Amendment_A0002_Ponce_De_Leon_17B0012.pdf
PDF 6 MB Posted
- Solicitation number
- W912EP-17-B-0012
About this file
Amendment 0002 W912ep17B0012
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Maintenance Dredging, 12-Foot Projects, Intracoastal Waterw ay Cut V-22 Through Cut V-35 and Ponce De Leon Inlet Cut-1A Through Cut-5N, Volusia County, Florida
This Amendment is being issued for the follow ing:
1.To incorporate the US Coast Guard dredging requirements.
2. To "Delete and Replace" several sections of the solicitation.
3. The Receipt of Bids due date is changed from 07 February 2018 @ 2:00 pm TO 13 February 2018 @ 2:00 pm
See Continuation Sheet for complete and full details.
All other conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP17B0012
X 9B. DATED (SEE ITEM 11)
27-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jan-2018
CODE
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
W912EP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SF 30 CONTINUATION SHEET
Maintenance Dredging, 12-Foot Projects, Intracoastal Waterway Cut V-22 Through Cut V-35 and Ponce De Leon Inlet Cut-1A Through Cut-5N, Volusia County, Florida
W912EP-17-B-0012 2 Amendment 0002
SUMMARY OF CHANGES
1. SPECIFICATIONS:
The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents. New sections are added without underlines and cross-outs.
Changes to Specifications:
DELETE Section 00010A and REPLACE with the attached revised Section 00010A.
DELETE Project Table of Contents and REPLACE with the attached revised Project Table of Contents.
DELETE Section 01 11 00 and REPLACE with the attached revised Section 01 11 00.
DELETE Section 01 22 00 and REPLACE with the attached revised Section 01 22 00.
DELETE Submittal Register and REPLACE with the attached revised Submittal Register.
DELETE Section 01 35 26 and REPLACE with the attached revised Section 01 35 26.
DELETE Section 01 57 20 and REPLACE with the attached revised Section 01 57 20.
DELETE Section 01 57 25 and REPLACE with the attached revised Section 01 57 25.
ADD new Section 31 23 24.
DELETE Section 35 20 23 and REPLACE with the attached revised Section 35 20 23.
2. DRAWINGS:
DELETE Drawing No. G-02 and REPLACE with the attached revised Drawing No. G-02.
DELETE Drawing No. G-03 and REPLACE with the attached revised Drawing No. G-03.
DELETE Drawing No. BG-01 and REPLACE with the attached revised Drawing No. BG-01.
DELETE Drawing No. BC-05 and REPLACE with the attached revised Drawing No. BC-05.
DELETE Drawing No. BC-07 and REPLACE with the attached revised Drawing No. BC-07.
ADD new Drawing No. BC-08.
ADD new Drawing No. CG-01.
ADD new Drawing No. CC-01.
ADD new Drawing No. CC-02.
ADD new Drawing No. CC-03.
(End of Summary of Changes)
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
MAINTENANCE DREDGING, 12-FOOT PROJECTS
INTRACOASTAL WATERWAY CUT V-22 THROUGH CUT V-35
AND PONCE DE LEON INLET CUT-1A THROUGH CUT-5N
W912EP-17-B-0012 00010A-1 AMENDMENT 0002
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________
0002 EXCAVATION, UNCLASSIFIED
IWW CUTS 22 THROUGH 35
(ESTIMATED QUANTITY, SEE NOTE 1) 294,000 CUBIC YARD $___________ $_______________
0003 EXCAVATION, UNCLASSIFIED
PONCE DE LEON INLET CHANNEL
(ESTIMATED QUANTITY, SEE NOTE 1) 133,000 CUBIC YARD $___________ $_______________
0004 TURBIDITY MONITORING JOB $_______________
0005 DEDICATED MANATEE OBSERVER
(CLAMSHELL DREDGE ONLY) JOB $_______________
0006 SEA TURTLE NEST MONITORING JOB $_______________
0007 LIABILITY INSURANCE ($5,000,000.00 COVERAGE) JOB $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0007) $_______________
OPTION A
0008 INTERIM MOBILIZATION AND DEMOBILIZATION JOB $_______________
0009 GOPHER TORTOISE SURVEY, PERMITTING AND
REPORTING JOB $_______________
0010 GOPHER TORTOISE CAPTURE AND RELOCATION
(ESTIMATED QUANTITY) 25 EACH $___________ $_______________
0011 GOPHER TORTOISE BURROW GROUTING
(ESTIMATED QUANTITY) 25 EACH $___________ $_______________
0012 EXCAVATION, UNCLASSIFIED
COAST GUARD STATION PONCE DE LEON BOAT
BASIN (ESTIMATED QUANTITY, SEE NOTE 1) 9,000 CUBIC YARD $___________ $_______________
0013 TURBIDITY MONITORING JOB $_______________
0014 DEDICATED MANATEE OBSERVER
(CLAMSHELL DREDGE ONLY) JOB $_______________
0015 MIGRATORY BIRD MONITORING JOB $_______________
TOTAL OPTION A (LINE ITEMS 0008 THROUGH 0015) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0015) $_______________
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
MAINTENANCE DREDGING, 12-FOOT PROJECTS
INTRACOASTAL WATERWAY CUT V-22 THROUGH CUT V-35
AND PONCE DE LEON INLET CUT-1A THROUGH CUT-5N
W912EP-17-B-0012 00010A-2 AMENDMENT 0002
NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY
BE EXCEEDED.
(2) ALL BIDS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.
(3) ALL SPECIFICATION REFERENCES TO "LUMP SUM" SHALL APPLY TO LINE ITEMS INDICATING "JOB" AS THE UNIT.
(4) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE PARAGRAPH 999.214-4018 OF SECTION 00100. SEE
CLAUSE 52.214-18 PREPARATION OF BIDS--CONSTRUCTION OF SECTION 00100.
(5) DEDICATED MANATEE OBSERVER IS REQUIRED FOR A CLAMSHELL DREDGE ONLY.
