SEE ADDENDUM
(No Collect Calls)
W912EP18R0027 19-Jun-2018
b. TELEPHONE NUMBER
904-232-2314
8. OFFER DUE DATE/LOCAL TIME
03:00 PM 19 Jul 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.404-815-8959
W912EP9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
W912EP18D0008 01-Oct-2018
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LAVAUGHN T WILLIAMS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
PHILIP M MAULDIN / Added by UPASS
$48,000,000.00
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: SEE SCHEDULE
.18-Jul-2018 YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN W912EP18R0027
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE 4L767 4L767FACILITY
OFFEROR CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
AECOM TECHNICAL SERVICES, INC.
JOEL BURKE
ONE MIDTOWN PLAZA 1360 PEACHTREE ST NE
ATLANTA GA 30309
US ARMY CORPS OF ENGINEERS FINANCE CTR
5722 INTEGRITY DRIVE
MILLINGTON TN 38054-5005
18a. PAYMENT WILL BE MADE BY CODE 964145
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE
SEE ITEM 9
15. DELIVER TO CODE W912EP 16. ADMINISTERED BY
Net 30
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
CD CONSTRUCTION DIVISION
ANELIS NAZARIO CASTILLO
CD-CONSTRUCTION DIV
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
541990
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
X
EMAIL: philip.m.mauldin@usace.army.mil
904-232-1240TEL:
31c. DATE SIGNED
28-Sep-2018
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF52
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912EP18D0008
Section SF 1449 - CONTINUATION SHEET
MINIMUM/MAXIMUM
This will be an indefinite quantity-indefinite delivery type contract for a period of one year from date of award, with options to extend for four additional years; not to exceed a total of five years. Funding will be allocated per Task
Order. The total amount of the contract shall not exceed $48,000,000.00 and the remaining capacity will be rolled over when each option is exercised. Minimum guarantee for this contract will be $25,000.00 for the total term of the contract including options, if exercised.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job $48,000,000.00 $48,000,000.00 HHD QA Services-Base year
FFP
The contractor shall provide all services as detailed in the Performance Work
Statement (PWS). The contract labor rates are provided in the Pricing Schedule.
Specific requirements will be issued and awarded on individual task orders.
FOB: Destination
NET AMT $48,000,000.00
1001 1 Job $0.00 OPTION HHD QA Services-Option Year 1
FFP
The contractor shall provide all services as detailed in the Performance Work
Statement (PWS). The contract labor rates are provided in the Pricing Schedule.
NET AMT $0.00
2001 1 Job $0.00 OPTION HHD QA Services-Option Year 2
FFP
The contractor shall provide all services as detailed in the Performance Work
Statement (PWS). The contract labor rates are provided in the Pricing Schedule.
3001 1 Job $0.00 OPTION HHD QA Services-Option Year 3
FFP
The contractor shall provide all services as detailed in the Performance Work
Statement (PWS). The contract labor rates are provided in the Pricing Schedule.
4001 1 Job $0.00 OPTION HHD QA Services-Option Year 4
FFP
The contractor shall provide all services as detailed in the Performance Work
Statement (PWS). The contract labor rates are provided in the Pricing Schedule.
5001 1 Job $0.00 OPTION HHD QA Services- FAR 52.217-8
FFP
The contractor shall provide all services as detailed in the Performance Work
Statement (PWS). The contract labor rates are provided in the Pricing Schedule.
