This federal contract opportunity solicitation is for dredging and beach renourishment services along the North Reach Segment of Brevard County, Florida. The solicitation will consist of a Base and Option A and Option B for dredging beach compatible sand from the Canaveral Shoals II borrow area located approximately 4.5 miles offshore of Cape Canaveral Air Force Station and transporting the excavated material to placement areas shown in the project plans. Incidental work includes beach tilling, turbidity monitoring, vibration control monitoring, bird monitoring, sea turtle trawler and sweeping, and endangered species monitoring. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Jacksonville with the number W912EP20B0009. Responses are due based on the standard FAR solicitation process and any contract awards will be made thereafter.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-01
W E
P -2
-B -0
A N
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C H
E
B R
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T of Engineers
US Army Corps
SOLICITATION NO.:
SHEET INDEX
G-01
G-02
COVER AND SHEET INDEX
G-04
G-05
PROJECT OVERVIEW
C-01
C-02
C-03
C-04
C-05
CIVIL
C-06
C-07
C-08
G-06
SHEET TITLESHEET ID
C-09
C-10
C-11
C-12
C-13
C-14
C-15
C-16
C-17
C-18
C-19
C-20
C-21
G-07
G-01
G
N E
R
L
A T L A N T I C O C E A N
C O
V E
R A
N D S
H E
E T I
N D
E X
SURVEY CONTROL PLAN AND DATA
S T A T E O F F L O R I D A
B R E V A R D C O U N T Y
G-03
G-08
CANAVERAL HARBOR
(CSII)
BORROW AREA
CANAVERAL SHOALS II 4
-B
C N
R -G
I0 c o v e r.
d g n
CONTROL DATA
CONTROL DATA
CONTROL DATA
PAYMENT AND ACCEPTANCE PROFILES
CANAVERAL SHOALS II BORROW AREA PLAN
BEACH FILL PROFILES R-54 TO R-54-A
TYPICAL BEACH FILL PROFILE
BEACH FILL PROFILES R-51 TO R-53-A
BEACH FILL PROFILES R-48 TO R-50-A
BEACH FILL PROFILES R-45 TO R-47-A
BEACH FILL PROFILES R-42 TO R-44-A
BEACH FILL PROFILES R-39 TO R-41-A
BEACH FILL PROFILES R-36 TO R-38-A
BEACH FILL PROFILES R-30 TO R-32-A
SHORE PROTECTION PROJECT (SPP)
BEACH RENOURISHMENT 2021
JACKSONVILLE DISTRICT
W912EP-20-B-0009
N
BEACH FILL PLAN STA. 266+00 TO STA. 291+00
BEACH FILL PLAN STA. 291+00 TO STA. 318+00
BEACH FILL PLAN STA. 318+00 TO STA. 344+00
BEACH FILL PLAN STA. 344+00 TO STA. 370+00
BEACH FILL PLAN STA. 370+00 TO STA. 396+00
BEACH FILL PLAN STA. 396+00 TO STA. 423+00
BEACH FILL PLAN STA. 423+00 TO STA. 449+00
BEACH FILL PLAN STA. 449+00 TO STA. 475+00
BEACH FILL PLAN STA. 475+00 TO STA. 502+00
BEACH FILL PLAN STA. 502+00 TO STA. 511+00
BEACH FILL PROFILES R-33 TO R-35-A
BREVARD COUNTY, FLORIDA
NORTH REACH SEGMENT,
ABBREVIATIONS, SYMBOLS, AND SURVEY NOTES
GENERAL
R
IV
E R
IN
D
IA
N
PORT CANAVERAL
R
IV
E R
B A
N A
N A
COCOA BEACH
AFB
PATRICK
P L
A C
E M
E N
T A
R E
A
B E
A
TERMS AND ABBREVIATIONS
INDENTITY SYMBOL KEY REFERENCE SYMBOL KEY
REDUCED TO FIT
DRAWING AREA TITLE
GENERAL NOTES
DISCIPLINE DESIGNATOR
DRAWING SYMBOLOGY AND GENERAL NOTES
4255-123 1 on 20
FILL SLOPE 1' VERTICAL TO 20' HORIZONTAL
FILL SLOPE INDICATOR SYMBOL
EROSION CONTROL POINT (ECL)
CONSTRUCTION BASELINE POINT (CBL)4255-124
CB-JH99-22 IDENTIFIER
CORE BORING 200'0 100'
N
PLAN
TITLE
NORTH INDICATOR
GRAPHIC SCALE
49.5 ELEVATION AND LOCATION
CONTROL MONUMENT
HORIZONTAL AND VERTICAL
IN DIRECTION OF ARROW
MONUMENT OFF SHEET
FILL PROFILE AREA
G-02
N E
R
REDUCED TO FIT
DRAWING AREA TITLE WITH ASYMMETRICAL SCALES
PROFILE
C-01
SHEET NO.
20'0 10'100' 200'0
VERTICAL SCALE
TITLE
-B
C N
R -G
I0 S y m b .d g n
C - CIVIL
G - GENERAL
BE CCAFS 27
STAGING / ACCESS AREA
SURVEY NOTES - CSII SURVEY NOTES - BEACH
SURVEYING, 30 NOV 13.
SURVEY IN ACCORDANCE WITH USACE EM 1110-2-1003, HYDROGRAPHIC
QUALITY ASSURANCE REQUIREMENTS WERE FOLLOWED DURING THIS
11. SURVEY ACCURACY PERFORMANCE STANDARDS, QUALITY CONTROL, AND
THE TIME OF THE SURVEY.
THIS CHART IS SOLELY FOR THE DISTRIBUTION OF AVAILABLE DEPTHS AT
CONSIDERED AS INDICATING THE GENERAL CONDITIONS AT THAT TIME.
OF SURVEYS MADE ON THE DATES INDICATED ABOVE AND CAN ONLY BE
10. THE INFORMATION DEPICTED ON THIS MAP REPRESENTS THE RESULTS
9. AIDS TO NAVIGATION WERE NOT LOCATED DURING THIS SURVEY.
BREVARD CO. BORROW AREA 22, 28-30 OCT 2019 SV JACKSONVILLE
BREVARD CO. BORROW AREA 04-05, 09 OCT 2019 SV FLORIDA II
CUT DATE OF SURVEY VESSEL
FREQUENCY.
SOUNDER OPERATING AT 28/200 KHZ. ALL SOUNDINGS SHOWN ARE IN HIGH
BEAM CHECK LINES WERE CONDUCTED USING A ROSS MODEL 835 SMART
BEAM ECHOSOUNDER OPERATING AT 240 KHZ (HIGH FREQUENCY). SINGLE-
8. VERTICAL MEASUREMENTS WERE MADE USING A R2SONIC 2024 & 2026 MULTI-
AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
7. DEPTHS DEPICTED BY THIS SURVEY ARE REFERENCED TO THE NORTH
TIDE STAFF LOCATED FROM MONUMENT "JEFFORDS" (PID: BBCQ55)
REFERENCE BASE LOCATED AT "CANAVERAL LOCK ARP" (PID: BBCV67)
POSITIONING WITH THE FOLLOWING REFERENCE BASE LOCATION:
6. THIS SURVEY WAS PEROFRMED USING REAL-TIME KINEMATIC (RTK) GPS
NORTH AMERICAN DATUM OF 1983 (NAD83(2011)).
PROJECTION FOR THE EAST ZONE OF FLORIDA AND REFERENCED TO
5. PLANE COORDINATES ARE BASED ON THE TRANSVERSE MERCATOR
A (+) SIGN.
4. ALL ELEVATIONS ARE BELOW THE CHART DATUM UNLESS PRECEDED BY
(RTK) GPS AND COMPARED DAILY TO THE PROJECT TIDE STAFF.
3. TIDAL REDUCTIONS WERE OBTAINED UTILIZING A REAL-TIME KINEMATIC
AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
2. ELEVATIONS ARE IN FEET AND TENTHS AND REFER TO THE NORTH
1. REFER TO SURVEY NO. 19-303.
R -4
WITH AZIMUTH BEARING
FDEP RANGE MONUMENT
LEGEND
450+00
USCG
USACE
TYP
TOS
TOL
TOB
STA
ST
SF
RGE
RFI
RD
PI
ODMDS
N.T.S.
NOAA
NAVD88
NAD83
MLW
MLLW
MHW
LF
IP
INV
FT
FDOT
FDEP
EOB
EL
ECL
DWG
CR
CL
CBL
BLVD
APPROX
CBL STATION
UNITED STATES COAST GUARD
UNITED STATES ARMY CORPS OF ENGINEERS
TYPICAL
TOE OF SLOPE
TOLERANCE
TOP OF BERM
STATION
STREET
SQUARE FEET
RANGE
REQUEST FOR INFORMATION
ROAD
POINT OF INTERSECTION
OCEAN DREDGED MATERIAL DISPOSAL SITE
NOT TO SCALE
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
NORTH AMERICAN VERTICAL DATUM OF 1998
NORTH AMERICAN DATUM OF 1983
MEAN LOW WATER
MEAN LOWER LOW WATER
MEAN HIGH WATER
LINEAR FOOT
IRON PIPE
INVERT
FOOT/FEET
FLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
EDGE OF BERM
ELEVATION
EROSION CONTROL LINE
DRAWING
COUNTY ROUTE
CENTERLINE
CONSTRUCTION BASELINE
BOULEVARD
APPROXIMATE
A B
B R
E V
IA
T
IO
N S S
Y M
B O
L S
A N
D S
U R
V E
Y N
O T
E S
HORIZONTAL SCALE
OVERLAPPED THE HYDROGRAPHIC SURVEY.