Mai nt enance Dr edgi ng, 12- Foot Pr oj ect s I nt r acoast al Wat er way and Ponce De Leon I nl et
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRI PTI ONS
00 33 50 WEATHER, WATER STAGE AND TI DE DATA
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMI NI STRATI VE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 25 OWNER SAFETY REQUI REMENTS - DI VI NG
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 45 00 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 45 05 DREDGI NG/ BEACH FI LL PLACEMENT - CONTRACTOR QUALI TY CONTROL
01 50 02 TEMPORARY CONSTRUCTI ON FACI LI TI ES
01 57 20 ENVI RONMENTAL PROTECTI ON
01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG
DI VI SI ON 31 - EARTHWORK
31 23 24 CONTROLLED LOW STRENGTH MATERI AL ( CLSM or FLOWABLE FI LL)
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 23 DREDGING
35 20 26 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM SCOW -
TRACKI NG PROFI LE
35 20 27 NATI ONAL DREDGI NG QUALI TY MANAGEMENT PROGRAM PI PELI NE
HYDRAULI C DREDGE
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1 W912EP-17-B-0012 Amendment 0002
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
1. 2. 2 Wor k Rest r i ct i ons
1. 2. 3 Locat i on
1. 2. 4 Saf et y Requi r ement s
1. 2. 5 Wor k Per f or med by Ot her s
1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON
1. 5 PHYSI CAL DATA
1. 5. 1 Physi cal Condi t i ons
1. 5. 2 Weat her , Wat er St age and Ti de Dat a
1. 5. 3 Cont r act or I nvest i gat i on
1. 5. 4 Mar i t i me Tr af f i c
1. 5. 5 Obst r uct i on of Channel
1. 5. 6 Hydr ogr aphi c Sur veys
1. 6 LAYOUT OF WORK
1. 6. 1 Est abl i shed Pr oj ect Cont r ol
1. 6. 2 Layout
1. 6. 3 Sur vey
1. 7 DAMAGE TO WORK
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTI ON 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
GDR Sect i on 00 31 32, Geot echni cal Dat a Repor t f or Mai nt enance Dr edgi ng, 12- Foot Pr oj ect s, I nt r acoast al Wat er way Cut - 22 t hr ough Cut - 35 And Ponce de Leon I nl et Cut - 1A t hr ough Cut - 5N, Vol usi a Count y, Florida
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
1. 2 WORK COVERED BY CONTRACT DOCUMENTS
1. 2. 1 Pr oj ect Descr i pt i on
Base W wor k consi st s of mai nt enance dr edgi ng t he I nt r acoast al Wat er way ( I WW) i n t he v i c i ni t y of Ponce de Leon I nl et f r om Cut V- 22 t o Cut V- 35 t o a dept h of 12 f eet pl us 2 f eet of al l owabl e over dept h. Al so i ncl uded i s mai nt enance dr edgi ng t he Ponce de Leon I nl et navi gat i on channel f r om Cut - 1A t o Cut - 5N t o a dept h of 12 f eet pl us 2 f eet of al l owabl e over dept h.
The Ponce de Leon channel i nt er sect s t he I WW i n t wo l ocat i ons. Excavat ed mat er i al f r om bot h pr oj ect s wi l l be pl aced i n a desi gnat ed near shor e pl acement ar ea whi ch l i es sout h of t he i nl et i n 8 t o 18 f eet of wat er . The excavat ed mat er i al wi l l be ei t her pi ped either f r om t he I WW vi a a cr oss- i s l and r out e whi ch emer ges ont o t he beach or ar ound t he sout h j et t y and t hen t r anspor t ed by bar ge t o t he di sposal ar ea. The pi pel i ne r out e t o be used wi l l be dependent on condi t i ons at t he t i me of t he wor k.
I nci dent al wor k i ncl udes t ur bi di t y moni t or i ng and endanger ed speci es monitoring. Opt i on A wor k consi st s of mai nt enance dr edgi ng t he boat basi n of U. S. Coast Guar d St at i on Ponce De Leon I nl et t o a dept h of 7. 66 f eet pl us 2 f eet of al l owabl e over dept h. Excavat ed mat er i al wi l l be t r anspor t ed t o and pl aced i n upl and di sposal ar ea MSA- 434A. Opt i on A i nci dent al wor k i ncl udes t ur bi di t y moni t or i ng; endanger ed speci es moni t or i ng associ at ed wi t h t he upl and si t e; and pr epar at i on of t he upl and si t e by l i mi t ed veget at i on c l ear i ng, r el ocat i ng gopher t or t oi ses, qr out i ng gopher t or t oi se bur r ows i n or i n c l ose pr oxi mi t y of t he cont ai nment di ke, and dewat er i ng t he si t e.
1. 2. 2 Wor k Rest r i ct i ons
Cut t er suct i on dr edges used f or t hi s wor k ar e r est r i ct ed t o di schar ge di amet er s of 16 i nches or gr eat er t o r educe t he r i sk of damage or s i nki ng due t o sever e seasonal wave condi t i ons known t o occur i n t he v i c i ni t y of
SECTI ON 01 11 00 Page 2
Ponce De Leon I nl et . Al l vessel s, i ncl udi ng but not l i mi t ed t o t ugs, scows, and ot her t ypes of bar ges per f or mi ng wor k seawar d of t he l i ne connect i ng t he t i ps of t he nor t h and sout h j et t i es shal l be Coast Guar d Certified.
1. 2. 3 Location
I WW and Ponce I nl et I nl et Wor k i s l ocat ed near New Symr na I nl et i n Vol usi a Count y, Fl or i da.
1. 2. 4 Saf et y Requi r ement s
See Sect i on 01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS and EM 385- 1- 1.
1. 2. 5 Wor k Per f or med by Ot her s
See par agr aph PROJECT COORDI NATI ON of Sect i on 01 30 00 ADMI NI STRATI VE
PROCEDURES.
1. 3 COMMENCEMENT, PROSECUTI ON AND COMPLETI ON OF WORK
a. Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause COMMENCEMENT, PROSECUTI ON, AND COMPLETI ON OF WORK ( FAR 52. 211- 10) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
c. I n addi t i on t o t he above, t he f ol l owi ng shal l appl y: The phr ase " commence wor k" means " commence dr edgi ng" . The commencement t i me i ndi cat ed appl i es unl ess pr ecl uded by i ncl ement weat her as det er mi ned by t he Cont r act i ng Of f i cer .
1. 4 LI QUI DATED DAMAGES - CONSTRUCTI ON
Ref er t o t he Cl ause LI QUI DATED DAMAGES - CONSTRUCTI ON ( FAR 52. 211- 12) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5 PHYSI CAL DATA
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause PHYSI CAL DATA ( FAR
52. 236- 4) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 5. 1 Physi cal Condi t i ons
The i ndi cat i ons of physi cal condi t i ons on t he dr awi ngs and i n t he speci f i cat i ons ar e t he r esul t of s i t e i nvest i gat i ons by sur veys and/ or by cor e bor i ngs. When t he i ndi cat ed physi cal condi t i ons ar e t he r esul t of s i t e i nvest i gat i ons by cor e bor i ngs, t he cor e bor i ng l ogs and l abor at or y dat a ar e i n Sect i on 00 31 32 GEOTECHNI CAL DATA REPORT ( GDR) and t he cor e bor i ng l ocat i ons ar e shown on t he dr awi ngs. Al so, see t he GDR f or i nst r uct i ons concer ni ng avai l abi l i t y of cor e bor i ngs f or i nspect i on.
1. 5. 2 Weat her , Wat er St age and Ti de Dat a
See Sect i on 00 33 50 WEATHER, WATER STAGE AND TI DE DATA.
1. 5. 3 Cont r act or I nvest i gat i on
Ref er t o t he Cl ause SI TE I NVESTI GATI ON AND CONDI TI ONS AFFECTI NG THE WORK ( FAR 52. 236- 3) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
SECTI ON 01 11 00 Page 3
1. 5. 4 Mar i t i me Tr af f i c
Mar i ne Tr af f i c i n t he pr oj ect ar ea consi st s of commer ci al , pl easur e, and smal l r ecr eat i onal vessel s of al l t ypes and si zes whi ch can be accommodat ed by exi st i ng dept hs.
1. 5. 5 Obst r uct i on of Channel
The Gover nment wi l l not under t ake t o keep t he channel f r ee f r om vessel s or ot her obst r uct i ons, except t o t he ext ent of such r egul at i ons, i f any, as may be pr escr i bed by t he Secr et ar y of t he Ar my, i n accor dance wi t h t he pr ovi s i ons of Sect i on 7 of t he Ri ver and Har bor Act appr oved 8 August 1917. The Cont r act or wi l l be r equi r ed t o conduct t he wor k i n such manner as t o obst r uct navi gat i on as l i t t l e as possi bl e, and i n case t he Cont r act or ' s pl ant so obst r uct s t he channel as t o make di f f i cul t or endanger t he passage of any vessel s, sai d pl ant shal l be pr ompt l y moved on t he appr oach of any vessel t o such an ext ent as may be necessar y t o af f or d a pr act i cabl e passage. Upon compl et i on of t he wor k t he Cont r act or shal l pr ompt l y r emove hi s pl ant , i ncl udi ng r anges, buoys, pi l es, and ot her mar ks pl aced by hi m under t he cont r act i n navi gabl e wat er s or on shor e.
1. 5. 6 Hydr ogr aphi c Sur veys
Hydr ogr aphi c sur veys ar e post ed at t he f ol l owi ng web addr ess:
http://navigation.usace.army.mil/Survey/Hydro# Sur vey number s ar e i ndi cat ed on t he dr awi ngs.
1. 6 LAYOUT OF WORK
Read t hi s par agr aph i n conj unct i on wi t h t he Cl ause LAYOUT OF WORK ( FAR
52. 236- 17) of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 6. 1 Est abl i shed Pr oj ect Cont r ol
The Gover nment has est abl i shed monument s al ong t he wor k s i t e( s) . Each monument i s r epr esent ed i n t he cont r act dr awi ngs by a Desi gnat i on and i n most cases, an al phanumer i c Per manent I dent i f i er ( PI D) . I nf or mat i on concer ni ng t he l ocat i on and el evat i ons can be f ound wi t hi n t he Sur vey Not es on t he pl an sheet s. The Sur vey Not es f or each i ncl uded f i el d sur vey wi l l c i t e a par t i cul ar sur vey number , and speci f y t he cont r ol used t o conduct t hat sur vey. Addi t i onal i nf or mat i on i s i ncl uded i n t he Sur vey Not es t hat must be dupl i cat ed i f an at t empt t o r ecr eat e t he subj ect sur vey i s desi r ed.
For navi gat i on channel s, t he Gover nment has est abl i shed t i dal cal i br at i on s i t es f or pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um. Each t i dal cal i br at i on s i t e i s r epr esent ed i n t he pl an sheet dr awi ngs by St at i on I D, and i s c i t ed i n t he Sur vey Not es. Al l pr oj ect s const r uct ed and mai nt ai ned t o a t i dal dat um shal l be cal i br at ed t o t he St at i on I D speci f i ed i n t he pl an sheet dr awi ngs. I nf or mat i on r egar di ng t he l ocat i on and associ at ed benchmar ks of t he r ef er enced St at i on I D i s i ncl uded i n t he Monument Descr i pt i on sect i on of t hese speci f i cat i ons.
See Sect i on 00 31 21 CONTROL MONUMENT DESCRI PTI ONS.
1. 6. 2 Layout
Fr om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment , t he Cont r act or shal l compl et e t he l ayout of t he wor k and shal l
SECTI ON 01 11 00 Page 4 be r esponsi bl e f or al l measur ement s t hat may be r equi r ed f or t he execut i on of t he wor k t o t he l ocat i on and l i mi t mar ks pr escr i bed i n t he speci f i cat i ons or on t he cont r act dr awi ngs, subj ect t o such modi f i cat i ons as t he Cont r act i ng Of f i cer may r equi r e t o meet changed condi t i ons or as a r esul t of necessar y modi f i cat i ons t o t he cont r act wor k.
1. 6. 3 Survey
The Cont r act or shal l f ur ni sh, at hi s own expense, such st akes, t empl at es, pl at f or ms, equi pment , t ool s and mat er i al , and al l l abor as may be r equi r ed i n l ayi ng out any par t of t he wor k f r om t he monument s, cont r ol dat a and el evat i ons est abl i shed by t he Gover nment . I t shal l be t he r esponsi bi l i t y of t he Cont r act or t o mai nt ai n and pr eser ve al l st akes and ot her mar ks est abl i shed by t he Cont r act i ng Of f i cer unt i l aut hor i zed t o r emove t hem, and i f such mar ks ar e dest r oyed by t he Cont r act or or t hr ough hi s negl i gence, pr i or t o t hei r aut hor i zed r emoval , t hey may be r epl aced by t he Cont r act i ng Of f i cer , at hi s di scr et i on, and t he expense of r epl acement wi l l be deduct ed f r om any amount s due or t o become due t he Cont r act or .
The Cont r act i ng Of f i cer may r equi r e t hat wor k be suspended at any t i me when l ocat i on and l i mi t mar ks est abl i shed by t he Cont r act or ar e not r easonabl y adequat e t o per mi t checki ng of t he wor k.
1. 7 DAMAGE TO WORK
The r esponsi bi l i t y f or damage t o any par t of t he per manent wor k shal l be as set f or t h i n Cl ause PERMI TS AND RESPONSI BI LI TI ES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. However , i f , i n t he j udgment of t he Cont r act i ng Of f i cer , any par t of t he per manent wor k per f or med by t he Cont r act or i s damaged by f l ood, ear t hquake, hur r i cane, or t or nado, whi ch damage i s not due t o t he f ai l ur e of t he Cont r act or t o t ake r easonabl e pr ecaut i ons or t o exer ci se sound engi neer i ng and const r uct i on pr act i ces i n t he conduct of t he wor k, t he Cont r act or wi l l make t he r epai r s as or der ed by t he Cont r act i ng Of f i cer and f ul l compensat i on f or such r epai r s wi l l be made at t he appl i cabl e cont r act uni t or l ump sum pr i ces as f i xed and est abl i shed i n t he cont r act . I f , i n t he opi ni on of t he Cont r act i ng Of f i cer , t her e ar e no cont r act uni t or l ump sum pr i ces appl i cabl e t o any par t of such wor k, an equi t abl e adj ust ment pur suant t o Cl ause CHANGES of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1 wi l l be made as f ul l compensat i on f or t he r epai r s of t hat par t of t he per manent wor k f or whi ch t her e ar e no appl i cabl e cont r act uni t or l ump sum pr i ces. Except as her ei n pr ovi ded, damage t o al l wor k ( i ncl udi ng t empor ar y const r uct i on) , ut i l i t i es, mat er i al s, equi pment and pl ant shal l be r epai r ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer at t he Cont r act or ' s expense, r egar dl ess of t he cause of such damage.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON ( NOT APPLI CABLE)
- - End of Sect i on - -
SECTI ON 01 11 00 Page 5
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
1. 1. 1 Ref er ence
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Def i ni t i on
1. 2. 2 I nst r uct i ons
1. 3 SUBMI TTALS
1. 4 JOB PAYMENT I TEMS
1. 4. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)
1. 4. 2 Tur bi di t y Moni t or i ng ( Li ne I t ems 0004 and 0013)
1. 4. 3 Dedi cat ed Manat ee Obser ver ( Li ne I t ems 0005 and 0014)
1. 4. 4 Sea Tur t l e Nest Moni t or i ng ( Li ne I t em 0006)
1. 4. 5 Li abi l i t y I nsur ance ( Li ne I t em 0007)
1. 4. 6 I nt er i m Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0008)
1. 4. 7 Gopher Tor t oi se Sur vey, Per mi t t i ng and Repor t i ng ( Li ne I t em
0009)
1. 4. 8 Mi gr at or y Bi r d Moni t or i ng ( Li ne I t em 0015)
1. 5 UNI T PRI CE PAYMENT I TEMS
1. 5. 1 Excavat i on, Uncl assi f i ed ( Li ne I t ems 0002, 0003 and 0012)
1. 5. 1. 1 Payment
1. 5. 1. 2 Measur ement
1. 5. 1. 3 Uni t of Measur e
1. 5. 2 Gopher Tor t oi se Capt ur e and Rel ocat i on ( Li ne I t em 0010)
1. 5. 2. 1 Payment
1. 5. 2. 2 Measur ement
1. 5. 2. 3 Uni t of Measur e
1. 5. 3 Gopher Tor t oi se Bur r ow Gr out i ng ( Li ne I t em 0011)
1. 5. 3. 1 Payment
1. 5. 3. 2 Measur ement
1. 5. 3. 3 Uni t of Measur e
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
3. 1. 1 Request i ng Pr ogr ess Payment
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00 Page 1
SECTI ON 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1. 1 SUMMARY
Thi s sect i on descr i bes how Li ne I t ems wi l l be measur ed and pai d f or when maki ng pr ogr ess payment s. Wor k t o be measur ed i s descr i bed i n speci f i cat i on sect i ons l i s t ed f or each Li ne I t em. Measur ement pr ocedur es f or payment , r equi r ed quant i t y sur vey or pr ocur ement document at i on and payment r est r i ct i ons ar e descr i bed i n appl i cabl e speci f i cat i on sect i ons.
Al l ocat e cost s f or wor k not speci f i cal l y ment i oned t o t he Li ne I t em most c l osel y associ at ed wi t h wor k i nvol ved. Unl ess t her e i s a speci f i c Li ne I t em f or admi ni st r at i ve cost s, such as Qual i t y Cont r ol and Saf et y, al l ocat e such cost s pr opor t i onal l y acr oss al l Li ne I t ems.
1. 1. 1 Reference
The publ i cat i on l i s t ed bel ow f or ms a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. Thi s publ i cat i on i s r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 1110- 2- 1003 ( 2013) Engi neer i ng and Desi gn, Hydr ogr aphi c Sur veyi ng
1. 2 RESI DENT MANAGEMENT SYSTEM ( RMS)
1. 2. 1 Definition
The t er ms " Cont r act Li ne I t em Number ( CLI N) " and " Li ne I t em" ar e i nt er changeabl e her ei n ( e. g. : CLI N 0001 i s Li ne I t em 0001) . The t er m " CLI N" i s a cont r act i ng t er m used i n t he Resi dent Management Syst em ( RMS) payment dat a base.
1. 2. 2 Instructions
See Sect i on 01 45 05 DREDGI NG/ BEACH FI LL PLACEMENT - CONTRACTOR QUALI TY CONTROL f or i nst r uct i ons on l i nki ng a CLI N t o a schedul e of val ues of pay act i v i t i es and const r uct i on schedul e, and i n- dept h payment pr ocedur e.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Tr ansmi t submi t t al i t ems i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES. Submi t t he f ol l owi ng pr econst r uct i on submi t t al i t ems no l at er t han 20 cal endar days af t er awar d or 5 cal endar days af t er Not i ce t o Pr oceed, whi chever i s later:
SECTI ON 01 22 00 Page 2
SD- 01 Pr econst r uct i on Submi t t al s
Schedul e of Val ues; G, RO
Pr ovi de a br eakdown of j ob i t ems i nt o pr oposed pay act i v i t i es as par t of t he i ni t i al pr oj ect schedul e. Schedul e of Val ues wi l l become basi s f or CLI N and Pay Act i v i t y dat a i n t he RMS payment dat a base.
1. 4 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed l ump sum i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
Pr ogr ess payment s f or j ob CLI Ns wi l l be made i n accor dance wi t h t he Payment s Under Fi xed- Pr i ce Const r uct i on Cont r act s c l ause of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1. Submi t a l i s t of pay act i v i t i es, ( Schedul e of Val ues) t o br eakdown bi d f or each j ob CLI N. The Schedul e of Val ues shal l be submi t t ed f or Gover nment appr oval wi t h t he basel i ne schedul e submi t t al ( see Sect i on 01 32 01 PROJECT SCHEDULE) . An unbal anced Schedul e of Val ues and Pay Act i v i t y Schedul e wi l l be r et ur ned f or r evi s i on. I f t hi s cont r act cont ai ns ei t her t he Cont i nui ng Cont r act s c l ause or t he Cont i nui ng Cont r act s ( Al t er nat e) c l ause, t he Cont r act or shoul d t ake i nt o account t he amount r eser ved f or cont r act payment s when pr epar i ng t he const r uct i on schedul e.
1. 4. 1 Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0001)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on and est abl i shment of i ni t i al pr oj ect management and coor di nat i on. See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 4. 2 Tur bi di t y Moni t or i ng ( Li ne I t ems 0004 and 0013)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o obt ai ni ng, anal yzi ng, and r epor t i ng t he r esul t s of moni t or i ng f or t ur bi di t y. See Section 01 57 25 TURBI DI TY AND DI SPOSAL MONI TORI NG.
1. 4. 3 Dedi cat ed Manat ee Obser ver ( Li ne I t ems 0005 and 0014)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o a dedi cat ed manat ee obser ver r equi r ed when cl amshel l dr edgi ng. See Sect i on
01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 4. 4 Sea Tur t l e Nest Moni t or i ng ( Li ne I t em 0006)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o sea t ur t l e nest moni t or i ng i n accor dance wi t h Sect i on 01 57 20 ENVI RONMENTAL
SECTI ON 01 22 00 Page 3
PROTECTION.
1. 4. 5 Li abi l i t y I nsur ance ( Li ne I t em 0006 0007)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o obt ai ni ng a pr oper t y damage l i abi l i t y i nsur ance pol i cy f or f i ve mi l l i on dol l ar s ( $5, 000, 000. 00) of cover age. The pol i cy shal l meet al l t he r equi r ement s of FAR 52. 228- 5 i n Sect i on 00700 CONTRACT CLAUSES and Par agr aph
999. 228- 4000 i n Sect i on 00800 SPECI AL REQUI REMENTS.
1. 4. 6 I nt er i m Mobi l i zat i on and Demobi l i zat i on ( Li ne I t em 0008)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mobi l i zat i on and demobi l i zat i on of addi t i onal equi pment r equi r ed t o execut e dr edgi ng of t he U. S. Coast Guar d Boat Basi n ( Opt i on A) . See Cl ause PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1.
1. 4. 7 Gopher Tor t oi se Sur vey, Per mi t t i ng and Repor t i ng ( Li ne I t em 0009)
Payment wi l l be made f or al l cost s associ at ed wi t h or i nci dent al t o per f or mance of gopher t or t oi se sur vey( s) pr i or t o t he st ar t of const r uct i on act i v i t i es i ncl udi ng but not l i mi t ed t o acqui s i t i on of appl i cabl e per mi t ( s) , ser vi ces pr ovi ded by qual i f i ed i ndi v i dual s, and coor di nat i on wi t h per mi t t i ng agenci es. Tor t oi se sur veys shal l be per f or med i n accor dance wi t h Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON.
1. 4. 8 Mi gr at or y Bi r d Moni t or i ng ( Li ne I t em 0015)
Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o mi gr at or y bi r d moni t or i ng i n accor dance wi t h Sect i on 01 57 20 ENVI RONMENTAL
PROTECTION.
1. 5 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he LI NE I TEMS AND PRI CI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
Each Uni t Pr i ce CLI N may be a s i ngl e pay act i v i t y i t em or may be br oken down i nt o pay act i v i t i es wi t h smal l er quant i t i es equal t o CLI N t ot al .
Cont r act uni t pr i ce mul t i pl i ed by agr eed quant i t y i s f ul l compensat i on.
1. 5. 1 Excavat i on, Uncl assi f i ed ( Li ne I t ems 0002, and 0003 and 0012)
1. 5. 1. 1 Payment
a. Payment wi l l be made f or cost s associ at ed wi t h or i nci dent al t o excavat i on, t r anspor t at i on, and di sposal of mat er i al s; maneuver s t o pr event obst r uct i on of channel ; pr ovi di ng and mai nt ai ni ng access t o t he wor k s i t e( s) and di sposal ar ea( s) ; and noi se cont r ol ; debr i s r emoval ; scr eeni ng f or r ock and debr i s on t he beach di sposal , and beach di sposal ar ea mar ki ng. See Sect i on 35 20 23 DREDGI NG.
SECTI ON 01 22 00 Page 4
b. I nsof ar as consi st ent wi t h t he par agr aph CONTI NUI TY OF WORK of Section 35 20 23 DREDGI NG, mont hl y par t i al payment s wi l l be based on appr oxi mat e quant i t i es det er mi ned by soundi ngs or sweepi ngs per f or med by t he Cont r act or behi nd t he dr edge. The t er m " ar ea desi gnat ed by t he Cont r act i ng Of f i cer " as used i n t he CONTI NUI TY OF WORK par agr aph, i s def i ned as " accept ance sect i on" .
c. Hydr ogr aphi c sur veys f or f i nal measur ement and payment and f or channel c l ear ance wi l l be made by t he Gover nment . Al l sur veys wi l l be per f or med i n accor dance wi t h USACE EM 1110- 2- 1003. Sur vey f r equenci es wi l l be t he same as t hose shown i n t he dr awi ngs and wi l l r emai n consi st ent t hr oughout t he cont r act .
1. 5. 1. 2 Measurement
a. The maps and/ or dr awi ngs al r eady pr epar ed ( c l ause CONTRACT DRAWI NGS AND SPECI FI CATI ONS of Sect i on 00700 CONTRACT CLAUSES i n Vol ume 1) ar e bel i eved t o r epr esent accur at el y aver age exi st i ng condi t i ons, but t he dept hs shown t her eon may be ver i f i ed and cor r ect ed by soundi ngs t aken bef or e dr edgi ng. Once quant i t i es wi t hi n a speci f i ed r each or sect i on have been det er mi ned t hr ough t he use of i n- pl ace measur ement , t hey wi l l not be r eopened except on evi dence of col l usi on, f r aud, or obvi ous er r or .
b. The t ot al amount of mat er i al r emoved, and t o be pai d f or under t he cont r act , wi l l be measur ed by t he cubi c yar d i n pl ace. The vol ume comput ed shal l be bet ween t he bot t om sur f ace shown by soundi ngs t aken wi t hi n 3 weeks bef or e dr edgi ng and t he bot t om sur f ace shown by t he soundi ngs t aken wi t hi n 2 weeks af t er t he wor k speci f i ed i n each accept ance sect i on has been compl et ed. The Cont r act or shal l gi ve 10 days advance not i ce, i n wr i t i ng, t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve of t he need f or a pr e- dr edgi ng sur vey or af t er - dr edgi ng sur vey f or f i nal accept ance f or each accept ance sect i on. The quant i t y shal l i ncl ude t he vol ume wi t hi n t he l i mi t s of t he s i de sl opes descr i bed i n subpar agr aph " Si de Sl opes" of par agr aph REQUI RED DEPTH, ALLOWABLE OVERDEPTH, AND SI DE SLOPES of Sect i on 35 20 23 DREDGI NG, l ess any deduct i ons t hat may be r equi r ed f or mi spl aced mat er i al descr i bed i n subpar agr aph " Mi spl aced Mat er i al s" of par agr aph DI SPOSAL OF EXCAVATED MATERI AL of Sect i on 35 20 23 DREDGI NG.
1. 5. 1. 3 Uni t of Measur e
Cubi c yar d.
1. 5. 2 Gopher Tor t oi se Capt ur e and Rel ocat i on ( Li ne I t em 0010)
1. 5. 2. 1 Payment
Payment wi l l be made f or al l cost s associ at ed wi t h or i nci dent al t o r el ocat i on of gopher t or t oi ses i n accor dance wi t h Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON i ncl udi ng sur vey, capt ur e, t r anspor t at i on, and cost s and f ees associ at ed wi t h t he r ecei v i ng f aci l i t y .
1. 5. 2. 2 Measurement
The t ot al number of gopher t or t oi se r el ocat i ons per f or med and pai d f or under t hi s cont r act wi l l be measur ed by t he number of gopher t or t oi ses det er mi ned t o be i mpact ed by pr oj ect const r uct i on act i v i t i es accor di ng t o t he cr i t er i a set f or t h i n Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON and
SECTI ON 01 22 00 Page 5 appl i cabl e pr oj ect const r uct i on per mi t s. Payment wi l l not be made f or r el ocat i ng any gopher t or t oi se t hat has been det er mi ned t o not be i mpact ed by pr oj ect const r uct i on.
1. 5. 2. 3 Uni t of Measur e
Each.
1. 5. 3 Gopher Tor t oi se Bur r ow Gr out i ng ( Li ne I t em 0011)
1. 5. 3. 1 Payment
Payment wi l l be made f or al l cost s associ at ed wi t h or i nci dent al t o gr out i ng of gopher t or t oi se hol es i n accor dance wi t h Sect i on 01 57 20 ENVI RONMENTAL PROTECTI ON, Sect i on 31 23 24 CONTROLLED LOW STRENGTH MATERI AL ( CLSM or FLOWABLE FI LL) and Sect i on 35 20 23 DREDGI NG.
1. 5. 3. 2 Measurement
The t ot al number of gopher t or t oi se hol es gr out ed t o be pai d f or under t hi s cont r act wi l l be measur ed by t he number of gopher t or t oi se hol es grouted.
1. 5. 3. 3 Uni t of Measur e
Each.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 PAYMENT PROCEDURES
Upon r ecei v i ng i ni t i al Resi dent Management Syst em i mpor t f i l e, go t o " Pay Act i v i t i es" and est abl i sh a l i nk bet ween bi d br eakdown schedul e of val ues of " Pay Act i v i t i es" t o cont r act CLI Ns usi ng " Schedul e Act i v i t i es" dat a ent r y page.
3. 1. 1 Request i ng Pr ogr ess Payment
For pr ogr ess payment s, ensur e " Act i v i t y Schedul e" , " Feat ur e Schedul e" , submi t t al r egi st er , and punchl i st s ar e al l up t o dat e. Use " Pr ogr ess Payment s" t o " r equest Act i v i t y Ear ni ngs" f or bot h " Act i v i t y Ear ni ngs" dat a ent r y page and " Ot her Ear ni ng" . Pr ovi de har d copi es of suppor t i ng i nvoi ces and quant i t y measur ement s t o suppor t al l r equest ed ear ni ngs.
Ensur e t hat sum of payment act i v i t i es do not exceed cont r act awar d CLI N f undi ng amount s, or " unbal anced" CLI Ns er r or wi l l pr event pr ocessi ng t he payment.
3. 1. 2 Opt i ons and Modi f i cat i on CLI NS
When addi t i onal wor k i s added by modi f i cat i on, exi st i ng CLI Ns f undi ng amount s must be updat ed, or new CLI Ns f or modi f i cat i on wi l l be cr eat ed.
I f cont r act has opt i on CLI Ns not yet awar ded, opt i on CLI Ns wi l l appear as zer o dol l ar CLI Ns unt i l opt i on i s awar ded by modi f i cat i on. No payment may be r equest ed f or Opt i ons or Modi f i cat i on CLI Ns unt i l cont r act modi f i cat i on has been f unded and si gned.
- - End of Sect i on - -
SECTI ON 01 22 00 Page 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
W912EP-17-B-0012
M/D, 12-Ft Projects., IWW and Ponce De Leon Inlet, Am 0002
01 22 00 SD-01 Preconstruction Submittals
G ROSchedule of Values
01 30 00 SD-01 Preconstruction Submittals
List of Subcontractors
SD-07 Certificates
Signature Authority
Drug-Free Work Place Record
01 32 01 SD-01 Preconstruction Submittals
1.2.1 G RORMS Schedules
1.2.2 G ROBar Chart
1.2.2 G RO'S' Curve
SD-07 Certificates
1.4Progress Photographs
01 33 00 SD-01 Preconstruction Submittals
G ROExport File
01 35 25 SD-01 Preconstruction Submittals
G RODive Operations Plan
SD-07 Certificates
G RODive Personnel Qualifications
01 35 26 SD-01 Preconstruction Submittals
1.6 G DOAccident Prevention Plan (APP)
1.7 G DOActivity Hazard Analysis (AHA)
3.1.1 G DOSafe Access Plan
3.1.1 G DOSafe Access Plan
SD-02 Shop Drawings
1.6.1 G DOCrane Critical Lift Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
M/D, 12-Ft Projects., IWW and Ponce De Leon Inlet, Am 0002
01 35 26 1.6.1 G ROStandard Lift Plan (SLP)
SD-06 Test Reports
1.11Notifications and Reports
1.11.1Accident Reports
1.11.2Crane Reports
SD-07 Certificates
1.8Confined Space Entry Permit
1.8Hot work permit
1.13License Certificates
1.5.2.4 G DOCrane Operators
1.11.4Third Party Certification of
Barge-Mounted Mobile Cranes
1.11.3Certificate of Compliance
01 45 05 SD-01 Preconstruction Submittals
G ROQuality Control Plan
SD-07 Certificates
Letter of Authority
G ROPersonnel Qualifications
01 50 02 SD-01 Preconstruction Submittals
Mobilization/Demobilization Plan
3.6Security Plan
SD-02 Shop Drawings
3.5Contractor's Temporary Facilities
01 57 20 SD-01 Preconstruction Submittals
G DOEnvironmental Protection Plan
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
M/D, 12-Ft Projects., IWW and Ponce De Leon Inlet, Am 0002
01 57 20 Marine Turtle Permit
Sea Turtle Nesting Monitor and
Relocation Qualifications
Gopher Tortoise Nesting Monitor and Relocation Qualifications
G DOMigratory Bird Monitoring
Qualifications
G DOManatee Observer Qualifications
SD-11 Closeout Submittals
Logs/Final Summary Report
Project Environmental Summary
Sheet
Logs/Summary of Bird Nesting
Monitoring
Logs/Summary of Marine Turtle
Nesting and Relocation
Invasive And Nuisance Species
Report
Gopher Tortoises Comprehensive
Final Report
01 57 25 SD-03 Product Data
Calibration Standard
SD-06 Test Reports
Turbidity Monitoring
31 23 24 SD-01 Preconstruction Submittals
G DOWork Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
M/D, 12-Ft Projects., IWW and Ponce De Leon Inlet, Am 0002
31 23 24 SD-05 Design Data
G DOCLSM Mix Design
SD-07 Certificates
Receipts
35 20 23 SD-01 Preconstruction Submittals
Notice of Intent to Dredge
3.1.1Navigation Aids
SD-07 Certificates
3.4.6 G DOAcceptance Sections Plan
Electronic Tracking System Data
Equipment and Performance
Data
1.8Historical Period Shipwreck Sites
Dredging Surveys
Daily/Monthly Report of
Operations
3.3.7Misplaced Material
1.11Declaration of Inspection
35 20 26 SD-01 Preconstruction Submittals
Dredge Plant Instrumentation
Plan Revisions or Addendum
G, SAM-OP-J
SD-06 Test Reports
G ROData Appropriately Archived
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
M/D, 12-Ft Projects., IWW and Ponce De Leon Inlet, Am 0002
35 20 26 G ROLetter of National Dredging
Quality Management Program
Certification
35 20 27 SD-06 Test Reports
G ROData Appropriately Archived
SD-07 Certificates
G ROLetter of National Dredging
Quality Management Program
Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 35 26
GOVERNMENTAL SAFETY REQUI REMENTS
PART 1 GENERAL
1. 1 REFERENCES
1. 2 DEFI NI TI ONS
1. 3 SUBMI TTALS
1. 4 REGULATORY REQUI REMENTS
1. 5 SI TE QUALI FI CATI ONS, DUTI ES AND MEETI NGS
1. 5. 1 Saf et y Per sonnel Tr ai ni ng
1. 5. 2 Per sonnel Qual i f i cat i ons
1. 5. 2. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)
1. 5. 2. 1. 1 Cont r act or Qual i t y Cont r ol ( QC) Per son
1. 5. 2. 2 Dr edgi ng Requi r ement s
1. 5. 2. 2. 1 SSHO St af f i ng
1. 5. 2. 2. 2 SSHO Requi r ement s
1. 5. 2. 2. 3 Desi gnat ed Repr esent at i ve ( DR) Requi r ement s
1. 5. 2. 2. 4 Saf et y Per sonnel Tr ai ni ng Requi r ement s
1. 5. 2. 3 Qual i f i ed Per son f or Conf i ned Space Ent r y
1. 5. 2. 4 Cr ane Oper at or s
1. 5. 3 Per sonnel Dut i es
1. 5. 3. 1 Si t e Saf et y and Heal t h Of f i cer ( SSHO)
1. 5. 4 Meet i ngs
1. 5. 4. 1 Pr econst r uct i on Conf er ence
1. 5. 4. 2 Saf et y Meet i ngs
1. 6 ACCI DENT PREVENTI ON PLAN ( APP)
1. 6. 1 EM 385- 1- 1 Cont ent s
1. 7 ACTI VI TY HAZARD ANALYSI S ( AHA)
1. 8 DI SPLAY OF SAFETY I NFORMATI ON
1. 9 SI TE SAFETY REFERENCE MATERI ALS
1. 10 EMERGENCY MEDI CAL TREATMENT
1. 11 NOTI FI CATI ONS and REPORTS
1. 11. 1 Acci dent Repor t s
1. 11. 2 Cr ane Repor t s
1. 11. 3 Cer t i f i cat e of Compl i ance
1. 11. 4 Thi r d Par t y Cer t i f i cat i on of Bar ge- Mount ed Mobi l e Cr anes
1. 12 HOT WORK
1. 13 RADI ATI ON SAFETY REQUI REMENTS
1. 14 FACI LI TY OCCUPANCY CLOSURE
1. 15 SEVERE STORM PLAN
1. 16 CONFI NED SPACE ENTRY REQUI REMENTS.
PART 2 PRODUCTS ( NOT APPLI CABLE)
PART 3 EXECUTI ON
3. 1 CONSTRUCTI ON AND OTHER WORK
SECTI ON 01 35 26 Page 1
3. 1. 1 Saf e Access t o Dr edge and Associ at ed Fl oat i ng Pl ant
3. 1. 2 Hazar dous Mat er i al Excl usi ons
3. 1. 3 Unf or eseen Hazar dous Mat er i al
3. 2 PRE- OUTAGE COORDI NATI ON MEETI NG
3. 3 CONTROL OF HAZARDOUS ENERGY ( LOCKOUT/ TAGOUT)
3. 4 FALL HAZARD PROTECTI ON AND PREVENTI ON PROGRAM
3. 4. 1 Tr ai ni ng
3. 4. 2 Fal l Pr ot ect i on Equi pment and Syst ems
3. 4. 2. 1 Per sonal Fal l Ar r est Equi pment
3. 4. 3 Fal l Pr ot ect i on f or Roof i ng Wor k
3. 4. 4 Hor i zont al Li f el i nes
3. 4. 5 Guar dr ai l s and Saf et y Net s
3. 4. 6 Rescue and Evacuat i on Pr ocedur es
3. 5 SCAFFOLDI NG
3. 6 EQUI PMENT
3. 6. 1 Mat er i al Handl i ng Equi pment
3. 6. 2 Load Handl i ng Equi pment ( LHE)
3. 6. 3 Equi pment and Mechani zed Equi pment
3. 6. 4 Use of Expl osi ves
3. 7 EXCAVATI ONS
3. 7. 1 Ut i l i t y Locat i ons
3. 7. 2 Ut i l i t y Locat i on Ver i f i cat i on
3. 7. 3 Ut i l i t i es Wi t hi n and Under Concr et e, Bi t umi nous Asphal t , and
Ot her I mper vi ous Sur f aces
3. 8 ELECTRI CAL
3. 8. 1 Conduct of El ect r i cal Wor k
3. 8. 2 Por t abl e Ext ensi on Cor ds, Gener at or s and Tool s
3. 9 WORK I N CONFI NED SPACES
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 35 26 Page 2
SECTI ON 01 35 26
GOVERNMENTAL SAFETY REQUI REMENTS
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN NATI ONAL STANDARDS I NSTI TUTE ( ANSI / ASSE)
ANSI / ASSE A10. 32 ( 2013) Fal l Pr ot ect i on
ANSI / ASSE A10. 34 ( 2001; R 2012) Pr ot ect i on of t he Publ i c on or Adj acent t o Const r uct i on Si t es
ANSI / ASSE Z359. 1 ( 2007) Saf et y Requi r ement s f or Per sonal Fal l Ar r est Syst ems, Subsyst ems and Components
AMERI CAN NATI ONAL STANDARDS I NSTI TUTE/ AMERI CAN SOCI ETY OF
MECHANI CAL ENGI NEERS ( ANSI / ASME)
ANSI / ASME B30. 22 ( 2010) Ar t i cul at i ng Boom Cr anes
ANSI / ASME B30. 3 ( 2009) Tower Cr anes
ANSI / ASME B30. 5 ( 2007) Mobi l e and Locomot i ve Cr anes
ANSI / ASME B30. 8 ( 2010) Fl oat i ng Cr anes and Fl oat i ng Derricks
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 10 ( 2013) St andar d f or Por t abl e Fi r e Extinguishers
NFPA 241 ( 2013) St andar d f or Saf eguar di ng Const r uct i on, Al t er at i on, and Demol i t i on Operations
NFPA 306 ( 2009) St andar d f or Cont r ol of Gas Hazar ds on Vessel s
NFPA 51B ( 2009; TI A 09- 1) St andar d f or Fi r e Pr event i on Dur i ng Wel di ng, Cut t i ng, and Ot her Hot Wor k
NFPA 70 ( 2017) Nat i onal El ect r i cal Code
NFPA 70E ( 2015; ERTA 1 2015) St andar d f or El ect r i cal Saf et y i n t he Wor kpl ace
SECTI ON 01 35 26 Page 3
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
29 CFR 1910 Occupat i onal Saf et y and Heal t h St andar ds
29 CFR 1910. 146 Per mi t - r equi r ed Conf i ned Spaces
29 CFR 1910. 147 Cont r ol of Hazar dous Ener gy ( Lock Out / Tag Out)
29 CFR 1915 Conf i ned and Encl osed Spaces and Ot her Danger ous At mospher es i n Shi pyar d Employment
29 CFR 1919 Gear Cer t i f i cat i on
29 CFR 1926 Saf et y and Heal t h Regul at i ons f or Construction
29 CFR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.