20R0010 Amendment 002 Pest Control.pdf
PDF 703 KB Posted
- Attached to
- SFOO Pest Control Services Federal contract opportunity
- Solicitation number
- W912EP20R0010
About this file
This combined synopsis/solicitation requests proposals for pesticide application services at government facilities within the South Florida Operations Office area. The U.S. Army Corps of Engineers Jacksonville District seeks a contractor to provide monthly pest control treatments at buildings, recreation areas, and maintenance compounds; including fire ant and rodent control. The requirement is set aside for small businesses with a NAICS code of 561710 and size standard of $12 million. The selected contractor must submit a pest control plan for approval and apply appropriate pesticides to control ants, roaches, spiders, wasps, ticks, and other pests at multiple lock, recreation, and office locations. Proposals are due by 09:00 A.M. EST on 19 February 2020, and the agency intends to make one award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment W912EP20R0010001 Pest Control.pdf | ||
| Solicitation W912EP20R0010 Pest Control.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. This amendment is issue to answ er bidders questions, add revised pricing sheet, Correct Wage Determination, and add the Determination of Responsibilities Form to the solicitation.
2. All other items and conditions remain in effect.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 43
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Feb-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP20R0010
X 9B. DATED (SEE ITEM 11)
04-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Feb-2020
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EP20R0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
DETERMINATION FORM
Determination of Responsibility Form
Prospective Contractor:
Solicitation No: W912EP20R0010
The following information is provided to assist the Contracting Officer in determining whether or not the proposed contractor meets the general standards of responsibility enumerated at FAR 9.104-1 and DFARS 209.104-1.FAR 9.104-1 General Standards. To be determined responsible, a prospective contractor must:
(a) HAVE ADEQUATE FINANCIAL RESOURCES TO PERFORM THE CONTRACT, OR THE ABILITY TO OBTAIN THEM (SEE 9.104-3(b))
The prospective contractor's financial statement for the period ending shows assets to liabilities at a ratio of to
PROVIDE A COPY OF YOUR LATEST FINANCIAL STATEMENT.
Comments by Contracting Officer:
Banking References
(Provide signed reference on letterhead from financial institution supporting each banking reference.)
1st bank's name:
Telephone #:
Address:
Person:
Title:
Length of time with bank:
Credit Rating:
Number/type of accounts:
Amount in each account (# of figures):
Credit line: ____________________________ (Secured)
Credit line: ___________________________(Unsecured)
Outstanding loans: ____(Secured)
Outstanding loans: _______________(Unsecured)
Banking References (continued)
2nd bank's name:
Telephone #:
Address:
Person:
Title:
Length of time with bank:
Credit Rating:
Number/type of accounts:
Amount in each account (# of figures):
Credit line: _________________________________(Secured)
Credit line: _______________________________(Unsecured)
Outstanding loans:__________(Secured)
Outstanding loans: _________________________(Unsecured)
(b) BE ABLE TO COMPLY WITH THE REQUIRED OR PROPOSED DELIVERY OR
PERFORMANCE SCHEDULE, TAKING INTO CONSIDERATION ALL EXISTING
COMMERCIAL AND GOVERNMENTAL BUSINESS COMMITMENTS
Comments by Contracting Officer:
(c) HAVE A SATISFACTORY PERFORMANCE RECORD (SEE 9.104-3(c) and Subpart 42.15)
Performance References
1st company:
Address:
Name:
Title:
Location and type of work:
Completed on time?
On budget?
Quality of work?
Management cooperative?
Any problems encountered:
Performance References (continued)
2nd company:
Telephone #:
Address:
Name:
Title:
Location and type of work:
Completed on time?
On budget?
Quality of work?
Management cooperative?
