About this file

W912EP18B0007 Amendment 0002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Tampa Harbor Maintenance Dredging, 45-Foot Project – Egmont Channel Cuts 1 & 2 and 43-Foot Project – Mullet Key Channel, Hillsborough County, Florida

A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.

B. THE PROPOSAL DUE DATE HAS BEEN CHANGED FROM 09 AUG 2018 TO 14 AUG 2018 @ 2:00 PM LOCAL TIME.

C. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

1. CONTRACT ID CODE PAGE OF PAGES

1 63

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP18B0007

X 9B. DATED (SEE ITEM 11)

10-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2018

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SF 30 CONTINUATION SHEET

Tampa Harbor Maintenance Dredging, 45-Foot Project – Egmont Channel Cuts 1 & 2 and 43-Foot Project – Mullet Key Channel, Hillsborough County, Florida

W912EP18B0007 2 Amendment 0002

SUMMARY OF CHANGES

1. SPECIFICATIONS:

The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.

Changes to Specifications:

DELETE Section 00010A and REPLACE with the attached revised Section 00010A.

DELETE Section 01 11 00 and REPLACE with the attached revised Section 01 11 00.

DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.

DELETE Section 35 20 23 and REPLACE with the attached revised Section 35 20 23.

DELETE Clause 52.211-10 and REPLACE with the below revised Clause 52.211-10 DELETE Clause 52.211-12 and REPLACE with the below revised Clause 52.211-12

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OFWORK

The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 160 calendar days.* The time stated for completion shall include final cleanup of the premises.

* Total Duration: 160 Calendar Days Base 130 Calendar Days Option 30 Calendar Days

52.211-12 LIQUIDATEDDAMAGES--CONSTRUCTION

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $5,063.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

2. DRAWINGS:

DELETE the entire set of drawings and REPLACE with the attached revised set of drawings.

3. AVAILABLE INFORMATION:

Two zipped survey XYZ files for Survey Numbers 18-139 and 18-146.

One PDF copy of the applicable FDEP permit.

(End of Summary of Changes)

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROEJCT - EGMONT

CHANNEL CUTS 1 & 2 AND 43 FOOT PROJECT - MULLET KEY CHANNEL

HILLSBOROUGH COUNTY, FLORIDA

W912EP18B0007 00010A-1 Amendment 0002

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

BASE

0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________

0002 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY, SEE NOTE 2) 425,000 CUBIC YARD $___________ $_______________

0003 TURBIDITY MONITORING JOB $_______________

0004 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY, SEE NOTE 3) JOB $_______________

0005 MANATEE OBSERVER

(CLAMSHELL DREDGING ONLY, SEE NOTE 3) JOB $_______________

0006 MOBILIZATION AND DEMOBILIZATION FOR

SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) JOB $_______________

0007 SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY $___________ $_______________

0008 STANDBY TIME (SEE NOTE 4) 24 HOUR $___________ $_______________

0009 BEACH TILLING

(ESTIMATED QUANTITY, SEE NOTE 6) 1 ACRE $___________ $_______________

0010 SCREENING OF UNACCEPTABLE MATERIAL

(ESTIMATED QUANTITY, SEE NOTE 7) 1,000 CUBIC YARD $___________ $_______________

0011 REMOVAL OF UNACCEPTABLE MATERIAL

(ESTIMATED QUANTITY, SEE NOTE 7) 10 CUBIC YARD $___________ $_______________

TOTAL BASE (LINE ITEMS 0001 THROUGH 0011) $_______________

OPTION A

0012 EXCAVATION, UNCLASSIFIED

(ESTIMATED QUANTITY, SEE NOTE 2) 137,000 CUBIC YARD $___________ $_______________

0013 TURBIDITY MONITORING JOB $_______________

0014 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY, SEE NOTE 3) JOB $_______________

0015 MANATEE OBSERVER

(CLAMSHELL DREDGING ONLY, SEE NOTE 3) JOB $_______________

0016 SEA TURTLE TRAWL SWEEPING

(HOPPER DREDGE ONLY, SEE NOTE 5) 1 DAY $___________ $_______________

0017 BEACH TILLING

(ESTIMATED QUANTITY, SEE NOTE 6) 1 ACRE $___________ $_______________

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

TAMPA HARBOR MAINTENANCE DREDGING, 45-FOOT PROEJCT - EGMONT

CHANNEL CUTS 1 & 2 AND 43 FOOT PROJECT - MULLET KEY CHANNEL

HILLSBOROUGH COUNTY, FLORIDA

W912EP18B0007 00010A-2 Amendment 0002

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0018 SCREENING OF UNACCEPTABLE MATERIAL

(ESTIMATED QUANTITY, SEE NOTE 7) 200 CUBIC YARD $___________ $_______________

0019 REMOVAL OF UNACCEPTABLE MATERIAL

(ESTIMATED QUANTITY, SEE NOTE 7) 5 CUBIC YARD $___________ $_______________

TOTAL BID (LINE ITEMS 0012 THROUGH 0019) $_______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0019) $_______________

NOTES: (1) BIDDERS MUST PROVIDE PRICING FOR ALL ITEMS. SEE SECTION 00100 "INSTRUCTIONS TO OFFERORS".

(2) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS

AND ACTUAL DREDGING. ACTUAL QUANTITIES MAY DIFFER FROM ESTIMATED QUANTITIES.

(3) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A MANATEE OBSERVER

IS REQUIRED FOR CLAMSHELL DREDGING ONLY.

(4) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERIING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER.

STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT

AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

(5) SEA TURTLE TRAWL SWEEPING IS REQUIRED FOR HOPPER DREDGE ONLY WHEN DIRECTED BY THE CONTRACTING OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION, SUBPARAGRAPH "SUSPENSION OF DREDGING

(HOPPER DREDGE ONLY)".

