W912EP-17-B-0005_Amendment_0001.pdf

PDF 179 KB Posted

Attached to
Jacksonville Harbor, Construction Dredging 47-Foot Project, Contract A, Bar Cut-3 to Cut-7, Duval County, Florida
Solicitation number
W912EP-17-B-0005
Issued by

About this file

Amendment 0001 to 17B0005

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04 EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

JACKSONVILLE HARBOR, CONSTRUCTION DREDGING 47-FOOT PROJECT, CONTRACT A, BAR CUT-3 TO CUT-7, DUVAL COUNTY, FLORIDA

A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.

B. THE BID OPENING DATE REMAINS UNCHANGED @ AUGUST 08, 2017 @ 2:00 P.M. EST.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED

1. CONTRACT ID CODE PAGE OF PAGES

1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA 15C. DATE SIGNED 15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer) (Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EP17B0005

X 9B. DATED (SEE ITEM 11)

07-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Jul-2017

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODE CODE

EMAIL: TEL:

W912EP-17-B-0005 Amendment 0001

SF 30 CONTINUATION SHEET

Jacksonville Harbor, Construction Dredging, 47-Foot Project, Contract A, Bar Cut-3 to Cut-7

Duval County, Florida Amendment 0001

SUMMARY OF CHANGES

1. SPECIFICATIONS:

A. In some Volume 1 sections, asterisks appear before and after the line or lines where revisions have been made to the text, and pertain only to changes made by this amendment. In some cases, replacement clauses are attached to this amendment.

B. In Volume 2 sections, the text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change.

The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.

Changes to Specifications:

Volume 1 of 2 – Technical Specifications:

DELETE STANDARD FORM 1442(SF 1442) and REPLACE with the attached revised STANDARD FORM

1442(SF 1442).

DELETE Line Items and Pricing Schedule and REPLACE with the attached revised Line Items and Pricing Schedule.

SECTION 00700 – C ONTRACT CLAUSES: The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 45 60 calendar days after the date the Contractor receives the notice to proceed, (b)prosecute the work diligently, and (c) complete the entire work ready for use not later than 606 calendar days after the NTP. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Volume 2 of 2 – Technical Specifications:

N/A.

2. DRAWINGS:

N/A.

(End of Summary of Changes)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

W912EP-17-B-0005

2. TYPE OF SOLICITATION 3. DATE ISSUED

07 Jul 2017

PAGE OF PAGES

X SEALED BID (IFB)

NEGOTIATED(RFP)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

7. ISSUED BY CODE W912EP 8. ADDRESS OFFER TO (If Other Than Item 7) CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLEFL 32207-8175

TEL: FAX:

See Item 7

TEL: FAX:

9. FOR INFORMATION

CALL:

A. NAME

TIMOTHY G HUMPHREY

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

904-232-1072

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS(Title, identifying no., date):

JACKSONVILLE HARBOR, CONSTRUCTION DREDGING 47-FOOT PROJECT, CONTRACT A, BAR CUT-3 TO CUT-7, DUVAL

COUNTY, FLORIDA

DESCRIPTION OF WORK: REFER TO SECTION 01 11 00 FOR COMPLETE PROJECT DESCRIPTION DRAWINGS: SEE DFARS

CLAUSE 252.236-7001, IN SECTION 00700.

MAGNITUDE OF CONSTRUCTION IS BETWEEN $25,000,000.00 - $50,000,000.00.

THIS IS AN UNRESTRICTED SOLICITATION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. THE NAICS CODE IS 237990

AND THE SIZE STANDARD IS $27.5 MILLION.

***BLOCK 11 - SEE SECTION 00700, CLAUSE 52.211-10 FOR PERIOD OF PERFORMANCE

A SITE VISIT WILL BE HELD ON 20 JULY 2017 AT 10:00AM. SEE FAR CLAUSE 52.236-27 IN SECTION 00100.

A PRE-PROPOSAL TELECONFERENCE HAS BEEN SCHEDULED FOR 26 JULY 2017 FROM 10:00AM - 11:00AM. PLEASE CALL:

877-402-9753, ACCESS CODE: 6546236 SECURITY CODE: 2873

YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM THIS SOLICITION. THE SAM WEBSITE IS LOCATED AT

WWW.SAM.GOV.

11. The Contractor shall begin performance within 45 60 calendar days and complete it within 606 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See ***Section 00700 .)

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM (hour) local time 08 Aug 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e) http://www.sam.gov/

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

See Item 14

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN 20B. SIGNATURE 20C. OFFER DATE

OFFER (Type or print)

21. ITEMS ACCEPTED:

SEE SCHEDULE

AWARD (To be completed by Government)

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

(4 copies unless otherwise specified) 10 U.S.C. 2304(c) 41 U.S.C. 253(c)

26. ADMINISTERED BY CODE K3M0E00 27. PAYMENT WILL BE MADE BY CODE 964145

NORTH FLORIDA AREA OFFICE

SUITE 201

4070 BOULEVARD CENTER DRIVE,

JACKSONVILLE, FL 32206-3474

PH: (904) 232-3086

USACE FINANCE CENTER

5722 INTEGRITY DRIVE

ATTN: CEFC-AO-P

MILLINGTON, TN 38054-5005

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this 29. AWARD (Contractor is not required to sign this document.)

document and return _ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print) summates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

NSN 7540-01-155-3212 00010-2 STANDARD FORM 1442 BACK (REV. 4-85)

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

JACKSONVILLE HARBOR, CONSTRUCTION DREDGING

47-FOOT PROJECT, CONTRACT A, BAR CUT-3 TO CUT-7

DUVAL COUNTY, FLORIDA

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 MOBILIZATION AND DEMOBILIZATION JOB $_______________

0002 EXCAVATION, UNCLASSIFIED

BAR CUT-3 STA. 187+00 TO CUT-7 STA. 10+00

(ESTIMATED QUANTITY) 2,718,000 CUBIC YARD $___________ $_______________

0003 TURBIDITY MONITORING JOB $_______________

0004 ENDANGERED SPECIES OBSERVER

(HOPPER DREDGE ONLY) JOB $_______________

0005 DEDICATED MANATEE OBSERVER

(CLAMSHELL DREDGING ONLY) JOB $_______________

0006 MOBILIZATION AND DEMOBILIZATION FOR

SEA TURTLE TRAWLING

(HOPPER DREDGE ONLY, SEE NOTE 6 7) JOB $_______________

0007 SEA TURTLE TRAWLING

(HOPPER DREDGE ONLY, SEE NOTE 6 7) 1 DAY $___________ $_______________

0008 STANDBY TIME (SEE NOTE 5 6) 24 HOUR $___________ $_______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0008) $_______________

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY

BE EXCEEDED.

(2) ALL BIDS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.

(3) ALL SPECIFICATION REFERENCES TO "LUMP SUM" SHALL APPLY TO LINE ITEMS INDICATING "JOB" AS THE UNIT.

(4) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE PARAGRAPH 999.214-4018 OF SECTION 00100. SEE

CLAUSE 52.214-18 PREPARATION OF BIDS--CONSTRUCTION OF SECTION 00100.

(5) AN ENDANGERED SPECIES OBSERVER IS REQUIRED FOR A HOPPER DREDGE ONLY. A DEDICATED MANATEE

OBSERVER IS REQUIRED FOR CLAMSHELL DREDGING ONLY.

(6) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERIING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER.

STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT

AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.

(7) SEA TURTLE TRAWLING IS REQUIRED FOR HOPPER DREDGE ONLY WHEN DIRECTED BY THE

CONTRACTING OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION, SUBPARAGRAPH "SUSPENSION OF

DREDGING (HOPPER DREDGE ONLY).

W912EP-17-B-0005 00010A-1 Amendment 0001

W912EP-17-B-0005 Amendment 0001

SECTION 00700 - CONTRACT CLAUSES

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to (a) commence work under this contract within 45 60 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 606 calendar days after the NTP. The time stated for completion shall include final cleanup of the premises.

(End of clause)

SF-30-AMD0001.pdf
SUMMARY OF CHANGES
Changes to Specifications:
Volume 1 of 2 – Technical Specifications:
SECTION 00700 – C ONTRACT CLAUSES: The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 45 60 calendar days after the date the Contractor receives the notice to proceed, (b)prosecute the work diligently, and (c) complete the entire work ready for use not lat...
(End of clause)
Volume 2 of 2 – Technical Specifications:
2. DRAWINGS:
17B05 Revised 1442 Amendment 0001.pdf
SOLICITATION, OFFER, AND AWARD (Continued)
OFFER (Must be fully completed by offeror)
See Item 14
AWARD (To be completed by Government)

File details come from the government source that posted it. Updated .