Any problems encountered:
(d) HAVE A SATISFACTORY RECORD OF INTEGRITY AND BUSINESS ETHICS
Trade References
1st company:
Address:
Name:
Title:
Length of time with company:
Credit line:
Average monthly business:
High credit:
Payment history:
Takes discounts:
Trade References (continued)
2nd company:
Telephone #:
Address:
Name:
Title:
Length of time with company:
Credit line:
Average monthly business:
High credit:
Payment history:
Takes discounts:
Comments by Contracting Officer:
(e) HAVE THE NECESSARY ORGANIZATION, EXPERIENCE, ACCOUNTING AND
OPERATIONAL CONTROLS, AND TECHNICAL SKILLS, OR THE ABILITY TO OBTAIN THEM
(INCLUDING, AS APPROPRIATE, SUCH ELEMENTS AS PRODUCTION CONTROL PROCEDURES,
PROPERTY CONTROL SYSTEMS, QUALITY ASSURANCE MEASURES, AND SAFETY
PROGRAMS APPLICABLE TO MATERIALS TO BE PRODUCED OR SERVICES TO BE
PERFORMED BY THE PROSPECTIVE CONTRACTOR AND SUBCONTRACTORS) (SEE 9.104-3(b))
(f) HAVE THE NECESSARY PRODUCTION, CONSTRUCTION, AND TECHNICAL EQUIPMENT AND FACILITIES, OR THE ABILITY TO OBTAIN THEM (SEE 9.104-3(b))
(g) BE OTHERWISE QUALIFIED AND ELIGIBLE TO RECEIVE AN AWARD UNDER
APPLICABLE LAWS AND REGULATIONS
The prospective contractor is is not registered in the System for Award Management (SAM) and has self-certified they are a Small Business in SAM.
The prospective contractor and its proposed subcontractors are are not debarred or excluded from restricted from doing business with the U.S. Federal Government (no exclusions are listed under SAM registration).
The prospective contractor is is not owned or controlled by a foreign government that supports terrorism (DFARS 209.104-1(g)) (See contractor's response in section K of Solicitation.)
Recommendation
Based on the foregoing information, I recommend do not recommend that the prospective contractor be determined responsible for performance of this contract.
Contract Specialist:
Date:
Determination
After considering the above information, I hereby determine that the prospective contractor is _____ is not _____ a responsible contractor for the purpose of performing the proposed contract.
Comments:
Contracting Officer:
Date:
ANSWERS TO BIDDERS QUESTIONS
Question 1:
CLIN 0001AA looks to be missing 3 locations listed below from page 69 of the RFP. Is this intentional?
SF21 Equipment, Boat Storage Building/Metal (Lower Yard) 2542 sq ft
SF22 Core Drill Building 3500 sq ft
SF-24 Water system building 6x6x7 36 sq ft
Answer:
SF19 and SF22 are removed. SF19 is no longer used and SF22 is the responsibility of the Contractor leasing the facility. (Attached is a revised pricing sheet).
Question 2:
CLINS 0001GA has open blocks under month column. This is different from all other CLINS, is this intentional and the government would like a monthly price in this column?
Answer: Correction was made on the revised Pricing Sheet.
Question 3:
Can you please explain this part of the submittal. Is the Determination of Responsibility form something the bank would provide to us when we request for our financial statements? If you could please provide us an example of this and what we would need exactly.
Submittal - Volume I (pg.12) Completed Determination of Responsibility Form, including the firm's latest Financial Statements and signed reference on letterhead from financial institution(s) supporting banking reference(s).
Answer: See attached Determination of Responsibility form
REVISED PRICING SHEET
PESTICIDE CONTRACT (SFOO)
Clewiston, Florida
South Florida Operations Office Project
ITEM
NO
QUANTITY UNIT UNIT
PRICE
AMOUNT
South Florida Operations Office (SF00) Clewiston, FL
525 Ridgelawn Road, Clewiston FL, 33440 Phone# 863-983-8101
0001AA
Building Square Footage (44,524 estimated)
12 Months
SF1 Main Office. 5,121 sq. ft
SF2
Contract Unit & Meeting Room - /Warehouse
2,968 sq. ft 4,532 sq ft
SF3 Field Maintenance Office 1,500 sq ft
SF4
Fuel Building - Gas pumps
90 sq ft
SF5
Carpenter Shop (Office & Bathroom - 153 sq. ft.)