(6) BEACH TILLING WILL ONLY BE PAID FOR IF THE CONTRACTOR IS REQUIRED TO PERFORM THE WORK UNDER THE PROVISIONS OF THIS CONTRACT. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION FOR PRVISIONS TO INITIATE

BEACH TILLING.

(7) SCREENING OF UNACCEPTABLE MATERIAL AND REMOVAL OF UNACCEPTABLE MATERIAL ARE NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, BUT PAYMENT WILL ONLY BE MADE FOR ACTUAL EXECUTION

OF EACH OF THESE LINE ITEMS AS APPROVED BY THE CONTRACTING OFFICER.

Tampa Har bor Mai nt enance Dr edgi ng, 45- Foot Pr oj ect - Egmont Channel Cut s 1 & 2 and 43- Foot Pr oj ect - Mul l et Key Channel

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1. 1 REFERENCES

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

1. 2. 2 Locat i on

1. 2. 3 Saf et y Requi r ement s

1. 2. 4 Wor k Per f or med by Ot her s

1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK

1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON

1. 5 PHYSI CAL DATA

1. 5. 1 Physi cal Condi t i ons

1. 5. 2 Weat her , Wat er St age and Ti de Dat a

1. 5. 3 Cont r act or I nvest i gat i on

1. 5. 4 Mar i t i me Tr af f i c

1. 5. 5 Obst r uct i on of Channel

1. 5. 6 Hydr ogr aphi c Sur veys

1. 6 LAYOUT OF WORK

1. 6. 1 Est abl i shed Pr oj ect Cont r ol

1. 6. 2 Layout

1. 6. 3 Sur vey

1. 7 DAMAGE TO WORK

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON ( NOT APPLI CABLE)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 00 Page 1 W912EP18B0007 Amendment 0002

SECTI ON 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

GDR Sect i on 00 31 32, Geot echni cal Dat a Repor t f or Tampa Har bor , Mai nt enance Dr edgi ng 45- Foot Pr oj ect - Egmont Channel Cut s 1 & 2 and 43- Foot Pr oj ect - Mul l et Key Channel , Hi l l sbor ough Count y, Fl or i da

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

1. 2 WORK COVERED BY CONTRACT DOCUMENTS

1. 2. 1 Pr oj ect Descr i pt i on

Pr oj ect consi st s of mai nt enance dr edgi ng Egmont Channel Cut - 1 and Cut - 2, and Mul l et Key Cut . Thi s pr oj ect was l ast under t aken i n 2014. Dr edged mat er i al wi l l be pl aced i n t he desi gnat ed beach pl acement ar ea on Egmont Key. Addi t i onal wor k i ncl udes mi nor bed l evel i ng, t ur bi di t y moni t or i ng, sea t ur t l e t r awl sweepi ng and r el ocat i on, envi r onment al speci es obser vat i on, and beach t i l l i ng. Wor k wi l l be di v i ded i nt o a base and one option.

1. 2. 2 Location

Pr oj ect i s l ocat ed i n Tampa Har bor , Hi l l sbor ough Count y, Fl or i da.

1. 2. 3 Saf et y Requi r ement s

See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and EM 385- 1- 1.

Dr edgi ng i n t he pr oj ect ar ea may cause t he r el ease of hydr ogen sul f i de (H 2S) gas. Requi r ement s f or hydr ogen sul f i de ar e f ound i n OSHA r egul at i ons i ndi cat ed i n par agr aphs CONFI NED SPACE ENTRY REQUI REMENTS ( PART 1) and WORK I N CONFI NED SPACES ( PART 3) of Sect i on 01 35 26 GOVERNMENTAL SAFETY

REQUIREMENTS.

1. 2. 4 Wor k Per f or med by Ot her s

See par agr aph PROJECT COORDI NATI ON of Sect i on 01 30 00 ADMI NI STRATI VE

PROCEDURES.

1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK

Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause COMMENCEMENT, SECTI ON 01 11 00 Page 2

PROSECUTI ON, AND COMPLETI ON OF WORK ( FAR 52. 211- 10) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON

Ref er t o t he Cl ause LI QUI DATED DAMAGES - CONSTRUCTI ON ( FAR 52. 211- 12) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 5 PHYSI CAL DATA

Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause PHYSI CAL DATA ( FAR

52. 236- 4) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 5. 1 Physi cal Condi t i ons

The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons by sur veys and/ or by cor e bor i ngs. When t he i ndi cat ed physi cal condi t i ons ar e t he r esul t of s i t e i nvest i gat i ons by cor e bor i ngs, t he cor e bor i ng l ogs and l abor at or y dat a ar e i n Sect i on 00 31 32 GEOTECHNI CAL DATA REPORT ( GDR) and t he cor e bor i ng l ocat i ons ar e shown on t he dr awi ngs. Al so, see t he GDR f or i nst r uct i ons concer ni ng avai l abi l i t y of cor e bor i ngs f or i nspect i on.

1. 5. 2 Weat her , Wat er St age and Ti de Dat a

See Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA.

1. 5. 3 Cont r act or I nvest i gat i on

Ref er t o t he Cl ause SI TE I NVESTI GATI ON AND CONDI TI ONS AFFECTI NG THE WORK ( FAR 52. 236- 3) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 5. 4 Mar i t i me Tr af f i c

Mar i ne Tr af f i c i n t he pr oj ect ar ea consi st s of Naval , cr ui se shi ps, commer ci al , pl easur e, and smal l r ecr eat i onal vessel s of al l t ypes and si zes whi ch can be accommodat ed by exi st i ng dept hs.