CONTROL POINTS FOR HORIZONTAL AND VERTICAL ACCURACY. THE UPLAND SURVEY
ALL CASES RTK/GPS MEASUREMENTS WERE VERIFIED DAILY AGAINST EXISTING
USING AN ODOM DIGI-BAR VELOCIMETER. DATA WAS COLLECTED WITH HYPACK 2019. IN
REFERENCED IN THE FIELD NOTES. SOUND VELOCITY PROFILES WERE CAPTURED
WAS COLLECTED DAILY AND RECORDED IN HYPACK LINE FILES. THE DATA FILES ARE
(WHEN POSSIBLE) AT A CONTROL POINT. CALIBRATION AND QUALITY ASSURANCE DATA
100M FATHOMETER. THE VERTICAL COMPONENT WAS VERIFIED ON LAND TWICE DAILY
WAS COMPLETED UTILIZING RTK/GPS, APPLANIX POS MV SURFMASTER, AND ODOM CV
THE UPLAND AND WADING PORTIONS OF THE PROJECT. THE HYDROGRAPHIC SURVEY
8. RTK/GPS TECHNIQUES WERE USED TO COLLECT DATA ALONG THE RANGE LINES FOR
(NAVD88), U.S. SURVEY FEET.
7. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988
SURVEY FEET.
1983 (2011), FLORIDA STATE PLANE COORDINATE SYSTEM, FLORIDA EAST ZONE, U.S.
6. HORIZONTAL COORDINATES ARE REFERENCED TO THE NORTH AMERICAN DATUM OF
PROFILE LINE ORIGIN ALONG THE PUBLISHED AZIMUTH.
MONUMENT, WHEN CONDITIONS ALLOWED, AND EXTENDED 3000 FEET SEAWARD OF THE
R-141. IN GENERAL THE RANGE LINES WERE SURVEYED FROM 150 FEET WEST OF THE
5. THE SURVEY WAS LIMITED TO PROFILES OF RANGE MONUMENTS R-1T THROUGH
TO FURNISH DELIVERABLE FILES OF THE TOPOGRAPHIC & HYDROGRAPHIC DATA.
HYDROGRAPHIC SURVEY OF THE BREVARD COUNTY,SHORE PROTECTION PROJECT AND
4. THE PURPOSE OF THIS SURVEY WAS TO PERFORM A TOPOGRAPHIC AND
3. DATE OF FIELD SURVEY: 06/01/2020 THROUGH 07/10/2020.
2. LOCATION: BREVARD COUNTY, FLORIDA.
HYDROGRAPHIC MONITORING SURVEY.
1. REFER TO SURVEY NO. 20-162, BREVARD COUNTY, TOPOGRAPHIC AND
ACCESS AREA REQUIREMENTS.
TEMPORARY CONSTRUCTION FOR SPECIFICS FOR STAGING AND
OFFICER AT THE TIME OF CONSTRUCTION. SEE SECTION 01 50 02
AREAS SHOWN ARE SUBJECT TO CHANGE BY THE CONTRACTING
CONSTRUCTION ACCESS AREA BACK TO EXISTING CONDITIONS.
8. THE CONTRACTOR SHALL RESTORE THE STAGING AREA AND
MINOR DIFFERENCES IN THE BEARING.
OF FDEP’S RANGE MONUMENTS WILL VARY SLIGHTLY DUE TO
SEAWARD DISTANCE. DISTANCES ALONG ESTABLISHED AZIMUTHS
CONSTRUCTION BASELINE (CBL). POSITIVE VALUES INDICATE
TEMPLATE FEATURES ARE MEASURED PERPENDICULAR TO THE
7. UNLESS OTHERWISE INDICATED, BERM WIDTHS AND OTHER
ELEVATIONS ARE IN THE UNITS OF U.S. SURVEY FEET.
6. UNLESS OTHERWISE INDICATED, ALL POSITIONS, STATIONING AND
THE PLUS SYMBOL (+).
ALL ELEVATIONS SHOWN ABOVE REFERENCED DATUM ARE ASSIGNED
TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88).
5. UNLESS OTHERWISE INDICATED, ALL ELEVATIONS ARE REFERENCED
ADJUSTMENT OF THE NORTH AMERICAN DATUM OF 1983 (NAD83(2011)).
FLORIDA EAST ZONE (0901), AND ARE REFERENCED TO THE 2011
SHOWN IN THE STATE PLANE COORDINATE SYSTEM OF 1983,
4. UNLESS OTHERWISE INDICATED, ALL HORIZONTAL POSITIONS ARE
SYMBOLS SHOWN ON THIS SHEET.
OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF
LEGENDS AND/OR ABBREVIATIONS MAY APPEAR IN THIS SET
SET OF DRAWINGS TO THE EXTENT APPLICABLE. ADDITIONAL
SYMBOLS AND ARE PERTINENT TO THE CONDITIONS ON THIS
3. THE LEGENDS ON THIS SHEET ARE COMPOSED OF STANDARD
MEASUREMENTS (AERIAL IMAGERY DATED AUGUST 2018).
GENERAL INFORMATION ONLY AND IS NOT TO BE USED FOR
THE AERIAL IMAGERY SHOWN ON THESE DRAWINGS IS FOR
THE PERFORMANCE OF CONSTRUCTION OF THIS PROJECT.
OF ALL SUCH FEATURES THAT ARE NECESSARY FOR OR AFFECT
THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION
AND WERE NOT PHYSICALLY LOCATED BY SURVEY.
DEPICTED ON THESE DRAWINGS ARE FOR INFORMATION ONLY
2. UNLESS OTHERWISE INDICATED, ALL PLANIMETRIC FEATURES
THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF
SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS
OF THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR
1. THIS PROJECT WAS DESIGNED BY THE JACKSONVILLE DISTRICT
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-02
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
BOAT R
AMP
D O C K
D O C K
D O C K D O C K
RIP - RAP
RIP - RAP
CH
AI
N
FE
NC
E
PILINGS
CONCRETE
2' X 2'
SCATTERED ROCKS
DOLPHIN PAD
CONCRETE
12'X12' CHAIN FENCE
5' W
A
LK
W A
Y
WOOD PILING
WOOD PILING
CHAIN-LINK FENCE
D O C K
RIP - RAP
MOOR PAD
MOOR PAD
MOOR PAD
MOOR PAD
D O C K
EXISTING PIER
EXIS
TIN
G R
IP
RAP
EXISTING RAMP
E X I S T I N G D O C KE X I S T I N G D O C K
EX. RIP - RAP
EX. BOAT RAMP
EX. D O C K
EX. 3' WALKWAY
EX. SEAW
ALLEX. SEAWALL
EX. SEAWALL EX. SEAWALL
EX. SEAWALL
EX. SEAWALL
EX. SEAWALL
EX. SEAWALL
EXISTING EX. SEAWALL
EX. SEAWALL
EXISTING
EX. BULKHEAD
EX. RIP-RAP
EX. RIP-RAP
E X . E
X . M
O O
R
IN
G P
A D
E X . M
O O
R
IN
G P
A D
EX. M
OORING PADS
5' EX. MOORING PAD
EX. MOORING PADS
2.5' RADIUS
EX. MOORING PADS
3.5' RADIUS
EX. DOCK
EX. DOCK
EX.
DOCKS
EX. DOCK
E X . D
O C
K
E X . D
O C
K
EX. WOOD PILINGS
EX. WOOD PILINGS
EX. WOOD PILINGS
EX. WOOD PILINGS
E X . W
O O
D P
ILIN
G S
EX. CONCRETE RIP-RAP
E X I S T I
N G C O N C R E T E
W H A R F
EX. CONCRETE PILINGS
EX. CONCRETE PILINGS
EX. SEAWALLEX. SEAWALL
EX. SEAWALLEX. SEAWALL
EX. SEAWALL
E X . S
E A
W A
LL
EX. SEAWALL
EX. SEAWALL
E X I S T I
I P
R A P
E X I S T I N G R I P R A P
E X I S T I N G R I P - R A P
PILING
CONCRETE
16"X16"
EXISTING
PILING
CONCRETE
16"X16"
EXISTING
EX. STRUCTURES
(MERRIT ISLAND CAUSWAY)
STATE HWY NO. 520
S T
A T E H
W Y A
A
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-03
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
GULF OF MEXICO
LAKE
OKEECHOBEE
ALABAMA
GEORGIA
TALLAHASSEE
PENSACOLA
JACKSONVILLE
ORLANDO
FT MYERS
MIAMI
TAMPA
KEY WESTN.T.S.
LOCATION MAP
OF WORK
LOCATION
CANAVERAL
ST LUCIE
ST AUGUSTINE
GAINESVILLE
FLORIDA
OCEAN
ATLANTIC
BEACH
WEST PALM
FT. LUDERDALE
N
N
4000' 8000'0
A T L A N T I C O C E A N
EN
TR
A N C E C
H A
N N
EL
RIVER
BANANA
CANAVERAL HARBOR
R-1-T
T-10
R-20
R-16
R-8A
R-6T
R-4A
R-25
R-31
R-45
R-50-T
R-54 A
B E
A C
H P
L A
C E
M E
N T A
R E
A
R-54 A
R-31
PROJECT VICINITY
G-03
G E
N E
R
P
O J E
C T O
V E
R V
IE
W
(CSII)
BORROW AREA
CANAVERAL SHOALS II
Y=1480000
Y=1460000
Y=1440000
X
X
X
X
-B
C N
R -G
I0 .d g n
.9 N
A U
TI
C A L
M
IL
E S
S T
A T E H
W Y A
A
(MERRIT ISLAND CAUSWAY)
STATE HWY NO. 520
B A
S E
OPTION B
OPTION A
PORT CANAVERAL
AIR FORCE STATION (CCAFS)
CAPE CANAVERAL
R-34
R-37
R-40 R-40
R-34
R-37
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-04
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
FDEP RANGE MONUMENT TABULATION
784,164.49R-15-T
783,779.49R-17-T
MONUMENT ID X (EASTING) Y (NORTHING) AZ.
R-1-T
R-2
R-3
T-4
R-5
R-6-T
R-7-T
R-8
R-9
T-10
R-11
R-12
R-13
R-14
R-15-T
R-16
R-17-T
R-18
R-19
R-20
R-0
R-18
R-19
R-20
783,366.99
783,084.99
783,473.71
R-0 787,343.49 1,481,170.30 90
R-1-T 787,346.47 1,481,070.24 90
R-2 787,295.48 1,480,231.74
R-3 786,910.98 1,479,170.25
T-4 786,645.05 1,478,243.10
R-5 786,340.98 1,477,340.25
R-6-T 786,076.10 1,476,402.77
R-7-T 785,758.98 1,475 489.76
R-8 785,520.48 1,474,610.26
R-9 785,405.48 1,473,671.77
T-10 785,228.48 1,472,764.77
R-11 784,979.98 1,471,795.77
R-12 784,766.98 1,470,852.27
R-13 784,573.99 1,469,892.28
R-14 784,333.49 1,468,976.78
1,467,997.28
R-16 784,020.95 1,466,988.41
1,466,064.79
1,465,248.29
1,464,270.42
1,463,307.80
DSI 102
DSI 101
872 1608 F TIDAL
C 133
DESIGNATION PID NORTHING EASTING NAVD88
70 80 A 28
C 133
BREVARD GPS 1007
872 1608 F TIDAL
DSI 102
DSI 101
AK7479
AK2641
AK7478
AK6999
N/A
N/A
1397551.94
1479470.SC
1394597.61
1481030.SC
1481008.28
1480872.57
787929.76
783470.SC
788639.21
783890.SC
786278.00
785611.67
13.06
13.61
13.63
11.42
10.32
8.58
HORIZONTAL AND VERTICAL CONTROL POINT
VERTICAL CONTROL / TIDE CALIBRATION POINT
USE FOR HORIZONTAL CONTROL.
NOTE: "SC" INDICATES A SCALED HORIZONTAL POSITION; DO NOT
(SURVEY NO. 20-162 "BREVARD NORTH")
SURVEY CONTROL - BEACH
HORIZONTAL AND VERTICAL CONTROL POINT
VERTICAL CONTROL / TIDE CALIBRATION POINT
J JEFFORDS
J JEFFORDS
CANAVERAL LOCK ARP
BBCQ55
BBCV67
1,481,470.SC
1,481,407.37
783,890.SC
772,449.44
11.04
29.03
13.86
N/A
DESIGNATION PID NORTHING EASTING NAVD88
DO NOT USE FOR HORIZONTAL CONTROL.
NOTE: "SC" INDICATES A SCALED HORIZONTAL COORDINATE/POSITION,
MLLW
(SURVEY NO. 19-303 "CSII BORROW AREA")
SURVEY CONTROL - BORROW AREA
G-04
Y=1470000
Y=1480000
Y=1490000
X
X
X
TTB
TAC
MTB
WTB PORT CANVERAL
G E
N E
R
U
R V
E Y C
O N
T R
O L P
L A
N A
N D D
A T
A
LOCK ARP
CANAVERAL
NAVY
STATES
UNITED
N
1500' 3000'0
B A
N A
N A R
IV
E R
(MERRIT ISLAND CAUSWAY)
STATE HWY NO. 520
-B
C N
R -G
I0 .d g n
BREVARD GPS 1007
A T L A N T I C O C E A N
S T
A T E H
W Y A
A
PLAN VIEW - SURVEY CONTROL DATA
AIR FORCE STATION (CCAFS)
CAPE CANAVERAL
70 80 A 28
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-05
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
PT (X) EASTING (Y) NORTHING
NORTH REACH
EROSION CONTROL DATA (ECL)
782,351.08
782,347.46
782,348.02
782,352.92
782,352.66
782,359.51
782,365.20
782,370.72
782,372.85
782,378.25
782,385.30
782,399.31
782,403.69
782,412.34
782,424.21
782,430.56
782,450.80
782,462.71
782,474.27
782,480.44
782,489.85
782,504.88
782,519.77
782,531.68
782,544.78
782,555.96
782,572.30
782,586.85
782,603.38
782,612.31
782,625.49
782,640.06
782,648.55
782,666.31
782,679.20
782,704.45
782,725.47
782,741.73
782,762.28
782,771.13
782,788.47
782,804.78
782,822.49
782,836.75
1,447,552.24
1,447,752.64
1,447,938.44
1,448,174.13
1,448,346.13
1,448,564.45
1,448,759.63
1,448,960.29
1,449,155.97
1,449,357.28
1,449,542.53
1,449,750.12
1,449,950.25
1,450,148.38
1,450,339.06
1,450,517.71
1,450,752.73
1,450,957.07
1,451,170.35
1,451,359.64
1,451,546.33
1,451,762.03
1,451,965.40
1,452,160.76
1,452,349.95
1,452,529.12
1,452,763.43
1,452,959.51
1,453,170.94
1,453,345.75
1,453,555.87
1,453,783.29
1,453,945.29
1,454,161.37
1,454,292.51
1,454,564.63
1,454,771.80
1,454,952.92
1,455,187.70
1,455,342.87
1,455,562.35
1,455,753.83
1,455,957.21
1,456,153.53
PLANE COORDINATES (NAD83(90)) FL E
POINT (X) EASTING (Y) NORTHING STATIONING
PLANE COORDINATES (NAD83(90))
782,438.28
782,467.98
782,650.35
782,838.09
1,448,044.34
1,450,194.22
1,453,622.32
1,456,120.32
337+49.11
315+99.02
281+66.08
256+61.03
CONSTRUCTION BASELINE (CBL)
BREVARD NORTH REACH
R-36 A
R-36
R-35 A
R-35-T
R-34 A
R-34
R-33 A
R-33
R-32 A
R-32
R-31 A
R-31
R-30 A
R-30
R-29 A
R-29-T
R-28 A
R-28-T
R-27 A
POINT (X) EASTING (Y) NORTHING
FDEP RANGE MONUMENT CONTROL DATA
782,020.41
782,025.49
782,020.47
782,030.49
782,041.36
782,052.49
782,061.28
782,307.99
782,328.55
782,364.49
782,384.31
782,306.49
782,376.22
782,427.99
782,496.52
782,442.49
782,518.84
782,399.49
782,645.63
1,447,481.29
1,448,037.84
1,448,497.71
1,448,948.34
1,449,346.54
1,449,877.83
1,450,188.69
1,450,683.33
1,451,157.19
1,451,653.83
1,452,169.65
1,452,645.33
1,453,093.55
1,453,622.32
1,454,117.88
1,454,631.82
1,455,057.50
1,455,598.32
1,456,120.57
PLANE COORDINATES (NAD83(90))
R-36-A
R-36
R-35-A
R-35-T
R-34-A
R-34
R-33-A
R-33
R-32-A
R-32
R-31-A
R-31
R-30-A
R-30
R-29-A
R-29-T
R-28-A
R-28-T
R-27-A
SHORELINE
APPROXIMATE
ECL
CBL
SHORELINE
APPROXIMATE
O C E A N
A T L A N T I C
X ,0
X ,0
X ,0
X ,0
Y=1,456,000
Y=1,454,000
Y=1,452,000
Y=1,450,000
Y=1,448,000
BAHAMA BLVD.
N
A T
L A
N T
IC
B
L V
D
N. 4TH ST.
MINUTEMEN CAUSEWAY
T R
IN
ID
A D R
D
TULIP AVE.
S T A T E O F F L O R I D A
B R E V A R D C O U N T Y
C I T Y O F C O C O A B E A C H
N
500' 1000'0
CONTROL DATA
MATCHLINE SHEET G-06 STA. 344+00
G-05
G E
N E
R
N T
R O
L D
A T
A -B
C N
R -G
I0 .d g n
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-06
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
POINT (X) EASTING (Y) NORTHING STATIONING
PLANE COORDINATES (NAD83(90))
782,647.51
782,510.08
782,397.73
1,438,734.69
1,442,694.65
1,446,736.05
430+63.33
391+00.99
350+58.03
CONSTRUCTION BASELINE (CBL)
BREVARD NORTH REACH
PT (X) EASTING (Y) NORTHING
NORTH REACH
EROSION CONTROL DATA (ECL)
782,581.90
782,560.40
782,551.13
782,547.56
782,537.75
782,518.23
782,513.34
782,510.08
782,498.16
782,482.53
782,480.04
782,477.20
782,471.82
782,469.70
782,468.28
782,465.90
782,462.86
782,458.09
782,440.59
782,439.73
782,433.51
782,419.41
782,409.29
782,391.09
782,379.35
782,375.28
782,366.51
782,359.96
782,354.76
782,351.38
782,346.88
782,346.65
782,348.30
782,344.49
782,346.49
782,341.63
782,342.67
782,341.80
782,339.17
782,341.03
782,346.72
782,343.84
782,346.95
PLANE COORDINATES (NAD83(90)) FL E
1,438,645.45
1,438,852.79
1,439,052.78
1,439,239.55
1,439,454.50
1,439,664.26
1,439,835.51
1,440,031.78
1,440,246.80
1,440,443.00
1,440,665.41
1,440,850.93
1,441,037.47
1,441,221.98
1,441,450.13
1,441,656.72
1,441,846.84
1,442,024.81
1,442,217.32
1,442,415.64
1,442,611.35
1,442,838.16
1,443,025.46
1,443,314.82
1,443,625.35
1,443,833.38
1,444,176.52
1,444,416.52
1,444,563.97
1,444,758.79
1,444,988.09
1,445,178.83
1,445,360.75
1,445,550.45
1,445,751.57
1,445,959.13
1,446,179.83
1,446,366.74
1,446,538.73
1,446,753.05
1,446,924.69
1,447,149.12
1,447,345.70
R-45 A
R-45
R-44 A
R-44
R-43 A
R-43-T
R-42 A
R-42
R-41 A
R-41-T
R-40 A
R-40
R-39 A
R-39
R-38 A
R-38
R-37 A
R-37
(X) EASTING (Y) NORTHING
FDEP RANGE MONUMENT CONTROL DATA
1,438,734.69
1,439,252.57
1,439,767.69
1,440,256.80
1,440,721.55
1,441,201.85
1,441,687.88
1,442,192.35
1,442,686.96
1,443,190.35
1,443,736.09
1,444,142.85
1,444,751.57
1,445,103.84
1,445,597.27
1,446,091.34
1,446,730.05
1,447,176.35
R-45-A
R-45
R-44-A
R-44
R-43-A
R-43-T
R-42-A
R-42
R-41-A
R-41-T
R-40-A
R-40
R-39-A
R-39
R-38-A
R-38
R-37-A
R-37
PLANE COORDINATES (NAD83(90))