2,047 sq. ft
SF6 Sign Storage 1271 sq ft
SF7 Ice Machine Building 150sq ft
SF8 Records Storage 175 sq ft
SF9
Lock & Dam Mechanic Office & Storage
600 sq ft
SF10 Generator Building 175 sq ft
SF11
Office, Kitchen, & Bath Machine & Equip Repair Shop
703 sq ft 6500 sq ft
SF12 Dive Equipment Building 200Sq ft
SF13
Storage Building (Old Equipment Shop)
2542 sq ft
SF18 Radio Tower Building 180 sq ft
SF 21
2 Equipment, Boat Storage Building Metal (Lower Yard)
SF 24 Water system building 6x6 36 sq ft S-277 Control Structure 50 sq ft S-278 Control Structure 50 sq ft
0001AB
Acreage Square Footage (9 estimated)
W.P. Franklin
1661 South Franklin Lock Rd, Alva FL, 33920 Phone # 239-694-2582.
0001BA
Building Square Footage (8,551 estimated)
SF31 Main Office Building 1,980 sq.
SF32 Storage Building (Hose) 64 sq.
SF34 Visitor Center 2,014 sq. ft.
SF36 South Side Restroom . 700 sq. ft.
SF37
North East Lock Control Building
156 sq. ft
SF38
South East Lock Control
SF39
South West Lock Control
SF40
North West Lock Control
SF41
North Side Restroom - East
700 sq. ft.
SF42
North Side Storage
223 sq. ft.
SF43
North Side Entrance Station
188 sq. ft.
SF44
South Side Storage Building (By Visitor Center)
1,200 sq. ft.
SF45
West
858 sq. ft.
0001BB
Acreage Square Footage (42 estimated)
0001CA
Building Square Footage (6,470 estimated)
SF51 Office 1,330 sq. ft.
SF52 Large Warehouse 806 sq. ft.
SF53 3 Bay Garage 774 sq. ft.
SF54 Water Treatment Building 208 sq. ft.
SF55 Fire Pump Building 166 sq. ft.
SF60
96 sq. ft.
SF61
SF62
SF63
SF64 Spillway Control Building 120 sq. ft.
SF65
North Side Recreation Bathroom
700 sq. ft
SF66
South Side Camper Bathroom - East
488 sq. ft.
SF67
South Side Water Tank Building - East
224 sq. ft.
SF68
Building - West
SF69
South Side Entrance Control Station
SF70
Bathroom - West
0001CB
(42.5 estimated)
Moore Haven Lock
204 Lock Rd, Moore Have Fl, 33471 Phone # 863-946-0414
0001DA
Building Square Footage (3,694 estimated)
SF77 Lock Control Building 132 sq. ft.
SF80 Generator Building 208 sq. ft.
SF81 Fire Pump Building 170 sq. ft
SF82
Residence (on Lock wall ) Office
1,443 sq ft edSF83 Residence (West) 1443 sq ft
SF84 Garage (West) 250 sq ft
SF85
Spillway Control House
48 sq. ft.
S-267 Control Structure 50 sq ft
S-268 Control Structure
(Okeechobee) 50 sq ft
S-279 Control Room/Generator
Room 220 sq ft
S-280 Control Room/Generator
S-281 Control Structure 50 sq ft
S-283 Control Structure 50 sq ft
S-286 Control Structure 50 sq ft
S-287 Control Structure 50 sq ft
S-289 Control Structure 50 sq ft
S-291 Control Structure 50 sq ft
S-292 Control Structure 50 sq ft
0001DB
(15 estimated)
Port Mayaca Lock
18100 SW Canal Conner’s HWY, Canal Point FL, 33438 Phone # 561-924-2858
0001EA
(2,386estimated)
SF90 South West Lock Control
320 sq. ft.
SF91 North West Lock Machinery Building
248 sq. ft.
SF92 South East Lock Control & Machinery Building
SF93 North East Lock
SF94 Office & Garage 906 sq. ft.
SF95 Generator Bldg 416 sq. ft
0001EB
(31 estimated)
St. Lucie Lock
2200 SW Canal Street Stuart FL, 34997 Phone#772-287-2665 2170 SW Canal Street, Stuart FL, 34997 Phone#772-219-4575
0001FA
Building Square Footage (7,154 estimated)
SF100
Main Lock Control
952 sq. ft.
SF101 2 Bay Garage 512 sq. ft.
SF102 Water Treatment Building 192 sq. ft.
