B.08.03 Amendment 0004 - Ponce de Leon.pdf
PDF 619 KB Posted
- Attached to
- Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
- Solicitation number
- W912EP20R0008
About this file
This solicitation seeks proposals for the Ponce De Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement project in Volusia County, Florida. Work includes repairing the 3,855-foot long, 7.2-foot high North Jetty using marine construction methods and equipment, and constructing a new concrete base and U.S. Coast Guard Aid to Navigation at the jetty's seaward extent. The estimated performance period is 560 calendar days with a 60-day commencement period.
The Army Corps of Engineers will issue a Request for Proposal on or around March 30, 2020, with a 30-day response timeframe. Award will be made using best value tradeoff procedures, evaluating technical merit, past performance, small business participation, and price. The project's NAICS code is 237990 and size standard is $39.5 million. The magnitude of construction is estimated between $5-10 million. The solicitation will be posted on SAM.gov and interested vendors must register to receive amendments. Registration in SAM.gov is required to receive an award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W32CS500072839
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Ponce de Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement, Volusia County, Florida
A. See continuation sheet for amendment details B. Proposal response date has changed from 28 May 2020 to 02 June 2020 at 2:00PM, Local Time C. All other terms and conditions remain unchanged
1. CONTRACT ID CODE PAGE OF PAGES
J 1 33
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP20R0008
X 9B. DATED (SEE ITEM 11)
30-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-May-2020
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Ponce de Leon Inlet, North Jetty Rehabilitation and Aid to Navigation Replacement Volusia County, Florida
W912EP20R0008 2 Amendment 0004
SUMMARY OF CHANGES
1. SPECIFICATIONS:
Text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF) except in the Submittal Register. These text changes pertain only to changes made by this amendment.
DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.
DELETE Submittal Register and REPLACE with the attached revised Submittal Register.
DELETE Section 01 50 02 and REPLACE with the attached revised Section 01 50 02.
2. DRAWINGS: No change to drawings.
(End of Summary of Changes)
Ponce de Leon Inlet, North Jetty Rehabilitation And Aid to Navigation Replacement
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
1.2 RESIDENT MANAGEMENT SYSTEM (RMS)
1.2.1 Definition
1.2.2 Instructions
1.3 SUBMITTALS
1.4 JOB PAYMENT ITEMS
1.4.1 Mobilization and Demobilization (Line Item 0001)
1.4.2 Aid to Navigation Base (Line Item 0005)
1.4.3 Aid to Navigation (Line Item 0006)
1.4.4 Environmental Species Monitoring (Line Item 0007)
1.5 UNIT PRICE PAYMENT ITEMS
1.5.1 Armor Stone
1.5.1.1 Covered Line Items
1.5.1.2 Payment
1.5.1.3 Measurement
1.5.1.4 Unit of Measure
1.5.2 Standby Time (Line Item 0008)
1.5.2.1 Payment
1.5.2.2 Measurement
1.5.2.3 Unit of Measure
1.5.3 Partnering Regroup (Line Item 0009)
1.5.3.1 Payment
1.5.3.2 Measurement
1.5.3.3 Unit of Measure
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
3.1.1 Requesting Progress Payment
3.1.2 Options and Modification CLINS
-- End of Section Table of Contents --
SECTION 01 22 00 Page 1 W912EP20R0008 Amendment 0004
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 SUMMARY
This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.
Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.
1.2 RESIDENT MANAGEMENT SYSTEM (RMS)
1.2.1 Definition
The terms "Contract Line Item Number (CLIN)" and "Line Item" are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term "CLIN" is a contracting term used in the Resident Management System (RMS) payment data base.
1.2.2 Instructions
See Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) for more information on CLINs, schedule of values of pay activities and construction schedule, and payment procedures. The Contractor mode user manual with in-depth instructions can be downloaded from the RMS web site indicated in Section 01 45 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE
(RMS CM).
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Transmit submittal items in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:
SD-01 Preconstruction Submittals
Schedule of Values ; G, RO
Provide a breakdown of job items into proposed pay activities as part of the initial project schedule. Schedule of Values will become basis for CLIN and Pay Activity data in the RMS payment data base.
SECTION 01 22 00 Page 2
SD-07 Certificates
Request for Progress Payment ; G, RO
Submit monthly in accordance with subparagraph "Requesting Progress Payment" below.
Weight Scales ; G, RO
For all weight scales used to weigh materials brought to the site for incorporation in this project, Certificates of Calibration testing shall be provided by the Contractor.
Weight Slips ; G, RO
The Contractor shall submit the original weight slips signed by the stone supplier's representative for each load of stone brought to the site for use on the project. Include the quantity of stones weighed in each load.
1.4 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE with the unit "JOB" and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
Progress payments for job CLINs will be made in accordance with the Payments Under Fixed-Price Construction Contracts clause of Section 00700 CONTRACT CLAUSES in Volume 1. Submit a list of pay activities, (Schedule of Values) to breakdown bid for each job CLIN. The Schedule of Values shall be submitted for Government approval with the baseline schedule submittal (see Section 01 32 01 PROJECT SCHEDULE). An unbalanced Schedule of Values and Pay Activity Schedule will be returned for revision. If this contract contains either the Continuing Contracts clause or the Continuing Contracts (Alternate) clause, the Contractor should take into account the amount reserved for contract payments when preparing the construction schedule.
1.4.1 Mobilization and Demobilization (Line Item 0001)
Payment will be made for costs associated with or incidental to mobilization and demobilization, establishment of initial project management and coordination, and clearing, grubbing and restoration for access and staging areas. See Clause PAYMENT FOR MOBILIZATION AND DEMOBILIZATION of Section 00700 CONTRACT CLAUSES in Volume 1.
1.4.2 Aid to Navigation Base (Line Item 0005)
Payment will be made for all costs associated with or incidental to construction of a new concrete base for the Aid to Navigation. A
SECTION 01 22 00 Page 3 photograph of the previous navigation aid at the seaward extent of the jetty is shown in the drawings.
1.4.3 Aid to Navigation (Line Item 0006)
Payment will be made for all costs associated with or incidental to construction of a new Aid to Navigation. A photograph of the previous navigation aid at the seaward extent of the jetty is shown in the drawings.
1.4.4 Environmental Species Monitoring (Line Item 0007)
Payment will be made for costs associated with or incidental to all environmental species monitoring indicated in Section 01 57 20
ENVIRONMENTAL PROTECTION.
1.5 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the LINE ITEMS AND PRICING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
Each Unit Price CLIN may be a single pay activity item or may be broken down into pay activities with smaller quantities equal to CLIN total.
Contract unit price multiplied by agreed quantity is full compensation.
1.5.1 Armor Stone
1.5.1.1 Covered Line Items
Armor Stone A (Line Item 0002) Armor Stone B (Line Item 0003) Armor Stone C (Line Item 0004)
1.5.1.2 Payment
Payment will be made for costs associated with or incidental to reworking of existing stone, and furnishing, delivering and installing new armor stone materials required for repairing the jetty as shown on the drawings, and as specified in Section 35 31 19 ARMOR STONE FOR JETTY REPAIR.
Included in the unit cost is sampling and evaluation test section work (field quality control), providing and maintaining access to the work site(s), and noise control, barricades and signs, debris removal, obstruction of channel avoidance, dive reports, and surveys.
The Government will pay the contractor progress payments for that tonnage of stone delivered to the storage/staging area at 50 percent of the CLIN unit-price. The remaining 50 percent payment will be made upon final in-place acceptance by the Contracting Officer as verified by Government survey (see next subparagraph "Measurement" below). Payment will not be made for excess stone, unsuitable stone, or materials placed beyond the boundary of the rehabilitation areas shown on the drawings. If the initial 50 percent payment was already made for excess stone, unsuitable material, or misplaced stone, this payment amount will be deducted from future progress payments or final payment by utilizing weight slips signed
SECTION 01 22 00 Page 4 by the armor stone supplier's representative. New stone placed completely above or partially above the tolerance limits indicated in the drawings will be evaluated and determined by the Contracting Officer to either be reworked to be below the tolerance limits at no additional cost to the Government or deducted from payment.
Deduction of payment will only be for entire stones, and not for portions of stones that are above the tolerance limit. If there is excess stone for a Work Area that is unable to fit within the tolerance, and the Contractor has not yet qualified for all of the estimated tonnage agreed upon following the pre-construction survey (as described in Section 01 11 00 SUMMARY OF WORK, paragraph PRE-CONSTRUCTION CROSS SECTIONS), then the Contractor shall receive payment for the excess stone (up to the agreed amount). The Contractor will place the excess stone along the jetty at a location directed by the Contracting Officer.
1.5.1.3 Measurement
The total amount of material to be paid for under this item shall be measured by the ton with certified calibrated weight scales. Certificates of calibration for weight scales shall be provided by the Contractor. The Contractor shall weigh stone brought to the site, using certified weight scales, and shall provide to the Contracting Officer the original weight slips signed by the stone supplier's representative for each load. These signed weight slips shall also include the quantity of stones, and will be used as a basis of payment for this item. The Contractor shall ensure a means to track the weight of each unsuitable and rejected stone at the project site, for deduction from initial partial payment.
For stones placed above or partially above the tolerance limit, please see previous subparagraph "Payment" above for direction.
If the new stone is unable to be identified, the weight of the stone will be determined by field inspection measurements by the Contracting Officer. The volume of the stone will be determined by multiplying the stone's measured volume by the density of the stone (165 lb/cf), and then divided by 2,000 lb/ton to calculate tonnage. The volume will be calculated by measuring at least three representative sides of the stone to determine the stone's nominal diameter. The volume is calculated using the nominal diameter as input into the general equation for a sphere.
In place acceptance shall be determined by Government survey of no more than four (4) separate surveys of acceptance sections during the performance period. The limits of these acceptance sections shall be determined by the Contractor prior to the commencement of construction.
When the area is found to be in a satisfactory condition, it will be accepted. Should more than four (4) Government surveys be required, the cost of each additional survey will be charged against the Contractor at the rate of $20,000 per survey. The Contractor shall give seven (7) calendar days advance notice, in writing, to the Contracting Officer's Representative of the need to perform the acceptance surveys.
1.5.1.4 Unit of Measure
Ton.
SECTION 01 22 00 Page 5
1.5.2 Standby Time (Line Item 0008)
1.5.2.1 Payment
Standby time is defined as when the plant and equipment is not in operation at the direction of the Contracting Officer or Administrative Contracting Officer yet remains on-site. Standby time will be utilized only due to the presence of endangered species in the immediate area of operations, differing site conditions, security operations or other conditions as determined by the Contracting Officer. Standby time is not afforded for delays caused by adverse weather conditions. This line item is not subject to the variation in estimated quantity clause and payment will only be made for actual standby time required by the Contracting Officer. If performance of this line item is not required or implemented per the NOTES in Section 00010A LINE ITEMS AND PRICING SCHEDULE, no payment will be made to the Contractor for this line item. See Section
01 57 20 ENVIRONMENTAL PROTECTION.
1.5.2.2 Measurement
Standby Time, if required and implemented as described in payment above, will be measured and paid for each hour or part thereof in 1/10 hour increments, or 6 minute intervals, that the plant is not in operation by request of the Contracting Officer or the Administrative Contracting Officer.
1.5.2.3 Unit of Measure
Hour.
1.5.3 Partnering Regroup (Line Item 0009)
1.5.3.1 Payment
Payment will be made for costs associated with or incidental to conducting a partnering regroup. See Section 01 30 00 ADMINISTRATIVE PROCEDURES.
The initial partnering meeting will not be paid for under this line item as it is a distributed cost mandatory administrative action.
1.5.3.2 Measurement
The basis for payment will be for the completion of each partnering regroup meeting and Government receipt of all completed work products.
1.5.3.3 Unit of Measure
Each.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.1 PAYMENT PROCEDURES
Upon receiving initial Resident Management System import file, go to "Pay Activities" and establish a link between bid breakdown schedule of values of "Pay Activities" to contract CLINs using "Schedule Activities" data entry page.
SECTION 01 22 00 Page 6
3.1.1 Requesting Progress Payment
For progress payments, ensure "Activity Schedule", "Feature Schedule", submittal register, and punchlists are all up to date. Use "Progress Payments" to "Request Activity Earnings" for both "Activity Earnings" data entry page and "Other Earning". Provide hard copies of supporting invoices and quantity measurements to support all requested earnings.
Ensure that sums of payment activities do not exceed contract award CLIN funding amounts, or "unbalanced" CLINs error will prevent processing the payment. Submit a request for progress payment monthly in accordance with Clause 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700 CONTRACT CLAUSES. In addition to the items listed in Clause 52.232-5(b)(1), submit the following in the request for progress payment:
a. Approved construction schedule.
b. Up-to-date payroll records.
c. Current submittal register.
d. Approved submittals on installed property.
e. QA/QC deficiency tracking list.
f. Current as-built drawings.
Once the complete and accepted (by the Contracting Officer) pay application package is received, including the Contractor's signed ENG 93, the 14 calendar days will commence. The Contracting Officer may ask the Contractor to revise, re-date, and re-submit (including through RMS) any progress payment as necessary. Once the complete pay application package previously accepted by the Contracting Officer is received, to include the Contractor's signed ENG 93, the 14 calendar days will commence.
3.1.2 Options and Modification CLINS
When additional work is added by modification, existing CLINs funding amounts must be updated, or new CLINs for modification will be created.
If contract has option CLINs not yet awarded, option CLINs will appear as zero dollar CLINs until option is awarded by modification. No payment may be requested for Options or Modification CLINs until contract modification has been funded and signed.
-- End of Section --
SECTION 01 22 00 Page 7
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES
Ponce de Leon Inlet North Jetty Rehab./Aid to Nav. Rep. (Am 0004)
01 11 00 SD-02 Shop Drawings
1.8 G ROPre-Construction Photographic
Survey Report
1.9 G ROPre-Construction Cross-Sections
01 22 00 SD-01 Preconstruction Submittals
G ROSchedule of Values
SD-07 Certificates
3.1.1 G RORequest for Progress Payment
1.5.1.3 G ROWeight Scales
1.5.1.2 G ROWeight Slips
1.5.1.3 G ROWeight Slips
01 30 00 SD-01 Preconstruction Submittals
Draft Joint Risk Register
List of Subcontractors
SD-07 Certificates
G ROPartnering Meeting(s) Written
Synopsis
Signature Authority
Drug-Free Work Place Record
01 32 01 SD-01 Preconstruction Submittals
1.3 G ROProject Scheduler Qualifications
3.4.1 G ROPreliminary Project Schedule
3.4.2 G RORMS Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
G ROExport File
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES
01 35 25 SD-01 Preconstruction Submittals
G RODive Operations Plan
SD-07 Certificates
G RODive Personnel Qualifications
01 35 26 SD-01 Preconstruction Submittals
1.7 G DOAccident Prevention Plan (APP)
1.16 G DOAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12.1Mishap Notification
1.12.2 G DOAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G ROStandard Lift Plan
1.7.2.3 G DOCritical Lift Plan
1.7.2.4 G DONaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
01 45 04 SD-01 Preconstruction Submittals
3.2 G ROContractor Quality Control (CQC)
Plan
G ROInitial Work Schedule
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES
01 45 04 3.7.2 G ROLaboratory Qualifications
3.2.2Letter of Authority
01 50 02 SD-01 Preconstruction Submittals
G ROMobilization/Demobilization Plan
3.6 G ROSecurity Plan
G DOVegetation Protection and
Restoration Plan
G RODocumentation of Existing
Conditions
1.6.1 G ROAlternate Staging Area
SD-02 Shop Drawings
3.5Contractor's Temporary Facilities
Temporary Electric Drawings
01 54 50 SD-01 Preconstruction Submittals
1.3.4Inspections and Certifications
01 57 20 SD-01 Preconstruction Submittals
G DOEnvironmental Protection Plan
SD-06 Test Reports
G DOPre-Construction Piping Plover
And Rufa Red Knot Survey(S)
SD-07 Certificates
G DOMarine Turtle Nesting Monitor
And Relocation Qualifications
G DOMarine Animal Observer
Qualifications
G DOBird Monitoring Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES
01 57 20 SD-11 Closeout Submittals
3.1.5.8Protected Species Summary
Report
G DOLogs/Summary Of Marine Turtle
Nesting And Relocation
G DOMarine Animal Observation
Report
Logs/Summary of Bird Nesting
Monitoring
Invasive And Nuisance Species
Report
01 71 23 SD-01 Preconstruction Submittals
1.4.1 G ROProfessional Surveyor and
Mapper (PSM)
G DOSurvey Plan
SD-11 Closeout Submittals
3.2Record Drawings
3.3 G ROAs-Built Cross-Sections
03 31 29 SD-02 Shop Drawings
1.4.2.1Reinforcing Steel
1.4.2.2Formwork
Construction Joints
SD-03 Product Data
Materials For Curing Concrete
2.2.4Non-Shrink Grout
2.2.4Non-Shrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES
03 31 29 Reinforcement Supports
3.4.5 G ROConstruction Joint Treatment
SD-05 Design Data
1.4.1Mixture Design
1.4.4.7Mixture Design
SD-06 Test Reports
1.4.3.1Concrete Mixture Proportions
1.4.3.2Fly Ash
1.4.3.2Natural Pozzolan
1.4.3.3Ground Iron Blast Furnace Slag
1.4.3.4Silica Fume
Accelerators
1.4.3.5Aggregates
1.4.3.6Admixtures
1.4.3.7Fiber Reinforced Concrete
1.4.3.8Cement
1.4.3.9Water
1.4.3.10Reinforcement
SD-07 Certificates
1.4.4.1Curing Concrete Elements
1.4.4.2Form Removal Schedule
1.4.4.3Concrete Placement And
Compaction
2.2.4Non-Shrink Grout
2.2.4Non-Shrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES
03 31 29 1.4.4.4Silica Fume Manufacturer's
Representative
1.4Quality Assurance
1.4.4.5Quality Assurance
1.4.4.6Field Testing Technician And
Testing Agency
1.4.1Mixture Design
1.4.4.7Mixture Design
05 50 15 SD-02 Shop Drawings
2.1 G DOMiscellaneous Metals & Standard
Metal Articles
2.2 G DOShop Fabricated Metal Items
SD-03 Product Data
2.1 G DOMiscellaneous Metals & Standard
Metal Articles
2.2 G DOShop Fabricated Metal Items
G DOAnchor Bolts
G DOThreaded Rod
SD-06 Test Reports
2.1 G DOMiscellaneous Metals & Standard
Metal Articles
2.2 G DOShop Fabricated Metal Items
06 50 14 SD-01 Preconstruction Submittals
1.4.1 G DOQualification of Manufacturer
1.4.2 G DOQualification of Engineer of
Record
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES
06 50 14 SD-03 Product Data
1.5Manufacturer's Catalog Data
SD-06 Test Reports
G DOUltraviolet Testing
06 71 33 SD-01 Preconstruction Submittals
1.4.1 G DOQualification of Manufacturer
1.4.2 G DOQualification of Engineer of
Record
SD-02 Shop Drawings
1.4.2 G DOFabrication and Installation
Drawings and Details
SD-03 Product Data
1.2.1Manufacturer's Catalog Data
SD-05 Design Data
G DOLadder Design
SD-06 Test Reports
2.1.1 G DOThermal Expansion
2.1.1 G DOUltraviolet Testing
SD-08 Manufacturer’s Instructions
1.5Manufacturer's
Recommendations
06 73 01 SD-03 Product Data
2.1.1FRP Grating
2.1.2 GFasteners, Clips And Anchorage
SD-11 Closeout Submittals
3.3Manufacturer's Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES
06 82 14 SD-01 Preconstruction Submittals
1.3.1 G DOQualifications of Manufacturer
1.3.2 G DOQualifications of Engineer of
Record
SD-02 Shop Drawings
1.3.2 G DOInstallation Drawings
SD-03 Product Data
2.1.2 G DOFRP Pipe and Tube
2.1.2 G DORailings/Guards
2.1.2 G DOAnchorage Materials
SD-05 Design Data
G DORailing Design
SD-06 Test Reports
2.1.3 G DOUltraviolet Test Reports
SD-07 Certificates
1.3.1 G DOProof of Certification from a
minimum of two quality assurance programs for its facilities or products (UL, DNV, ABS, USCG, AARR)
35 31 19 SD-02 Shop Drawings
1.7 G DOStone Source
1.4 G DOWork Plan
1.7.4 G DODelivery Method
1.8.1 G DOStone Material Quality Control
(SMQC)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES
35 31 19 G DOPedestrian Protection Plan
G DOProgress Map
SD-04 Samples
1.5 G DODemonstration Stockpiles
SD-06 Test Reports
G DOBulk Specific Gravity
1.6.2 G DOGradation Test
2.3 G DOEvaluation Testing of Stone
G DOJetty Demonstration Section
SD-07 Certificates
1.7.1 G DOStone Material Quality Control
(SMQC) Supervisor
1.8.2 G DOStone Material Quality Control
(SMQC) Supervisor
G DOConstruction Personnel
Qualifications
1.6.1 G DOWeekly Certificate
1.8.1.1 G DOWeekly SMQC Inspection/SMQC
Inspector Schedule
1.6.1 G DOSMQC Daily Inspection
Certificates
1.8.1.2 G DOSMQC Daily Inspection
Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 02
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 EXISTING UTILITIES
1.4.1 Water
1.4.2 Electricity
1.5 BRIDGE-TO-BRIDGE COMMUNICATION
1.6 WORK AND ACCESS DATA
1.6.1 Staging and Access Areas
1.6.1.1 Existing Conditions Documentation and Post Construction
Restoration
1.6.2 Contractor Responsibilities
1.7 ADJACENT PROPERTY AND STRUCTURES
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
2.1.2 Project Identification and Safety Signs
2.1.3 Construction Forms and Details
2.1.4 Warning Signs
2.1.5 Haul Road Traffic and Construction Warning Signs
2.2 TEMPORARY TRAFFIC CONTROL
2.2.1 Haul Roads
2.2.2 Barricades
2.3 TEMPORARY FENCING
2.3.1 Polyethylene Mesh Safety Fencing
2.3.2 Chain Link Panel Fencing
2.3.3 Post-Driven Chain Link Fencing
2.4 TEMPORARY WIRING
2.5 STORAGE CONTAINERS
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.1.1 Identification of Employees
3.1.2 Employee Parking
3.1.3 Onsite Information
3.1.4 Janitorial Services
3.2 AVAILABILITY AND USE OF UTILITY SERVICES
3.2.1 Lighting
3.2.2 Heating and Cooling
3.2.3 Water
3.2.4 Fire Extinguisher
SECTION 01 50 02 Page 1
3.2.5 Utility Lines
3.2.6 Electric Power
3.3 PROTECTION AND MAINTENANCE OF TRAFFIC
3.4 MAINTENANCE OF HAUL AND ACCESS ROADS
3.5 CONTRACTOR'S TEMPORARY FACILITIES
3.5.1 Contractor Field Office
3.5.1.1 Office Space for Government Personnel
3.5.2 Appearance of Trailer(s)
3.5.3 Storage Area
3.5.3.1 Maintenance of Storage Area
3.5.4 Waste Storage
3.5.5 Fuel Storage and Fueling Operations
3.6 SECURITY PLAN
3.6.1 Visitors
3.7 ACCOMMODATIONS AND MEALS FOR INSPECTORS
3.8 CLEANUP
3.9 RESTORATION OF STORAGE AREA
-- End of Section Table of Contents --
SECTION 01 50 02 Page 2
SECTION 01 50 02
TEMPORARY CONSTRUCTION FACILITIES
PART 1 GENERAL
1.1 SUMMARY
In addition to Construction Facilities this Section covers:
Temporary Utilities Construction Aids Vehicular Access and Parking Project Identification
See Section 01 57 20 ENVIRONMENTAL PROTECTION for requirements including silt control, trailer placement, fueling restrictions, dust control, solid waste, and cleanup. Upon completion of project, clean up and restore area in accordance with Clause CLEANING UP of Section 00700 CONTRACT CLAUSES in Volume 1.
