifications are not desired or required.
4.2 PHASE II – VOLUME II – TAB G – ELEMENT 1: ORGANIZATION AND TECHNICAL
APPROACH
4.2.1 SUBMISSION REQUIREMENTS FOR ELEMENT 1
4.2.2 Provide information that describes the offeror’s organization and intended technical approach to executing the design-build contract per the detailed requirements herein. Concisely and clearly, describe the organizational and technical approach to project management and execution.
4.2.3 Organization: Describe the roles and responsibilities and any contractual arrangements between firms involved in the proposal. Identify the design firm(s) chosen, if not to be self-performed. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. The Offeror shall document unequivocal teaming arrangements with its design firms(s) using the format in (Attachment 7). Include an organizational chart illustrating the organization, including key personnel and the proposed quality control group(s). The chart shall depict the key positions and names of personnel, their firm affiliations and their job locations (function or physical location?), their job/position title within the organization.
This is the start of the file's text. The full file is on GovTribe.