PLANS__HHD_HP1_18R0013.pdf
PDF 34 MB Posted
- Solicitation number
- W912EP18R0013
About this file
HHD HP-1 PLANS
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
$AFETY PAY$
Risk
Lower
Quality
Increased
In Many Ways!
Jacksonville District of Engineers
US Army Corps
PRO
DUCTI
O N
IN
CREASED
STRUCTURE REPLACEMENT
PLANS
FOR CONSTRUCTION OF
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT, CORPS OF ENGINEERS
JACKSONVILLE, FLORIDA
TO ACCOMPANY INVITATION
"INCREASE PROFIT -- SUBMIT VECP'S"
E
V
HERBERT HOOVER DIKE REHABILITATION
NO. W912EP-18-R-XXXX
GLADES COUNTY, FLORIDAGLADES COUNTY, FLORIDA
S-288 (HP-1) RECONSTRUCTION
114527-HHDRCRHP-2-GI000.dgn
G-01
G E
N E
R A
L
IN
D
E X T
O D
R A
W
IN
G S
C .W .H
-H
H D
C R
H P -G
.d g n
INDEX TO DRAWINGS
TITLE
GENERAL
DWG NODWG NO DWG NO TITLE
HERBERT HOOVER DIKE REHABILITATION
STRUCTURE REPLACEMENT
S-288 (HP-1) RECONSTRUCTION
INDEX TO DRAWINGSG-01
G-02 ABBREVIATIONS AND REFERENCE SYMBOLOGY
G-03
G-04
SURVEY
V-01
CIVIL
C-02
C-03
C-05
C-04
C-07
C-06
C-08
C-10
C-09
C-12
C-14
C-13
C-16
C-15
C-01
PHASE I - COFFERDAM CROSS SECTIONS
PHASE II - EXCAVATION CROSS SECTIONS
PHASE II - EXCAVATION PLAN
PHASE II - EXCAVATION CONTOUR PLAN
PHASE I - COFFERDAM ARMORING PLAN AND SECTIONS
STRUCTURAL
ELECTRICAL
E-01
T-02
SYMBOL LEGEND
E-02
E-03
E-04
E-05
E-06
E-07
E-08
E-09
E-10
ABBREVIATIONS AND GENERAL NOTES
STRUCTURE ELECTRICAL PLAN, SHEET 1
STRUCTURE ELECTRICAL PLAN, SHEET 2
OPERATING PLATFORM DETAILS
CONTROL SCHEMATIC
CONDUIT, CIRCUIT AND PANEL BOARD SCHEDULES
ELECTRICAL DETAILS, SHEET 1
ELECTRICAL DETAILS, SHEET 2
T-03
T-04
T-05
T-06
TELECOMMUNICATIONS
T-01 LEGEND AND SYMBOLS
SUTRON SYSTEM MONITORING DIAGRAM
SUTRON SYSTEM COMPONENTS
SUTRON PANEL WIRING DIAGRAM, SHEET 1
SUTRON PANEL WIRING DIAGRAM, SHEET 2
TITLE
PHASE III - STRUCTURE INSTALLATION PLAN
MECHANICAL
M-01
M-02
RESOURCE
C .D .R
C-11
PHASE III - STRUCTURE INSTALLATION CROSS SECTIONS
PHASE III - STRUCTURE INSTALLATION DETAILS - DRAINAGE
PHASE IV - EMBANKMENT RECONSTRUCTION PLAN
PHASE II - EXCAVATION SEEPAGE PROTECTION PLAN
STRUCTURAL
T-07
T-08
T-11 RTU RADIO BRACKET
INCLINOMETER DETAILS
M-03
STILLING WELL PLAN, AND ELEVATIONS
STILLING WELL SECTIONS AND SCHEMATIC
STILLING WELL SECTIONS AND DETAILS
SITE ACCESS, SURVEY MARKERS, VICINITY AND LOCATION MAPS
M .C
S-01
S-02
S-04
S-05
S-06
S-07
S-08
S-09
S-10
S-11
S-12
S-13
S-14
S-15
S-16
S-17
S-18
GENERAL NOTES
HEADWALL ELEVATIONS
S-03
GENERAL PLAN
GENERAL PROFILE
S-19
S-20
S-21
S-22
S-23
S-24
S-25
S-26
S-27
S-28
S-29
S-30
S-31
S-32
S-34
S-35
S-36
S-37
S-38
S-39
S-40
S-41
S-42
S-44
S-45
S-46
S-47
S-48
S-49
S-50
S-51
S-52
S-53
S-54
S-55
S-56
S-57
S-58
S-59
S-60
S-61
S-62 SIGN DETAILS
S-63
LAKESIDE WINGWALL
LANDSIDE WINGWALL
BULKHEAD SLOT DETAILS AND METAL FABRICATIONS
BULKHEAD SILL AND ARMOUR DETAILS
LANDSIDE HEADWALL FIXTURES
HEADWALL ACCESSORIES
TYPICAL DETAILS MANATEE SCREEN PLAN AND SECTIONS
60"x60" COMBINATION GATE. GATE ASSEMBLY ELEVATION AND SECTIONS
60"x60" COMBINATION GATE. GATE ASSEMBLY ELEVATION AND SECTIONS
60"x60" COMBINATION GATE. FRAME ASSEMBLY ELEVATION AND WALL THIMBLE
60"x60" COMBINATION GATE. FRAME ASSEMBLY ELEVATION AND SECTIONS
60"x60" COMBINATION GATE. SLIDE GATE ASSEMBLY, ELEVATION AND SECTIONS
60"x60" COMBINATION GATE. FLAP GATE ASSEMBLY
60"x60" COMBINATION GATE. FLAP GATE PIVOT ARM ASSEMBLY
MISCELLANEOUS CONCRETE DETAILS
TYPICAL HANDRAIL DETAILS
TYPICAL HANDRAIL DETAILS
RUNG LADDER AND FALL PROTECTION ANCHOR DETAILS
VERTICAL LADDERS AND SHIP LADDER DETAILS
REMOVEABLE FALL PRROTECTION COVERS
S-33 LAKESIDE HEADWALLS SCOUR CUTOFF WALLS
S-43
LAKESIDE HEADWALL SECTIONS
LAKESIDE HEADWALL SECTIONS
LAKESIDE HEADWALL SECTIONS
LAKESIDE HEADWALL FOUNDATION PLAN AND SECTIONS
LAKESIDE HEADWALL FOUNDATION SECTIONS AND DETAILS
LAKESIDE HEADWALL PLAN EL 7.0 AND EL 17.5
LAKESIDE HEADWALL PLAN EL 25.0
LANDSIDE HEADWALL FOUNDATION PLAN AND SECTIONS
LANDSIDE HEADWALL FOUNDATION SECTIONS AND DETAILS
LANDSIDE HEADWALL PLAN EL 7.0 AND EL 17.5
LANDSIDE HEADWALL PLAN EL 25.0
LANDSIDE HEADWALL SECTIONS
LANDSIDE HEADWALL SECTIONS
LANDSIDE HEADWALL SECTIONS
OUTLET CONDUIT CONCRETE ENCASEMENT
OUTLET CONDUIT CONCRETE ENCASEMENT CONSTRUCTION SEQUENCE
LAKESIDE HEADWALL REINFORCEMENT
LAKESIDE HEADWALL REINFORCEMENT
LAKESIDE HEADWALL REINFORCEMENT
LAKESIDE HEADWALL REINFORCEMENT
LAKESIDE HEADWALL REINFORCEMENT
LANDSIDE HEADWALL REINFORCEMENT
LANDSIDE HEADWALL REINFORCEMENT
LANDSIDE HEADWALL REINFORCEMENT
LANDSIDE HEADWALL REINFORCEMENT
LANDSIDE HEADWALL REINFORCEMENT
OUTLET CONDUIT CULVERT REINFORCEMENT
LANDSIDES HEADWALLS SCOUR CUTOFF WALLS
LAKESIDE WINGWALL REINFORCEMENT
LANDSIDE WINGWALL REINFORCEMENT
LAKESIDE HEADWALL FIXTURES
LAKESIDE HEADWALL RAILING PLAN AND ELEVATION
LANDSIDE HEADWALL RAILING PLAN AND ELEVATION
TYPICAL DETAILS MANATEE SCREEN DETAILS AND PARTS
60"x60" COMBINATION GATE. SLIDE GATE ASSEMBLY, ELEVATION AND SECTIONS
TYPICAL CONTROL BUILDING - PLAN AND SECTIONS
STEEL COFFERDAM PLAN, ELEVATION AND DETAILS
R-01
R-02
R-03
RESOURCE
HP_CULVERT_SHEET_1_DO_463-25, 182-1
HP_CULVERT_SHEET_2_DO_463-25, 182-1
HP_CULVERT_SHEET_3_DO_463-25, 182-1
BY-PASS PUMPING PLAN
CONSTRUCTION LIMITS, BORING LOCATIONS, WORK LIMITS, STAGING AREAS AND
PHASE I - BY-PASS ROAD AND COFFERDAM PLAN
PHASE I - BY-PASS ROAD AND COFFERDAM CONTOUR PLAN
PHASE IV - EMBANKMENT RECONSTRUCTION ACCESS RAMP AND PLATFORM PLAN
PHASE IV - EMBANKMENT RECONSTRUCTION CONTOUR PLAN
PHASE IV - EMBANKMENT RECONSTRUCTION SURFACING PLAN
ELECTRICAL SITE PLAN
PHASE IV - EMBANKMENT AND PIEZOMETER RECONSTRUCTION DETAILS
EXISTING CONDITIONS AND CONSTRUCTION LIMITS PLAN
SOLAR PANEL WIRING DIAGRAM
SOLAR POWER PANEL INSTALLATION DETAIL
T-09
T-10
ANTENNA POLE DETAILS
INCLINOMETER INSTALLATION DETAILS
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \0
G e n e ra l\
G -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
W N
G-02
E
N E
R A
L
C .W .H
-H
H D
R C
R H
P -G
I0
A B
B R
E V
IA
T
IO
N S A
N D R
E F
E R
E N
C E S
Y M
B O
L O
G Y
M .C
C .D .R
T - TELECOMMUNICATIONS
E - ELECTRICAL
M - MECHANICAL
F - FIRE PROTECTION
Q - EQUIPMENT
A - ARCHITECTURAL
S - STRUCTURAL
C - CIVIL
B - GEOTECHNICAL
V - SURVEY/MAPPING
G - GENERAL
TERMS AND ABBREVIATIONS LINE SYMBOL KEY
WASTE LINE, SANITARY
POTABLE COLD WATER
DEMOLITION/REMOVAL
COMPRESSED AIR
COMMUNICATION, UNDERGROUND
CONSTRUCTION LIMITS
CULVERT
DITCH
ELECTRICAL PRIMARY, OVERHEAD
ELECTRICAL PRIMARY, UNDERGROUND
ELECTRICAL SECONDARY, OVERHEAD
ELECTRICAL SECONDARY, UNDERGROUND
FENCE
FIBER OPTIC, UNDERGROUND
POTABLE HOT WATER
OBJECT CENTERLINE
FUEL OIL RETURN
FUEL OIL SUPPLY
GUARDRAIL
LPG SUPPLY
WATER MAIN
NONPOTABLE WATER SUPPLY
RIGHT-OF-WAY
PROPERTY LINE
IDENTITY SYMBOL KEY
SECTION
SCALE: A SCALE: A
DETAIL
SECTION
SCALE: A
PLAN
SCALE: A
FULL SECTION
PARTIAL SECTION
DETAIL INDICATOR
M-511
DETAIL IDENTIFICATION
DRAWING WHERE SHOWN
OUT IN DETAIL
LOCATION CALLED
SMALL CONDITIONS DETAIL INDICATOR
S-203
F
SECTION IDENTIFICATION
SCALE REFERENCE
SECTION TITLE
DRAWING WHERE CUT
M-102
SECTION IDENTIFICATION
SCALE REFERENCE
DETAIL TITLE
DRAWING TAKEN FROM
DRAWINGS WHERE CUT
SECTION TITLE W/ MULTIPLE CALLOUTS
OBJECT REFERENCED
VIEWING PLANE
CUTTING PLANE LINE
EXTERIOR ELEVATION
WITH MULTIPLE VIEWS
INTERIOR ELEVATIONS
EMBANKMENT TYPICAL SECTION
MARK No. CALLOUT MARK TITLE
INTERIOR ELEVATION
4 REQ'D
PART
PART
WITH ASYMETRICAL SCALES
DRAWING TITLE
DRAWING TITLE (TYP)
SCALE REFERENCE
SEQUENCE NUMBER
DRAWING WHERE SHOWN
MARK PREFIX
AND MARK No.