1. 5. 5 Obst r uct i on of Channel

The Gover nment wi l l not under t ake t o keep t he channel f r ee f r om vessel s or ot her obst r uct i ons, except t o t he ext ent of such r egul at i ons, i f any, as may be pr escr i bed by t he Secr et ar y of t he Ar my, i n accor dance wi t h t he pr ovi s i ons of Sect i on 7 of t he Ri ver and Har bor Act appr oved 8 August 1917. The Cont r act or wi l l be r equi r ed t o conduct t he wor k i n such manner as t o obst r uct navi gat i on as l i t t l e as possi bl e, and i n case t he Cont r act or ' s pl ant so obst r uct s t he channel as t o make di f f i cul t or endanger t he passage of any vessel s, sai d pl ant shal l be pr ompt l y moved on t he appr oach of any vessel t o such an ext ent as may be necessar y t o af f or d a pr act i cabl e passage. Upon compl et i on of t he wor k t he Cont r act or shal l pr ompt l y r emove hi s pl ant , i ncl udi ng r anges, buoys, pi l es, and ot her mar ks pl aced by hi m under t he cont r act i n navi gabl e wat er s or on shor e.

1. 5. 6 Hydr ogr aphi c Sur veys

Hydr ogr aphi c sur veys ar e post ed as separ at e el ect r oni c f i l es. Sur vey number s ar e i ndi cat ed on t he dr awi ngs.

SECTI ON 01 11 00 Page 3

1. 6 LAYOUT OF WORK

Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause LAYOUT OF WORK ( FAR

52. 236- 17) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 6. 1 Est abl i shed Pr oj ect Cont r ol

The Gover nment has est abl i shed monument s al ong t he wor k s i t e( s) . Each monument i s r epr esent ed i n t he cont r act dr awi ngs by a Desi gnat i on and i n most cases, an al phanumer i c Per manent I dent i f i er ( PI D) . I nf or mat i on concer ni ng t he l ocat i on and el evat i ons can be f ound wi t hi n t he Sur vey Not es on t he pl an sheet s. The Sur vey Not es f or each i nc l uded f i el d sur vey wi l l c i t e a par t i cul ar sur vey number , and speci f y t he cont r ol used t o conduct t hat sur vey. Addi t i onal i nf or mat i on i s i ncl uded i n t he Sur vey Not es t hat must be dupl i cat ed i f an at t empt t o r ecr eat e t he subj ect sur vey i s desi r ed.

For navi gat i on channel s, t he Gover nment has est abl i shed t i dal cal i br at i on s i t es f or pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um. Each t i dal cal i br at i on s i t e i s r epr esent ed i n t he pl an sheet dr awi ngs by St at i on I D, and i s c i t ed i n t he Sur vey Not es. Al l pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um shal l be cal i br at ed t o t he St at i on I D speci f i ed i n t he pl an sheet dr awi ngs. I nf or mat i on r egar di ng t he l ocat i on and associ at ed benchmar ks of t he r ef er enced St at i on I D i s i ncl uded i n t he Monument Descr i pt i on sect i on of t hese speci f i cat i ons.

See Sect i on 00 31 21 CONTROL MONUMENT DESCRI PTI ONS.

1. 6. 2 Layout

Fr om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment , t he Cont r act or shal l compl et e t he l ayout of t he wor k and shal l be r esponsi bl e f or al l measur ement s t hat may be r equi r ed f or t he execut i on of t he wor k t o t he l ocat i on and l i mi t mar ks pr escr i bed i n t he speci f i cat i ons or on t he cont r act dr awi ngs, subj ect t o such modi f i cat i ons as t he Cont r act i ng Of f i cer may r equi r e t o meet changed condi t i ons or as a r esul t of necessar y modi f i cat i ons t o t he cont r act wor k.

1. 6. 3 Survey

The Cont r act or shal l f ur ni sh, at hi s own expense, such st akes, t empl at es, pl at f or ms, equi pment , t ool s and mat er i al , and al l l abor as may be r equi r ed i n l ayi ng out any par t of t he wor k f r om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment . I t shal l be t he r esponsi bi l i t y of t he Cont r act or t o mai nt ai n and pr eser ve al l s t akes and ot her mar ks est abl i shed by t he Cont r act i ng Of f i cer unt i l aut hor i zed t o r emove t hem, and i f such mar ks ar e dest r oyed by t he Cont r act or or t hr ough hi s negl i gence, pr i or t o t hei r aut hor i zed r emoval , t hey may be r epl aced by t he Cont r act i ng Of f i cer , at hi s di scr et i on, and t he expense of r epl acement wi l l be deduct ed f r om any amount s due or t o become due t he Cont r act or . The Cont r act i ng Of f i cer may r equi r e t hat wor k be suspended at any t i me when l ocat i on and l i mi t mar ks est abl i shed by t he Cont r act or ar e not r easonabl y adequat e t o per mi t checki ng of t he wor k.

