This document is an abstract of bids received in response to Solicitation Number W912EP23B0016 issued by the Department of the Army Corps of Engineers Engineering District Jacksonville. The solicitation was for maintenance dredging of the entrance channel at Naval Submarine Base Kings Bay in Camden County, Georgia and Nassau County, Florida, cutting material from Cut-1N through Range-E to depths of 49, 45 and 44 feet. Five bids were received by the August 15, 2023 closing date. The abstract lists 22 line items for base requirements and one optional line item, with estimated quantities where provided. Bidders provided unit pricing for each line item as well as total proposed pricing for the base work and optional work. Line items included mobilization, excavation of various channel sections by disposal area, environmental and water quality monitoring, sea turtle relocation, beach tilling and other site works. The independent government estimate for total base requirements was $20,848,650. Award is pending review of the bids received by the contracting officer.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER: W912EP23B0016

USA ENGINEER DISTRICT, JACKSONVILLE

PRUDENTIAL OFFICE BUILDING

701 SAN MARCO BLVD

ATTN: CESAJ-CT

JACKSONVILLE FL 32207-8175 BIDS

NO. 1 NO. 2 NO. 3 NO. 4 NO. 5

BIDDER: BIDDER: BIDDER: BIDDER: BIDDER:

B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY B. BID SECURITY

(Type & amount) (Type & amount) (Type & amount) (Type & amount) (Type & amount)

C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE: C. BUSINESS SIZE:

D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA D. ADDENDA

NUMBER OF AMENDMENTS ISSUED: 2 ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED: ACKNOWLEDGED:

CLIN NO. 7B DESCRIPTION OF OFFERED ITEM: QUANTITY UNIT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND DEMOBILIZATION 1 JOB 4,433,000.00$ $4,433,000.00 5,510,000.00$ $5,510,000.00 6,150,000.00$ $6,150,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED

CUT-1N STA 17+00 TO STA 45+00; (D/A-NB DISPOSAL)

ESTIMATED QUANTITY (SEE NOTE 2)

10,000 CUBIC YARD 23.75$ $237,500.00 45.00$ $450,000.00 25.00$ $250,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED

CUT-1N STA 72+00 TO STA 100+00; (D/A-NB DISPOSAL)

ESTIMATED QUANTITY (SEE NOTE 2)

10,000 CUBIC YARD 21.35$ $213,500.00 40.00$ $400,000.00 25.00$ $250,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED

CUT-1N STA 100+00 TO STA 200+00 (D/A-NB DISPOSAL)

ESTIMATED QUANTITY (SEE NOTE 2)

75,000 CUBIC YARD 19.65$ $1,473,750.00 27.20$ $2,040,000.00 25.00$ $1,875,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED

CUT-1N STA 200+00 TO STA 230+00; (D/A-N DISPOSAL)

ESTIMATED QUANTITY (SEE NOTE 2)

55,000 CUBIC YARD 11.85$ $651,750.00 11.90$ $654,500.00 6.50$ $357,500.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED

CUT-1N STA 230+00 TO STA 340+00; (D/A-O DISPOSAL)

ESTIMATED QUANTITY (SEE NOTE 2)

561,000 CUBIC YARD 9.00$ $5,049,000.00 6.80$ $3,814,800.00 10.00$ $5,610,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED,

CUT-1N NORTH SETTLING BASIN

STA 119+00 TO STA 227+50; RANGE 1250 TO RANGE 1300

(D/A-NB DISPOSAL) ESTIMATED QUANTITY (SEE NOTE 2)

115,000 CUBIC YARD 9.30$ $1,069,500.00 16.75$ $1,926,250.00 25.00$ $2,875,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED,

RANGE A STA 6+500 TO RANGE A2 STA 12+005.31

RANGE 1000 TO NORTH RANGE VARIES (EXCEPT FULL

CHANNEL BETWEEN STA 7+500 TO 8+500)

(D/A-NB DISPOSAL) ESTIMATED QUANTITY (SEE NOTE 2)

9,000 CUBIC YARD 26.50$ $238,500.00 40.90$ $368,100.00 25.00$ $225,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED,

RANGE B STA 12+005.31 TO STA 15+348.53

RANGE 1000 TO RANGE 1250+ (VARIES)

(D/A-N DISPOSAL) ESTIMATED QUANTITY (SEE NOTE 2)

7,000 CUBIC YARD 23.60$ $165,200.00 20.65$ $144,550.00 17.50$ $122,500.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED,

RANGE C TO D STA 15+348.53 TO STA 15+900 AND

STA 18+500 TO STA 24+700 (INCLUDING WIDENER)

RANGE 1000 TO RANGE VARIES

(D/A-N DISPOSAL) ESTIMATED QUANTITY (SEE NOTE 2)

50,000 CUBIC YARD 12.35$ $617,500.00 11.80$ $590,000.00 10.00$ $500,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED,