NOMENCLATURE
VERTICAL SCALE: B
HORIZONTAL SCALE: A
QUANTITY REQUIRED
SCALE REFERENCE
DRAWING WHERE SHOWN
DETAIL IDENTIFICATION
DETAIL BOUNDRY
A-302
S-205
S-206
S-203
F
SECTION IDENTIFICATION
DRAWING WHERE SHOWN
T
S-706
OBJECT REFERENCED
S-506
J
SECTION IDENTIFICATION
DRAWING WHERE SHOWN
VIEWING PLANE
CUTTING PLANE LINE
S-506
J
F
A-201
F
A-201
A-202
G
F H
J
D
A-202
(CONCST)
CONCRETE
CAST-IN-PLACE
(GRVCRE)
/FDM
DRAINAGE BLANKET
(GRVSCL)
BEDDING MATERIAL
(RIPRAP)
RIPRAP
(ROCK)
ROCK
(EARTH, 45^)
EXISITNG SOIL
(TERRZO)
FILTER SAND
(GRAVEL)
GRAVEL
(POROUS)
COBBLES
REFERENCE SYMBOL KEY
REDUCED TO FIT
REDUCED TO FIT
REDUCED TO FIT REDUCED TO FIT
REDUCED TO FIT
REDUCED TO FIT
REDUCED TO FIT
REDUCED TO FITREDUCED TO FIT
REDUCED TO FIT
REDUCED TO FIT
REDUCED TO FIT
REDUCED TO FIT
FEET-INCHES
EQUAL TO
NUMBER
PERCENT
ELEVATION DATUM INDICATOR
KEYNOTE INDICATOR
DRAWING REVISION INDICATOR
OBJECT CENTERLINE IDENTIFIER
AT
DEGREE(S)
INCHES
(TSAEC.RSC ~ LINE STYLES ARE RELATIVE)
X'-X"
EL 45.0
14 14OR
A
C
X^
X"
REDUCED TO FIT
Mk. M-614-6
BUSHING MARK M-614-6
C
E
COMMUNICATION, OVERHEAD
(EARTH)
EMBANKMENT FILL
CROSS SECTION MATERIAL SYMBOL KEY
ES
ES
SOIL BENTONITE
POUND FORCELBF
ANGLEL
INSIDE RADIUSIR
IRON PIPE SIZEIPS
IRON PIPEIP
INVERT ELEVATIONINV EL
INVERTINV
INCH POUNDIN-LB
INSIDE DIAMETERID
HEIGHTHT
HIGH PERFORMANCE TURF REINFORCEMENT MATHPTRM
HORIZONTALHORIZ
HOLLOW METAL DOOR MANUFACTURERS ASSOCIATIONHMMA
HANDICAPPEDHCP
FEDERAL GOVERNMENTGOVT
FEET/FOOTFT
FEDERAL SPECIFICATIONFS
FIGUREFIG
FLORIDA DEPARTMENT OF TRANSPORTATIONFDOT
ESTIMATEEST
EQUIPMENTEQUIP
EQUALEQ
ELEVATIONEL
EACHEA
DRAWINGDWG
DIAGONALDIAG
DIAMETERDIA
DETAILDET
DEMOLITIONDEMO
DEGREEDEG
CUBIC YARDCU YD
CUBIC FEETCU FT
CONTROLCTRL
CENTERCTR
CONSTRUCTION SPECIFICATIONS INSTITUTECSI
CONCRETE REINFORCING STEEL INSTITUTECRSI
CHANGE ORDER REQUESTCOR
CONCRETECONC
CONTRACTING OFFICERCO
CLEARCLR
CENTERLINECL
BETWEENBTWN
BOTTOMBOT
BELOWBLW
BULKHEADBLKHD
BUILDINGBLDG
AMERICAN WATER WORKS ASSOCIATIONAWWA
AMERICAN WIRE GAUGEAWG
AVERAGEAVG
ASYMMETRICALASYM
AMERICAN SOCIETY FOR TESTING AND MATERIALSASTM
ASSEMBLYASSY
AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME
AMERICAN SOCIETY OF CIVIL ENGINEERSASCE
AS REQUIREDAR
APPENDIXAPPX
APPROXIMATEAPPROX
APPROVEDAPPD
AMERICAN NATIONAL STANDARDS INSTITUTEANSI
ALTERNATEALT
ALIGNMENTALNMT
ALLOWANCEALLOW
AMERICAN INSTITUTE OF STEEL CONSTRUCTIONAISC
ASPHALT INSTITUTEAI
ADDENDUMADDM
ADDITIONALADDL
ACROSSACR
AMERICAN CONCRETE INSTITUTEACI
ABNORMALABNL
ABANDONABAN
ARCHITECT/ENGINEERA/E
WP WORKING POINT
TABLE OF CONTENTS GENERAL SYMBOLOGY
WORKING POINTWP
WITHOUTW/O
WITHW/
UNDER GROUND ELECTRICUGE
TYPICALTYP
SYSTEMSYS
SYMMETRICALSYMM
SYMBOLSYM
SST STAINLESS STEEL TYPE
SQUARE FEETSQ FT
SQUARESQ
SPECIFICATIONSPEC
SPOT ELEVATIONSP EL
RIGHT OF WAYR.O.W.
REQUEST FOR INFORMATIONRFI
REVISIONREV
REQUIREDREQD
REFERENCEREF
RECP ROLLED EROSION CONTROL PRODUCT
RADIUSR
QUANTITYQTY
PROPERTYPROP
PROJECTPROJ
PAIRPR
PART NUMBERPN
OPPOSITEOPP
OUTSIDE DIAMETEROD
CENTEROCON
OVERALLOA
NOT TO SCALEN.T.S.
NORMALNORM
NOMINALNOM
NUMBERNO.
NOT IN CONTRACTNIC
NIBS NATIONAL INSTITUTE OF BUILDING SCIENCES
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NATIONAL ELECTRIC CODENEC
MEAN SEA LEVELMSL
MINIMUMMIN
MAXIMUMMAX
MATERIALMATL
LARGELRG
LINEAR FOOTLF
POUNDSLBS
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \0
G e n e ra l\
G -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
SITE ACCESS
N.T.S.
LEVEE L-50
TIE BACK
HP-1
LEVEE L-50
TIE BACK
G-03
G E
N E
R A
L
-H
H D
R C
R H
P -G
I0 .D
G N
C .W .H
C .D .R
VICINITY MAP
LOCATION MAP
N.T.S.
N.T.S.
V
IC
IN
IT
Y A
N D L
O C
A T
IO
N M
A P
S
S
IT
E A
C C
E S
S S
U R
V E
Y M
A R
K E
R S
S-288 (HP-1) SURVEY MARKERS
N.T.S.
N
N
N
N
S.
R.
S.
R.
S.
R.