a. Construction Facilities include, but are not limited to, the following:
(1) Contractor Offices
(2) Information Bulletin Board
(3) Material and Equipment Storage Area
(4) Fueling Area
(5) Secured Storage Area
(6) Employee Parking Area
(7) Debris Container (dumpster)
(8) Construction Signage to include Project Sign; Safety Sign; and, Construction Warning Signs
b. Temporary Utilities include, but are not limited to, the following:
(1) Water
(2) Electric
(3) Sewage
(4) Communications
(i) Telephone
(ii) Internet (4 Mbps or higher speed)
(5) Lighting
1.2 REFERENCES
The publications listed below form a part of this specification to extent referenced. The publications are referred to in text by basic designation only.
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2017; Errata 1-2 2017; INT 1 2017)
SECTION 01 50 02 Page 3
National Electrical Safety Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14) National Electrical Code
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 Safety and Health Requirements Manual
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the following preconstruction submittal items no later than 30 calendar days after Notice to Proceed:
SD-01 Preconstruction Submittals
Mobilization/Demobilization Plan ; G, RO
Plan shall include, but not be limited to, the following:
a. Mobilization Requirements:
(1) Methods, equipment and materials
(2) Connection of utilities
(3) Placement of site facilities and temporary controls
(4) Construction of facilities
b. Demobilization Requirements (methods, equipment and materials required to clean-up and restore site at project conclusion):
(1) Collection, recycle and disposal of solid waste
(2) Contract-generated material
(3) Utility disconnection
(4) Removal of Contractor facilities
(5) Repair and restoration of site (i.e., fences, roads, or permanent facilities)
Security Plan ; G, RO
Prepare a Security Plan for Contracting Officer describing site security as follows:
a. Day and night security
b. Weekend and holiday security
c. General security duties
Vegetation Protection and Restoration Plan ; G, DO
Prior to clearing for access, the Contractor shall submit a Vegetation Protection and Restoration Plan which will describe the
SECTION 01 50 02 Page 4 methods to be used for protection of vegetation that is not to be disturbed or otherwise impacted, and include restoration measures for vegetation cleared from access areas and in the event of the accidental damage to, or destruction of, said vegetation.
Documentation of Existing Conditions ; G, RO
Before beginning any mobilization or work, survey the site and photo-document the work area including all staging areas, haul routes, parking areas, and vegetation. Include in the record conditions of roadways, utilities, and other site features, and the location and extent of existing damage prior to starting work. It is the Contractor's responsibility to document all pertinent existing conditions that may affect the subject property.
Alternate Staging Area ; G, RO
See subparagraph "Staging and Access Areas" below.
SD-02 Shop Drawings
Contractor's Temporary Facilities
General layout sketch of temporary site facilities shall include, but not be limited to, the following:
a. Trailer locations
b. Parking areas
c. Material storage
d. Equipment lay down area
e. Areas for gravel
f. Fuel areas
g. Supplemental or other staging area
h. Temporary well, water supply
i. Septic field or holding tanks, port-a-lets
j. Contaminated water handling
k. Concrete cleaning area and methods of disposal
l. Fences -- location and dimensions, entrance and exit points, and details of installation
m. Utilities (poles, connections and services)
n. Explosives storage
Temporary Electric Drawings
Electricity supply and lighting - from transformer source sketch layout locations, fixtures, and materials, to include outdoor lighting as described in subparagraph "Electric Power" below.