RANGE D STA 24+700 TO RANGE E STA 31+000

(D/A-NB DISPOSAL) ESTIMATED QUANTITY (SEE NOTE 2)

50,000 CUBIC YARD 23.65$ $1,182,500.00 32.90$ $1,645,000.00 25.00$ $1,250,000.00 -$ $0.00 -$ $0.00 -$ $0.00

EXCAVATION, UNCLASSIFIED,

RANGE E STA 31+000 TO STA 31+800

(D/A-O DISPOSAL) ESTIMATED QUANTITY (SEE NOTE 2)

8,000 CUBIC YARD 22.40$ $179,200.00 29.65$ $237,200.00 25.00$ $200,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0013 ENVIRONMENTAL SPECIES MONITORING 1 JOB 202,000.00$ $202,000.00 70,000.00$ $70,000.00 50,000.00$ $50,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0014 TURBIDITY MONITORING 1 JOB 114,000.00$ $114,000.00 37,000.00$ $37,000.00 75,000.00$ $75,000.00 -$ $0.00 -$ $0.00 -$ $0.00

SEA TURTLE/STURGEON TRAWL SWEEPING AND

RELOCATION (SEE NOTE 3) ESTIMATED QUANTITY

105 DAY 6,000.00$ $630,000.00 4,000.00$ $420,000.00 5,500.00$ $577,500.00 -$ $0.00 -$ $0.00 -$ $0.00

BEACH TILLING AT NORTH BEACH DISPOSAL AREA (D/A-NB)

ESTIMATED QUANTITY

8.2 ACRE 1,300.00$ $10,660.00 500.00$ $4,100.00 750.00$ $6,150.00 -$ $0.00 -$ $0.00 -$ $0.00

CONSTRUCTION/VIBRATION CONTROLS AND MONITORING

AT NORTH BEACH DISPOSAL AREA (D/A-NB)

1 JOB 78,500.00$ $78,500.00 28,000.00$ $28,000.00 25,000.00$ $25,000.00 -$ $0.00 -$ $0.00 -$ $0.00

BLENDING OF NONCOMPLIANT MATERIAL

ESTIMATED QUANTITY

1 ACRE 8,400.00$ $8,400.00 20,000.00$ $20,000.00 25,000.00$ $25,000.00 -$ $0.00 -$ $0.00 -$ $0.00

SCREENING OF UNACCEPTABLE MATERIAL

ESTIMATED QUANTITY

500 CUBIC YARD 78.00$ $39,000.00 15.00$ $7,500.00 25.00$ $12,500.00 -$ $0.00 -$ $0.00 -$ $0.00

TRANSPORTATION AND DISPOSAL OF UNACCEPTABLE

MATERIAL - ESTIMATED QUANTITY

25 CUBIC YARD 178.00$ $4,450.00 56.00$ $1,400.00 2,000.00$ $50,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0021 STANDBY TIME (SEE NOTE 4) 72 HOUR 5,000.00$ $360,000.00 3,800.00$ $273,600.00 5,000.00$ $360,000.00 -$ $0.00 -$ $0.00 -$ $0.00

0022 PARTNERING REGROUP 1 EACH 8,400.00$ $8,400.00 2,000.00$ $2,000.00 2,500.00$ $2,500.00 -$ $0.00 -$ $0.00 -$ $0.00

TOTAL BASE (LINE ITEMS 0001 THROUGH 0022) $16,966,310.00 $18,644,000.00 $20,848,650.00 $0.00 $0.00 $0.00

OPTION A

BEACH TILLING AND ESCARPMENT REMOVAL AT

FORT CLINCH DISPOSAL AREA (D/A-F, BEACH ONLY,

NOT GROINS) ESTIMATED QUANTITY

3 ACRE 1,300.00$ $3,900.00 500.00$ $1,500.00 750.00$ $2,250.00 -$ $0.00 -$ $0.00 -$ $0.00

TOTAL OPTION A (LINE ITEM 0023) $3,900.00 $1,500.00 $2,250.00 $0.00 $0.00 $0.00

TOTAL BASE + OPTION A (LINE ITEMS 0001 THROUGH 0023) 16,970,210.00$ 18,645,500.00$ 20,850,900.00$ -$ -$ -$

NAME AND TITLE OF CERTIFYING OFFICIAL:

Tedra N. Thompson, Contracting Officer

Signature

BIDSBIDS (Continued)

Yes Yes

Yes

PROJECT TITLE

IGE BIDS (Continued)

Great Lakes Dredge & Dock Co. LLC. Weeks Marine, Inc.

Yes

NAVAL SUBMARINE BASE KINGS BAY - ENTRANCE CHANNEL

MAINTENANCE DREDGING CUT-1N THROUGH RANGE-E 49, 45, AND

44-FOOT

PROJECT, CAMDEN COUNTY, GEORGIA & NASSAU COUNTY,

FLORIDA

Independent Government Estimate

ABSTRACT OF OFFERS

DATE ISSUED DATE CLOSED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation: ->