PROJECT LOCATION
HERBERT
H O
O V E R D
IK
E E
M B
A N
K M
E N T
R E
D B
A R
N R
D
SIXMILE MARSH
SNAKEPENS RD
FISHEATING BAY
LAKE OKEECHOBEE
C -4
C
A N
A L
ELEVATION 29.09'
E. 633600.98 N. 969100.15
PID AE6404
CONTROL POINT "POND"
ELEVATION 14.80'
E. 629671.85 N. 967058.46
PID AE6452
CONTROL POINT "H439"
ELEVATION 16.44'
E. 634013.04 N. 968333.63
"SFWMD C41 H78 2007"
CONTROL POINT
M .C
C -4
H
A R
N E
Y P
O N
D C
A N
A L
C -4
H
A R
N E
Y P
O N
D C
A N
A L
IN THE CONTRACT.
5. CONTRACTOR SHALL LAYOUT ALL WORK USING CONTROLS PROVIDED
AMERICAN VERTICAL DATUM 1988 (NAVD).
4. ELEVATIONS ARE IN FEET AND TENTHS AND REFER TO NORTH
GOVERNMENT OFFICIALS AND STATE PERSONNEL.
3. CONSTRUCTION ACCESS IS SHARED WITH OTHER CONTRACTORS,
01 11 00 LOCATION AND ACCESS.
2. ACCESS AT S.R. 78 IS GATED. REFER TO SPECIFICATION SECTION
TIE BACK LEVEE L-50 IN ACCORDANCE WITH EM 385-1-1 SECTION 08.C
VEHICLE ACCESS AT THE INTERSECTION OF STATE ROAD 78 AND
1. CONTRACTOR TO PROVIDE TRAFFIC CONTROL FOR CONSTRUCTION
NOTE:
KEY WEST
TALLAHASSEE
JACKSONVILLE
TAMPA
ORLANDO
COCOA
FT MYERS
MIAMI
BEACH
WEST
PALM
LAKE
OKEECHOBEE
PENSACOLA
ALABAMA
GEORGIA
ATLANTIC OCEAN
GULF OF MEXICO
OF WORK
LOCATION
FLORIDA
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \0
G e n e ra l\
G -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
W N
P
721A
LANDSIDE
HARNEY POND CANAL C-41
HP-1
100'50'050'
LEGEND:
NOTES
0.26 ac. ±
STAGING STORAGE
CONSTRUCTION
REMOVE TREES WITHIN LIMITS OF
BORING DESCRIPTIONS.
SOIL BORING, REFER TO SPECIFICATIONS FOR
FOR PROBE DESCRIPTIONS.
SEDIMENT PROBES, REFER TO SPECIFICATIONS
PROBE DESCRIPTIONS.
TEST PIT, REFER TO SPECIFICATIONS FOR
LAND
OF FLORIDA OWNED
SEMINOLE TRIBE
ACCORDANCE WITH SPECIFICATION 01 50 02.
4. INSTALL CONSTRUCTION FENCING IN
SUBMITTAL.
SHOWN ON CONTRACTORS WORK PLAN
BE DETERMINED BY THE CONTRACTOR AND
PARKING AREAS AND TRAILER LOCATION ARE TO
3. CONSTRUCTION STAGING STORAGE IS SHOWN.
RIGHT-OF-WAY.
2. CONSTUCTION LIMITS ARE WITHIN THE FEDERAL
PUMPING SYSTEM REQUIREMENTS.
1. REFER TO SPECIFICATION 01 11 00 FOR BYPASS
E 633218 N 970722
HHD17-S288-CB-1
E 633242 N 970649
HHD16-S288-TP-1
E 633434 N 970441
HHD16-S288-CB-1
M
C H
R
IS
T O
F
ID
IS
S U
R V
E Y M
A P
P
IN
G
G-04
M C
C W
H C
D R
S T
A G
IN
G A
R E
A S A
N D B
Y P
A S
S P
U M
P
IN
G P
L A
N
C O
N S
T R
U C
T
IO
N L
IM
IT
S
B O
R
IN
G L
O C
A T
IO
N S
W O
R K L
IM
IT
S
GRAPHIC SCALE
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \0
G e n e ra l\
G -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
W N
E 633190.46
N 970207.43
E 633521.35
N 970251.86
E 633049.00 N 971232.12
E 633383.70 N 971277.06
E 633383.70 N 971277.06
HHD13-S288-CB-1
E 633189.87 N 970592.44
HHD13-S288-CB-8
E 633205.16 N 970739.62
HHD13-S288-CB-2
E 633157.43 N 970779.70
HHD13-S288-CB-4
E 633062.47 N 971221.82
E 633157.35 N 971083.21
E 633136.80 N 971231.80
E 633200.90
N 970220.94
E 633180.37
N 970369.37
E 633083.02 N 971073.23
AND/OR PUMPS
BYPASS INTAKE PIPES
ASSUMED LOCATION OF
E 633356 N 970692
HHD-HP1-2
E 633377 N 970657
HHD-HP1-1
E 633419 N 970641
HHD-HP1-3
E 633455 N 970651
HHD-HP1-10
E 633419 N 970641
HHD-HP1-3
E 633382 N 970856
HHD17-S288-CB-3
0.26 ac. ±
STAGING STORAGE
E 633323 N 970828
HHD17-S288-CB-2
E 633311 N 970798
HHD16-S288-TP-2
DIRT ROAD
R.O.W.
FEDERAL
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF
E 633180.84 N 970865.25
HHD13-S288-CB-6
E 633290.83 N 970750.54
CB-HP-1-R
E 633363.17 N 970723.19
HHD13-S288-CB-3
E 633318.17 N 970845.89
HHD13-S288-CB-5
E 633384.06 N 970861.19
HHD13-S288-CB-7
E 633255.27 N 970379.59
E 633275.23 N 970230.92
AND/OR PUMPS
BYPASS INTAKE PIPES
ASSUMED LOCATION OF
E 633130 N 970833
HHD-HP1-18
E 633166 N 970793
HHD-HP1-17
E 633211 N 970783
HHD-HP1-16
E 633419 N 970803
HHD-HP1-4
E 633428 N 970692
HHD-HP1-7
E 633473 N 970692
HHD-HP1-8
E 633464 N 970813
HHD-HP1-5
E 633555 N 970813
HHD-HP1-6
E 633554 N 970601
HHD-HP1-12
E 633545 N 970712
HHD-HP1-9
E 633491 N 970409
HHD-HP1-13
E 633536 N 970409
HHD-HP1-14
E 633582 N 970399
HHD-HP1-15
WHEN IMPACTED BY CONSTRUCTION)
(TO BE REMOVED AND REPLACED
EXISTING BARBED WIRE FENCE
LAKESIDE
EXISTING EMBANKMENT ROAD
EXISTING EMBANKMENT ROAD
H P -1 C
A N
A L
H P -1 C
A N
A L
-5
-5
-5
-5
-5
-5 -5
-5
-5
-5
-5
-5
-5
-5
-5
-5
-5
-5
-5
N
LANDSIDE
NOTES:
HARNEY POND CANAL C-41
HP-1
6. REFER TO SURVEY 12-211.
TIME.
AS INDICATING THE GENERAL CONDITIONS AT THAT
FEBRUARY 2013 AND CAN ONLY BE CONSIDERED
COMPLETED BETWEEN 10 DECEMBER 2012 AND 7
REPRESENTS THE RESULTS OF FIELD WORK
5. THE INFORMATION DEPICTED BY THIS SURVEY
FEET.
NGVD29 ELEVATION = NAVD88 ELEVATION +1.34
ELEVATION TO NGVD29 ELEVATION IS +1.34 FEET,
4. THE CONVERSION FACTOR FROM NAVD88
SURVEY FEET.
AMERICAN VERTICAL DATUM OF 1988 (NAVD88) US
3. ELEVATIONS ARE REFERENCED TO THE NORTH
GEODETIC SURVEYS OPUS WEBSITE.
PROCESSING THROUGH THE NATIONAL
FROM STATIC GPS OBSERVATIONS AND
SURVEY. THE COORDINATES WERE ESTABLISHED
COORDINATES WERE USED TO CONTROL THE
FLORIDA EAST ZONE, US SURVEY FEET. NGS
FLORIDA STATE PLANE COORDINATE SYSTEM,
THE NORTH AMERICAN DATUM OF 1983 (2007),
2. HORIZONTAL COORDINATES ARE REFERENCED TO
THE HARNEY POND CANAL.
THE RIGHT OF WAY LIMITS AND/OR FENCING OF
OKEECHOBEE. ALL WORK WAS CONDUCTED WITHIN
APPROXIMATELY 4.5 MILES UPSTREAM FROM LAKE
PORTION OF THE HARNEY POND CANAL
STRUCTURES HP-1, 2, 3, 5, 6 AND 7, ALONG A
SURVEY FOR THE LAND AND CANAL ADJACENT TO
1. THIS IS A HYDROGRAPHIC AND TOPOGRAPHIC
100'50'050'
M
C H
R
IS
T O
F
ID
IS
S U
R V
E Y M
A P
P
IN
G
V-01
M C
C W
H C
D R
A N
D C
O N
S T
R U
C T
IO
N L
IM
IT
S P
L A
N
E X
IS
T
IN
G C
O N
D
IT
IO
N S
GRAPHIC SCALE
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \0
S u rv e y M a p p in g \V -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
W N
20 25
EXISTING RIPRAP
EXISTING WINGWALL
EXISTING WINGWALL
HEADWALL
EXISTING CONCRETE
EXISTING RIPRAP
FENCE
BARBED WIRE
EXISTING
FENCE
BARBED WIRE
EXISTING
DIRT ROAD
R.O.W.