1.4 EXISTING UTILITIES
The Contractor is responsible for investigating the availability of utilities at the project site. Contractor shall provide potable water, sanitary sewer, electricity from transformer, communications and optional utilities the Contractor may require at the project site. Provide internet services with 4 Mbps minimum speed and wireless capabilities to the Contractor's Field Office complex.
SECTION 01 50 02 Page 5
1.4.1 Water
In addition to the above, the Contractor shall provide and maintain at his own expense an adequate supply of water for his use for construction, and to install and maintain necessary supply connections and piping for same, but only at such locations and in such manner as may be approved by the Contracting Officer. The Contractor shall also provide and maintain his own temporary toilet and washing facilities. Toilet and washing facilities shall be installed and maintained in a location approved by the Contracting Officer. Refer to paragraph AVAILABILITY AND USE OF UTILITY SERVICES below.
1.4.2 Electricity
In addition to the above, all electric current required by the Contractor shall be furnished at his own expense. All temporary lines will be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner at his expense prior to completion of the construction. Refer to paragraph AVAILABILITY AND USE OF UTILITY SERVICES below.
1.5 BRIDGE-TO-BRIDGE COMMUNICATION
In order that radio communication may be made with passing vessels, all dredges/marine equipment engaged in work under this contract shall be equipped with bridge-to-bridge radio telephone equipment. The radio equipment shall operate on a single channel very high frequency (VHF), FM, on a frequency of 156.55 MC per second with low power output having a communication range of approximately ten miles. The frequency has been approved by the Federal Communications Commission. Channels #13 and #16 must be monitored at all times.
1.6 WORK AND ACCESS DATA
1.6.1 Staging and Access Areas
The Contractor is responsible for obtaining and coordinating staging areas and submitting for Contracting Officer's approval. Access areas are shown on the contract drawings that have been identified for the Contractor's use. The final limits of the access areas indicated on the drawings shall be field-determined by the Contracting Officer in coordination with the Local Sponsor and the Contractor. It shall be the responsibility of the Contractor to investigate and obtain any additional areas which may be necessary for his/her construction operations at the Contractor's expense. In addition to the staging area shown on the drawings, partial payment may be made for stone stored at an one alternate staging area identified by the Contractor. The additional staging area will be subject to the approval of the Contracting Officer. Approval for an alternate staging area to be used as the location for partial payment as described in Section 01 22 00 MEASUREMENT AND PAYMENT, subparagraph "Armor Stone", will be based upon, but not limited to, proximity to the project site (not greater than 100 miles), ease of transport to the job site (limited handling), and security of the site. Limited handling capability and security of the Contractor's proposed alternate staging area will be solely determined, accepted or rejected by the Contracting Officer upon the review of the Contractor's submittal detailing the proposed alternate staging area. Any damage to materials after acceptance at said staging area will be rejected at the project site and weight deducted from
SECTION 01 50 02 Page 6 payment. The Contractor shall include in the alternate staging area submittal a means to clearly identify methods as to how damaged stone would be identified and tracked if deduction is necessary. In addition, the submittal shall address the handling (removal from site) of the site-rejected stone.
1.6.1.1 Existing Conditions Documentation and Post Construction Restoration
At all access sites and staging areas to be used, the Contractor shall:
a. Photo-document the condition of all such areas prior to disrupting the site.
b. Limit access width through existing vegetation to 20 feet or less.
c. Replace any fencing, signage, curbing, or any other structural features disturbed by the Contractor's activities.
d. Restore and revegetate the access route with native dune plants to the pre-project condition subject to the approval of the Contracting Officer. Revegetation of access and staging areas shall be with sod (non-dune areas) or viable plant units (dune areas) at 18-inch maximum spacing with species and diversity equivalent to preconstruction conditions. Revegetation shall include a survival warranty of 90 percent of the plant material for 90 days. Vegetation shall be installed with fertilization and irrigation, or with initial irrigation and fertilization, at no additional expense to the Government. Shrubs and trees shall be replaced to preconstruction conditions per the requirements of Section 01 57 20 ENVIRONMENTAL
PROTECTION.
1.6.2 Contractor Responsibilities
The Contractor shall exclude the public from the work area in the immediate vicinity of his operations including but not limited to fill placement, grading, and transport. The Contractor shall minimize areas closed to the public. The Contractor shall install warning signs to warn the public and all commercial recreational boats of all construction activities. The Contractor shall be responsible for providing and maintaining all water and land access routes necessary for his equipment and plant to and from the work sites. The Contractor shall ascertain the environmental conditions which can affect access, such as climate, terrain, and winds.
1.7 ADJACENT PROPERTY AND STRUCTURES
Any damage to private or public property within the project boundaries, including staging site(s) and work and access areas/roads, shall be repaired promptly by the Contractor. Any damage as a result of the Contractor's operations shall be repaired at no cost to the Government.
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
Prior to commencement of work activities, provide a clear weatherproof covered bulletin board not less than 915 by 1220 mm (36 by 48 inches) in
SECTION 01 50 02 Page 7 size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, Safety and Health Information as required by EM 385-1-1 Section 01 and other information approved by the Contracting Officer. Legible copies of the aforementioned data shall be displayed until work is completed. Upon completion of work the bulletin board shall be removed by and remain the property of the Contractor. Coordinate requirements herein with Section
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.
2.1.2 Project Identification and Safety Signs
The requirements for the signs, their content, and location shall be as indicated on the web site provided in paragraph CONSTRUCTION FORMS AND DETAILS below. The signs shall be erected within 15 days after receipt of the Notice to Proceed. The data required by the safety sign shall be corrected daily, with light colored metallic or non-metallic numerals.
Upon completion of the project, the signs shall be removed from the site.
2.1.3 Construction Forms and Details
See the "Construction Forms & Details" module at the following web address:
https://www.saj.usace.army.mil/About/Divisions-Offices/Engineering/Design-Branch/ Specifications-Section/
2.1.4 Warning Signs
Post temporary signs, tags, and labels to give workers and the public adequate warning and caution of construction hazards according to the EM385-1-1 Section 04. Attach signs to the perimeter fencing every 150 feet or as determined by the Contracting Officer warning the public of the presence of construction hazards. Signs must require unauthorized persons to keep out of the construction site. Update the data required by the safety signs daily.
2.1.5 Haul Road Traffic and Construction Warning Signs
1/2 inch HDO plywood, or aluminum sheet, conforming to FDOT Specifications Section 700 Uniform Traffic Manual Standard Signs, non-standard signage high visibility orange with black lettering. Orange fabric mesh acceptable for temporary survey crew use.
2.2 TEMPORARY TRAFFIC CONTROL
During construction the Contractor shall provide access and temporary relocated roads as necessary to maintain traffic. The Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the State and local authorities having jurisdiction. The traveling public shall be protected from damage to person and property.
The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic.
The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads. The Contractor shall be responsible for the repair of any damage to roads caused by construction operations.
SECTION 01 50 02 Page 8
2.2.1 Haul Roads
Construct access and haul roads necessary for proper prosecution of the work under this contract in accordance with EM 385-1-1 Section 04.
Construct with suitable grades and widths; sharp curves, blind corners, and dangerous cross traffic are be avoided. Submit haul road plan for approval. Provide necessary lighting, signs, barricades, and distinctive markings for the safe movement of traffic. The method of dust control, although optional, must be adequate to ensure safe operation at all times. Location, grade, width, and alignment of construction, and hauling roads area subject to approval by the Contracting Officer. Lighting must be adequate to assure full and clear visibility for full width of haul road and work areas during any night work operations.
2.2.2 Barricades
Erect and maintain temporary barricades to limit public access to hazardous areas. Whenever safe public access to paved areas such as roads, parking areas or sidewalks is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic barricades will be required. Securely place barricades clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
2.3 TEMPORARY FENCING
Provide fencing along the construction site and at all open excavations and tunnels to control access by unauthorized personnel. Safety fencing must be highly visible to be seen by pedestrians and vehicular traffic.
Specific fencing requirements are as described herein. All fencing will meet the requirements of EM 385-1-1.
2.3.1 Polyethylene Mesh Safety Fencing
Temporary safety fencing must be a high visibility orange colored, high density polyethylene grid, a minimum of 48 inches high and maximum mesh size of 2 inches. Fencing must extend from the grade to a minimum of 48 inches above the grade and be tightly secured to T-posts spaced as necessary to maintain a rigid and taut fence. Fencing must remain rigid and taut with a minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection.
2.3.2 Chain Link Panel Fencing
Temporary panel fencing must be galvanized steel chain link panels 6 feet high. Multiple fencing panels may be linked together at the bases to form long spans as needed. Each panel base must be weighted down using sand bags or other suitable materials in order for the fencing to withstand anticipated winds while remaining upright. Fencing must remain rigid and taut with a minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection.
2.3.3 Post-Driven Chain Link Fencing
Temporary post-driven fencing must be galvanized chain link fencing 6 feet high supported by a tightly secured to galvanized steel posts driven below grade. Fence posts must be located on minimum 10 foot centers.
Posts may be set in various surfaces such as sand, soil, asphalt or
SECTION 01 50 02 Page 9 concrete as necessary. Chain link fencing must remain rigid and taut with…