SF104
Old Lock Control Building (Storage)
120 sq. ft.
SF105 Spillway Turbine Building 812 sq. ft.
SF106
South West Lock
154 sq. ft
SF107
North West Lock
SF108
South East Lock
SF109
North East Lock
SF110 Pump House & Well 154 sq. ft
SF111 Visitor Center 3,100 sq. ft
SF114 Restroom (Campground) 700 sq. ft.
SF115
Campground Entrance
150 sq ft
S-269 Control Room/Generator
0001FB
(18.9 estimated)
Canaveral Lock
1000 Mullet Drive, Canaveral FL, 32920 Phone # 321-783-5421
0001GA
Building Square Footage (3,020 estimated)
SF130 Office/Shop/Storage - 2,300 sq. ft.
SF131 Machinery Building #1 180 sq ft
SF132 Machinery Building #2 180 sq ft
SF133 Machinery Building #3 180 sq. ft
SF134 Machinery Building #4 180 sq ft
0001GB
(19 estimated)
Spillway 354 - Lake Harbor
*S-354, Lake Harbor FL, No phone
0001HA
Building Square Footage (586 estimated)
SF120
Old West Control
168 sq ft
SF121 Old East Control Building 168 sq ft
SF121A
New Generator/Equipment
250 sq ft
S-270
S-272 Control Structure 50 sq ft
S-275 Control Structure 50 sq ft
S-276 Control Structure 50 sq ft
0001HB
(3 estimated)
Spillway S-351 Belle Glade
S-351, Belle Glade FL, No phone
0001JA
Building Square Footage
SF122
New Control Building - Generator/Equipment
SF123
Old Control Building (Storage)
SF123A Sutron Building (Portable) 168 sq ft
0001JB
(2 estimated)
Spillway S-352 Canal Point
*S-352, Canal Point FL, No phone
0001KA
Building Square Footage (418 estimated)
SF124 Control Building 250 sq ft
SF124A Sutron Building (Portable) 168 sq ft
0001KB
Acreage Square Footage (8 estimated)
Spillway S-355A U.S. 41
*S-355A&B, US 41, Miccosukee land
0001LA
Building Square Footage (225 estimated)
SF127
Equipment/Generator Building
225 sq ft
0001LB
Acreage Square Footage
Spillway S-355B U.S. 41
0001MA
Building Square Footage
SF128
Building
225 sq ft
0001MB
Acreage Square Footage
Tug Boat Vessels
0001NA Leitner 3,000 sq. ft 12
0001NB Chobee 1,800 sq ft. 12
TOTAL
ANT BAIT PER YEAR
(Based on per square acre)
88Lbs /Per Acre/ Per month
1056 lbs Per Acre/ Per Year
PESTICIDE PER YEAR
(Based on per square foot)
1.6 Pints /acre/year
YEARLY GRAND TOTAL
PESTICIDE CONTRACT (SFOO)
Clewiston, Florida South Florida Operations Office Project
AMOUNT
South Florida Operations Office (SF00) Clewiston, FL
525 Ridgelawn Road, Clewiston FL, 33440 Phone# 863-983-8101
1001AA
Building Square Footage
Room - /Warehouse
Machine & Equip Repair Shop
SF 19 Boat House 4120 sq ft
S-278 Control Structure 50 sq ft
1001AB
Acreage Square Footage
1001BA
Building Square Footage
Building (By Visitor
1001BB
Ortona Lock
204 Lock Rd, Moore Have Fl, 33471 Phone # 863-946-
1001CA
Building Square Footage
1001CB
1001DA
Building Square Footage
S-280 Control Structure 220 sq ft
1001DB
1001EA
1001EB
Phone#772-287-2665 2170 SW Canal Street, Stuart FL, 34997 Phone#772-219-4575
1001FA
Building Square Footage
1001FB
1001GA
Building Square Footage
1001GB
1001HA
Building Square Footage
1001HB
1001JA
Building Square Footage
1001JB
1001KA
1001KB
Acreage Square Footage
1001LA
Building Square Footage
Building
225 sq ft
1001LB
Acreage Square Footage
1001MA
Building Square Footage
Building
225 sq ft
1001MB
Acreage Square Footage
1001NA Leitner 3,000 sq. ft 12
1001NB Chobee 1,800 sq ft. 12
(Based on per square acre)
88Lbs /Per Acre/ Per month
(Based on per square
South Florida Operations Office Project
AMOUNT
South Florida Operations Office (SF00) Clewiston, FL
525 Ridgelawn Road, Clewiston FL, 33440 Phone# 863-983-8101
2001AA
Building Square Footage
Contract Unit & Meeting Room - /Warehouse
Fuel Building - Gas
SF8 Records Storage 175 sq ft
SF9
Lock & Dam Mechanic
Office, Kitchen, & Bath
Storage Building (Old
S-277 Control Structure 50 sq ft S-278 Control Structure 50 sq ft
2001AB
Acreage Square Footage
2001BA
Building (By Visitor
2001BB
2001CA
Building Square Footage
2001CB
2001DA
Building Square Footage
SF85 Spillway Control House 48 sq. ft.