FEDERAL
BEAM
CONCRETE
EXISTING
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF
CONSTRUCTION
LIMITS OF
CULVERTS
EXISTING
LAKESIDE
EXISTING EMBANKMENT ROAD
EXISTING EMBANKMENT ROAD
H P -1 C
A N
A L
H P -1 C
A N
LANDSIDE
C-03
C-41
HARNEY POND CANAL
LAKESIDE
TOP EL. 25.0
COFFERDAM
SHEET PILE
DIRT ROAD
DIRT ROAD
T O
P
.2
T O
P
.9
W
IN
L L
T O
P
.9
W
L L
T O
P
.0
T O
P
.8
W
L L
T O
P
.9
W
L L
T O
P
.1
T O
P
.0
P
IP
E
C E
S S
IB
L E
T O
P
.3
C O
N C
R E
H
A D
W A
L L
P
IP
C E
S S
IB
L E
T O
P
.8
C O
N C
R E
A D
W A
L L
C O
N C
R E
B
A M
C
IV
IL
C-01
N
NOTES:
80'40'040'
GRAPHIC SCALE
P H
A S
E I B
Y P
A S
S R
O A
D A
N D C
O F F
E R
D A
M P
L A
N
SPECIFICATION 01 11 00.
MUST BE SUBMITTED BY THE CONTRACTOR, SEE
ELECTED, A TEMPORARY TURNOUT DESIGN PLAN
ELECT TO DESIGN AND CONSTRUCT TURNOUTS. IF SO
TRAFFIC ON THE BYPASS ROAD. CONTRACTOR MAY
TRAFFIC. CONTRACTOR SHALL CONTROL AND DIRECT
9. THE BYPASS ROAD WAS DESIGNED FOR ONE-WAY
COFFERDAM PRIOR TO CONSTRUCTION.
8. CLEAR AND GRUB AREAS FOR EARTHEN PLUGS AND
COFFERDAM.
OF LANDSIDE AND LAKESIDE DRIVEN PILE
7. REFER TO STRUCTURAL DRAWINGS FOR ELEVATIONS
BARRIERS PER THE SPECIFICATIONS.
AND MONITORING PLAN, INCLUDING TURBIDITY
6. CONTRACTOR SHALL PROVIDE A TURBIDITY CONTROL
REINSTALLATION AT PHASE IV RECONSTRUCTION.
AND GATE IMPACTED BY HP-1 CONSTRUCTION FOR
5. REMOVE AND STORE EXISTING GUARDRAIL, FENCE,
BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
SYSTEMS ARE IN PLACE, COMPLETE AND APPROVED
BE DEGRADED OR EXCAVATED UNTIL THE COFFERDAM
4. NO PORTION OF THE EXISTING EMBANKMENT SHALL
THE TEMPORARY COFFERDAM.
OPERATIONAL BEFORE BEGINNING INSTALLATION OF
3. BYPASS PUMPING SYSTEM SHALL BE FULLY
AREA.
GOVERNMENT USE. SEE SHEET G-04 FOR STORAGE
CONSTRUCTION TO BE STOCKPILED ON SITE FOR
2. EXISTING RIPRAP REMOVED TO ACCOMMODATE
NORTH AMERICAN VERTICAL DATUM 1988 (NAVD).
1. ELEVATIONS ARE IN FEET AND TENTHS AND REFER TO
LEGEND:
CONCRETE BARRIER
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \0
C iv il \C -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
W N
R
.5
EL. 18.50
E 633200.56
N 970555.41
PC STA. 3+28.63
SEE SHT. C-03
BARRIER
CONCRETE
B
C-03
R
.5
TOP EL. 17.0
SHEET PILE COFFERDAM
C
D
C-03
C-03
EL. 18.50
E 633160.07
N 970652.09
PT STA. 4+34.66
EL. 18.50
E 633154.06
N 970901.74
PT STA. 6+87.72
R
.5
R
.5
E 633457.51
N 970497.10
SHEET PILE
CENTERLINE
R.O.W.
FEDERAL
E 970862.15
N 633110.12
SHEET PILE
CENTERLINE
E 970789.00
N 633119.94
SHEET PILE
CENTERLINE
E 633435.94
N 970657.84
SHEET PILE
CENTERLINE
E 633441.32
N 970664.90
SHEET PILE
CENTERLINE
E 633415.40
N 970857.76
SHEET PILE
CENTERLINE
E 633408.36
N 970863.19
SHEET PILE
CENTERLINE
E 633387.60
N 971017.81
SHEET PILE
CENTERLINE
M .C
C .W .H
C .D .R
-H
H D
R C
R H
P -C
F .D
G N
PLUG TOE
EARTHEN
PLUG CREST
EARTHEN
EMBANKMENT
TOP OF
E 633350.26
N 970545.72
PLUG END
CENTERLINE EARTHEN
PLUG CREST
EARTHEN
PLUG TOE
EARTHEN
EL. 18.50
E 633140.51
N 970797.81
PC STA. 5+81.69
E 633448.46
N 970558.93
E 633394.28
N 970962.30
ROAD/COFFERDAM
CREST OF BYPASS
ROAD/COFFERDAM
TOE OF BYPASS
ELEVATION
MATCH EXISTING
E 633377.83
N 970283.03
PC STA. 0+00.00
ELEVATION
MATCH EXISTING
E 633252.26
N 971208.96
PT STA. 10+13.88
E 633330.44
N 970953.69
PLUG END
CENTERLINE EARTHEN
EL. 35.50
E 633337.94
N 970378.28
PT STA. 1+04.46
EL. 35.50
E 633238.91
N 971106.57
PC STA. 9+09.43
M
R C
H
J .S .F
C .B .G
W .E .S
-H
H D
R C
R H
P -S -0
.D
G N
S T
R U
C T
U R
A L
G E
N E
R A
L N
O T
E S
S-01
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y
$STAMP$
p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \0
S tr u c tu re s \S -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N A
U G
S O
L
IC
T
N /A
N /A
/1
/2
A S S
H O
W N
M
C H
R
IS
T O
F
ID
IS
50 PSF
250 PSF
ROOFS
COORDINATION
PRECAUTIONS
CONSTRUCTION LAYOUT
CAST-IN-PLACE CONCRETE
REINFORCEMENT FOR CAST-IN-PLACE CONCRETE
CONCRETE FINISHES:
CONNECTIONS:
PLACING CONCRETE.
WITH THE ARCHITECTURAL, CIVIL, ELECTRICAL AND MECHANICAL DRAWINGS PRIOR TO
CONTRACTOR SHALL COORDINATE ALL PIPE AND CONDUIT LOCATIONS THROUGH CONCRETE
AND/OR ORIENTATION OF STRUCTURES.
DRAWINGS ONLY. STRUCTURAL DRAWINGS DO NOT NECESSARILY SHOW TRUE LOCATION
FOR THE ACCURATE LOCATION AND ORIENTATION OF STRUCTURES, REFER TO THE CIVIL
STRUCTURAL DESIGN LOADS
ON THE DRAWINGS (REFERENCE ASCE 7 (2010)):
THE FOLLOWING LIVE LOADS SERVE AS THE BASIS OF DESIGN, UNLESS OTHERWISE NOTED
PRECAST CONCRETE BUILDING:
UNLESS OTHERWISE NOTED ON THE DRAWINGS:
THE FOLLOWING WIND LOADS SERVE AS THE BASIS OF DESIGN FOR PRECAST BUILDING
Kzt
BUILDING HEIGHT
MEAN ROOF HEIGHT (h)
ENCLOSURE CLASSIFICATION
EXPOSURE CATEGORY
BUILDING CLASSIFICATIONS
BASIC WIND SPEED
1.5
9ft - 10in
9ft - 10in
ENCLOSED
D
CATEGORY II
150 MPH
MAINTENANCE SURCHARGE 300 PSF
GRATING
WHERE THE ABOVE DOES NOT SPECIFICALLY DEFINE IT. A CLASS B FINISH SHALL BE USED.
CLASS D FINISH SHALL BE USED FOR ALL SURFACES TO BE BACKFILLED AND NOT EXPOSED TO VIEW.
INTERIOR AND EXTERIOR SURFACES OF ALL WATER CONTAINING STRUCTURES AND BUILDINGS.
CLASS B FINISH SHALL BE USED FOR ALL SURFACES EXPOSED TO VIEW INCLUDING BOTH THE
REINFORCEMENT LENGTH TABLE
STANDARD HOOK EMBEDMENT
3 4 5 6 7 8 9 10BAR SIZE/LENGTH
LAP SPLICE
BAR EMBEDMENT
6" "4 36 "2
18 10" "4 311 "2
113 15" "4
(f'c = 4,000 PSI)
"2 110 "4
115"2 14 6" "2
17 9" 12" "2
19" 48" 67"
REINFORCEMENT LENGTH TABLE
3 4 5 6 7 8 9 10BAR SIZE/LENGTH
LAP SPLICE
BAR EMBEDMENT
(f'c = 2,500 PSI)
47"
18" 24" 60" 85"
23" 31" 39"
30" 36"
68"
53"
78" 88"
68"
99"
76"
110"
14" 24" 29" 42" 54" 61"
19" 25" 31" 37" 54" 62" 70" 79" 87"
17"
17"
SHOWN ON DRAWINGS ARE MAXIMUM SPACING DIMENSIONS.
TO START AND END AT A MAXIMUM OF ONE HALF OF THE ADJACENT BARS SPACING. BAR SPACING
THE FIRST AND LAST BARS IN WALLS AND SLABS, STIRRUPS IN BEAMS AND TIES IN COLUMNS ARE
CLEAR COVER.
REINFORCEMENT PARALLELING CONSTRUCTION JOINTS SHALL HAVE A MINIMUM OF 2 INCHES OF
REINFORCING BARS SHALL BE CONTINUOUS AT ALL CORNERS UNLESS OTHERWISE NOTED.
REINFORCEMENT LENGTH TABLES INCREASED BY A FACTOR OF 1.3.
THE BAR) SHALL HAVE THE EMBEDMENT LENGTH AND LAP SPLICE LENGTH SPECIFIED IN THE
SHOW ON THIS SHEET. ALL TOP BARS (BARS WITH MORE THAN 12 INCHES OF CONCRETE BELOW
EMBEDMENT LENGTHS SHALL BE IN CONFORMANCE WITH THE REINFORCEMENT LENGTH TABLES
FOR DIFFERENT BAR SIZES, THE SPLICE LENGTH SHALL BE BASED ON THE SMALLER BAR SIZE.