1. 7 DAMAGE TO WORK

The r esponsi bi l i t y f or damage t o any par t of t he per manent wor k shal l be as set f or t h i n Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. However , i f , i n t he j udgment of t he Cont r act i ng Of f i cer , any par t of t he per manent wor k per f or med by t he Cont r act or i s

SECTI ON 01 11 00 Page 4 damaged by f l ood, ear t hquake, hur r i cane, or t or nado, whi ch damage i s not due t o t he f ai l ur e of t he Cont r act or t o t ake r easonabl e pr ecaut i ons or t o exer ci se sound engi neer i ng and const r uct i on pr act i ces i n t he conduct of t he wor k, t he Cont r act or wi l l make t he r epai r s as or der ed by t he Cont r act i ng Of f i cer and f ul l compensat i on f or such r epai r s wi l l be made at t he appl i cabl e cont r act uni t or l ump sum pr i ces as f i xed and est abl i shed i n t he cont r act . I f , i n t he opi ni on of t he Cont r act i ng Of f i cer , t her e ar e no cont r act uni t or l ump sum pr i ces appl i cabl e t o any par t of such wor k, an equi t abl e adj ust ment pur suant t o Cl ause CHANGES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1 wi l l be made as f ul l compensat i on f or t he r epai r s of t hat par t of t he per manent wor k f or whi ch t her e ar e no appl i cabl e cont r act uni t or l ump sum pr i ces. Except as her ei n pr ovi ded, damage t o al l wor k ( i ncl udi ng t empor ar y const r uct i on) , ut i l i t i es, mat er i al s, equi pment and pl ant shal l be r epai r ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer at t he Cont r act or ' s expense, r egar dl ess of t he cause of such damage.

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON ( NOT APPLI CABLE)

- - End of Sect i on - -

SECTI ON 01 11 00 Page 5

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 SUMMARY

1. 1. 1 Ref er ence

1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)

1. 2. 1 Def i ni t i on

1. 2. 2 I nst r uct i ons

1. 3 SUBMI TTALS

1. 4 JOB PAYMENT I TEMS

1. 4. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)

1. 4. 2 Tur bi di t y Moni t or i ng ( Li ne I t ems 0003 and 0013)

1. 4. 3 Endanger ed Speci es Obser ver ( Hopper Dr edge Onl y, Li ne I t ems

0004 and 0014)

1. 4. 4 Manat ee Obser ver ( Cl amshel l Dr edgi ng Onl y, Li ne I t ems 0005 and

0015)

1. 4. 5 Mobi l i zat i on and Demobi l i zat i on f or Sea Tur t l e Tr awl Sweepi ng

( Hopper Dr edge Onl y, Li ne I t em 0006)

1. 5 UNI T PRI CE PAYMENT I TEMS

1. 5. 1 Excavat i on, Uncl assi f i ed ( Li ne I t ems 0002 and 0012)

1. 5. 1. 1 Payment

1. 5. 1. 2 Measur ement

1. 5. 1. 3 Uni t of Measur e

1. 5. 2 Sea Tur t l e Tr awl Sweepi ng ( Hopper Dr edge Onl y, Li ne I t ems 0007 and 0016)

1. 5. 2. 1 Payment

1. 5. 2. 2 Measur ement

1. 5. 2. 3 Uni t of Measur e

1. 5. 3 St andby Ti me ( Li ne I t em 0008)

1. 5. 3. 1 Measur ement and Payment

1. 5. 3. 2 Uni t of Measur e

1. 5. 4 Beach Ti l l i ng ( Li ne I t ems 0009 and 0017)

1. 5. 4. 1 Payment

1. 5. 4. 2 Measur ement

1. 5. 4. 3 Uni t of Measur e

1. 5. 5 Scr eeni ng of Unaccept abl e Mat er i al ( Li ne I t ems 0010 and 0018)

1. 5. 5. 1 Payment

1. 5. 5. 2 Measur ement

1. 5. 5. 3 Uni t of Measur e

1. 5. 6 Removal of Unaccept abl e Mat er i al ( Li ne I t ems 0011 and 0019)

1. 5. 6. 1 Payment

1. 5. 6. 2 Measur ement

1. 5. 6. 3 Uni t of Measur e

PART 2 PRODUCTS ( NOT APPLI CABLE)

SECTI ON 01 22 00 Page 1

PART 3 EXECUTI ON

3. 1 PAYMENT PROCEDURES

3. 1. 1 Request i ng Pr ogr ess Payment

3. 1. 2 Opt i ons and Modi f i cat i on CLI NS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00 Page 2

SECTI ON 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i c t i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.

Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.

1. 1. 1 Reference

The publ i cat i on l i s t ed bel ow f or ms a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. Thi s publ i cat i on i s r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 1110- 2- 1003 ( 2013) Hydr ogr aphi c Sur veyi ng

1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)

1. 2. 1 Definition

The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Resi dent Management Syst em ( RMS) payment dat a base.

1. 2. 2 Instructions

See Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) f or mor e i nf or mat i on on CLI Ns, schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and payment pr ocedur es. The Cont r act or mode user manual wi t h i n- dept h i nst r uct i ons can be downl oaded f r om t he RMS web si t e i ndi cat ed i n Sect i on 01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE

( RMS CM) .

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 30 cal endar days

SECTI ON 01 22 00 Page 3 af t er Not i ce t o Pr oceed:

SD- 01 Pr econst r uct i on Submi t t al s

Schedul e of Val ues; G, RO

Pr ovi de a br eakdown of j ob i t ems i nt o pr oposed pay act i v i t i es as par t of t he i ni t i al pr oj ect schedul e. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he RMS payment dat a base.

SD- 07 Cer t i f i cat es

Request f or Pr ogr ess Payment ; G, RO

Submi t mont hl y i n accor dance wi t h subpar agr aph " Request i ng Pr ogr ess Payment " bel ow.

1. 4 JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act l ump sum payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE wi t h t he uni t " JOB" and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i s t ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

Pr ogr ess payment s f or j ob CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Submi t a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each j ob CLI N. The Schedul e of Val ues shal l be submi t t ed f or Gover nment appr oval wi t h t he basel i ne schedul e submi t t al ( see Sect i on 01 32 01 PROJECT SCHEDULE) . An unbal anced Schedul e of Val ues and Pay Act i v i t y Schedul e wi l l be r et ur ned f or r evi s i on. I f t hi s cont r act cont ai ns ei t her t he Cont i nui ng Cont r act s c l ause or t he Cont i nui ng Cont r act s ( Al t er nat e) c l ause, t he Cont r act or shoul d t ake i nt o account t he amount r eser ved f or cont r act payment s when pr epar i ng t he const r uct i on schedule.

1. 4. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on and est abl i shment of i ni t i al pr oj ect management and coor di nat i on. See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.

1. 4. 2 Tur bi di t y Moni t or i ng ( Li ne I t ems 0003 and 0013)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o obt ai ni ng, anal yzi ng, and r epor t i ng t he r esul t s of moni t or i ng f or t ur bi di t y. See Section 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG.

SECTI ON 01 22 00 Page 4

1. 4. 3 Endanger ed Speci es Obser ver ( Hopper Dr edge Onl y, Li ne I t ems 0004 and 0014 )

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o endanger ed speci es obser ver s r equi r ed wi t h t he use of a hopper dr edge. See Sect i on

01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 4. 4 Manat ee Obser ver ( Cl amshel l Dr edgi ng Onl y, Li ne I t ems 0005 and 0015)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o manat ee obser ver s r equi r ed when cl amshel l dr edgi ng. See Sect i on 01 57 20

ENVI RONMENTAL PROTECTI ON.

1. 4. 5 Mobi l i zat i on and Demobi l i zat i on f or Sea Tur t l e Tr awl Sweepi ng ( Hopper Dr edge Onl y, Li ne I t em 0006)

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on f or sea t ur t l e t r awl i ng and r el ocat i on ( Hopper Dr edge Onl y) . See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 5 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s , and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .

Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.

1. 5. 1 Excavat i on, Uncl assi f i ed ( Li ne I t ems 0002 and 0012)

1. 5. 1. 1 Payment

a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o excavat i on, t r anspor t at i on, and di sposal of mat er i al s; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and di sposal ar ea( s) ; noi se cont r ol ; debr i s r emoval ; and i nst al l at i on, oper at i on or mai nt enance of t he el ect r oni c t r acki ng syst em f or sur vei l l ance of al l dr edgi ng and di sposal act i v i t i es. See Sect i on 35 20 23 DREDGI NG.

b. I nsof ar as consi st ent wi t h t he par agr aph CONTI NUI TY OF WORK of Section 35 20 23 DREDGI NG, mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by soundi ngs or sweepi ngs per f or med by t he Cont r act or behi nd t he dr edge. The t er m " ar ea desi gnat ed by t he Cont r act i ng Of f i cer " as used i n t he CONTI NUI TY OF WORK par agr aph, i s def i ned as " accept ance sect i on" .

c. Hydr ogr aphi c sur veys f or f i nal measur ement and payment and f or channel c l ear ance wi l l be made by t he Gover nment . Al l sur veys wi l l be per f or med i n accor dance wi t h USACE EM 1110- 2- 1003. Sur vey f r equenci es wi l l be t he same as t hose shown i n t he dr awi ngs and wi l l r emai n consi st ent t hr oughout t he cont r act .

SECTI ON 01 22 00 Page 5

1. 5. 1. 2 Measurement

a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume

1) ar e bel i eved t o r epr esent accur at el y aver age exi st i ng condi t i ons, but t he dept hs shown t her eon may be ver i f i ed and cor r ect ed by soundi ngs t aken bef or e dr edgi ng. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l usi on, f r aud, or obvi ous er r or .

b. The t ot al amount of mat er i al r emoved, and t o be pai d f or under t he cont r act , wi l l be measur ed by t he cubi c yar d i n pl ace. The vol ume comput ed shal l be bet ween t he bot t om sur f ace shown by soundi ngs t aken wi t hi n 3 weeks bef or e dr edgi ng and t he bot t om sur f ace shown by t he soundi ngs t aken wi t hi n 2 weeks af t er t he wor k speci f i ed i n each accept ance sect i on i ndi cat ed on t he dr awi ngs has been compl et ed. The Cont r act or shal l gi ve 10 days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need f or a pr e- dr edgi ng sur vey or af t er - dr edgi ng sur vey f or f i nal accept ance f or each accept ance sect i on. The quant i t y shal l i ncl ude t he vol ume wi t hi n t he l i mi t s of t he s i de s l opes descr i bed i n subpar agr aph " Si de Sl opes" of par agr aph REQUI RED DEPTH, ALLOWABLE OVERDEPTH, AND SI DE SLOPES of Section 35 20 23 DREDGI NG, l ess any deduct i ons t hat may be r equi r ed f or mi spl aced mat er i al descr i bed i n subpar agr aph " Mi spl aced Mat er i al s" of par agr aph DI SPOSAL OF EXCAVATED MATERI AL of Sect i on 35 20 23 DREDGI NG.

1. 5. 1. 3 Uni t of Measur e

Cubi c yar d.

1. 5. 2 Sea Tur t l e Tr awl Sweepi ng ( Hopper Dr edge Onl y, Li ne I t ems 0007 and 0016 )

1. 5. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o t he Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng. Thi s pr i ce shal l i ncl ude al l cost s f or f ur ni shi ng l abor , equi pment , f uel , oi l , mat er i al s, and suppl i es r equi r ed f or t r awl sweepi ng t o c l ear and/ or r el ocat e sea t ur t l es f r om i n t he v i c i ni t y of t he dr edge, and shal l i ncl ude t he cost of r epor t i ng as speci f i ed. See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 5. 2. 2 Measurement

Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng wi l l be measur ed f or payment based upon t he dur at i on of per f or mance on a dai l y basi s. A day of t r awl sweepi ng i s def i ned as 24 hour s of cont i nuous t r awl i ng. The Cont r act or shal l conduct non- capt i ve t r awl sweepi ng as descr i bed i n Par agr aph " Sea Tur t l e Non- Capt ur e Tr awl Sweepi ng" i n Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.

1. 5. 2. 3 Uni t of Measur e

Day.

SECTI ON 01 22 00 Page 6

1. 5. 3 St andby Ti me ( Li ne I t em 0008)

1. 5. 3. 1 Measur ement and Payment

St andby t i me f or dr edgi ng wi l l be pai d f or each hour or par t t her eof t hat t he pl ant i s not i n oper at i on by r equest of t he Cont r act i ng Of f i cer .

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o st andby of t he dr edge pl ant onl y upon i mpl ement at i on of t hi s l i ne i t em. I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per t he NOTES i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em. The Cont r act i ng Of f i cer may cease oper at i ons subsequent t o t he i ni t i al 24- hour per i od f ol l owi ng a t ur t l e t ake. However , i f i t i s subsequent l y det er mi ned by t he Gover nment t hat a t ur t l e t ake r esul t ed f r om i mpr oper oper at i onal pr ocedur es, consi der at i on f or t he st andby t i me may be wi t hhel d by t he Gover nment .

1. 5. 3. 2 Uni t of Measur e

Hour.

1. 5. 4 Beach Ti l l i ng ( Li ne I t ems 0009 and 0017)

1. 5. 4. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o Beach Ti l l i ng. See Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON and Sect i on 35 20 23

DREDGING.

1. 5. 4. 2 Measurement

Measur ement wi l l be by t he ar ea t i l l ed.

1. 5. 4. 3 Uni t of Measur e

Acre.

1. 5. 5 Scr eeni ng of Unaccept abl e Mat er i al ( Li ne I t ems 0010 and 0018)

1. 5. 5. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o scr eeni ng of unaccept abl e mat er i al as det er mi ned by t he Cont r act i ng Of f i cer .

Scr eeni ng of unaccept abl e mat er i al shal l be of t he Cont r act or ' s desi gn t o ensur e t he qual i t y of beach pl acement mat er i al as speci f i ed i n par agr aph QUALI TY CONTROL FOR BEACH PLACEMENT of Sect i on 35 20 23 DREDGI NG. I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne i t em. See Sect i on 35 20 23 DREDGI NG.

1. 5. 5. 2 Measurement

Scr eeni ng of unaccept abl e mat er i al wi l l be measur ed f or payment by t he vol ume scr eened. The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses, and assumes t he ar ea t o be scr eened i s 10, 000 squar e f eet wi t h a 2. 7- f oot dept h of cut .

1. 5. 5. 3 Uni t of Measur e

Cubi c yar d.

SECTI ON 01 22 00 Page 7

1. 5. 6 Removal of Unaccept abl e Mat er i al ( Li ne I t ems 0011 and 0019)

1. 5. 6. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o r emoval of unaccept abl e mat er i al af t er i t has been scr eened f r om t he beach pl acement t empl at e and det er mi ned by t he Cont r act i ng Of f i cer . Removal pr ocedur es f or unaccept abl e mat er i al shal l be of t he Cont r act or ' s own desi gn and ensur e t he qual i t y of mat er i al pl aced. I f per f or mance of t hi s l i ne i t em i s not r equi r ed or i mpl ement ed per Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE, no payment wi l l be made t o t he Cont r act or f or t hi s l i ne item.

1. 5. 6. 2 Measurement

Removal of unaccept abl e mat er i al wi l l be measur ed f or payment by t he vol ume of t r ucki ng and di sposal . The est i mat ed vol ume i n Sect i on 00010A LI NE I TEMS AND PRI CI NG SCHEDULE i s pr ovi ded f or bi ddi ng pur poses onl y.

1. 5. 6. 3 Uni t of Measur e

Cubi c yar d.

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 PAYMENT PROCEDURES

Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.

3. 1. 1 Request i ng Pr ogr ess Payment

For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punchl i st s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " r equest Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs. Ensur e t hat sum of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment .

Submi t a r equest f or pr ogr ess payment mont hl y i n accor dance wi t h Cl ause

52. 232- 5 PAYMENTS UNDER FI XED- PRI CE CONSTRUCTI ON CONTRACTS of Sect i on 00700 CONTRACT CLAUSES. I n addi t i on t o t he i t ems l i s t ed i n Cl ause

52. 232- 5( b) ( 1) , submi t t he f ol l owi ng i n t he r equest f or pr ogr ess payment :

a. Appr oved const r uct i on schedul e.

b. Up- t o- dat e payr ol l r ecor ds.

c. Cur r ent submi t t al r egi st er .

d. Appr oved submi t t al s on i nst al l ed pr oper t y.

e. QA/ QC def i c i ency t r acki ng l i s t .

Once t he compl et e pay appl i cat i on package i s r ecei ved t o i ncl ude t he Cont r act or ' s s i gned ENG 93, t he 14 cal endar days wi l l commence.

SECTI ON 01 22 00 Page 8

3. 1. 2 Opt i ons and Modi f i cat i on CLI NS

When addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed. I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.

- - End of Sect i on - -

SECTI ON 01 22 00 Page 9

SECTI ON TABLE OF CONTENTS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

SECTI ON 35 20 23

DREDGING

PART 1 GENERAL

1. 1 SCOPE

1. 2 REFERENCES

1. 3 SUBMI TTALS

1. 4 DREDGI NG RESTRI CTI ONS

1. 4. 1 Or der of Wor k

1. 4. 2 Tr anspor t at i on of Mat er i al

1. 4. 3 Bed Level i ng i n Spot Shoal i ng Ar ea

1. 5 SPECI AL I NSTRUCTI ONS

1. 6 PUMPI NG OF BI LGES

1. 7 HI STORI CAL PERI OD SHI PWRECK SI TES

1. 8 UTI LI TY CROSSI NGS

1. 9 PERMI TS

1. 10 FUEL OI L TRANSFER OPERATI ONS

1. 11 SI GNAL LI GHTS

1. 12 NOTI CE TO MARI NERS - - DREDGI NG CONTRACTS

1. 13 FI NAL CLEANUP

1. 14 WORK VI OLATI ONS

1. 15 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM SYSTEM ( HOPPER

DREDGES AND DUMP SCOWS)

1. 15. 1 Syst em Requi r ement s

PART 2 PRODUCTS ( NOT APPLI CABLE)

PART 3 EXECUTI ON

3. 1 NOTI FI CATI ON OF COAST GUARD

3. 1. 1 Rel ocat i on of Navi gat i on Ai ds

3. 1. 2 Dr edgi ng Ai ds

3. 2 WORK AREA

3. 2. 1 Access

3. 2. 2 Pr ot ect i on of Exi st i ng Wat er ways

3. 2. 3 Adj acent Pr oper t y and St r uct ur es

3. 2. 4 Subaqueous Cabl e Cr ossi ngs

3. 3 DI SPOSAL OF EXCAVATED MATERI AL

3. 3. 1 Gener al

3. 3. 2 Beach Di sposal

3. 3. 2. 1 Or der of Pl acement

3. 3. 3 Gr ade St akes

3. 3. 4 Tempor ar y Longi t udi nal Di kes

3. 3. 5 Rehandl ed Mat er i al s

3. 3. 6 Dr essi ng

3. 3. 7 Tol er ances

3. 3. 8 Debr i s Removal

SECTI ON 35 20 23 Page 1

3. 3. 9 Qual i t y Cont r ol f or Beach Pl acement

3. 3. 9. 1 Beach Fi l l Obser vat i on and Sampl i ng

3. 3. 9. 2 Det er mi nat i on of Aer i al Ext ent of Noncompl i ant Beach Fi l l

3. 3. 9. 3 Remedi at i on

3. 3. 9. 4 Rock Removal Pl an

3. 3. 10 Exi st i ng Gr oi ns

3. 3. 11 Pi pel i ne Access

3. 3. 12 Bar ges

3. 3. 13 Pl aci ng of Dr edged Mat er i al

3. 3. 14 Dr edge Pi pel i nes

3. 3. 14. 1 Dr edge Di schar ge Pi pel i ne

3. 3. 14. 2 Submer ged Pi pel i ne

3. 3. 14. 3 Fl oat i ng Pi pel i ne

3. 3. 15 Boost er Pumps

3. 3. 16 Mi spl aced Mat er i al

3. 4 REQUI RED DEPTH, ALLOWABLE OVERDEPTH, AND SI DE SLOPES

3. 4. 1 Requi r ed Dept h

3. 4. 2 Al l owabl e Over dept h

3. 4. 3 Si de Sl opes

3. 4. 4 Excessi ve Dr edgi ng

3. 4. 5 Ar eas t o be Dr edged

3. 5 SURVEYS

3. 5. 1 Gener al

3. 5. 2 Cont r act or Repr esent at i ve

3. 5. 3 Sur vey Cer t i f i cat i on

3. 5. 4 Ti de Dat a

3. 5. 4. 1 Real Ti me Ki nemat i c ( RTK) GPS

3. 5. 4. 2 Ki nemat i c Ti dal Dat um

3. 6 I NSPECTI ON

3. 6. 1 Qual i t y Assur ance Repr esent at i ve ( QAR)

3. 6. 2 Fai l ur e t o Compl y

3. 7 FI NAL EXAMI NATI ON AND ACCEPTANCE

3. 7. 1 Fi nal Exami nat i on of Wor k

3. 7. 2 Bed Level i ng

3. 7. 3 Bed Level i ng - Repor t i ng and Document i ng

3. 7. 4 Fi nal Accept ance

3. 8 SHOALI NG

3. 9 CONTI NUI TY OF WORK

3. 10 NOI SE CONTROL

3. 11 DREDGE CERTI FI CATI ON

3. 12 GENERAL DREDGI NG SAFETY REQUI REMENTS

3. 12. 1 Dr edge Pl ant Rest r i c t i on Def i ni t i ons

3. 12. 1. 1 Cer t i f i cat i on Requi r ed Li ne - Load Li ne ( CRL- L)

3. 12. 2 Cer t i f i cat i on of At t endant and Auxi l i ar y Pl ant

3. 12. 3 Mi ni mum Tow- Boat Requi r ement s

3. 12. 4 Har bor Speci f i c Dr edgi ng Rest r i ct i ons

3. 12. 4. 1 Tampa Har bor

3. 13 CONSTRUCTI ON FORMS AND DETAI LS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 35 20 23 Page 2

SECTI ON 35 20 23

DREDGING

PART 1 GENERAL

1. 1 SCOPE

The wor k cover ed by t hi s sect i on consi st s of f ur ni shi ng al l l abor , mat er i al s, and equi pment , and per f or mi ng al l excavat i on and di sposal of al l mat er i al as speci f i ed her ei n or i ndi cat ed on t he dr awi ngs. Thi s scope al so i ncl udes al l necessar y measur es f or pr ot ect i on of t he envi r onment .

Envi r onment al pr ot ect i on r equi r ement s under t hi s cont r act ar e as i mpor t ant t o over al l compl et i on of t he wor k as ot her t echni cal aspect s. Fai l ur e t o meet t he r equi r ement s of t hese speci f i cat i ons f or envi r onment al pr ot ect i on may r esul t i n wor k st oppages or t er mi nat i on f or def aul t . No par t of t he t i me l ost due t o any such wor k st oppages shal l be made t he subj ect of c l ai ms f or ext ensi ons of t i me or f or excess cost s or damages by t he Cont r act or . I f t he Cont r act or f ai l s or r ef uses t o pr ompt l y r epai r any damage caused by v i ol at i on of t he pr ovi s i ons of t hese speci f i cat i ons, t he Cont r act i ng Of f i cer may have t he necessar y wor k per f or med and char ge t he cost t her eof t o t he Cont r act or .

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM D422 ( 1963; R 2007; E 2014; E 2014)

Par t i c l e- Si ze Anal ysi s of Soi l s

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

EM 1110- 1- 1000 ( 2015) Phot ogr ammet r i c Mappi ng

EM 1110- 1- 1002 ( 2012) Sur vey Mar ker s and Monument at i on

EM 1110- 1- 1003 ( 2011) NAVSTAR Gl obal Posi t i oni ng Syst em Surveying

EM 1110- 1- 2909 ( 2012) Geospat i al Dat a and Syst ems

EM 1110- 2- 1003 ( 2013) Hydr ogr aphi c Sur veyi ng

EM 1110- 2- 1009 ( 2002) St r uct ur al Def or mat i on Sur veyi ng

FLORI DA BOARD OF PROFESSI ONAL SURVEYORS AND MAPPERS ( FBPSM)

FBPSM Mi ni mum Techni cal St andar ds, Chapt er s 177, 472, 61G17

SECTI ON 35 20 23 Page 3

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

NFPA 30 ( 2015; ERTA 1 2016) Fl ammabl e and Combust i bl e Li qui ds Code

NFPA 31 ( 2016) St andar d f or t he I nst al l at i on of Oi l - Bur ni ng Equi pment

NFPA 70 ( 2018) Nat i onal El ect r i cal Code

TRI - SERVI CE STANDARDS ( TSS)

TSS ( 2006) A/ E/ C CADD St andar ds

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Not i ce of I nt ent t o Dr edge

Pr i or t o commencement of wor k on t hi s cont r act , t he Cont r act or shal l not i f y t he Commander , Sevent h Coast Guar d Di st r i c t of hi s i nt ended oper at i ons t o dr edge and r equest t hat i t be publ i shed i n t he Local Not i ce t o Mar i ner s. Thi s not i f i cat i on must be gi ven i n suf f i c i ent t i me so t hat i t appear s i n t he Not i ce t o Mar i ner s at l east t wo weeks pr i or t o t he commencement of t hi s dr edgi ng oper at i on. A copy of t he not i f i cat i on shal l be pr ovi ded t o t he Cont r act i ng Of f i cer .

Rel ocat i on of Navi gat i on Ai ds

The Cont r act or shal l not r emove, change t he l ocat i on of , obst r uct , wi l l f ul l y damage, make f ast t o, or i nt er f er e wi t h any ai d t o navi gat i on. Wi t hi n 7 cal endar days f ol l owi ng r ecei pt of Not i ce of Awar d, t he Cont r act or shal l not i f y t he Commander , Sevent h Coast Guar d Di st r i c t , Mi ami , Fl or i da, of hi s pl an t o dr edge adj acent t o any ai ds whi ch r equi r e r el ocat i on t o f aci l i t at e dr edgi ng. The not i f i cat i on shal l be sent v i a Fax t o 305- 415- 6757, ATTN: Mr . Joe Embr es Gene St r at t en. Thi s not i f i cat i on shal l be i mmedi at el y f ol l owed by a f or mal wr i t t en r equest wi t h a copy t o t he Cont r act i ng Of f i cer . The Cont r act or shal l al so cont act t he U. S. Coast Guar d, 305- 415- 6730, f or i nf or mat i on concer ni ng t he posi t i on t o whi ch t he ai ds wi l l be r el ocat ed.

SD- 02 Shop Dr awi ngs

Rock Removal Pl an

The Cont r act or shal l submi t a Rock Removal Pl an f or Cont r act i ng Of f i cer appr oval pr i or t o t he st ar t of Beach Di sposal Oper at i ons.

Dr ag Bar

SECTI ON 35 20 23 Page 4

Submi t dr awi ngs and one phot ogr aph showi ng dr ag bar equi pment used f or l evel i ng t he Spot Shoal i ng Ar ea i ndi cat ed i n subpar agr aph " Bed Level i ng i n Spot Shoal i ng Ar ea" , and f or f i nal l evel i ng wor k i ndi cat ed i n t he par agr aph FI NAL EXAMI NATI ON AND ACCEPTANCE bel ow.

SD- 07 Cer t i f i cat es

El ect r oni c Tr acki ng Syst em Dat a

The Cont r act or shal l f ur ni sh r equi r ed di scs, CD- ROM, and char t s t o t he Cont r act i ng Of f i cer .

Equi pment and Per f or mance Dat a

The Cont r act or shal l f ur ni sh pr oof of el ect r oni c posi t i oni ng equi pment cal i br at i on t o t he Cont r act i ng Of f i cer .

Hi st or i cal Per i od Shi pwr eck Si t es

The Cont r act or shal l i mmedi at el y not i f y t he Cont r act i ng Of f i cer i f any shi pwr eck, ar t i f act , or ot her obj ect s of ant i qui t y t hat have sci ent i f i c or hi st or i cal val ue, or ar e of i nt er est t o t he publ i c, ar e di scover ed, l ocat ed, and/ or r ecover ed.

Surveys

The Cont r act or shal l gi ve 10 days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer of t he need f or a pr e- dr edgi ng sur vey or af t er - dr edgi ng sur vey f or f i nal accept ance f or each accept ance section.

Dai l y/ Mont hl y Repor t of Oper at i ons

The Cont r act or shal l pr epar e on QCS and submi t one ( 1) har d copy of t he Dai l y Repor t of Oper at i ons, usi ng ENG For…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.