S-281 Control Room 50 sq ft
2001DB
2001EA
2001EB
St. Lucie Lock 2200 SW Canal Street Stuart FL, 34997
Phone#772-287-2665 2170 SW Canal Street, Stuart FL, 34997 Phone#772-219-4575
2001FA
Building Square Footage
2001FB
2001GA
Building Square Footage
2001GB
2001HA
Building Square Footage
2001HB
2001JA
Building Square Footage
2001JB
2001KA
Building Square Footage
2001KB
Acreage Square Footage
2001LA
Building Square Footage
Building
225 sq ft
2001LB
Acreage Square Footage
2001MA
Building Square Footage
Building
225 sq ft
2001MB
Acreage Square Footage
2001NA Leitner 3,000 sq. ft 12
2001NB Chobee 1,800 sq ft. 12
(Based on per square acre)
TOTAL PESTICIDE PER YEAR 1.6 Pints /acre/year
South Florida Operations Office Project
AMOUNT
South Florida Operations Office (SF00) Clewiston, FL
525 Ridgelawn Road, Clewiston FL, 33440 Phone# 863-983-8101
3001AA
Building Square Footage
SF1 Main Office. 5,121 sq. ft SF1
Room - /Warehouse
2,968 sq. ft
SF3 Field Maintenance Office 1,500 sq ft SF3
90 sq ft SF4
2,047 sq. ft SF5
SF6 Sign Storage 1271 sq ft SF6
SF7 Ice Machine Building 150sq ft SF7
SF8 Records Storage 175 sq ft SF8
600 sq ft SF9
SF10 Generator Building 175 sq ft SF10
SF12 Dive Equipment Building 200Sq ft SF12
2542 sq ft SF13
SF18 Radio Tower Building 180 sq ft SF18
SF 19 Boat House 4120 sq ft SF 19
S-277 Control Structure 50 sq ft S-277 S-278 Control Structure 50 sq ft S-278
3001AB
Acreage Square Footage
3001BA
Building Square Footage
Building (By Visitor
3001BB
3001CA
Building Square Footage
3001CB
3001DA
Building Square Footage
3001DB
3001EA
Building Square Footage
3001EB
Phone#772-287-2665 2170 SW Canal Street, Stuart FL, 34997 Phone#772-219-4575
3001FA
Building Square Footage
3001FB
3001GA
Building Square Footage
3001GB
3001HA
Building Square Footage
3001HB
3001JA
Building Square Footage
3001JB
3001KA
Building Square Footage
3001KB
Acreage Square Footage
3001LA
Building Square Footage
Building
225 sq ft
3001LB
Acreage Square Footage
3001MA
Building Square Footage
Building
225 sq ft
3001MB
Acreage Square Footage
3001NA Leitner 3,000 sq. ft 12
3001NB Chobee 1,800 sq ft. 12
(Based on per square
South Florida Operations Office Project
AMOUNT
South Florida Operations Office (SF00) Clewiston, FL
525 Ridgelawn Road, Clewiston FL, 33440 Phone# 863-983-8101
4001AA
Building Square Footage
Room - /Warehouse
Machine & Equip Repair Shop
S-278 Control Structure 50 sq ft
4001AB
Acreage Square Footage
4001BA
Building Square Footage
Building (By Visitor
4001BB
4001CA
Building Square Footage
4001CB
4001DA
Building Square Footage
(Okeechobee0
4001DB
4001EA
Building Square Footage
4001EB
Phone#772-287-2665 2170 SW Canal Street, Stuart FL, 34997 Phone#772-219-4575
4001FA
Building Square Footage
4001FB
4001GA
Building Square Footage
4001GB
4001HA
4001HB
4001JA
Building Square Footage