LAP SPLICES SHALL BE CLASS B AND CONFORM TO THE TABLE SHOW ON THIS SHEET.
OTHER COVER REQUIREMENTS ARE SHOWN ON THE STRUCTURAL DRAWINGS.
CLEAR COVER SHALL BE 2 INCHES FOR SECTIONS 12 INCHES OR LESS IN THICKNESS.
THAN 24 INCHES IN THICKNESS.
CLEAR COVER SHALL BE 3 INCHES FOR SECTIONS GREATER THAN 12 INCHES BUT LESS
IN THICKNESS.
CLEAR COVER SHALL BE 4 INCHES FOR SECTIONS GREATER THAN OR EQUAL TO 24 INCHES
MINIMUM COVER FOR WALLS MANUFACTURED UNDER PLANT CONDITIONS SHALL BE 1 INCH.
SPECIFICATIONS, SECTION 03 15 00, CONCRETE ACCESSORIES.
FOR BOND BREAKER, JOINT SEALANT, AND JOINT MATERIAL SPECIFICATIONS, REFER TO
OPERATING AND CONDUIT FLOOR SLABS SHALL RECEIVE A TROWEL FINISH.
STRUCTURAL CONCRETE FOR CIVIL WORKS.
FOR CONSTRUCTION JOINT TREATMENT. SEE SPECIFICATION SECTION 03 31 01 CAST-IN-PLACE
STRUCTURAL CONCRETE FOR CIVIL WORKS AND SECTION 03 35 00 CONCRETE FINISHING.
FOR CONCRETE SURFACE REQUIREMENTS. SEE SPECIFICATION SECTION 03 31 01 CAST-IN-PLACE
STRUCTURAL CONCRETE FOR CIVIL WORKS.
FOR CONSTRUCTION TOLERANCES. SEE SPECIFICATION SECTION 03 31 01 CAST-IN-PLACE
APPROVED BY THE CONTRACTING OFFICER..
STRUCTURAL DRAWINGS, UNLESS VARIATIONS ARE DETAILED ON SHOP DRAWINGS AND
CONSTRUCTION, CONTRACTION AND EXPANSION JOINTS SHALL BE AS SHOWN ON THE
OTHERWISE NOTED.
INCH CHAMFER ON ALL EXPOSED CONCRETE CORNERS AND EDGES, UNLESS4
3PROVIDE
STRUCTURAL AND ARCHITECTURAL ABBREVIATIONS
WELDED WIRE FABRICWWF
WIDE FLANGEWF
WITHW/
WEIGHTWT
WORKING POINTWP
UNDERWRITERS LABORATORIESUL
TOP AND BOTTOMT/B
TYPICALTYP
TOP OF SLABTSL
TOP OF STEELTOS
TOP OF BEARINGTOB
THICKNESSTHK
SYMMETRICALSYMM
SYMBOLSYM
STEELSTL
STANDARDSTD
STATIONSTA
STAINLESS STEELSST
SQUARESQ
SIMILARSIM
SHEETSHT
SQUARE FEETSF
SECTIONSECT
SECONDSEC
SCHEDULESCHD
ROUNDRND
REQUIREDREQ'D
REINFORCEMENTREINF
RADIUSR
POLYVINYL CHLORIDEPVC
POUNDS PER SQUARE INCHPSI
POUNDS PER SQUARE FOOTPSF
POSITIVEPOS
PANELPNL
PLATEPL
PRECAST CONCRETEPCC
ADMINISTRATION
OCCUPATIONAL SAFETY AND HEALTHOSHA
OUTSIDE DIAMETEROD
ON CENTEROC
NEARSIDENS
NEGATIVENEG
NORTH AMERICAN VERTICAL DATUMNAVD
NOT TO SCALEN.T.S.
NUMBERNO.
MANUFACTURERS
ARCHITECTURAL METAL
NATIONAL ASSOCIATION OFNAAMM
NORTHN
MILES PER HOURMPH
MISCELLANEOUSMISC
MINIMUMMIN
MARKMK.
MANUFACTURERMFR
MECHANICALMECH
MAXIMUMMAX
LONGLG
POUNDSLBS
JOINTJT
INFORMATIONINFO
INSIDE DIAMETERID
HEIGHTSHTS
HORIZONTALHORIZ
GYPSUMGYP
GALVANIZEDGALV
GALLONGAL
COMPRESSIVE STRESS FOR CONCRETEF'C
FEETFT
FACE OF STUDFOS
FACE OF CONCRETEFOC
FINISH GRADEFG
FOUNDATIONFDN
EMBEDMENTEMB
ELEVATIONEL / ELEV
EACH WAYEW
EXPANSION JOINTEJ
EACH FACEEF
EACHEA
DOWELDWL
DRAWINGDWG
DIAMETERDIA / Ø
DETAILDET
CORROSION RESISTANT STEELCRES
CONTINUOUSCONT
CONSTRUCTIONCONST
CONCRETECONC
COLUMNCOL
CONTRACTION JOINTCNJ
CONCRETE MASONRY UNITCMU
CORRUGATED METAL PIPECMP
CONTROL JOINTCLJ
CENTERLINECL
CONSTRUCTION JOINTCJ
CAST IN PLACE CONCRETECIPC
CAST IRONCI
CODE OF FEDERAL REGULATIONSCFR
BOTH WAYSBW
BUILDINGBLDG
BOARDBD
ARCHITECTURALARCH
APPROXIMATEAPPROX
AMERICAN WELDING SOCIETYAWS
AMERICAN WIRE GAGEAWG
AMERICAN SOCIETY FOR TESTING MATERIALSASTM
AMERICAN NATIONAL STANDARDS INSTITUTEANSI
ALUMINUMAL / ALUM
ABOVE FINISHED FLOORAFF
AIR CONDITIONA/C
ANCHOR BOLTAB
AT@
AND&
THE GROUND WATER LEVELS ACCORDINGLY DURING CONSTRUCTION.
THE CONTRACTOR IS RESPONSIBLE FOR HIS DEWATERING TECHNIQUES AND FOR MONITORING
CONSTRUCTED IN DRY CONDITIONS ONLY.
INSTALLATION OF A GIVEN STRUCTURE. STRUCTURES ARE DESIGNED TO BE FULLY
THE BOTTOM OF FOUNDATION EXCAVATIONS, AT ALL TIMES, DURING CONSTRUCTION AND
THE "DRY". THE GROUND WATER ELEVATIONS SHALL BE MAINTAINED TWO (2) FEET BELOW
ALL CAST-IN-PLACE AND PRECAST CONCRETE STRUCTURES SHALL BE CONSTRUCTED IN
AWS D1.6, STRUCTURAL WELDING CODE-STAINLESS STEEL.
ALL AUSTENITIC STAINLESS STEEL WELDING SHALL USE 3XXL FILLER METALS AS SPECIFIED IN
UNLESS OTHERWISE NOTED.
ALL STRUCTURAL STEEL WELDING SHALL USE E70XX ELECTRODES AS SPECIFIED IN AWS D1.1, BOLTS, NUTS, WASHERS AND MISCELLANEOUS HARDWARE, UNLESS OTHERWISE NOTED..
FURNISH BOLTS WITH ONE NUT AND TWO WASHERS UNLESS OTHERWISE NOTED. GALVANIZE
ENCLOSURE
INSTRUMENT
W/ CLAMPS
1" CONDUIT
SEE NOTE 4
S P
A C
IN
G
O C
S P
A C
IN
G
INSTRUMENT ENCLOSURE
W/ CLAMPS
1" CONDUIT
BOTH SIDES (TYP)
1/4" X 3" SLOT
HEADWALL STRUCTURE
STRUCTURE
HEADWALL
BOTH SIDES (TYP)
1/4" X 3" SLOT
SEE NOTE 4
3'-6"
DWG E-04)
(SEE ELECTRICAL
FROM COUNTERPOISE
# 4 AWG BC GROUND
DWG E-04)
(SEE ELECTRICAL
FROM COUNTERPOISE
# 4 AWG BC GROUND
3'-6"
NOTES:
SCALE: A
LANDSIDE PLAN
LAKESIDE PLAN
A
M-01
SCALE: A
M-02
C
M-02
C
B
M-01
LAKESIDE ELEVATION
SCALE: A
LANDSIDE ELEVATION
SCALE: A
A
B
M-01
M-01
M-02
M-02
C
C
"A"
2'1'01'
C
C
M-03
D
M E
C H
A N
IC
A L
P L
A N
S A
N D E
L E
V A
T
IO
N S
S T
IL
L
IN
G W
E L
L
M-01
A P
R
IL
-H
H D
R C
R H
P -M
I1 .D
G N
J .D .H
M .D
S .J .P
GRAPHIC SCALE
STILLING WELL
STILLING WELL
THE STILLING WELL.
RESPONSIBLE FOR THE PROPER INSTALLATION OF
VERIFIED BY THE CONTRACTOR WHO IS SOLELY
8. DIMENSIONS AND ELEVATIONS SHOWN SHALL BE
AND ELEVATIONS BEFORE CONSTRUCTION.
7. CONTRACTOR SHALL FIELD-VERIFY PIPE LENGTHS
CIRCUIT SCHEDULE ON ELECTRICAL DRAWINGS.
CONDUCTORS INSTALLED PER THE RTU DRAWINGS, OR
6. ALL CONDUITS SHALL HAVE PULL STRINGS OR
HEIGHT OF THE STILLING WELL.
MORE THAN 1/2" DEVIATION FROM VERTICAL OVER THE
5. THE STILLING WELL SHALL BE INSTALLED PLUMB WITH NO
SEE ELECTRICAL SPECIFICATIONS.
4. 3/4"-DIA. COPPER CLAD GROUNDING ROD, 10' LONG MINIMUM.
GRID.
3. GROUND ALL METAL PARTS TO CONTROL BUILDING GROUNDING
DRAWING M-02 FOR THE SCHEDULE.
2. FOR FEATURES NOTED USING CIRCLE CALLOUTS , REFER TO
LANDSIDE STILLING WELLS.
1. SEE DRAWINGS S-02 AND S-04 FOR LOCATION OF LAKESIDE AND
D
M-03
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \1
M e c h a n ic a l\
M -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
E-01
L E
C T
R
IC
A L
S Y
M B
O L L
E G
E N
D
V .L
-H
H D
R C
R H
P -E -0
.D
G N
AMMETER
VOLTMETER
WATTMETER
FREQUENCY METER
DIGITAL METER
SURGE SUPPRESSOR AND ARRESTER
TRANSIENT VOLTAGE
PUSH BUTTONS WITH INDICATOR LIGHTS
TRANSFORMER, SIZE AS SHOWN
50A - TRIP RATING IN AMPERE
2 POLE UNLESS OTHERWISE NOTED:
MOLDED CASE CIRCUIT BREAKER,
ELECTRICAL ENCLOSURE OUTLINE
OTHERWISE NOTED
NON-FUSED DISCONNECT SWITCH, SIZE
AS NOTED 2 POLE UNLESS
NOTED
NOTED, 2 POLE UNLESS OTHERWISE
FUSED DISCONNECT SWITCH, SIZE AS
3 PHASE UNLESS NOTED
MOTOR HP AS SHOWN
OPEN TORQUE SWITCH
CLOSE TORQUE SWITCH
OPEN LIMIT SWITCH
CLOSE LIMIT SWITCH
GREEN INDICATING LIGHT
RED INDICATING LIGHT
YELLOW INDICATING LIGHT
BLUE INDICATING LIGHT
MAGNETIC CONTRACTOR, CLOSE
WATER VALVE
MANUAL TRANSFER DEVICE,
TRANSFORMER
CONTROL
TRANSIENT SUPPRESSOR
LOCATED AT EQUIPMENT
COMPONENTS OR DEVICES
LOCATED AT MCC
COMPONENTS OR DEVICES
MAGNETIC OVERLOAD
OVERLOAD COIL
FUSED DISCONNECT SWITCH
FUSE
DISCONNECT SWITCH
AIR CIRCUIT BREAKER
FITTING AS REQUIRED
CONNECTION OF CONDUCTORS,
NOT CONNECTED
CROSSING OF CONDUCTORS,
G=GREEN, R=RED, Y=YELLOW, B=BLUE
INDICATING LIGHT:
O=OPEN, C=CLOSE
MOTOR STARTER RELAY (42)
N.O. LIMIT SWITCH
HEATER
PRESSURE SWITCH
MOTOR
OVERLOAD RELAY CONTACTS
(MAGNETIC)
GROUND CONNECTION
("ON-OFF", ETC.)
SINGLE POLE TOGGLE SWITCH,
MOMENTARY OPEN
NORMALLY CLOSED PUSH-BUTTON
MOMENTARY CLOSE
NORMALLY OPEN PUSH-BUTTON
NORMALLY CLOSED CONTACT
NORMALLY OPEN CONTACT
EXPOSED CONDUIT
CONDUIT RUN UNDERGROUND OR IN CONCRETE
CONDUIT RUN - CHANGE IN ELEVATION
CONDUIT BENDS TOWARD OBSERVER
CONDUIT BENDS AWAY FROM OBSERVER
CONDUIT CAPPED
SINGLE POLE SWITCH
15A, 125V, DUPLEX RECEPTACLE, NEMA 5-15R
DISCONNECT SWITCH
MOTOR, HORSEPOWER AS SHOWN
TRANSFORMER
HEATER
AIR TERMINAL
BALANCED MAGNETIC SWITCH
IR MOTION DETECTOR
SECURITY ALARM HORN
KEYPAD
GROUND ROD CONNECTION
GROUND CONNECTION
EXISTING POLE
EXISTING POLE TO BE REMOVED
EXISTING TRANSFORMER
EXISTING GUY
POLE GUY
ELECTRICAL SERVICE TO PUMPS
DUCTBANK FOR UNDERGROUND
FIBER OPTIC CABLE
DUCTBANK FOR UNDERGROUND
PUMP RECEPTACLE POWER WIRING
MONITORING WELL, CAMERA, AND
DUCTBANK FOR UNDERGROUND
CONTROL WIRING
DUCTBANK FOR UNDERGROUND
INJECTION WELL POWER WIRING
DUCTBANK FOR UNDERGROUND
TELEPHONE LINE
EXISTING OVERHEAD
TELEPHONE LINE
EXISTING UNDERGROUND
P=NEW POLE
E=EXISTING POLE
POLE DESIGNATION NUMBER:
"M" MONITORING WELL PANEL
"H" ELECTRICAL HANDHOLE
"J" JUNCTION BOX OR FITTING
GROUNDING TEST WELL
LP-1/3/5
S
M
TX
H
A
IR
P
F
M
C
I
NT
T
T
NT
P-1
J1
T
OL
M
R
TS
50A
30A
30A
MTR
OTS
CTS
OLS
CLS
GIL
RIL
YIL
BIL
MC
O
MC
C
MT
WV
A
V
W
F
DM
TVSS
PLAN SCHEMATIC DIAGRAM SINGLE LINE DIAGRAM
(NOT ALL SYMBOLS WILL APPLY TO THIS PROJECT)ELECTRICAL SYMBOL LEGEND
LONGER MARK INDICATES NEUTRAL.
CONDUCTORS.
CROSS MARKS INDICATE NUMBER OF
HOME RUN TO PANEL "LP". CIRCUITS #1/3/5.
J .D .H
ELECTRICAL PRIMARY, OVERHEADE
ES
ES
E
ELECTRICAL SECONDARY, OVERHEAD
A P
R
IL
S .J .P
MAGNETIC CONTRACTOR, OPEN
TELEPHONE LINE
UNDERGROUND
POLE
TRANSFORMER
OVERHEAD TELEPHONE LINE
ELECTRICAL PRIMARY, UNDERGROUND
ELECTRICAL SECONDARY, UNDERGROUND
GROUND ROD
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \1
E le c tr ic a l\ E -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
L E
C O
M M
U N
IC
A T
IO
N S
T-01
V .L
-H
H D
R C
R H
P -T
S .D
G N
L E
G E
N D A
N D S
Y M
B O
L S
INSTRUMENT IDENTIFICATION INSTRUMENT LINE SYMBOLS
LETTER MODIFIER PASSIVE FUNCTION
READOUT OR
OUTPUT FUNCTION MODIFIER
FIRST LETTER
INITIATING VARIABLE
PROCESS OR
INSTRUMENT, SYSTEMS, AND AUTOMATION SOCIETY TABLE
SV
M
P
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
A
ICXX
ICXX
VALVES AND GATES
INSTRUMENTATION LEGEND
ACTUATOR OR OPERATORS
PRIMARY ELEMENTS
SUCCEEDING LETTERS
J .D .H
ANALYSIS (*)
BURNER FLAME
CONDUCTIVITY
DENSITY (S.G.)
VOLTAGE
FLOW RATE
GAUGE
HAND (MANUAL)
CURRENT
POWER
TIME OR SCHEDULE
LEVEL OR LIMIT
MOTION
TORQUE
DIFFERENTIAL
SCAN
RATIO
ALARM
GLASS
USERS CHOICE (*)
PRIMARY ELEMENT
INDICATE
LIGHT (PILOT)
USERS CHOICE (*)
OFFICE
TEMPERATURE
LOOP VEH. DETECTOR
PRESSURE OR VACUUM
QUANTITY OR EVENT
RATIO
SPEED OR FREQUENCY
VISCOSITY
MULTIVARIABLE (*)
WEIGHT OR FORCE
PHOTO CELL
UNCLASSIFIED (*)
POSITION
SAFETY
POINT (TEST CONNECTION)
INTEGRATE
RECORD OR PRINT
MULTIFUNCTION (*)
WELL
UNCLASSIFIED (*)
LIGHT SOURCE
USERS CHOICE (*)
CONTROL STATION
USERS CHOICE (*)
CONTROL
GATE
USERS CHOICE (*)
UNCLASSIFIED (*)UNCLASSIFIED (*)
SWITCH
TRANSMIT
VALVE
RELAY OR COMPUTE (*)
FINAL CONTROL ELEMENT
DRIVE, ACTUATE OR UNCLASSIFIED
CLOSE
HIGH
LOW
MIDDLE
NORMAL
OPEN
FIRST LETTER(S)
SUCCEEDING LETTERS
LOOP NUMBER
UNIT PROCESS NUMBER
FUNCTIONAL LOOP IDENTIFICATION)
OR MORE INSTRUMENTS HAVING THE SAME
LOOP NUMBER MODIFIER (USED WITH TWO
FIELD MOUNTED INSTRUMENT
REAR OF PANEL MOUNTED INSTRUMENT
FRONT OF PANEL MOUNTED INSTRUMENT
LOCATED IN MCC)
WITH INTERLOCKS (OFTEN
MOTOR STATUS/CONTROL
PLC (PROGRAMMABLE LOGIC CONTROLLER)
TELEMETRY EQUIPMENT
STATUS INDICATION LIGHT
ALARM ANNUNCIATOR OR
TIMER
L A H
X-Y-Z
T
PRIMARY PROCESS FLOW
FUTURE PRIMARY PROCESS FLOW
INSTRUMENT SUPPLY
MECHANICAL LINK OR
CONNECTION TO PROCESS FLOW,
SECONDARY PROCESS FLOW,
ELECTRICAL SIGNAL (DISCRETE)
ELECTRICAL SIGNAL (ANALOG)
FIBER OPTIC DATA HIGHWAY
SOMEWHERE ELSE (X=1,2,3)
PROCESS OR SIGNAL CONTINUED
BUTTERFLY
GATE
SWING CHECK
BALL
GLOBE
DIAPHRAGM
PLUG
3-WAY GLOBE
CULVERT GATE
PRESSURE SUSTAINING VALVE
AIR RELEASE VALVE
BUTTERFLY
CENTRIFUGAL PUMP
CENTRIFUGAL PUMP (WET PIT)
AIR COMPRESSOR
VERTICAL TURBINE PUMP
METERING PUMP
PROGRESSING CAVITY PUMP
SUMP PUMP
PUMPS AND COMPRESSORS
HYDRAULIC
MOTOR
PNEUMATIC
SOLENOID VALVE
LEVEL (BUBBLE TUBE)
VORTEX METER
FLOWMETER
ELECTROMAGNETIC
ROTAMETER
WEIR
ORIFICE PLATE
VENTURI
PROPELLER METER
LEVEL (FLOAT)
LEVEL (ULTRASONIC)
(CLAMP-ON)
ULTRASONIC FLOWMETER
RF ADMITTANCE
PARSHALL FLUME
U = ULTRASONIC)
O = OPTICAL
(X: N = NUCLEAR
DENSITY METER
PITOT-STATIC
SUSPENDED SOLIDS
DIGITAL INPUT, ANALOG INPUT
DIGITAL OUTPUT, ANALOG OUTPUT
ACCELERATION
AUTO-TEST
BELT FILTER PRESS
CHLORINE
CLEARWELL
COMMON
CONDUCTIVITY
COM
CLW
CL2
BFP
AT
ACC
COND
CP CONTROL PANEL
EFFL
D.O.
DI, AI
DO, AO
DISSOLVED OXYGEN
DR DISTANCE RELAY
EFFLUENT
FIL
FIS
FILTER
HOA
HLO
EP ELECTRICAL PANEL
ES EMERGENCY STOP
ETM ELAPSED TIME METER
FD CHEMICAL FEEDER
FLOW INDICATING SWITCH
FOC FIBER OPTIC CABLE
FRS FORWARD-REVERSE-STOP
GEN GENERATOR
HLOR HIGH-LOW-OFF-REMOTE
HIGH-LOW-OFF
HAND-OFF-AUTO
H/L HIGH LOW
IND
INFL
HSP
JP
HOR HAND-OFF-REMOTE
HOTC HAND-OFF-TIMER-COMPUTER
HIGH SERVICE PUMP
INDICATION
INFLUENT
JOCKEY PUMP
LOR LOCAL-REMOTE-OFF
LOS LOCK-OUT-STOP
GPS GLOBAL POSITIONING SYSTEM
MCC
LPU
LR
MOV
OCA
PAFM
OSC
ME
M.G.
MANUAL-OFF-AUTO
ORP
OSCR
LINE PROTECTION UNIT
LOCAL-REMOTE
MOTOR CONTROL CENTER
MCP MAIN CONTROL PANEL
MISCELLANEOUS EQUIPMENT
MILLION GALLON
MOA
MOTOR OPERATED VALVE
OPEN-CLOSE-AUTO
OC OPEN-CLOSE
OO ON-OFF
OXIDATION REDUCTION POTENTIAL
OPEN-CLOSE-STOP
OPEN-CLOSE-STOP-REMOTE
POWER APPLIED FOR MOTION
RIP
REF
RES
RLS RAISE LOWER STOP
PRES PRESSURE
PH HYDROGEN ION CONCENTRATION
RESTORE
REFERENCE
RF RF (ADMITTANCE) LEVEL MONITOR
REMOTE I/O PANEL
SEC
SCC
SF
STOR
RSP
SECONDARY
SSL
SUS
REMOTE SET POINT
SA SURGE ARRESTER
STATION CONTROL CENTER
SONIC FLOWMETER
SP SETPOINT
SPEED SWITCH LOW
SS STOP/START
STORAGE
SUSPENDED SOLIDS
SSRVS SOLID STATE REDUCED VOLTAGE STARTER
TD THERMAL DISPERSION
TP TRANSFER PUMP
VARIABLE FREQUENCY DRIVE
SST STAINLESS STEEL
VFD
(*) WHEN USED, EXPLANATION IS SHOWN ADJACENT TO INSTRUMENT SYMBOL
A P
R
IL
S .J .P
INSTRUMENT ABBREVIATIONS
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \1
T e le c o m m u n ic a ti o n s \T -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
R-01
.E .S
C .B .G
R E
S O
U R
C E
NOTES:
DRAWING SHALL APPLY TO THIS CONTRACT.
NEW DETAILS SHOWN BESIDE OR BELOW THE REFERENCE
OF THIS CONTRACT. ALL KEY NOTES, GENERAL NOTES, AND
DRAWING INFORMATION USED DURING THE PERFORMANCE
CONTRACTOR IS RESPONSIBLE FOR VERIFYING REFERENCE
DETERMINE LINEAR OR ANGULAR MEASUREMENTS. THE
DRAWING IS NOT TO SCALE AND SHALL NOT BE USED TO
INCLUDED FOR REFERENCE ONLY. THIS REFERENCE
REPRESENT CURRENT CONDITIONS. THIS DRAWING IS
DRAWING FROM A PREVIOUS PROJECT(S) AND MAY NOT
1. THREE-QUARTER SIZED DRAWING SHOWN IS A CONTRACT
J .S .F
-H
H D
R C
R H
P -R -0
.D
G N
H P
C u lv e rt s S h e e t_
D O
-2
,1
-1
M A
Y
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \1
R e s o u rc e s \R -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
R-02
.E .S
C .B .G
R E
S O
U R
C E
NOTES:
DRAWING SHALL APPLY TO THIS CONTRACT.
NEW DETAILS SHOWN BESIDE OR BELOW THE REFERENCE
OF THIS CONTRACT. ALL KEY NOTES, GENERAL NOTES, AND
DRAWING INFORMATION USED DURING THE PERFORMANCE
CONTRACTOR IS RESPONSIBLE FOR VERIFYING REFERENCE
DETERMINE LINEAR OR ANGULAR MEASUREMENTS. THE
DRAWING IS NOT TO SCALE AND SHALL NOT BE USED TO
INCLUDED FOR REFERENCE ONLY. THIS REFERENCE
REPRESENT CURRENT CONDITIONS. THIS DRAWING IS
DRAWING FROM A PREVIOUS PROJECT(S) AND MAY NOT
1. THREE-QUARTER SIZED DRAWING SHOWN IS A CONTRACT
J .S .F
-H
H D
R C
R H
P -R -0
.D
G N
H P
C u lv e rt s S h e e t_
D O
-2
,1
-1
M A
Y
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \1
R e s o u rc e s \R -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
R-03
.E .S
C .B .G
R E
S O
U R
C E
NOTES:
DRAWING SHALL APPLY TO THIS CONTRACT.
NEW DETAILS SHOWN BESIDE OR BELOW THE REFERENCE
OF THIS CONTRACT. ALL KEY NOTES, GENERAL NOTES, AND
DRAWING INFORMATION USED DURING THE PERFORMANCE
CONTRACTOR IS RESPONSIBLE FOR VERIFYING REFERENCE
DETERMINE LINEAR OR ANGULAR MEASUREMENTS. THE
DRAWING IS NOT TO SCALE AND SHALL NOT BE USED TO
INCLUDED FOR REFERENCE ONLY. THIS REFERENCE
REPRESENT CURRENT CONDITIONS. THIS DRAWING IS
DRAWING FROM A PREVIOUS PROJECT(S) AND MAY NOT
1. THREE-QUARTER SIZED DRAWING SHOWN IS A CONTRACT
J .S .F
-H
H D
R C
R H
P -R -0
.D
G N
H P
C u lv e rt s S h e e t_
D O
-2
,1
-1
M A
Y
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \1
R e s o u rc e s \R -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
L E
C O
M M
U N
IC
A T
IO
N S
T-02
V .L
-H
H D
R C
R H
P -T
S .D
G N
S U
T R
O N S
Y S
T E
M M
O N
IT
O R
IN
G D
IA
G R
A M
J .D .H
S .J .P
A P
R
IL
NOTES:
SEE SPECIFICATION 25 31 01 FOR SPARE PARTS.11.
SHALL BE CONSIDERED "OR APPROVED EQUAL."
SUTRON EQUIPMENT, REFERENCED MANUFACTURERS
WITH THE EXCEPTION OF THE GE INET RADIO AND THE10.
VERIZON 3G/4G SERVICE SHALL BE PROVIDED.
3G/4G MODEM CAPABLE OF USING ATT OR 9.
ALARM CONTACT.
PROVIDE A CIRCUIT FOR CONTROL BUILDING8.
JUNCTION BOX.
COORDINATES PROPER LOCATION AND SIZE OF
MOUNTING ON POLE FOR CAT5E LINE. FIELD
PROVIDE A NEMA 4X STAINLESS STEEL JUNCTION BOX
FROM SUTRON CABINET TO ANTENNA POLE.
PROVIDE ONE SPARE CAT5E LINE IN 1-INCH CONDUIT 7.
PROVIDE ONE SPARE RADIO. SEE NOTE 11.
ANTENNA MOUNTING ON POLE AS INDICATED.
INSIDE THE SUTRON CABINET. PROVIDE A YAGI
PROVIDE TWO GE iNET-II RADIO OR APPROVED EQUAL6.
PROVIDE A SPARE CRADELPOINT. SEE NOTE 11.
FIELD COORDINATES CELLULAR ANTENNA ON POLE.
ROUTER (ISR) OR APPROVED EQUAL INSIDE THE SUTRON.
PROVIDE CRADELPOINT AER1600 INTEGRATED SERVICE5.
MANUFACTURER' S RECOMMENDATIONS.