782,244.41
782,439.77
782,218.39
782,355.17
782,195.58
782,201.50
782,174.16
782,164.00
782,150.05
782,144.50
782,122.22
782,112.99
782,096.56
782,084.99
782,058.16
782,035.49
782,236.34
782,207.06
POINT
O C E A N
A T L A N T I C
ECL
CBL
SHORELINE
APPROXIMATE
APPROXIMATE SHORELINE
X ,0
X ,0
X ,0
X ,0
Y=1,446,000
Y=1,444,000
Y=1,442,000
Y=1,440,000
S. 4TH ST.
S
O R
L A
N D
O A
V E
S
B R
E V
A R
D A
V E
W. BAY DR.
BANANA RIVER
BANANA RIVER
S T A T E O F F L O R I D A
B R E V A R D C O U N T Y
C I T Y O F C O C O A B E A C H
MATCHLINE SHEET G-05 STA. 344+00
CONTROL DATA
N
500' 1000'0
MATCHLINE SHEET G-07 STA. 433+00
G-06
G E
N E
R
N T
R O
L D
A T
A -B
C N
R -G
I0 .d
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-07
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
POINT (X) EASTING (Y) NORTHING STATIONING
PLANE COORDINATES (NAD83(90))
783,319.04
783,071.34
782,984.11
1,429,759.87
1,432,511.87
1,433,726.02
520+63.70
493+00.58
480+83.30
CONSTRUCTION BASELINE (CBL)
BREVARD NORTH REACH
PT (X) EASTING
NORTH REACH
EROSION CONTROL DATA (ECL)
783,245.74
783,224.06
783,203.62
783,180.93
783,163.78
783,141.98
783,122.64
783,106.38
783,077.12
783,061.70
783,048.61
783,038.30
783,020.51
783,008.51
782,999.44
782,986.21
782,970.54
782,957.91
782,941.89
782,922.59
782,904.59
782,890.86
782,877.24
782,862.36
782,842.04
782,826.58
782,814.70
782,801.08
782,790.94
782,781.27
782,761.32
782,743.23
782,720.58
782,713.52
782,700.46
782,680.59
782,669.30
782,657.08
782,648.17
782,630.65
782,616.78
782,597.72
782,588.49
PLANE COORDINATES (NAD83(90)) FL E
(Y) NORTHING
1,430,189.20
1,430,388.10
1,430,591.05
1,430,786.77
1,430,987.88
1,431,190.21
1,431,384.78
1,431,582.45
1,431,785.13
1,431,979.26
1,432,188.22
1,432,349.23
1,432,566.60
1,432,757.16
1,432,944.58
1,433,148.00
1,433,345.14
1,433,576.39
1,433,760.44
1,433,963.07
1,434,166.10
1,434,366.15
1,434,563.07
1,434,756.42
1,434,956.01
1,435,162.61
1,435,356.27
1,435,521.53
1,435,651.46
1,435,857.59
1,436,055.03
1,436,258.18
1,436,499.02
1,436,636.90
1,436,860.33
1,437,064.07
1,437,237.88
1,437,475.20
1,437,633.69
1,437,866.94
1,438,059.35
1,438,241.34
1,438,447.44
R-55-T
R-54 A
R-54
R-53 A
R-53-T
R-52 A
R-52-T
R-51 A
R-51-T
R-50 A
R-50-T
R-49 A
R-49
R-48 A
R-48
R-47 A
R-47
R-46 A
R-46
POINT (X) EASTING (Y) NORTHING
FDEP RANGE MONUMENT CONTROL DATA
783,215.26
783,174.00
782,998.63
782,928.00
782,864.13
782,802.00
782,766.51
782,740.00
782,733.11
782,705.00
782,698.91
782,805.00
782,717.18
782,697.53
782,517.74
782,473.00
782,418.57
782,382.00
782,325.30
782,268.50
1,429,258.62
1,429,759.87
1,430,203.24
1,430,708.87
1,431,197.19
1,431,698.87
1,432,090.88
1,432,511.87
1,433,023.65
1,433,470.87
1,433,726.02
1,434,181.36
1,434,847.99
1,435,345.76
1,435,822.27
1,436,358.86
1,436,893.61
1,437,298.86
1,437,806.34
1,438,293.36
R-55.5
R-55-T
R-54-A
R-54
R-53-A
R-53-T
R-52-A
R-52-T
R-51-A
R-51-T
R-50-A
R-50-T
R-49-A
R-49
R-48-A
R-48
R-47-A
R-47
R-46-A
R-46
PLANE COORDINATES (NAD83(90))
X ,0
X ,0
X ,0
X ,0
O C E A N
A T L A N T I C
SHORELINE
APPROXIMATE
CBL
ECL
APPROXIMATE SHORELINE
X=1,434,000
X=1,436,000
X=1,438,000
X=1,432,000
X=1,430,000
20TH ST.
R
IV
E R
S
ID
E T
R A
IL
A V
E
S . A
T L
A N
T
IC
BANANA RIVER
BASE
AIRFORCE
PATRICK
S T A T E O F F L O R I D A
B R E V A R D C O U N T Y
C I T Y O F C O C O A B E A C H
CONTROL DATA
N
500' 1000'0 G-07
G E
N E
R
N T
R O
L D
A T
A -B
C N
R -G
I0 .d g
MATCHLINE SHEET G-06 STA. 433+00
G-08
N E
R A
L
P A
Y M
E N
T A
N D A
C C
E P
T A
N C
E P
R O
F
IL
E S
-B
C N
R -G
I0 .d
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\01 General\G-08
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
(TYPICAL SECTION)
(TYPICAL SECTION)
(TYPICAL SECTION)
PAYMENT AREA
TOLERANCE TEMPLATE AREA
REQUIRED TEMPLATE AREA
A(P) = PAYMENT AREA
A(T) = TOLERANCE AREA
A(R) = REQUIRED AREA
(TYPICAL SECTION)
PAYMENT AREA
(TYPICAL SECTION)
ACCEPTANCE
NOT TO SCALE
SURVEYED CONDITION
PRE-CONSTRUCTION
SURVEYED CONDITION
PRE-CONSTRUCTION
SURVEYED CONDITION
PRE-CONSTRUCTION
PAY SURVEY
CONSTRUCTION
POST-
TEMPLATE
REQUIRED
WATERLINE (VARIES)
PAY SURVEY
CONSTRUCTION
POST-
WATERLINE (VARIES)
SURVEYED CONDITION
PRE-CONSTRUCTION
PAY SURVEY
CONSTRUCTION
POST-
WATERLINE (VARIES)
TEMPLATE
REQUIRED
PAY SURVEY
CONSTRUCTION
POST-
WATERLINE (VARIES)
TEMPLATE
REQUIRED
A(P)A(P)
SURVEYED CONDITION
PRE-CONSTRUCTION
WATERLINE (VARIES)
TEMPLATE
REQUIRED
BEACH BERM ACCEPTANCE PROFILES
BEACH BERM PAYMENT PROFILES
A(R)
A(T)
SLOUGH ZONE
UP-SLOPE
PLAN - PAYMENT AND ACCEPTANCE PROFILES
NOT TO SCALE
FLAT BERM
A(P) CANNOT BE GREATER THAN A(T)
A(P) MUST BE GREATER THAN OR EQUAL TO A(R)
A(R) ≤ A(P) ≤ A(T)
NOTES:
SEE NOTE 2
NOTES:
(SEE NOTE 1)
ACCEPTANCE SURFACE
AND FINAL GRADING
POST-CONSTRUCTION
FORESHORE BERM
TEMPLATE
REQUIRED
A(T)
A(P)
A(P)
3. THE PROFILE WILL NOT BE ACCEPTED IF THERE ARE UNFILLED AREAS BELOW THE REQUIRED TEMPLATE ALONG THE FLAT BERM.
2. NO PAYMENT WILL BE MADE FOR MATERIAL ABOVE TOLERANCE LANDWARD OF THE SLOPED BERM SHOWN.
1. NO PAYMENT WILL BE MADE FOR SQUARE FOOTAGE OF A(P) GREATER THAN A(T).
TOLERANCE
CONSTRUCTION
+0.5 FOOT
TOLERANCE
CONSTRUCTION
+0.5 FOOT
TOLERANCE
CONSTRUCTION
+0.5 FOOT
TOLERANCE
CONSTRUCTION
+0.5 FOOT
TOLERANCE
CONSTRUCTION
+0.5 FOOT
FOR PAYMENT
DOES NOT QUALIFY
BERM
SLOPED
AS DETERMINED BY THE CONTRACTING OFFICER.
2. MINOR SLOUGHING AT SEAWARD TOE CAUSED BY WAVES AND CURRENTS MAY BE ACCEPTABLE
THE SURFACE QUALIFIES FOR ACCEPTABLE.
THE FINAL GRADING CONDITION WILL BE INSPECTED BY THE ON-SITE GOVERNMENT REPRESENTATIVE TO VERIFY IF
1. FINAL ACCEPTANCE SURFACE SHALL BE GRADED BETWEEN THE REQUIRED TEMPLATE AND TOLERANCE TEMPLATE.
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-01
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
CL10
R-30
R-30 A
R-29 A
R-29-T
R-28 A
17.2 17.1 17.0
17.0 16.9 16.9
16.8 16.7 16.6
16.4 16.4 16.3
16.2 16.2 16.1
16.0 15.9
15.8
15.8
15.7 15.6
15.5 15.5
15.3
15.3
15.3
15.2
15.0
15.0
15.0 14.8
14.8
14.7 14.5
14.5
14.5 14.3
14.2 14.2
14.1
14.1 14.0
13.8 13.8
13.8 13.5 13.5
13.5 13.3 13.3
13.2 13.1
13.1
13.0
13.0
12.9 12.8
12.6 12.6
12.6 12.4
12.3
12.2 12.1
12.0
11.8 11.7
11.7 11.6
11.5 11.5 11.4 11.3
11.3
11.2 11.0
11.0 10.9
10.8
10.7
10.6 10.6
10.5
10.4 10.3
10.3
10.2 10.1
+-10.0
10.0 9.8
9.7
9.7
9.6
9.5 9.5
9.4 9.4
9.2 9.1
9.1
9.0 9.0
8.8 8.8
8.8
8.7
8.5
8.5 8.5
8.3
8.3 8.2
8.1
8.0 8.0
7.9
7.8
7.7 7.7
7.6
7.5 7.4
7.3
7.3
7.2
7.1
7.1
7.1
7.0
6.9
6.9
6.9
6.9
6.7
6.7
6.7
6.6
6.5
6.4
6.2
6.0
6.0
5.5
5.4 4.4
4.2 3.8
3.5
3.3
2.8
2.8
2.8
2.5
2.5
2.2
2.1
1.9
1.8
1.5
1.4
1.0 0.9
0.1 +0.0
+1.2
+1.3+3.1
+3.5+5.3
+5.7
+6.0
+6.1
+6.5
+6.7
+6.7 +6.9
+7.0 +7.3
+7.4
+7.7
+8.2
+9.0
+9.3
+9.8
+10.3
+10.6
+10.6 +10.7
+11.6
+12.3
+12.4
+12.5
+12.8
+13.0
+13.3
+14.0
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N
A T L A N T I C O C E A N
X=783500
X=783000
X=782500
Y
CBL
ECL
N
100' 200'0 C-01
-B
C N
R -C
N p ln .d g n
BEACH FILL PLAN
C
IV
IL
M A
T C
H L
IN
E E
T C
-0 S
T A
X=784000
Y
Y
Y
Y
Y
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
NO PLACEMENT ON THIS SHEET
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-02
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
CL11
R-33
R-33 A
R-32
R-31
R-32 AR-31 A
17.1 17.0 16.9
16.9
16.8 16.7 16.7
16.7
16.7 16.6
16.6 16.5
16.5 16.4
16.4
16.2 16.2 16.2
16.2
16.1 16.1 16.1 16.0
15.9 15.9 15.8 15.8
15.8 15.7
15.7
15.5 15.5
15.5
15.5 15.4 15.3
15.3
15.2
15.1
15.1 15.0 15.0
15.0
15.0 14.9 14.9
14.8 14.8
14.8
14.8 14.7 14.6
14.5 14.5 14.5
14.4 14.4
14.4 14.3 14.2 14.2 14.2
14.0 14.0 14.0
13.9 13.8
13.8 13.8 13.7
13.6 13.6
13.5
13.5 13.4
13.3 13.3
13.3 13.1 13.1 13.1
13.1 13.0
12.9 12.9
12.8 12.8
12.8 12.7 12.6
12.6 12.5
12.5 12.4
12.3 12.3
12.3 12.3
12.2 12.1 12.0 12.0
12.0 11.9 11.9 11.8 11.7
11.7 11.6 11.6 11.6 11.5 11.4
11.4
11.4 11.3
11.3
11.2 11.2 11.1
11.0 10.9
10.9 10.9 10.8
10.7 10.7 10.7 10.7 10.6
10.6 10.6 10.4
10.4
10.4 10.4
10.4 10.3
10.3 10.2
10.1 10.1
10.1
10.1 10.0 9.9
9.8 9.8
9.8 9.7 9.7 9.7
9.5 9.5 9.5
9.5 9.4
9.3 9.2
9.2
9.2
9.2 9.1
9.0 9.0 8.9
8.9 8.8 8.8
8.7
8.6 8.6
8.5 8.5
8.4
8.3 8.3
8.3
8.2 8.2
8.1
8.0 8.0
8.0 7.9
7.9 7.9
7.8 7.8 7.8
7.7 7.7 7.6 7.6
7.6
7.4 7.4 7.4 7.3
7.3
7.2 7.2 7.2 7.1
7.1 7.0 7.0 7.0
7.0
7.0
6.9
6.9 6.9
6.8
6.8
6.8
6.7
6.7 6.6
6.6
6.6
6.6
6.5 6.5
6.4
6.4 6.4
6.3 6.3
6.3
6.3
6.3
6.1 6.1
6.1
6.0 6.0
6.0 5.9
5.9
5.8 5.8 5.7
5.6
5.5
5.5
5.3
5.2
5.1 4.8
4.6
4.5
4.4 4.3 4.3
4.1 4.0
4.0 3.9
3.7
3.5
3.4 3.4
3.4
3.3
3.1 3.1
2.9
2.8 2.8
2.6 2.5 2.5
2.4 2.3
2.3 2.1
2.0
2.0 1.9
1.8
1.8 1.8
1.7
1.7 1.6 1.5 1.3
1.2 1.2 1.0
0.9 0.7
0.7
0.4 0.3
0.1
+0.0 +0.8 +0.8
+0.9 +1.0
+1.0 +2.3+2.4
+2.6 +3.7
+4.1 +4.3 +4.9+5.0
+5.6+5.7 +5.8+5.9+6.0
+6.1 +6.1
+6.1
+6.2
+6.3 +6.4
+6.6 +6.9
+6.9
+6.9
+7.1 +7.1
+7.3 +7.3+7.5
+7.6
+7.6
+7.7 +7.8
+7.8 +7.8
+8.2
+8.2
+8.2
+8.2 +8.3
+8.3
+8.4
+8.4
+8.5 +8.5
+8.5
+8.6 +8.7
+8.8
+8.8 +8.8
+8.8
+9.1
+9.1
+9.1
+9.1
+9.1
+9.2
+9.4
+9.5
+9.5
+9.6
+9.7
+9.7
+9.9
+9.9
+10.2
+10.2
+10.3
+10.6
+11.1
+11.1
+11.5+11.5
+14.3
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N
N
N D S
T
N
T H S
T
A T L A N T I C O C E A N
NO PLACEMENT ON THIS SHEET
X=783500
X=783000
X=782500
Y
Y
Y
Y
Y
CBL
ECL
N
100' 200'0
-B
C N
R -C
N p ln .d g n
BEACH FILL PLAN
C
IV
IL
M A
T C
H L
E E
T C
-0 S
T A
C-02
M A
T C
H L
E E
T C
-0 S
T A
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
N ATLANTIC A
VE
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-03
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
CL12
R-36 R-36 AR-34
R-35 A
R-34 A R-35-T
18.1 17.8 17.7
17.6 17.6
17.5
17.5 17.5
17.4 17.3
17.3
17.3 17.3
17.2
17.2 17.2
17.1
17.0
17.0
16.9 16.8
16.8
16.8
16.7
16.6
16.6 16.5
16.5
16.5 16.3 16.3
16.3 16.2
16.1 16.1
16.1
16.1
16.0
16.0
16.0 15.9
15.8
15.8
15.7
15.7 15.7
15.6 15.5
15.5
15.4
15.4
15.3 15.2
15.2
15.2
15.2 15.1
15.1
15.0 15.0
15.0
14.9 14.8
14.8
14.7
14.7
14.7
14.7 14.6
14.5 14.4
14.4 14.4
14.3
14.2
14.2
14.1
14.1
14.0
14.0
13.9
13.9
13.9
13.8
13.7
13.7
13.7 13.6
13.6
13.5
13.5
13.4
13.4
13.3
13.3
13.2
13.1
13.1
13.0 13.0
13.0
13.0
12.8
12.8 12.8 12.7
12.6
12.6
12.6
12.5 12.5
12.5 12.5
12.4 12.3
12.2
12.2 12.2
12.1 12.1
12.1
12.0
11.9 11.8
11.8
11.8
11.7
11.7 11.6
11.6
11.6 11.6
11.5
11.4 11.4
11.3
11.2
11.2
11.1 11.0
11.0 11.0
11.0 10.8
10.8
10.8
10.8
10.7 10.7
10.6
10.5
10.5
10.4 10.4
10.3 10.3
10.2 10.2
10.2
10.1 10.0
10.0 10.0
10.0
9.9
9.8
9.8
9.8
9.8 9.7
9.6
9.5
9.5 9.5
9.4 9.4
9.3
9.2
9.2 9.2
9.1 9.0 9.0
9.0
8.9 8.9
8.9
8.9 8.8
8.7 8.7 8.7
8.7 8.6 8.6
8.5
8.4 8.4
8.4 8.4 8.3
8.3
8.2 8.2
8.1 8.1 8.0
8.0 7.9 7.9
7.8 7.8 7.8
7.7 7.7
7.6 7.6
7.6 7.6 7.5
7.5
7.5
7.4
7.4
7.4 7.4 7.4 7.3
7.2 7.2
7.2
7.2 7.2
7.1 7.1
7.1
7.1 7.0
6.9 6.9
6.9
6.9
6.9
6.8
6.8 6.8
6.8
6.8
6.7 6.7
6.7
6.6
6.6 6.6
6.6 6.6
6.6
6.5
6.5
6.5
6.5
6.4
6.4 6.4
6.4
6.3
6.3
6.2 6.2
6.1
6.1
6.1
6.0
5.9 5.9
5.8
5.8
5.8
5.8 5.7
5.5
5.3
5.2
5.2
5.0
4.9 4.6
4.5
4.5
4.5
4.4 4.0 4.0
4.0 3.9
3.9
3.8 3.8
3.8
3.8
3.7 3.7
3.6
3.5 3.5
3.4 3.4
3.4
3.4
3.4
3.4
3.4
3.3
3.1 3.1
3.0
2.9 2.8
2.7 2.6
2.6
2.5 2.4 2.4
2.2
2.2
2.1 2.1
2.0 2.0
1.9
1.9
1.8
1.8
1.6 1.4
1.3
1.1 1.1 1.0
0.9 0.6
0.5
0.3 0.3 +0.2
+0.2
+0.5 +0.6
+0.9 +1.2
+1.4 +1.5
+1.8 +2.1
+3.0
+3.1+3.3
+3.4
+4.0
+4.4
+5.1 +5.2
+5.5 +5.6 +5.8
+5.8
+5.9+5.9
+6.0
+6.0 +6.1
+6.1
+6.2
+6.2+6.4
+6.4
+6.5
+6.6
+6.8
+6.9+7.0 +7.0
+7.5
+7.5
+7.5
+7.6+7.6 +7.8 +7.9
+8.1
+8.1
+8.4
+8.4 +8.5
+8.5
+8.6
+8.6
+8.6
+8.6
+8.6
+8.6
+8.7
+8.7
+8.7
+8.7
+8.7
+8.8
+8.8
+8.9 +8.9
+8.9
+9.0 +9.0
+9.0
+9.0
+9.2
+9.3 +9.3
+9.4 +9.6
+9.7
+10.0
+10.0
+10.0
+10.1
+10.2
+10.4 +10.5+10.5
+10.5 +10.6
+10.6
+10.7
+11.0
+11.0
+11.3 +11.5
+11.5+11.5
+11.6
+12.0
+12.1 +12.2
+12.2 +12.2 +12.4
+14.0
+14.1+14.1
+14.3 +15.3
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N
A T L A N T I C O C E A N o n o n
M
IN
U T
E M
E N C
A U
S E
W A
Y
N
S T S
T
-B
C N
R -C
N p ln .d g n
C-03
C
IV
IL
X=783500
Y
X=783000
X=782500
X=782000
Y
Y
Y
Y
ELEV. +8.2 (NAVD 88)
CBL
ECL
APPROXIMATE TOE OF FILL
N
100' 200'0
BEACH FILL PLAN
M A
T C
H L
E E
T C
-0 S
T A
M A
T C
H L
E E
T C
-0 S
T A
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
OPTION B
N ATLANTIC AVE
ELEV +6.7 (NAVD 88)
SLOPED BERM CREST
SEAWARD EDGE OF
ELEV +8.2 (NAVD 88)
FLAT BERM CREST
SEAWARD EDGE OF
525' TRANSITION (OPTION B)
E N
D O
F F
IL
L S
T A
S T
A
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-04
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
CL13
R-39 A R-39
R-38
R-37
R-38 A
R-37 A
18.3 18.3 18.2 18.2
18.2 18.2
18.1
18.0 18.0
18.0 17.9
17.9 17.9 17.9 17.8
17.8 17.7
17.7
17.7 17.6 17.6
17.5 17.4 17.4
17.4 17.4
17.2 17.2
17.2 17.2
17.1 17.0
17.0
17.0 16.9
16.9
16.8 16.8 16.7
16.7 16.6 16.6
16.6
16.6
16.5 16.5
16.4
16.4 16.3 16.3
16.2
16.2
16.1 16.1
16.1 16.0
15.9 15.9 15.8
15.8
15.8 15.8
15.7 15.6 15.6
15.6 15.5
15.4 15.4 15.4 15.3 15.3
15.3
15.2
15.1 15.1
15.0 15.0
15.0 14.9
14.8
14.8
14.8 14.7
14.7 14.6 14.5 14.5
14.5 14.4 14.3
14.3 14.3
14.2 14.1 14.0 14.0 14.0
13.9 13.9
13.8 13.7 13.7
13.6 13.5 13.5
13.5 13.5 13.5 13.4 13.3
13.2 13.2
13.2 13.1
13.0
13.0 13.0
13.0 12.8
12.7 12.7 12.7 12.7
12.5 12.5
12.4 12.4
12.4
12.3 12.1
12.1 12.1 12.1
12.0
12.0
11.9 11.8 11.8 11.7 11.7
11.7
11.6 11.5
11.4 11.3
11.3
11.2 11.1 11.1
11.0 11.0 10.9
10.9
10.9 10.8
10.8 10.6
10.6 10.6
10.5 10.5 10.4 10.3
10.3 10.3
10.1 10.1 10.1
10.0 10.0
9.8 9.8 9.8
9.7 9.7
9.6 9.6
9.5 9.4 9.3
9.3
9.3 9.3
9.0 9.0
9.0
9.0 9.0
8.8 8.8
8.7
8.7 8.7
8.6 8.6
8.5
8.5
8.4 8.4
8.3
8.3
8.2 8.2
8.2 8.1 8.1
8.0
8.0
8.0 7.9
7.9
7.8
7.8
7.7
7.7
7.7
7.6 7.6
7.6 7.6
7.5
7.4
7.3
7.3
7.3 7.3 7.3
7.2 7.1
7.1 7.1
7.1
7.1
7.0 7.0
7.0
6.8
6.8 6.8
6.8
6.8
6.7
6.6
6.5 6.5
6.5
6.4
6.4
6.4
6.3
6.3
6.2
6.2
6.2 6.2
6.1 6.0
6.0 6.0
6.0
5.9 5.9
5.8 5.7 5.7
5.6 5.5
5.4
5.4 5.3
5.3
5.0
5.0
5.0 4.5 4.5 4.4
4.4
4.3
4.1
3.9 3.9 3.8 3.7
3.7 3.5
3.4 3.4
3.2 3.1
3.1 3.1
2.9
2.8 2.8
2.8
2.7 2.5
2.5 2.3
2.2 2.1 2.0
1.9
1.9
1.6
1.5 1.5 1.4
1.3 1.2 0.9
0.7 0.7 0.5 0.5 +0.0
+0.2 +0.5
+0.6 +1.0
+1.2
+1.6 +2.3 +2.4
+2.7 +3.1
+4.2+4.2 +4.7 +5.3
+5.3 +5.4
+5.6 +5.8
+6.1 +6.2
+6.2
+6.2+6.2
+6.3 +6.4 +7.0
+7.1 +7.2
+7.2
+7.4
+7.6+7.7
+7.9
+7.9 +7.9
+8.0+8.0
+8.2
+8.2
+8.3
+8.3
+8.4
+8.4
+8.6
+8.6
+8.7
+8.7
+8.7
+8.8
+8.8
+8.9
+8.9 +9.0
+9.0 +9.1
+9.1
+9.2 +9.2
+9.3
+9.3
+9.3
+9.4
+9.5
+9.5
+9.6
+9.7 +9.8
+9.9
+9.9
+10.0
+10.0
+10.1 +10.3
+10.3 +10.4 +10.5 +10.6
+10.6
+10.6
+10.7 +10.8 +11.2
+11.4 +11.7
+11.8 +12.5
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N
S
T H S
T
A T L A N T I C O C E A N
S
R D S
T o n o n
Y
X=783500
X=783000
X=782500
X=782000
Y
Y
Y
Y
Y
N
100' 200'0
BEACH FILL PLAN
-B
C N
R -C
N p ln .d g n
M A
T C
H L
E E
T C
-0 S
T A
M A
T C
H L
E E
T C
-0 S
T A
ECL
CBL
APPROXIMATE TOE OF FILL
C-04
C
IV
IL
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
OPTION A
ELEV +6.7 (NAVD 88)
SLOPED BERM CREST
SEAWARD EDGE OF
ELEV +8.2 (NAVD 88)
FLAT BERM CREST
SEAWARD EDGE OF
S ATLANTIC AVE
OPTION B
450' TRANSITION (OPTION A)
S T
A
S T
A
SHEET GENERAL NOTES
STA. 350+75 SHALL BE PAID UNDER OPTION B.
3. IF OPTION B IS AWARDED, PLACEMENT OF FILL NORTH OF
2. OPTION A MUST BE AWARDED FOR OPTION B TO BE AWARDED.
TRANSITION FROM STA. 350+75 TO STA. 346+25.
1. IF OPTION A IS ONLY AWARDED, PLACEMENT OF FILL WILL
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-05
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
CL14
R-42
R-41 A
R-40 R-41-TR-40 AR-39 A
19.7
19.6
19.5 19.4
19.4 19.3
19.3 19.3
19.3
19.2 19.2
19.2 19.2
19.1 19.0
18.9
18.9 18.9
18.8 18.8
18.7 18.7
18.7 18.7 18.6 18.5
18.4 18.4 18.4 18.4
18.3
18.2 18.2 18.1
18.1
18.0
18.0 17.9 17.9
17.9
17.9
17.8 17.7
17.7 17.6
17.6
17.5
17.5 17.4 17.4
17.4
17.3
17.3 17.2
17.1
17.1 17.0 16.9
16.9
16.9
16.9
16.8 16.7 16.7 16.6
16.5 16.5 16.5 16.4
16.3 16.3 16.3
16.3
16.2
16.1 16.1
16.1
16.1
15.9 15.9
15.9
15.8 15.8
15.7 15.7
15.6
15.6
15.5
15.4 15.4
15.4
15.3 15.2
15.2
15.2 15.1
15.1 15.0
14.9 14.9
14.9 14.8 14.8 14.7
14.7
14.6
14.6 14.6 14.6
14.6
14.4 14.4
14.3 14.2 14.2
14.2 14.2
14.1 14.1
14.1
14.0 13.9
13.9
13.8 13.8
13.8
13.7 13.7
13.7
13.6
13.5 13.5 13.4 13.4
13.4
13.3 13.3
13.2 13.2
13.2
13.0 13.0
13.0
12.9 12.9
12.8 12.7
12.7 12.6 12.6 12.5
12.5
12.4
12.4 12.3
12.2
12.1 12.1 12.1
12.0 11.9
11.8 11.8 11.8
11.8 11.7
11.7 11.5 11.5
11.4 11.4
11.2
11.2 11.2
11.2
11.1 11.1
11.0
11.0 10.9
10.8
10.8
10.8
10.7 10.7
10.6
10.5
10.4
10.4 10.4
10.3
10.2
10.2 10.2 10.1
10.1
10.0
10.0 10.0 9.9
9.9
9.9 9.8
9.8
9.7
9.7 9.7
9.6
9.5 9.5
9.5
9.5
9.3 9.3
9.3
9.2
9.2
9.2
9.0 9.0
9.0
9.0
8.9 8.8
8.8
8.7 8.7
8.5 8.5
8.5
8.5
8.4
8.4
8.3
8.3 8.2
8.2
8.1
8.0
8.0 8.0 8.0
8.0
7.9 7.8 7.8
7.8
7.7
7.6 7.6 7.5
7.5
7.4
7.4
7.3 7.2 7.2
7.2
7.1 7.1
7.0 7.0
6.9 6.9
6.8 6.8
6.8
6.7 6.7
6.6
6.6 6.5
6.5
6.4
6.4 6.4
6.3
6.3
6.2
6.2 6.2
6.2
6.1
6.1
6.0 6.0
6.0
6.0
6.0
5.9
5.9
5.8
5.8 5.8
5.7 5.7
5.6 5.6
5.6 5.4
5.2
5.0
4.9
4.8
4.8 4.7
4.7 4.7
4.6 4.5
4.5
4.5
4.1
4.0
4.0
4.0 3.8
3.7
3.7
3.7 3.7 3.7
3.6 3.4
3.4
3.2
3.1
3.1
3.0 3.0
3.0 2.9 2.6
2.6
2.6
2.4 2.4
2.3 2.3
2.1 2.1
2.0
1.8 1.8
1.7 1.7
1.5
1.3 1.3
1.1 1.0
0.9 0.8
0.7 0.6
0.3 0.1
0.1 +0.3+0.3+0.3 +1.2 +1.3 +1.4
+1.4 +2.0+2.5 +2.8+3.5
+3.7 +3.7 +4.3
+4.4 +5.4+5.6
+5.8
+5.8 +5.8
+5.9
+6.0
+6.1
+6.1
+6.2
+6.3+6.3
+6.6 +6.7
+6.7 +7.0 +7.0
+7.0 +7.1 +7.3+7.7 +8.1
+8.1 +8.1 +8.2
+8.4
+8.4
+8.4
+8.4 +8.6 +8.8 +8.8
+8.8
+8.9
+8.9
+9.1 +9.2
+9.2 +9.4+9.4
+9.5
+9.5
+9.6
+9.6
+9.7
+9.7
+9.7
+9.8
+9.8
+9.9
+10.1 +10.4
+10.5
+10.7
+10.7
+10.8
+10.8
+10.8
+10.9
+11.0 +11.0
+11.0
+11.2
+11.2
+11.3
+11.5
+11.6
+11.7+11.8 +11.9
+12.3
+12.4
+12.5
+12.5
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N
S
T H S
T o n o n
A T L A N T I C O C E A N
S
T H S
T
N
100' 200'0
BEACH FILL PLAN
-B
C N
R -C
N p ln .d g n
C-05
C
IV
IL
Y
Y
Y
Y
Y
X=783500
X=783000
X=782500
M A
T C
H L
E E
T C
-0 S
T A
M A
T C
H L
E E
T C
-0 S
T A
APPROXIMATE TOE OF FILL
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
BASEOPTION A
SHEET GENERAL NOTES
STA. 380+50 SHALL BE PAID UNDER OPTION A.