4001JB
4001KA
Building Square Footage
4001KB
Acreage Square Footage
4001LA
Building Square Footage
Building
225 sq ft
4001LB
Acreage Square Footage
4001MA
Building Square Footage
Building
225 sq ft
4001MB
Acreage Square Footage
4001NA Leitner 3,000 sq. ft 12
4001NB Chobee 1,800 sq ft. 12
(Based on per square
REVISED WAGE DETERMINATION
In the performance of this contract the Contractor shall comply with the requirements of the U.S. Department of Labor Wage Determination Numbers (see below), dated (see below). Wage Determinations are available on line at www.wdol.gov or at http://www.wdol.gov/sca.aspx
Wage Determinations are required for all counties in the State of Florida, as follows:
2015-4529, Rev 9, dated 7/16/2019 (Lee County) 2015-4531, Rev 11, dated 7/16/2019 (Okaloosa County) 2015-4533, Rev 9, dated 7/30/2019 (Flagler and Volusia Counties) 2015-4535, Rev 13, dated 7/16/2019 (Broward County) 2015-4537, Rev 8, dated 7/30/2019 (Alachua and Gilchrist Counties) 2015-4539, Rev 9, dated 7/30/2019 (Baker, Clay, Duval, Nassau, and Saint Johns Counties) 2015-4541, Rev 8, dated 7/30/2019 (Polk County) 2015-4543, Rev 12, dated 7/16/2019 (Dade County) 2015-4545, Rev 10, dated 7/16/2019 (Collier County) 2015-4547, Rev 10, dated 7/16/2019 (Manatee and Sarasota Counties) 2015-4549, Rev 9, dated 7/24/2019 (Marion County) 2015-4551, Rev 11, dated 7/16/2019 (Lake County) 2015-4553, Rev 11, dated 7/16/2019 (Orange, Osceola and Seminole Counties) 2015-4555, Rev 8, dated 7/30/2019 (Brevard County) 2015-4559, Rev 11, dated 7/16/2019 (Bay and Gulf Counties) 2015-4561, Rev 11, dated 7/16/2019 (Escambia and Santa Rosa Counties) 2015-4563, Rev 10, dated 7/16/2019 (Martin and St. Lucie Counties) 2015-4565, Rev 10, dated 7/16/2019 (Charlotte County) 2015-4567, Rev 10, dated 7/16/2019 (Indian River County) 2015-4569, Rev 9, dated 7/16/2019 (Gadsden, Jefferson, Leon, and Wakulla Counties) 2015-4571, Rev 9, dated 7/16/2019 (Hernando, Hillsborough, Pasco and Pinellas Counties) 2015-4573, Rev 10, dated 7/16/2019 (Palm Beach County) 2015-4575, Rev 11, dated 7/16/2019 (Calhoun, Franklin, Holmes, Jackson, Liberty and Washington Counties) 2015-4577, Rev 11, dated 7/16/2019 (Bradford, Dixie, Levy, and Union Counties) 2015-4579, Rev 11, dated 7/16/2019 (Columbia, Hamilton, Lafayette, Madison, Putnam, Suwannee, Taylor Counties) 2015-4581, Rev 11, dated 7/16/2019 (Glades, Hendry and Okeechobee Counties) 2015-4583, Rev 11, dated 7/16/2019 (Monroe County) 2015-4585, Rev 11, dated 7/16/2019 (De Soto and Hardee Counties) 2015-5727, Rev 10, dated 7/16/2019 (Citrus County) 2015-5729, Rev 10, dated 7/16/2019 (Sumter County) 2015-5731, Rev 11, dated 7/16/2019 (Walton County) 2015-5735, Rev 9, dated 7/16/2019 (Highlands County)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .