Pre-Proposal Conference W912EP24R0006 IDC Geotechnical 3JAN24.pptx
PPTX presentation 2 MB Posted
- Solicitation number
- W912EP24R0006
About this file
This document provides details for a federal solicitation seeking an indefinite delivery contract for geotechnical core drilling and laboratory testing services. The U.S. Army Corps of Engineers, Jacksonville District will award a single-task order contract for up to $15 million over five years to provide geotechnical design, core drilling, laboratory testing, and hydrogeological investigation and study services in Puerto Rico, the U.S. Virgin Islands, and the Caribbean area. Services will include geotechnical core drilling, sampling, field and laboratory testing, geophysical investigations, hydrologic testing, and chemical analytical laboratory testing. Responses are due through the Procurement Integrated Enterprise Environment website by January 16, 2024. The North American Industry Classification System code is 541330 for engineering services, and the small business size standard is $25.5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Proposal Teleconference
Solicitation # W912EP24R0006, Indefinite Delivery Contract for Geotechnical Core Drilling and Laboratory Testing for Puerto Rico, the U.S. Virgin Islands, and the Caribbean Area
Engineering Division/ Jacksonville District/ A-E Contract Administration Section
Date: 3 January 2024
Agenda
Introductions (Roll Call)
Administrative Items
Geosystems Engineering Program
Selection Procedures
Questions & Answers/Closing Remarks
Important References
Contract Information
Overview of A-E Selection Process
Introductions and Roll Call
Phones Muted, unless speaking or asking questions
Questions will be allowed:
General questions OK Technical questions OK if yes/no Otherwise it is the offeror’s responsibility to submit in writing to the POC
Submit questions in writing via email
Slides and roster will be posted
Administrative items
Gainesville Panama City Pensacola Sebring Clewiston
DISTRICT
HEADQUARTERS
CIVIL WORKS AREA
OF RESPONSIBILITY (FLORIDA AREA)
MILCON PROGRAM THROUGHTOUT FLORIDA IS COVERED BY BOTH JACKSONVILLE AND MOBILE DISTRCTS
U.S Virgin Islands San Juan Palatka Ft. Myers
Tampa
Cocoa Melbourne
AREAS OF RESPONSIBILITY
CIVIL WORKS
Portions of Florida and Georgia (defined by watersheds) Puerto Rico and the Antilles
JACKSONVILLE DISTRICT OFFICES
AND AREAS OF RESPONSIBILITY
Miami Palm Beach Gardens West Palm Beach Naples
FLORIDA
GEORGIA
Wellington
Jacksonville
Civil Works in Florida: boundary breaks along the Suwannee River.
Real Estate in Florida: boundary breaks at the Apalachicola River.
Regulatory Boundary: Entire State of Florida plus Puerto Rico
Military Customers: Mobile District
Note: This contract is only for PR, US VI, and Caribbean
DEEP DRAFT HARBORS
San Juan Harbor Arecibo Harbor Ponce Harbor Mayaguez Harbor
NAVIGATION
FLOOD STORM RISK MANAGEMENT
Rio Puerto Nuevo is a large complex project affecting over 250,000 people in metropolitan San Juan, Puerto Rico Portugues & Bucana, Puerto Rico
PORTUGUES DAM
CERRILLOS DAM
MARGARITA CHANNEL
CONTRACT 2B, 2D & 2E
FLOOD RISK MANAGEMENT
Risk management includes both coastal and inland projects and programs – examples include Rio Puerto Nuevo and Rio de la Plata Coastal projects include beach nourishment projects that protect built infrastructure from storm surge and other flood risk – several feasibility studies ongoing for PR Coastal projects.
Inland projects ensure dam and levee safety to reduce flooding risk – examples are Cerrillos Dam, Portugues Dam, and Guajataca Dam.
USACE flood risk management projects avoid $8 of damages for each $1 invested. USACE projects have prevented over $500 billion in damages (2004-2013).
Our Interagency Flood Risk Management Project Study will develop adaptive strategies to address coastal storm surge and flood damage reduction associated with sea level rise effects related to Miami-Dade County.
The South Atlantic Coastal Comprehensive Study, now authorized in WIIN, is a comprehensive assessment to address coastal storm and flood risks along the south Atlantic coastline. The strategy will identify initial measures that address vulnerabilities with emphasis on regional sediment management as a strategy.
FLOOD & Coastal RISK MANAGEMENT & Ecosystem restoration Projects
ARECIBO
SAN JUAN
CAGUAS
PONCE
AGUADILLA
Puerto Rico
RIO GRANDE
DE ARECIBO (C)
RIO DE LA PLATA (C)
RIO PUERTO
NUEVO (C)
PORTUGUES & BUCANA (C)
ACTIVE PROJECT
LEGEND
C: CONSTRUCTION I: INVESTIGATIONS
SAVANT GUT
PHASE II (I)
TURPENTINE
RUN (I)
USVI
CHRISTIANSTED
CHARLOTTE
AMALIE
RIO GRANDE DE LOIZA (C)
MAYAGUEZ
RIO GUANAJIBO (C)
CAÑO MARTIN PEÑA (I)
SALINAS
RIO NIGUA (C)
RIO GUAYANILLA (I)
GUAYANILLA
RIO GRANDE
DE MANATI (I)
RINCON
SAN JUAN METRO COASTAL (I)
RIO
CULEBRINAS (I)
PUERTO RICO COASTAL (I)
ESTATE LAGRANGE
CAP 205 (C)
FREDERIKSTED
CONTINUING AUTHORITIES PROGRAM (CAP)
OVERVIEW
9 legislative authorities under which the Corps is authorized to plan, design, and construct certain water resources projects
These authorities are targeted at small to mid-size projects specifically developed to aid municipalities, counties and non-federal agencies
Local sponsor cost share amount* varies per authority and work in kind is available
* Per WRDA 2014, certain territories of the United States, including Puerto Rico and the U.S. Virgin Islands, are eligible for a CAP program cost-sharing reduction - CAP projects with feasibility phase agreements or construction contracts executed on or after June 10, 2014, are eligible for waivers up to $455,000.
Aguadilla Harbor
Continuing Authorities Program Facts
Our Water Resources Branch executes smaller projects through the Continuing Authorities Program. Projects include, but are not limited to, environmental restoration and emergency stream bank protection. The Continuing Authorities Program has 12 active projects, currently budgeted for approximately $3 million.
The Continuing Authorities Program has 16 active projects with approximately $2 million in budget (FY2017).
The program encompasses nine general authorities whereby the Corps is authorized to plan, design and implement certain types of water resources projects.
MAJOR TAKE AWAY:
CAP is divided into 2 overall phases: Feasibility + Design, Construction As one of the largest programs in USACE, SAJ has 10 CAP projects in the study phase with several others waiting on “new start” approvals. These studies will continue into the design phase in FY18. By FY19 SAJ will be advertising CAP construction projects in the $5-million range.
BLUF: Contractors should monitor our forecast regularly as project developments, including new projects are identified and updated
Jacksonville District Active CAP Projects
Overview of work Subsurface Investigations and In Situ Testing Engineering Geology, Blasting, and Grouting Engineering During Construction (QA Testing) Coastal and Marine Geology Hydrogeology and Aquifer Storage and Recovery (ASR) Chemistry and Geochemistry of Surface Water and Groundwater Sediment Evaluations and Hazardous, Toxic, or Radioactive Waste (HTRW) Materials Testing and Evaluation
Work often includes SPT and rock coring, auger borings, muck probes, field testing, geophysical logging, lab testing, and environmental sampling and analysis. On occasion, vibracores are required for coastal protection and navigation projects.
Geosystems engineering
Full-service Branch within the Engineering Division for geotechnical engineering, geology and environmental/HTRW (Geosystems Branch)
Robust District-based workload as well as Regional and National support in coordination with Task Force VIPR (Virgin Islands Puerto Rico)
For USACE projects within the Commonwealth of Puerto Rico, U.S. Virgin Islands, and the Caribbean
Work under this contract encompasses Geologic/geotechnical investigations (land based and water based) Geotechnical sampling and laboratory testing and analyses Geophysical investigations and surveys Hydrologic investigations, testing, and data analysis/interpretation Chemical and analytical sampling and laboratory testing Engineering During Construction (EDC) Data Reports and Site Investigation Reports
Clearly state that geotechnical design is not included in this contract.
Geosystems engineering Work we do:
Geologic/geotechnical investigations, field testing and laboratory testing AE contracting and in-house resources Investigations: Drilling, including Standard Penetration Testing; rock coring; sonic; vibracoring; washprobing; test pits; etc.
Instrumentation installation: monitoring wells; piezometers; inclinometers; etc.
Field testing: cone penetration; dilatometer testing; vane shear; pressuremeter, etc.
Laboratory analyses: grain size; Atterbergs; moisture content; consolidation; direct shear; triaxial; compaction; relative density; permeability; unconfined compressive strength; organic content; sedimentation rate; etc.