SOLAR PANELS, ANTENNA AND OTHER EQUIPMENT PER
OTHER ACCESSORIES FOR PROPER INSTALLATION OF
LOCKNUTS, AND ETC., POLE STRAP OR ADAPTER, AND
PROVIDE MOUNTING HARDWARE SUCH AS ANCHOR BOLTS,4.
TELECOMMUNICATIONS.
SEE DRAWINGS T-03 THROUGH T-11 FOR3.
ANTENNA POLE.
STRUCTURAL PLAN S-55 FOR LOCATION OF
SEE DRAWING T-08 FOR ANTENNA POLE DETAIL. SEE2.
SEE DRAWINGS E-01 THROUGH E-10 FOR ELECTRICAL.1.
A
B
C
D
1234567
D
C
B
A
8 7 6 5 4 3 2
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D R
A W
IN
G D
A T
E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DEPENDS ON YOU
SAFETY ON THIS JOB
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
D E
P A
R T
M E
N T O
F T
H E A
R M
Y D
E S
IG
N E
D B
Y p w \C
O E -S
A J P
W P J
A X .s a j.
d s .u s a c e .a rm y .m il :S
A J P
W \D o c u m e n ts \C
S
F \H e rb e rt H o o v e r
D ik e R e h a b il it a ti o n \0
-C u lv e rt R e h a b il it a ti o n \S -2
H P
P la n s \1
T e le c o m m u n ic a ti o n s \T -0
S -2
H P -1
R E
C O
N S
T R
U C
T
IO
N
S T
R U
C T
U R
E R
E P
L A
C E
M E
N T
H E
R B
E R
T H
O O
V E
R D
IK
E R
E H
A B
IL
IT
A T
IO
N
/1
/2
A S S
H O
W N
WELL
STILLING
LANDSIDE
WELL
STILLING
LAKESIDE
POSITION
GATE 1
INCLINOMETER
GATE 1
UPS
EQUIPMENT
SUTRON
SUPPLY
POWER
900 MHZ RADIO
GE iNET-II
CONTACT
ALARM
DOOR
CNTRL BLDG
ETHERNET
ON ANTENNA POLE
YAGI ANTENNA
ON ANTENNA POLE
YAGI ANTENNA
900 MHZ RADIO
GE iNET-II ISR
AER1600
CRADELPOINT
SUTRON ENCLOSURE
SCALE: N.T.S.
TYPICAL MONITORING SYSTEM DIAGRAM
ON ANTENNA POLE
GOES ANTENNA
ON ANTENNA POLE
YAGI ANTENNA
ON ANTENNA POLE
GPS ANTENNA
ON ANTENNA POLE
YAGI ANTENNA
V .L
V .L
T-03
T E
L E
C O
M M
U N
IC
A T
IO
S
V .L
J .D .H
S .J .P
A U
G U
S T
S U
T R
O N S
Y S
T E
M C
O M
P O
N E
N T S
NOTES:
EQUAL."
AND 6E SHALL BE MANUFACTURERS AS SHOWN "OR APPROVED
REFERENCED ITEMS: 1A THRU 2M, 3D, 3G, 3J, 5A, 5B, 5C, 5F, 6A,3.
SUPPRESSION SHALL DISSIPATE 3,000 W/PAIR.
AND POE'S. SURGE SUPPRESSION SHALL MEET UL 497B. SURGE
PROVIDE SURGE SUPPRESSION FOR ALL CABLES BETWEEN CAMERAS 2.
CONTRACTOR SHALL COORDINATE WITH EQUIPMENT PROVIDED.1.
-H
H D
R C
R H
P -T
S .D
G N
3G
3C
3E
BATTERY BOX
iNET-II 900
GE
1"-WIRING DUCT
1-1/2" WIRING DUCT
iNET-II 900
GE
CRADLEPOINT
MANUFACTURER DESCRIPTION
PART
1-1/2"x1-1/2" WIREWAY
1-1/2" WIREWAY COVER
DIN RAIL
TERMINAL BLOCK
TERMINAL BLOCK END COVER
END CLAMPS
TERMINAL STRIP MARKER
MEASUREMENT AND CONTROL MODULE (DATA LOGGER)
F1.5X1.5LG6
C1.5LG6
08 01 73 3
30 04 36 2
HOFFMAN
PANDUIT
PHOENIX CONTACT
PHOENIX CONTACT
1C
1D
1E
2C
2B
2A
3A
2G
2E
2D
5B
5A
5C
PANDUIT
PHOENIX CONTACT
PHOENIX CONTACT
BURNDY
PHOENIX CONTACT
KC17B1
30 03 02 0
08 00 88 6
08 00 30 7
2F
TYPE SP SERVICE GRD POST CONNECTOR
PHOENIX CONTACT 55 31 72 3 10AMP CIRCUIT BREAKER-1 POLE
30 04 03 2 KNIFE DISCONNECTPHOENIX CONTACT
5D
3/8" DIA. X 1" LONG HYDROPHOBIC FILTER MATERIAL
PRODUCTS #5541
INTERSTATE SPECIALTY
GALVANIZED STEEL CORD GRIP FOR 3/8" CORDCGFP1931B CROUSE HINDS
POREX
3D
3E
3F
2H PHOENIX CONTACT 13 02 21 5 PARTITION PLATE
2I PHOENIX CONTACT 02 03 25 0 FIXED BRIDGE
1F
A-30P24 BACK PANELHOFFMAN1G
3G
4A
4B
4C SUTRON
4D
6411-11624E
6411-15614F
SUTRON
N1186-B DUAL RATED GROUND BARILSCO1H
PANDUIT
1I
1J
PANDUIT 1"x1" WIREWAY
1" WIREWAY COVER
F1X1LG6
C1LG6
3B
SUTRON
SUTRON TRANSMITTER
MORNINGSTAR
SUTRON 5000-0081 YAGI GOES SATELLITE ANTENNA
SUTRON 5000-0170 JAM RESISTANT GPS ANTENNA
8111-1113-1 RF COAX LIGHTNING PROTECTOR
LIGHTNING PROTECTORN/A N/A
SUTRON ANTENNA CABLE
SUTRON ANTENNA CABLE
XPERT2
2J
3H N/A N/A GATE POSITION INDICATOR IN GATE ACTUATOR
SUTRON STILLING WELL SDI-12 SHAFT ENCODER
3K N/A N/A
3I
3J
SUTRON ANALOG I/O MODULE
SDI-12 TERMINATION6461-1241
PHOENIX CONTACT
PHOENIX CONTACT
2K
2L
2M
PHOENIX CONTACT
PHOENIX CONTACT
28 56 12 6 PLUGTRAB BASE
28 58 04 3 PLUGTRAB PLUG
28 56 11 3 PLUGTRAB BASE
28 56 03 2 PLUGTRAB PLUG
1A
56-0540
GE GE iNET-II 900 GE iNET-II 900 RADIO OR APPROVED EQUAL
N/A
PHOENIX CONTACT
PHOENIX CONTACT
8080-0003
A604816SSLP, ADP2
SOLAR CONTROLLER
GATE POSITION INDICATOR IN GATE ACTUATOR
TOYO BATTERY CO.
5E
6A N/A 3.5AMP CIRCUIT BREAKER-1 POLE
6B
6C
6D
6E A-VK33
6F
09 15 06 9 10 AMP CIRCUIT BKR - 2 POLE W/ AUX CONTACTS
FURNISHED BY CONTRACTOR N/A 4 COND, #14 AWG SIS CONDUCTORS
FURNISHED BY CONTRACTOR N/A 6 COND, #14 AWG SIS CONDUCTORS
HOFFMAN 4" X 4" LOUVER WITH FILTER
WIEGMANN RSC161610 16" X 16" X 10" NEMA 3R ENCLOSURE
N/A N/A
BP SOLAR BP 350
N/A
5F
50 WATT SOLAR PANELS
12 VOLT 50 AH BATTERIES
SOLAR PANEL ROOF MOUNTING BRACKET
A906-ST-BD-V
N/A
DOOR POCKET, POWDER COAT EXTERIOR WHITE
48H"x36W"x12D" STAINLESS STEEL ENCLOSURE WITH INTERIOR
SS-10L
6GFM55
N/A AC QUAD RECEPTACLE6G
CRADLEPOINT AER1600LP6-NA-M CRADLEPOINT AER1600LP6 OR APPROVED EQUAL
POWER SONIC PSC-12800A POWER SUPPLY
3C SUTRON 6461-1242-1 POWER TERMINATION
JEWELL INSTRUMENTS
SATLINK-3, MODEL SL3-1
REF
SUTRON SYSTEM COMPONENTS
CLOSE NIPPLE
1/2" RIGID
1G
1A
SCALE: N.T.S.
SUTRON ENCLOSURE LAYOUT
5F
3A
3B
1J1I
4C
3D
2A
5A
4D 4D 4D 4C
1H
4C
2D
6A 2C 2C 2C 2I
2C
1B 1F1C1B
6D
1D 1E
2B
2B
2F 2B
2D 2G
CLOSE NIPPLE
1/2" RIGID
6A
2F
5F
SELECT
FLOODED
OR
SEALED
DISCONNECT
LOAD
BATTERY
FLOODED
WIRE FOR
JUMPER
REMOVE
IN-PLACE INCLINOMETER (IPI)
XPERT
SUTRON
000 00
1I
3F
1J
2C
2F 2F
2H
2B 2B
1I 1J2L 2M
2F
2J 2K
POWER SONIC
6G
P H
O E
N
IX
C
O N
T A
C T S
P T
X
F -B
E
P T -H
F -1
D
C -S
T
P H
O E
N
IX
C
O N
T A
C T S
P T
X
F -B
E
P T -H
F -1
D
C -S
T
P H
O E
N
IX
C
O N
T A
C T S
P T
X -2
D
C -S
T
P T
X -B
E
P H
O E
N
IX
C
O N
T A
C T S
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.