Specific requirements will be issued and awarded on individual task orders. This
CLIN will only be used in the event that the Government Exercises FAR Clause
52.217-8, Option to Extend Services. Duration of this CLIN will be up to 6 months.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
1001 Destination Government Destination Government
2001 Destination Government Destination Government
3001 Destination Government Destination Government
4001 Destination Government Destination Government
5001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-OCT-2018 TO
30-SEP-2019
N/A CD CONSTRUCTION DIVISION
ANELIS NAZARIO CASTILLO
CD-CONSTRUCTION DIV
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
904-232-3285
W912EP
1001 POP 01-OCT-2019 TO
30-SEP-2020
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-OCT-2020 TO
30-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-OCT-2021 TO
30-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-OCT-2022 TO
30-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
5001 POP 01-OCT-2023 TO
31-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
PRICING SCHEDULE
Base Year
Line Item Discipline Quantity Unit Unit Price Total
A01 QA Rep I Reg Rate Hours 74.64 $
A02 QA Rep I OT Rate Hours 111.96 $
A03 QA Rep II Reg Rate Hours 81.85 $
A04 QA Rep II OT Rate Hours 122.78 $
A05 QA Rep III Reg Rate Hours 97.05 $
A06 QA Rep III OT Rate Hours 145.58 $
A07 Civil Eng I Reg Rate Hours 86.31 $
A08 Civil Eng I OT Rate Hours 129.47 $
A09 Civil Eng II Reg Rate Hours 92.71 $
A10 Civil Eng II OT Rate Hours 139.07 $
A11 Civil Eng III Reg Rate Hours 102.25 $
A12 Civil Eng IIII OT Rate Hours 153.38 $
A13 Env Eng I Reg Rate Hours 73.38 $
A14 Env Eng I OT Rate Hours 110.07 $
A15 Env Eng II Reg Rate Hours 83.81 $
A16 Env Eng II OT Rate Hours 125.72 $
A17 Geotech Eng I Reg Rate Hours 77.32 $
A18 Geotech Eng I OT Rate Hours 115.98 $
A19 Geotech Eng II Reg Rate Hours 83.74 $
A20 Geotech Eng II OT Rate Hours 125.61 $
A21 Electrical Eng I Reg Rate Hours 89.38 $
A22 Electrical Eng I OT Rate Hours 134.08 $
A23 Electrical Eng II Reg Rate Hours 99.51 $
A24 Electrical Eng II OT Rate Hours 149.27 $
A25 Mechanical Eng I Reg Rate Hours 86.70 $
A26 Mechanical Eng I OT Rate Hours 130.05 $
A27 Mechanical Eng II Reg Rate Hours 98.28 $
A28 Mechanical Eng II OT Rate Hours 147.42 $
A29 Lab Tech Reg Rate Hours 48.26 $
A30 Lab Tech OT Rate Hours 72.39 $
A31 Scheduler Reg Rate Hours 102.71 $
A32 Scheduler OT Rate Hours 154.07 $
A33 Cost Estimator Reg Rate Hours 85.68 $
A34 Cost Estimator OT Rate Hours 128.52 $
A35 Admin Assistant Specialist Reg Rate Hours 43.61 $
A36 Admin Assistant Specialist OT Rate Hours 65.42 $
A37 Data Entry Operator Reg Rate Hours 43.01 $
A38 Data Entry Operator OT Rate Hours 64.52 $
A39 Contract Manager Hours 159.62 $
A40 Vehicle - Monthly Rate Month 886.51 $
A41 Travel - Civil Works (TBN) JTR $
OPTION YEAR 1
Line Item Disciplines Quantity Unit Unit Price Total
B01 QA Rep I Reg Rate Hours 76.51 $
B02 QA Rep I OT Rate Hours 114.76 $
B03 QA Rep II Reg Rate Hours 83.90 $
B04 QA Rep II OT Rate Hours 125.85 $
B05 QA Rep III Reg Rate Hours 99.48 $
B06 QA Rep III OT Rate Hours 149.22 $
B07 Civil Eng I Reg Rate Hours 88.47 $
B08 Civil Eng I OT Rate Hours 132.71 $
B09 Civil Eng II Reg Rate Hours 95.03 $
B10 Civil Eng II OT Rate Hours 142.55 $
B11 Civil Eng III Reg Rate Hours 104.81 $
B12 Civil Eng IIII OT Rate Hours 157.22 $
B13 Env Eng I Reg Rate Hours 75.22 $
B14 Env Eng I OT Rate Hours 112.82 $
B15 Env Eng II Reg Rate Hours 85.91 $
B16 Env Eng II OT Rate Hours 128.86 $
B17 Geotech Eng I Reg Rate Hours 79.25 $
B18 Geotech Eng I OT Rate Hours 118.88 $
B19 Geotech Eng II Reg Rate Hours 85.83 $
B20 Geotech Eng II OT Rate Hours 128.75 $
B21 Electrical Eng I Reg Rate Hours 91.62 $
B22 Electrical Eng I OT Rate Hours 137.34 $
B23 Electrical Eng II Reg Rate Hours 102.00 $
B24 Electrical Eng II OT Rate Hours 153.00 $
B25 Mechanical Eng I Reg Rate Hours 88.87 $
B26 Mechanical Eng I OT Rate Hours 133.30 $
B27 Mechanical Eng II Reg Rate Hours 100.73 $
B28 Mechanical Eng II OT Rate Hours 151.10 $
B29 Lab Tech Reg Rate Hours 49.47 $
B30 Lab Tech OT Rate Hours 74.20 $
B31 Scheduler Reg Rate Hours 105.28 $
B32 Scheduler OT Rate Hours 157.92 $
B33 Cost Estimator Reg Rate Hours 87.82 $
B34 Cost Estimator OT Rate Hours 131.73 $
B35 Admin Assistant Specialist Reg Rate Hours 44.70 $
B36 Admin Assistant Specialist OT Rate Hours 67.05 $
B37 Data Entry Operator Reg Rate Hours 44.09 $
B38 Data Entry Operator OT Rate Hours 66.13 $
B39 Contract Manager Hours 163.64 $
B40 Vehicle - Monthly Rate Month 906.45 $
B41 Travel - Civil Works (TBN) JTR $
OPTION YEAR 2
C01 QA Rep I Reg Rate Hours 78.42 $
C02 QA Rep I OT Rate Hours 117.63 $
C03 QA Rep II Reg Rate Hours 85.99 $
C04 QA Rep II OT Rate Hours 128.99 $
C05 QA Rep III Reg Rate Hours 101.97 $
C06 QA Rep III OT Rate Hours 152.95 $
C07 Civil Eng I Reg Rate Hours 90.68 $
C08 Civil Eng I OT Rate Hours 136.03 $
C09 Civil Eng II Reg Rate Hours 97.41 $
C10 Civil Eng II OT Rate Hours 146.11 $
C11 Civil Eng III Reg Rate Hours 107.43 $
C12 Civil Eng IIII OT Rate Hours 161.15 $
C13 Env Eng I Reg Rate Hours 77.10 $
C14 Env Eng I OT Rate Hours 115.64 $
C15 Env Eng II Reg Rate Hours 88.06 $
C16 Env Eng II OT Rate Hours 132.08 $
C17 Geotech Eng I Reg Rate Hours 81.23 $
C18 Geotech Eng I OT Rate Hours 121.85 $
C19 Geotech Eng II Reg Rate Hours 87.98 $
C20 Geotech Eng II OT Rate Hours 131.97 $
C21 Electrical Eng I Reg Rate Hours 93.91 $
C22 Electrical Eng I OT Rate Hours 140.86 $
C23 Electrical Eng II Reg Rate Hours 104.55 $
C24 Electrical Eng II OT Rate Hours 156.82 $
C25 Mechanical Eng I Reg Rate Hours 91.09 $
C26 Mechanical Eng I OT Rate Hours 136.64 $
C27 Mechanical Eng II Reg Rate Hours 103.25 $
C28 Mechanical Eng II OT Rate Hours 154.88 $
C29 Lab Tech Reg Rate Hours 50.70 $
C30 Lab Tech OT Rate Hours 76.05 $
C31 Scheduler Reg Rate Hours 107.91 $
C32 Scheduler OT Rate Hours 161.87 $
C33 Cost Estimator Reg Rate Hours 90.02 $
C34 Cost Estimator OT Rate Hours 135.02 $
C35 Admin Assistant Specialist Reg Rate Hours 45.82 $
C36 Admin Assistant Specialist OT Rate Hours 68.73 $
C37 Data Entry Operator Reg Rate Hours 45.19 $
C38 Data Entry Operator OT Rate Hours 67.78 $
C39 Contract Manager Hours 167.75 $
C40 Vehicle - Monthly Rate Month 926.85 $
C41 Travel - Civil Works (TBN) JTR $
OPTION YEAR 3
D01 QA Rep I Reg Rate Hours 80.38 $
D02 QA Rep I OT Rate Hours 120.57 $
D03 QA Rep II Reg Rate Hours 88.14 $
D04 QA Rep II OT Rate Hours 132.22 $
D05 QA Rep III Reg Rate Hours 104.52 $
D06 QA Rep III OT Rate Hours 156.77 $
D07 Civil Eng I Reg Rate Hours 92.95 $
D08 Civil Eng I OT Rate Hours 139.43 $
D09 Civil Eng II Reg Rate Hours 99.84 $
D10 Civil Eng II OT Rate Hours 149.76 $
D11 Civil Eng III Reg Rate Hours 110.12 $
D12 Civil Eng IIII OT Rate Hours 165.17 $
D13 Env Eng I Reg Rate Hours 79.02 $
D14 Env Eng I OT Rate Hours 118.54 $
D15 Env Eng II Reg Rate Hours 90.26 $
D16 Env Eng II OT Rate Hours 135.39 $
D17 Geotech Eng I Reg Rate Hours 83.26 $
D18 Geotech Eng I OT Rate Hours 124.89 $
D19 Geotech Eng II Reg Rate Hours 90.18 $
D20 Geotech Eng II OT Rate Hours 135.27 $
D21 Electrical Eng I Reg Rate Hours 96.26 $
D22 Electrical Eng I OT Rate Hours 144.38 $
D23 Electrical Eng II Reg Rate Hours 107.16 $
D24 Electrical Eng II OT Rate Hours 160.75 $
D25 Mechanical Eng I Reg Rate Hours 93.37 $
D26 Mechanical Eng I OT Rate Hours 140.05 $
D27 Mechanical Eng II Reg Rate Hours 105.83 $
D28 Mechanical Eng II OT Rate Hours 158.75 $
D29 Lab Tech Reg Rate Hours 51.97 $
D30 Lab Tech OT Rate Hours 77.95 $
D31 Scheduler Reg Rate Hours 110.61 $
D32 Scheduler OT Rate Hours 165.91 $
D33 Cost Estimator Reg Rate Hours 92.27 $
D34 Cost Estimator OT Rate Hours 138.40 $
D35 Admin Assistant Specialist Reg Rate Hours 46.96 $
D36 Admin Assistant Specialist OT Rate Hours 70.45 $
D37 Data Entry Operator Reg Rate Hours 46.32 $
D38 Data Entry Operator OT Rate Hours 69.48 $
D39 Contract Manager Hours 171.97 $
D40 Vehicle - Monthly Rate Month 947.70 $
D41 Travel - Civil Works (TBN) JTR $
OPTION YEAR 4
E01 QA Rep I Reg Rate Hours 82.39 $
E02 QA Rep I OT Rate Hours 123.59 $
E03 QA Rep II Reg Rate Hours 90.35 $
E04 QA Rep II OT Rate Hours 135.52 $
E05 QA Rep III Reg Rate Hours 107.13 $
E06 QA Rep III OT Rate Hours 160.69 $
E07 Civil Eng I Reg Rate Hours 95.28 $
E08 Civil Eng I OT Rate Hours 142.91 $
E09 Civil Eng II Reg Rate Hours 102.34 $
E010 Civil Eng II OT Rate Hours 153.51 $
E011 Civil Eng III Reg Rate Hours 112.87 $
E012 Civil Eng III OT Rate Hours 169.30 $
E013 Env Eng I Reg Rate Hours 81.00 $
E014 Env Eng I OT Rate Hours 121.50 $
E015 Env Eng II Reg Rate Hours 92.51 $
E016 Env Eng II OT Rate Hours 138.77 $
E017 Geotech Eng I Reg Rate Hours 85.34 $
E018 Geotech Eng I OT Rate Hours 128.02 $
E019 Geotech Eng II Reg Rate Hours 92.43 $
E020 Geotech Eng II OT Rate Hours 138.65 $
E021 Electrical Eng I Reg Rate Hours 98.66 $
E022 Electrical Eng I OT Rate Hours 147.99 $
E023 Electrical Eng II Reg Rate Hours 109.84 $
E024 Electrical Eng II OT Rate Hours 164.76 $
E025 Mechanical Eng I Reg Rate Hours 95.70 $
E026 Mechanical Eng I OT Rate Hours 143.55 $
E027 Mechanical Eng II Reg Rate Hours 108.48 $
E028 Mechanical Eng II OT Rate Hours 162.72 $
E029 Lab Tech Reg Rate Hours 53.27 $
E030 Lab Tech OT Rate Hours 79.90 $
E031 Scheduler Reg Rate Hours 113.37 $
E032 Scheduler OT Rate Hours 170.06 $
E033 Cost Estimator Reg Rate Hours 94.57 $
E034 Cost Estimator OT Rate Hours 141.86 $
E035 Admin Assistant Specialist Reg Rate Hours 48.14 $
E036 Admin Assistant Specialist OT Rate Hours 72.21 $
E037 Data Entry Operator Reg Rate Hours 47.48 $
E038 Data Entry Operator OT Rate Hours 71.22 $
E039 Contract Manager Hours 176.27 $
E040 Vehicle - Monthly Rate Month 969.03 $
E041 Travel - Civil Works (TBN) JTR $
FAR 52.217-8 (6 Months)
Line Item Discipline Quantity Unit Unit Price Total
F01 QA Rep I Reg Rate Hours 83.42 $
F02 QA Rep I OT Rate Hours 125.14 $
F03 QA Rep II Reg Rate Hours 91.48 $
F04 QA Rep II OT Rate Hours 137.22 $
F05 QA Rep III Reg Rate Hours 108.47 $
F06 QA Rep III OT Rate Hours 162.71 $
F07 Civil Eng I Reg Rate Hours 96.47 $
F08 Civil Eng I OT Rate Hours 144.70 $
F09 Civil Eng II Reg Rate Hours 103.62 $
F10 Civil Eng II OT Rate Hours 155.43 $
F11 Civil Eng III Reg Rate Hours 114.28 $
F12 Civil Eng IIII OT Rate Hours 171.43 $
F13 Env Eng I Reg Rate Hours 82.01 $
F14 Env Eng I OT Rate Hours 123.02 $
F15 Env Eng II Reg Rate Hours 93.67 $
F16 Env Eng II OT Rate Hours 140.51 $
F17 Geotech Eng I Reg Rate Hours 86.41 $
F18 Geotech Eng I OT Rate Hours 129.62 $
F19 Geotech Eng II Reg Rate Hours 93.59 $
F20 Geotech Eng II OT Rate Hours 140.39 $
F21 Electrical Eng I Reg Rate Hours 99.90 $
F22 Electrical Eng I OT Rate Hours 149.85 $
F23 Electrical Eng II Reg Rate Hours 111.22 $
F24 Electrical Eng II OT Rate Hours 166.83 $
F25 Mechanical Eng I Reg Rate Hours 96.90 $
F26 Mechanical Eng I OT Rate Hours 145.35 $
F27 Mechanical Eng II Reg Rate Hours 109.84 $
F28 Mechanical Eng II OT Rate Hours 164.76 $
F29 Lab Tech Reg Rate Hours 53.94 $
F30 Lab Tech OT Rate Hours 80.91 $
F31 Scheduler Reg Rate Hours 114.80 $
F32 Scheduler OT Rate Hours 172.19 $
F33 Cost Estimator Reg Rate Hours 95.76 $
F34 Cost Estimator OT Rate Hours 143.64 $
F35 Admin Assistant Specialist Reg Rate Hours 48.74 $
F36 Admin Assistant Specialist OT Rate Hours 73.11 $
F37 Data Entry Operator Reg Rate Hours 48.07 $
F38 Data Entry Operator OT Rate Hours 73.11 $
F39 Contract Manager Hours 178.48 $
F40 Vehicle - Monthly Rate Month 979.98 $
F41 Travel - Civil Works (TBN) JTR $
In the event the Government requires continued performance under subject contract, the Government reserves the right to extend the contract under FAR Clause 52.217-8. The prices under this option 5001, will be evaluated and will only be used in the event that FAR Clause 52.217-8 is exercised. Should an extension of services be required, rates will be adjusted only as result of revisions to applicable prevailing Department of Labor wage rates.
PWS
PERFORMANCE WORK STATEMENT (PWS)
Quality Assurance Services for Herbert Hoover
Part 1
GENERAL INFORMATION
1.0 GENERAL: This is a non-personal services contract to provide quality assurance services. The Government shall not exercise any supervision or control over the contractor employees performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the
Government.
Work to be performed does not fall under the Brooks Act. Under this contract, the Contractor is prohibited from performing architect-engineer type services which require professional registration or design related services, which require supervision by a registered professional. The Contractor is prohibited from performing survey or mapping services associated with architect-engineer type planning, development construction, design, or alteration of real property.
Services shall not be provided which are considered closely related to inherently governmental functions. Under no circumstances will this Contract be utilized in a manner which would require the Contractor to manage or direct another contractor, nor in manner such as where the Contractor might influence official evaluations of other contractors; neither directly nor indirectly.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform quality assurance services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The effort required under this Performance Work Statement is to provide support to the US Army
Corps of Engineers, Jacksonville District (CESAJ). CESAJ has an immediate need to provide quality assurance services to support programs administered by CESAJ, as required and at the discretion of the Contracting Officer.
1.3 Objective: The US Army Corp of Engineers is seeking a contractor that can provide Quality Assurance services for Civil Works projects to monitor the construction contractors’ progress and document compliance with the plans, specifications and ancillary documents. The contractor shall be able to provide multiple number of personnel per discipline as outlined in the PWS. The contractor can expect a surge in the number of personnel per discipline to meet the Government’s mission. The Government reserves the right to require the contractor to increase the number of personnel per discipline in order to meet the mission and the requirements.
1.4 Scope: Quality assurance services for Civil Works projects are to be performed. Services include, assessment and monitoring of compliance with plans, specifications, and ancillary documents; quality assurance review of submittals, reports, plans, studies, technical documents and any other Construction Contractor document to assure compliance with plans, specifications, and ancillary documents; reporting of findings to the Field COR; materials testing; cost estimate quantity take-offs; construction and project scheduling support; geotechnical lab tests and borings, with no PE judgment; file and data management; and other similar non-design tasks, as necessary.
Each task order will incorporate the expanded scope of work, which is specific to the services for that task order, in accordance with the services categories in the basic contract.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 12 months and four (4) 12 month option years. See each Task Order for the period of performance.
1.6 General Information:
1.6.1 Work Requirements: Services requested by each task order (Exhibit A), will be discussed by the Contactor’s
Representative and the Contracting Officer’s Representative as necessary to develop a mutual understanding of the
Government’s requirements.
1.6.2 Contractor Responsibilities: The Contractor shall be held responsible for the accuracy, quality and completeness of the services to be provided. The Contractor must provide services within 30 days after the issuance of a Task Order. In performing required services, the contractor shall provide all management necessary in receiving assignments, planning, training personnel, checking completed work, and reporting results. Except as otherwise provided in the specifications, the Contractor shall furnish all plant, personnel, transportation, fuel and supply materials as necessary to perform the services required in each task order.
1.6.3 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The contractor shall submit a QC Plan to the COR within 14 days after contract award. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.
An acceptable plan must be on file with the Government prior to the issuance of a task order. This plan shall include but is not limited to the following:
1.6.3.1 The Contractor shall provide a description of the Contractor’s QC organization and the name of the contractor’s QC Manager. The description shall include a chart showing lines of authority and acknowledgement that the QC staff shall report to the QC manager. The QC Manager shall have rights provided by the company to take action on behalf of the company for all activities with respect to quality control.
1.6.3.2 Letter of Authority to the QC Manager from an officer of the company.
1.6.3.3 The name, qualifications, duties, responsibilities, and authority of each person with a QC function.
1.6.3.4 Contractors plan to monitor contract personnel.
1.6.3.5 Description of how contractor plans to temporarily replace contract personnel if personnel are gone from the project site for vacation or sick.
1.6.3.6 Description of the process in the event of an accident caused by or suffered by a contract person.
1.6.3.7 Description of the process in the event of severe weather.
1.6.3.8 Description of the contractor’s plan for severe weather such as a hurricane, tornado or other acts of nature.
How will contract personnel be notified? How much time in advance of a hurricane will contractor personnel be removed from the project site? What is the contractor’s plans for evacuation of contractor personnel?
1.6.4 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.5 Recognized Holidays: The contractor may be required to work holidays depending on the nature of the work.
Federal holidays are:
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
1.6.6 Hours of Operation: The contractor is responsible for conducting business, 8 hours a day or more depending on the nature of the work. The contractor is to conduct business up to seven days a week depending on the nature of the work. Exceptions may be federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons.
The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.6.7 Place of Performance: The work to be performed under this contract will be performed within the boundaries of the state of Florida, specifically the area covered by the Herbert Hoover Dike Resident Office. Each Task Order will establish the place of performance for that task order.
1.6.8 Type of Contract: Firm Fixed Price IDIQ contract.
1.6.9 Security Requirements:
1.6.9.1 AT Level I Training - All contractor employees, to include subcontractor employees, requiring access to
Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the Contracting Officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html
1.6.9.2 Access and General Protection/Security Policy and Procedures - All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity
Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.6.9.3 For contractors requiring Common Access Card (CAC) - Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05 and Homeland Security Presidential Directive-12
(HSPD-12). Proposed language: “The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.”
1.6.9.4 Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something) -
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT
5 calendar days after the completion of the training.
http://jko.jten.mil/courses/atl1/launch.html
1.6.9.5 Contractor Employees Who Require Access to Government Information Systems - All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking
System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter IAW AR 380‐67 (Personnel Security
Program) and Homeland Security Presidential Directive 12 (Policy for a Common Identification Standard for
Federal Employees and Contractors).
1.6.9.6 OPSEC Standing Operating Procedure/Plan - The Contractor shall develop an OPSEC SOP/Plan within 90 days of contract award. The OPSEC SOP/Plan must be reviewed and approved by the RA OPSEC Officer. The
SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC
Coordinator.
1.6.9.7 OPSEC Training - All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html
1.6.9.8 For Information Assurance (IA)/Information Technology (IT) Training - All contractor employees and associated sub‐contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoD 8570 01-M and AR 25‐2 within six months of employment.
1.6.9.9 Escort Requirements - All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.6.9.10 Pre‐screen candidates using E‐Verify Program - The Contractor must pre‐screen Candidates using the E‐ verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements.
The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
1.6.9.11 Threat Awareness Reporting Program - All new contractor employees will complete annual Threat
Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12.
The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized web based TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474
1.6.10 Physical Security - The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.10.1 Key Control - Not Applicable.
1.6.10.2 Lock Combinations - Not Applicable.
1.6.11 Special Qualifications:
http://www.cdse.edu/catalog/operations-security.html https://www.us.army.mil/suite/page/655474
1.6.11.1 General Qualifications – All contractor personnel must be duly qualified and experienced to perform the type of required services in accordance with referenced publications herein. All personnel must have a valid driver’s license. The determination of whether personnel are duly qualified and experienced or whether the Contractor's work is unsatisfactory will be made by the Contracting Officer or the COR. Personnel who are determined to be not qualified and/or experienced, or who do not perform the required services in accordance with the provisions herein, or who compromise or jeopardize the Government's position in any way, shall be replaced immediately by the
Contractor at Contractor's expense. Correction of work or reimbursement to the Government by the Contractor shall be as set forth in 1.6.11.15 Unsatisfactory Work. Contractor employees shall be thoroughly familiar with the construction phases of the respective work to which the services are provided.
1.6.11.2 Specific Qualifications - Positions to accomplish the work for this contract are listed below. Minimum qualifications for each position are described below. The Contract employees provided for these positions shall have at least the minimum qualifications listed.
1.6.11.2.1 QC Manager, Contract Manager, and Alternate Contract Manager - The QC Manager, Contract Manager, and Alternate Contract Manager should have a four year degree in business, engineering and/or related technical field and a minimum of five years of experience in a responsible role in business, engineering and/or related technical field; or a minimum of fifteen years of experience in a responsible role in business, engineering and/or related technical field. The Government expects Contract Managers are able to manage scope, schedule, budget, and expectations to facilitate any action from inception to closure by tasking, tracking, and supporting. The Government expects Contract Managers and Alternate Contract Managers are able to manage the development and execution of a contract from inception to closure by tasking, tracking, and supporting.
1.6.11.2.2 Quality Assurance Representative I - The required skills shall include a minimum of five years in construction and one to five years of experience in heavy civil projects. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.3 Quality Assurance Representative II - The required skills shall include a minimum of seven years of experience in construction and six or more years of experience in heavy civil projects. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.4 Quality Assurance Representative III - The required skills shall include a minimum of ten years of experience in construction and seven or more years of experience in heavy civil projects. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.5 Civil Engineer I - Requires a bachelor's degree in area of specialty. The required skills shall include none to two years of related experience. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.6 Civil Engineer II - Requires a bachelor's degree in area of specialty. The required skills shall include a minimum of three years of related experience. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.7 Civil Engineer III - Requires a bachelor's degree in area of specialty. The required skills shall include a minimum of five years of related experience. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.8 Environmental Engineer I - Requires a bachelor's degree in area of specialty. The required skills shall include none to two years of related experience. Shall be physically capable of walking over rough terrain and
1.6.11.2.9 Environmental Engineer II - Requires a bachelor's degree in area of specialty. The required skills shall include a minimum of three years of related experience. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.10 Geotechnical Engineer/Geologist I - Requires a bachelor's degree in area of specialty. The required skills shall include none to two years of related experience. Shall be physically capable of walking over rough terrain and
1.6.11.2.11 Geotechnical Engineer/Geologist II - Requires a bachelor's degree in area of specialty. The required skills shall include a minimum of three years of related experience. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.12 Electrical Engineer I - Requires a bachelor's degree in area of specialty. The required skills shall include none to two years of related experience. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.13 Electrical Engineer II - Requires a bachelor's degree in area of specialty. The required skills shall include a minimum of three years of related experience. Shall be physically capable of walking over rough terrain and
1.6.11.2.14 Mechanical Engineer I - Requires a bachelor's degree in area of specialty. The required skills shall include none to two years of related experience. Shall be physically capable of walking over rough terrain and
1.6.11.2.15 Mechanical Engineer II - Requires a bachelor's degree in area of specialty. The required skills shall include a minimum of three years of related experience. Shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.16 Construction Cost Estimator – Requires a bachelor's degree in area of specialty is recommended but not required. The required skills shall include a minimum of five years of related experience.
1.6.11.2.17 Construction Scheduler - Requires a bachelor's degree in area of specialty. The required skills shall include a minimum of five years of related experience.
1.6.11.2.18 Construction Laboratory Technician (Materials Testing Technician/Laboratory Tester) - The required skills shall include a minimum five years of experience and shall be physically capable of walking over rough terrain and standing long periods of time.
1.6.11.2.19 Administrative Specialist - The required skills shall include a minimum of three years of experience.
1.6.11.2.20 Data Entry Operator - The required skills shall include a minimum of three years of experience.
1.6.11.3 Training: All contractor personnel are required to have successfully completed the Corps of Engineers’
Construction Quality Management for Contractors course and to have and maintain a valid certificate for same.
Training of these employees is the responsibility of the Contractor and each individual employee. It is the
Contractor's responsibility to ensure that all personnel are adequately trained within 60 days after beginning work.
CQM-C is periodically offered by Jacksonville District. Information regarding course can be obtained by contacting
Chief, Quality Assurance Branch at 904-232-1269 or at http://www.saj.usace.army.mil/About/Divisions-
Offices/Construction/CQMC-Course/.
1.6.11.4 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal
Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other
Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government. Individual task orders may require additional meetings as requested at no additional cost to the government.
http://www.saj.usace.army.mil/About/Divisions-Offices/Construction/CQMC-Course/ http://www.saj.usace.army.mil/About/Divisions-Offices/Construction/CQMC-Course/
1.6.11.5 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11.6 Field COR: Each task order will identify a Field COR(s) by separate appointment letter. The Field COR monitors all aspects of the task order. The Field COR has all the rights, responsibilities and limitations identified in the appointment letter for the specific task order identified in the letter.
1.6.12 Key Personnel - The following personnel are considered key personnel by the Government:
1.6.12.1 Contract Manager, Alternate Contract Manager and QC Manager - The contractor shall provide a contract manager who shall be responsible for the performance of the work. The contract manager shall be responsible for coordinating continual coverage of every project site. This includes providing site coverage in the event that an employee is sick or is in a leave status. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract managers or alternates shall be available for contact by the Government whenever the construction work is being performed. Managers will be responsible for tracking and recording the number of hours each employee worked on each individual project. This breakdown shall be included in the invoice submitted to the
Government for payment purposes.
1.6.12.2 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are
Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor shall provide to their personnel all project required Personal Protective Equipment (PPE) such as hard hats, safety vests, steel toes boots, safety glasses, etc. Contractor shall not wear emblems or other markings that would give the impression the contractor is a Government official.
1.6.13 Contractor Travel: Contractor will be required to travel within CONUS during the performance of this contract. Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel
Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR.
1.6.13.1 Contractor Request and Approval of Travel - Any travel under this contract must be specifically requested in writing by the contractor and approved by the Contracting Officer’s Representative (COR), prior to incurring any travel expense. The contractor shall submit the written request to the COR three weeks in advance, when possible.
The travel request shall include as a minimum, the following: contract number, date, time and place of proposed travel, purpose of travel and how it relates to the contract. Contractor’s estimated cost of travel with a breakdown of the estimated costs of transportation, lodging, meals, and incidentals; name(s) of individual(s) traveling. The
Contracting Officer shall review and approve/disapprove (as appropriate) all travel requests submitted giving written notice of such approval or disapproval to the contractor.
1.6.13.2 Travel Reimbursement - The Contractor shall be reimbursed for the reasonable actual cost of transportation, lodging, meals and incidental expenses. However, actual costs shall be considered reasonable, allowable, and reimbursable only to the extent that they do not exceed on a daily basis the maximum per diem rate in effect at the time of travel as set forth in the DOD Joint Travel Regulations located at http://www.defensetravel.dod.mil/. Actual cost does not include handling charges, general and administrative cost, overhead, profit or any other indirect cost.
1.6.13.3 The Contractor shall use the allowable Government personnel rate for transportation and lodging.
Reimbursement for airfare shall not exceed the lowest customary standard, coach, or equivalent airfare offered during normal business hours. The Contractor will not be reimbursed for travel expenses unless audited records for transportation contain evidence, such as original receipts, substantiating actual expenses incurred for travel. In no event will reimbursement exceed the published rates of common carriers. Expenses for lodging, meals and incidental expenses shall be reimbursed to the Contractor, provided that the overnight stay was documented as necessary.
1.6.13.4 Each Contract CLIN for travel will include a not-to-exceed funding limitation for travel costs. When the
Contractor expects total funding expended for reimbursable travel to reach 85 percent of the total funds available on each travel CLIN, the Contractor shall notify the Contracting Officer and the COR. The notice shall state the estimated amount of additional funds required to continue performance for the period specified in the Contract. The
Contractor shall not exceed or incur costs that exceed the amount of funding stated on the Contract.
1.6.13.5 No notice, communication, or representation from any person other than the Contracting Officer shall affect the Government’s obligation to reimburse the Contractor.
1.6.14 Other Direct Costs - All Other Direct Costs not associated with contract line items must be pre-approved by the Contracting Officer.
1.6.15 Vehicle: Vehicles will be required for personnel on project sites. Numbers of vehicles will be determined for each task order and will be negotiated on a task order basis.
1.6.16…
This is the start of the file's text. The full file is on GovTribe.