Geophysical investigations AE contracting and in-house resources Performance of geophysical investigations including: seismic (reflection, refraction, crosshole, and tomography); gravity and microgravity; magnetic; electrical (self-potential, resistivity, and induced polarization); electromagnetic (time domain and frequency domain); ground penetrating radar; acoustical impedance; and borehole logging (spontaneous potential, resistivity, electrical, natural gamma, gamma-gamma, neutron, caliper, temperature, sonic and borehole camera).
Geosystems engineering
Work we do:
Hydrologic investigations AE contracting and in-house resources Performance of hydrologic investigations including: recharge; slug; percolation; aquifer drawdown; aquifer performance; double ring infiltrometer; etc.
Environmental/HTRW investigations, field testing and laboratory testing AE contracting and in-house resources HTRW sampling: grab sampling; vibracore sampling; sonic sampling; low flow sampling; Section 103; Section 404; etc.
Analytical laboratory procedures: EPA 500 series for drinking water; EPA 600 series for waste water microbiological analyses; EPA 8000 series for organics; inorganic analyses; toxicity characteristic leachate procedure; radiochemical analyses; methods for evaluating solid waste; physical/chemical methods; SW-846; toxicity bioassays; etc.
QA/QC reporting and data validation Electronic Data Deliverables (EDD)
Overview of A-E Selection
Synopsis
Selection
Receipt of Qualifications
Interviews with 3 most highly qualified
Consensus
Reviews & Approvals
Notifications
Debriefings
Source selection evaluation board (SSEB) Qualifications for Technical SSEB:
Highly qualified Federal employees having collective experience in:
Architecture Engineering Construction Acquisition Specific type of technical work being contracted
SSEB
SSEB Chairperson
Technical SSEB
KO (non-voting member)
Contract information
Responses shall be submitted in PIEE by 16 January 2024, 1:00 PM (EST).
1 Contract to be awarded Max contract value $15 million, up to 5 years Small Business Set-Aside NAICS 541330, Engineering Services
Selection criteria
Primary Criteria
Specialized Experience & Technical Competence
Qualified Professional Personnel
Past Performance
Capacity to accomplish the work
Knowledge of the locality
Secondary Criteria (tie-breaker)
Geographic Proximity
Volume of DOD Contracts
Engineer Pamphlet (EP) 715-1-7 – Architect-Engineer Contracting in USACE, provides guidance and procedures for A-E services in accordance with the Selection of Architects and Engineers Statute.
Selection of Architects and Engineers Statute (formerly the Brooks Act) – provides the policy and procedures for awarding architect-engineer contracts for the Federal Government.
Public announcement for all architectural and engineering services Annual company submission of qualifications statements Selection of winning offeror based on demonstrated technical competence and professional qualifications directly related to the professional services required Discussion with and a ranking of at least three firms in order of preference Negotiation with the highest qualified firm Negotiation with the second highest qualified offeror if a satisfactory agreement cannot be reached with the first ranked offeror Negotiation of fair and reasonable prices
Important references
System for Award Management (SAM) - the Official U.S. Government System for contract opportunities. Every contract announcement is posted in the SAM.gov website. To receive an award with us you must be registered in SAM.
Federal Acquisition Regulations System (FAR 1.101) - is established for the codification and publication of uniform policies and procedures for acquisition by all executive agencies.
The Federal Acquisition Regulations System consists of the Federal Acquisition Regulation (FAR), which is the primary document, and agency acquisition regulations that implement or supplement the FAR.
https://www.acquisition.gov/browse/index/far
Procurement Integrated Enterprise Environment (PIEE), (Cont.)
The only authorized transmission method of proposals in response to the subject solicitation is electronically via the Procurement Integrated Enterprise Environment (PIEE) website. No other transmission methods, such as email, facsimile, hand-carried, proprietary or DOD SAFE submissions, proposals submitted by mail, etc. will be accepted. Offers submitted via any other transmission method other than the Procurement Integrated Enterprise Environment (PIEE) website will not be evaluated.
The Offeror’s bid/proposal must be received by the Government no later than the date/time specified in the solicitation and cited above. Offerors shall submit their bid using the following link:
https://piee.eb.mil/ Responses due 16 January 2024, 1:00 (EST)
General questions OK
Technical Questions OK if yes/no Otherwise it is the offeror’s responsibility to submit in writing to the POC
Submit questions in writing via email to Solicitation’s Primary Point of Contact: Adeline Fuata, Contract Specialist; Adeline.F.Fuata@usace.army.mil
Slides, roster, and Q&A will be posted to SAM questions image4.png image5.png image6.png image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.png image12.png image13.png image14.jpeg image15.jpeg image16.jpeg image17.jpeg image18.png image19.jpeg image20.png image21.png image22.png image1.png image2.png image3.png
File details come from the government source that posted it. Updated .