2. IF OPTION A IS AWARDED, PLACEMENT OF FILL NORTH OF
TRANSITION FROM STA. 380+50 TO STA. 376+50.
1. IF BASE IS ONLY AWARDED, PLACEMENT OF FILL WILL
400' TRANSITION (BASE)
ELEV +6.7 (NAVD 88)
SLOPED BERM CREST
SEAWARD EDGE OF
ELEV +8.2 (NAVD 88)
FLAT BERM CREST
SEAWARD EDGE OF
S ATLANTIC AVE
ECL
CBL
S T
A
F
O O
T B
E R
M
S T
A
F
O O
T B
E R
M
BERM TRANSITION
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-06
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
R-44
R-44 A R-42 A
R-43-T R-43 A
19.4 19.2
19.2 19.2 19.1
19.1 19.0
19.0
19.0
18.9 18.9
18.8 18.8
18.8 18.7
18.7 18.6 18.6
18.6
18.5
18.5
18.4 18.4
18.4
18.3
18.3 18.3
18.3
18.2 18.2
18.1 18.1
18.1 18.1
18.1 18.0
18.0
17.9 17.9 17.8
17.8
17.7
17.7
17.7
17.7
17.7
17.5 17.4 17.4
17.4 17.4
17.4
17.3
17.3
17.2
17.2 17.1
17.1 17.1
17.0
17.0
16.9
16.9 16.9
16.9
16.8
16.8 16.7
16.7
16.6 16.6
16.6 16.6
16.5
16.5
16.4 16.4 16.4
16.3
16.3 16.3
16.3 16.2
16.2
16.2
16.1 16.0
16.0 16.0
16.0
15.9
15.9
15.8 15.8
15.8
15.7 15.7 15.6
15.6
15.5
15.5 15.5
15.5 15.4
15.3 15.3 15.3 15.2
15.2 15.2
15.1
15.1
15.0 15.0
14.9
14.8
14.8 14.8
14.7
14.7 14.6
14.6
14.6
14.6 14.5
14.5
14.4
14.3
14.3 14.3
14.2
14.2
14.1
14.1
14.1
14.0 14.0 14.0
13.9
13.8 13.8
13.7 13.7 13.6
13.5 13.5 13.5
13.5
13.5
13.4 13.4
13.3 13.2
13.2
13.1 13.1
13.0
13.0
12.9 12.9
12.9
12.8 12.7
12.7
12.7 12.7
12.6
12.6
12.5 12.5
12.4
12.4
12.3
12.3
12.3
12.2 12.1
12.1
12.0 12.0
12.0
11.9 11.8
11.7 11.7
11.7
11.6 11.6
11.5 11.5
11.4 11.3 11.3
11.2
11.2 11.2
11.0 11.0
11.0
11.0
10.9
10.8 10.8
10.8
10.7
10.7
10.7 10.6
10.6 10.5
10.5
10.4 10.4
10.4
10.4
10.3
10.3
10.2
10.2
10.2
10.1
10.1
10.0
10.0
9.9
9.9 9.9
9.8 9.8
9.8
9.8
9.7 9.6
9.6 9.6
9.5
9.5
9.4 9.4
9.4
9.4 9.3
9.2 9.2
9.1
9.1 9.1
9.1
9.1
9.0
9.0
8.9
8.9 8.9
8.9
8.9 8.8
8.7
8.7 8.6 8.6
8.6 8.6
8.5
8.4
8.4
8.4 8.3 8.3
8.3
8.2
8.2 8.1 8.1
8.1
8.0
8.0
7.9
7.9
7.9 7.8
7.8 7.8
7.7
7.7
7.7
7.6 7.5 7.5
7.5
7.5
7.4
7.4
7.3 7.3
7.2
7.2
7.1 7.0 7.0
7.0
7.0
6.9
6.8 6.8 6.7
6.6 6.6
6.6 6.6
6.5 6.5
6.4
6.4
6.3
6.2 6.2
6.2
6.2
6.1 6.0
6.0
6.0
6.0
5.9 5.9 5.8
5.8
5.8
5.7
5.6 5.5
5.4
5.3
5.3
5.2 5.2
5.1 5.1
5.0
4.9
4.8
4.6
4.5
4.5
4.5
4.2
4.2 4.2
4.2 4.1
4.0
4.0
4.0
4.0
3.9
3.7 3.7
3.7
3.6
3.5
3.5 3.5
3.4
3.4
3.4
3.2
3.1
3.1
3.0
3.0
3.0 2.6
2.6 2.5 2.4
2.3
2.0 2.0 1.7
1.6 1.6
1.4 1.4 1.2 1.1
0.7 0.6
0.5 0.3 0.1
+0.2 +0.2
+0.7 +0.7
+1.2 +1.3
+1.5 +1.7
+2.2 +2.2
+3.3 +3.4
+3.7
+3.9
+3.9+4.1
+5.3 +5.4
+5.6 +5.6 +5.7
+5.8
+5.8
+5.8 +5.8
+5.8 +5.9
+5.9 +6.1
+6.4 +6.6
+6.9
+6.9 +7.0
+7.0 +7.1
+7.9 +8.2
+8.2 +8.3
+8.3
+8.5
+8.5
+8.6
+8.7
+8.9 +8.9
+9.1
+9.1
+9.2
+9.2 +9.3
+9.3
+9.3 +9.4
+9.4
+9.5
+9.5
+9.7
+9.8
+9.8+9.8
+9.9
+10.0
+10.1
+10.1
+10.1
+10.1
+10.2
+10.2+10.2
+10.3
+10.5
+10.6
+10.7
+10.7 +10.7
+10.8
+10.9
+11.1 +11.3
+11.5
+11.7 +11.7 +11.9
+11.9
+12.4
+12.5
+12.9
+13.1 +13.2
+13.7+14.4 +15.2
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N
S
T
H S
T
S
T
H S
T o n o n
A T L A N T I C O C E A N
S
T
H S
T
M A
T C
H L
E E
T C
-0 S
T A
M A
T C
H L
E E
T C
-0 S
T A
N
100' 200'0
BEACH FILL PLAN
-B
C N
R -C
N p ln .d g n
Y
Y
Y
Y
Y
X=783500
X=783000
X=782500
CBL
ECL
C-06
C
IV
IL
APPROXIMATE TOE OF FILL
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
AND STAGING AREA
CONSTRUCTION ACCESS
BASE
CONSTRUCTION ACCESS
ELEV +6.7 (NAVD 88)
SLOPED BERM CREST
SEAWARD EDGE OF
ELEV +8.2 (NAVD 88)
FLAT BERM CREST
SEAWARD EDGE OF
S ATLANTIC AVE
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-07
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
CL15
R-47 A
R-47R-46 A
R-46
R-45
R-45 A
20.3
20.2 20.1
20.0
20.0 19.9
19.9 19.9 19.9
19.7
19.7 19.7
19.6 19.5 19.5
19.4 19.4
19.4 19.3
19.2 19.2
19.1 19.1
19.0
19.0
19.0 18.9 18.8
18.8
18.8
18.8 18.6
18.6 18.6 18.5
18.5
18.5
18.5
18.5 18.4
18.4 18.3
18.3 18.2
18.2
18.2 18.1 18.1
18.0 18.0 17.9 17.8
17.8
17.8 17.7 17.6
17.6
17.5 17.5
17.5
17.4
17.3 17.3
17.3 17.2
17.1 17.0 17.0 17.0
17.0 16.9
16.8
16.8 16.8 16.7
16.7
16.7 16.7
16.5
16.5
16.5 16.5
16.4
16.4
16.4
16.3
16.3 16.2
16.1 16.1
16.1 16.0
16.0
15.8 15.8
15.8 15.6
15.6 15.6
15.6 15.6
15.4
15.4 15.3
15.3
15.2 15.1
15.1
15.1 14.9
14.9
14.8
14.8
14.8 14.7
14.7
14.6 14.5 14.5
14.5
14.4
14.3 14.2 14.2
14.2
14.1 14.0 14.0
13.9
13.9 13.8
13.7
13.7 13.6
13.6 13.6
13.6
13.5 13.5
13.3
13.3
13.2
13.1
13.1
13.1 13.0 12.9
12.9 12.8
12.8
12.7
12.6
12.6
12.6
12.5 12.5
12.4
12.3
12.3 12.2 12.2
12.2 12.1 12.1
11.9
11.9
11.8
11.8
11.8 11.7
11.6
11.6
11.5
11.5 11.5
11.3 11.3
11.3 11.3
11.1
11.1 11.1
11.0 11.0 10.9
10.9 10.9
10.7 10.7
10.7 10.6
10.6
10.6 10.5 10.5
10.4
10.4
10.4 10.3 10.3
10.3
10.2 10.2
+-10.1 10.0
10.0
9.9
9.9 9.9
9.8 9.7
9.7
9.6
9.6 9.6
9.5
9.4
9.4 9.4
9.3 9.3
9.3
9.2
9.2 9.2
9.1 9.1
9.0 9.0 9.0
8.9
8.9 8.8
8.8 8.8 8.7
8.7 8.6
8.6 8.6
8.5 8.4
8.4
8.4 8.3
8.2 8.2
8.1 8.1
8.0 8.0
8.0 7.9
7.8
7.8 7.8
7.7 7.6
7.6 7.6 7.5
7.4 7.3 7.3
7.2
7.1
7.0
7.0 6.9
6.8 6.8
6.6
6.6 6.6 6.5
6.5
6.3
6.3 6.2
6.1
6.1
5.9
5.9
5.9 5.7
5.7
5.5
5.4
5.4
5.4
5.3
5.3
5.2
5.1 5.0
4.9
4.8 4.8
4.8
4.8
4.7
4.7
4.7
4.6
4.6
4.6
4.6
4.6
4.4
4.4
4.4
4.4
4.4
4.3 4.0
4.0
3.9 3.9
3.8 3.8
3.8
3.7
3.6
3.5 3.5
3.4 3.3
3.2
3.2
3.0
2.9 2.8
2.7 2.7
2.6
1.8
1.4
1.3 0.9 0.7 0.5
0.1
+0.4
+0.8+0.9 +1.2 +1.3 +2.3+2.5 +2.9 +3.1
+3.6
+3.6+3.7 +4.5
+4.6 +4.7+5.0 +5.1
+5.2 +5.4 +5.6+5.6
+5.6 +5.7
+5.7+5.8
+5.9
+5.9 +6.0 +6.1
+6.3
+6.4 +6.6 +6.8
+6.8 +7.2 +7.7 +7.9
+8.0 +8.2
+8.6 +8.7
+8.9
+9.1+9.2
+9.2
+9.2 +9.4
+9.4
+9.6 +9.6
+9.7+9.8
+10.0
+10.1
+10.6
+10.6
+10.7 +10.7
+10.9
+11.1
+11.2
+11.3 +11.3
+11.8
+11.8
+11.8
+11.8
+12.0
+12.1
+12.5 +12.6 +12.7
+12.7
+12.8
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N o n o n
A T L A N T I C O C E A N
M A
T C
H L
E E
T C
-0 S
T A
M A
T C
H L
E E
T C
-0 S
T A
N
100' 200'0
BEACH FILL PLAN
-B
C N
R -C
N p ln .d g n
Y
X=784000
Y
Y
Y
Y
X=783500
X=783000
X=782500
CBL
ECL
C-07
C
IV
IL
APPROXIMATE TOE OF FILL
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
BASE
S ATLANTIC AVE
ELEV +6.7 (NAVD 88)
SLOPED BERM CREST
SEAWARD EDGE OF
ELEV +8.2 (NAVD 88)
FLAT BERM CREST
SEAWARD EDGE OF
R-49 A R-49
R-48 A R-48
20.2
20.2
20.1 20.0 20.0 19.9
19.9 19.8
19.8
19.8
19.7
19.7
19.7
19.7 19.6
19.6
19.6
19.5
19.5 19.5 19.5
19.4
19.3
19.2
19.2
19.1 19.1 19.0
19.0
18.8 18.8
18.8
18.7
18.7 18.7
18.7
18.7
18.6
18.5 18.4
18.4 18.3
18.3
18.3
18.3 18.2
18.2
18.2
18.1 18.0 17.9 17.9
17.9 17.8
17.8 17.7
17.7 17.5
17.5
17.4 17.4 17.4
17.3
17.2
17.2 17.1
17.0
17.0 17.0
16.9 16.9
16.8
16.7 16.7
16.7 16.6
16.6
16.6
16.5
16.4
16.3
16.3
16.1
16.1
16.1
16.0
15.9
15.9
15.9
15.8
15.8
15.8 15.7
15.7 15.6
15.6
15.5 15.4
15.4
15.3
15.3
15.3
15.1
15.1 15.1
15.1
15.0
15.0
14.9
14.9
14.8
14.7 14.6
14.6 14.5
14.5 14.4
14.4
14.3 14.3
14.2
14.2
14.1 14.0
14.0 14.0
13.9 13.8
13.7
13.7
13.6
13.6 13.5
13.5
13.4
13.3
13.3 13.3
13.3
13.2
13.1
13.0 13.0
12.9 12.8
12.8
12.8
12.6
12.5
12.5
12.5
12.4
12.3 12.3
12.3 12.2
12.1
12.1
12.0 11.9
11.9 11.9
11.9
11.8
11.7
11.7 11.6
11.5 11.5
11.5
11.5
11.4
11.3 11.2
11.2
11.1
11.1 11.0
11.0 10.9
10.8
10.7 10.7
10.6 10.6
10.5
10.4
10.4 10.3
10.2
10.1
10.1 10.1
10.1
9.9 9.9
9.9 9.9
9.8 9.8
9.7 9.7 9.7
9.7
9.7
9.6 9.5
9.5
9.5 9.5
9.5 9.4
9.4
9.3 9.3
9.2
9.2
9.1
9.1
9.1
9.1
9.1 9.0
8.9
8.9
8.9 8.9
8.9 8.8 8.8
8.7 8.7
8.6 8.6
8.6
8.5
8.4
8.4 8.3
8.2 8.2
8.2
8.1 8.1
8.0
7.9 7.9
7.9 7.8
7.7 7.6
7.6
7.6
7.6
7.4 7.4
7.3 7.3 7.2 7.1
6.9
6.9 6.8 6.7
6.7
6.6 6.4
6.4
6.2
6.1
6.0
6.0 5.8
5.8
5.7 5.7
5.7
5.7 5.3
5.3
5.1
5.0 4.9
4.9
4.8
4.8
4.6
4.6 4.3
4.3
4.3
4.3
4.2
4.1
4.0
4.0
3.9
3.9
3.8
3.7
3.6
3.5 3.5
3.4
3.3
3.2
3.2 3.2
3.2
3.1
3.0 2.9 2.7
2.7
2.6
2.6 2.6
2.6
2.4
1.8 1.8
1.6 0.9
0.9
0.7
0.7 0.1
+0.6 +0.7
+0.9+1.1 +1.5
+1.7 +2.4
+2.4 +2.5
+3.0+3.1 +3.4 +3.6 +4.2+4.5 +4.6
+4.7
+4.9 +5.1 +5.3
+5.3
+5.4 +5.4 +5.6
+5.6 +5.6
+6.0 +6.4+6.5
+6.7
+6.8 +7.4 +7.4 +7.5
+8.2
+8.2 +8.4+8.7
+9.0
+9.1 +9.2 +9.5+9.6
+9.7
+9.9 +10.2
+10.4
+10.5
+10.5
+10.6
+10.6
+10.7
+10.9 +10.9
+11.0
+11.0
+11.1
+11.1
+11.2
+11.3
+11.8
+11.8
+12.0 +12.4
+12.6 +12.7
+14.8
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162 Beach\30_45-Foot Flat Berm-BCOES-Cert\080 - Plans\05 Civil\C-08
W E
P -2
-B -0
S I
D
N /A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
S
A N M
A R
C O B
L V
D
J A
C K
S O
N V
IL
L E F
L
W
R E
IL
L Y
J L
A G
R O
N E
H T
R O
C
E V
A R
D C
O U
N T
Y F
L O
R
ID
A
S H
O R
E P
R O
T E
C T
IO
N P
R O J E
C T S
P P
N O
R T
H -R
E A
C H S
E G
M E
N T
B E
A C
H R
E N
O U
R
IS
H M
E N
T
KEY PLAN
NOT TO SCALE
C-01
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
N
S
R
D S
T o n o n
A T L A N T I C O C E A N
S
T
H S
T
M A
T C
H L
E E
T C
-0 S
T A
M A
T C
H L
E E
T C
-0 S
T A
N
100' 200'0
BEACH FILL PLAN
-B
C N
R -C
N p ln .d g n
Y
Y
Y
Y
Y
X=784000
X=783500
X=783000
X=782500
C-08
C
IV
IL
APPROXIMATE TOE OF FILL
CBL
ECL
B E
A C
H F
IL
L P
L A
N
S T
A T
O S
T A
BASE
ELEV +6.7 (NAVD 88)
SLOPED BERM CREST
SEAWARD EDGE OF
ELEV +8.2 (NAVD 88)
FLAT BERM CREST
SEAWARD EDGE OF
S ATLANTIC AVE
S ORLANDO AVE
S ATLANTIC AVE
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
/3
/2
F
IL
E N
A M
E
D R
A W
IN
G D
A T
E pw:\\COE-SAJPWP02JAX.saj.ds.usace.army.mil:SAJPW\Documents\Shore Protection Projects\Brevard Co.--SPP\North Reach FY20\080 - Plans\InRoads 20-162…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .