AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84 STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

A. SEE CONTINUATION SHEET FOR AMENDMENT DETAILS.

B. THE BID OPENING DATE REMAINS UNCHANGED @ OCTOBER 24, 2017 @ 2:00 P.M. LOCAL TIME.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EP17B0004 X 9B. DATED (SEE ITEM 11)17-Aug-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Oct-2017

CODE

USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION

701 SAN MARCO BLVD

JACKSONVILLE FL 32207-8175

W912EP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SF 30 CONTINUATION SHEET

U.S. Naval Station Kings Bay, Maintenance Dredging, Entrance Channel, Cut-1N Through Range-E, 49, 45, and 44-Foot Project

W912EP17B0004 2 Amendment 0004

SUMMARY OF CHANGES

1. SPECIFICATIONS:

The text changes have been updated with additions noted by underlined text and deletions noted by line/cross-outs, and pertain only to changes made by this amendment. The entire section is replaced if there is any change. The Project Table of Contents and Submittal Register are replaced without underlines and cross-outs if there are changes to these documents.

DELETE Section 01 57 25 and REPLACE with the attached revised Section 01 57 25.

(End of Summary of Changes)

U.S. Naval Station Kings Bay, Maintenance Dredging, Entrance Channel, Cut-1N through Range-E, 49, 45, and 44-Foot Project, Camden County, GA and Nassau County, FL

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 25

TURBIDITY AND DISPOSAL MONITORING

PART 1 GENERAL

1.1 SCOPE

1.2 SUBMITTALS

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 MONITORING REQUIREMENTS

3.1.1 General

3.1.1.1 Turbidity Monitoring Equipment

3.1.2 Dredging and Disposal Locations

3.1.2.1 Station Descriptions

3.2 TURBIDITY TESTS

3.2.1 Testing

3.2.2 Reporting

3.2.2.1 Report Contents

3.2.2.2 Notification

3.3 WORK DELAY

3.4 CONSTRUCTION FORMS AND DETAILS

-- End of Section Table of Contents --

W912EP-17-B-0004 SECTION 01 57 25 PAGE 1 Amendment 0004

SECTION 01 57 25

TURBIDITY AND DISPOSAL MONITORING

PART 1 GENERAL

1.1 SCOPE

The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all work required to obtain, analyze, and report the results of turbidity and disposal monitoring.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Calibration Standard

The Contractor shall furnish to the Contracting Officer a copy of the operating instructions and standards used in calibrating equipment used in collecting samples for turbidity.

SD-06 Test Reports

Turbidity Monitoring

All required daily turbidity test reports shall be submitted (by electronic mail in Excel format) to the Contracting Officer, within 24 hours after completion of each test.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 MONITORING REQUIREMENTS

3.1.1 General

Nearshore or inland water samples shall be obtained and analyzed for turbidity. Sampling shall be conducted in accordance with techniques described in the latest edition of "Standard Methods" published by the American Public Health Association (APHA), American Water Works Association (AWWA), and Water Pollution Control Federation (WPCF), and other current techniques recognized by the scientific community and approved by the Jacksonville District, Corps of Engineers. Samples obtained for turbidity analysis shall be analyzed within 30 minutes of collection. Samples shall be taken with a sampler obtaining samples uncontaminated by water from any other depth.

W912EP-17-B-0004 SECTION 01 57 25 PAGE 2 Amendment 0004

3.1.1.1 Turbidity Monitoring Equipment

Monitoring required for turbidity shall be measured in Nephelometric Turbidity Units (NTU) using a standard Nephelometer. Global Positioning System (GPS) is also required to record sampling stations. The Contractor shall provide the Government with a certification, attesting to the accuracy of his testing equipment and procedure. The Contractor shall also provide the Contracting Officer with a duplicate of the standard used to calibrate his testing instrument as well as a complete set of operating instructions for the turbidity testing equipment. The Contractor and the Contracting Officer will use this standard throughout the project to maintain the calibration of the equipment.

Calibration: The instruments used to measure turbidity shall be fully calibrated with primary standards within one month of the commencement of the project, and at least once a month throughout the project.

Calibration with secondary standards shall be verified each morning prior to use, after each time the instrument is turned on, and after field sampling using two secondary turbidity "standards" that that bracket the anticipated turbidity samples. If the post-sampling calibration value deviates more than 8% from the previous calibration value, results shall be reported as estimated and a description of the problem shall be included in the field notes.

Analysis of turbidity samples shall be performed in compliance with DEP-SOP-001/01 FT 1600 Field Measurement of Turbidity:

http://publicfiles.dep.state.fl.us/dear/sas/sopdoc/2008sops/ft1600.pdf

3.1.2 Dredging and Disposal Locations

The Contractor shall obtain maps and electronic files (Shapefile, KML, or similar) for all Outstanding Florida Waters (OFW) within the project area.

Maps and electronic files can be downloaded from the DEP GIS websites at the following links: http://ca.dep.state.fl.us/mapdirect/?focus=standard;

http://geodata.dep.state.fl.us/datasets/681b93ec295f4003abb5a97cd5b51173_0.

Monitoring shall occur provided sea, wind, visibility, marine traffic and other conditions allow for safe performance of the activity. The Contractor shall document all instances where turbidity monitoring within the bounds of the above parameters could not be performed. Routine monitoring shall occur at the following locations:

3.1.2.1 Station Descriptions

a. Dredge Site Locations:

Background:

At surface and mid-depth, at least 300 meters upcurrent from the source of turbidity at the dredge site and clearly outside the influence of any turbidity generated by the project.

Compliance:

At surface and mid-depth, no more than 1000 meters downcurrent from the dredge head, and from any other source of turbidity generated by the dredge, in the densest portion of any visible turbidity plume. If no plume is visible, follow the likely direction of flow.

W912EP-17-B-0004 SECTION 01 57 25 PAGE 3 Amendment 0004

Intermediate:

At the surface and mid-depth, at a point approximately 150, 500, and 750 meters downcurrent from the turbidity source, within the densest portion of any visible turbidity plume generated by this project.

Frequency:

Three times daily at least 4 hours apart during all dredging operations, unless inclement weather and/or sea conditions make sample collection unsafe. Sampling shall be conducted while the highest project-related turbidity levels are crossing the edge of the mixing zone. Since turbidity levels can be related to pumping rates, the dredge pumping rates shall be recorded, and provided to the Contracting Officer upon request. The compliance samples and the corresponding background samples shall be collected at approximately the same time, i.e., one shall immediately follow the other.

b. Disposal Site Location at North Beach Disposal Area (D/A-NB), Fernandina Nearshore Disposal area (D/A-N), and Fort Clinch Disposal Area (C/A-F):

Background:

At the surface and mid-depth, clearly outside the influence of any artificially generated turbidity plume. Samples shall be collected at least 500 meters up-current from any portion of the beach that has been, or is being, filled during the current construction event, at the same distances offshore as the associated compliance samples.

Compliance:

At the surface and mid-depth, samples shall be collected where the densest portion of the turbidity plume crosses the edge of the mixing zone, which measures no more than 1,000 750 meters downcurrent from the point where the return water from the dredged discharge reenters the Atlantic Ocean.

Intermediate:

At the surface and mid-depth, at points approximately 150, 500 and 750 meters downcurrent from the turbidity source, within the densest portion of any visible turbidity plume generated by this project.

Frequency:

Three times daily at least 4 hours apart during all dredging operations, unless inclement weather and/or sea conditions make sample collection unsafe. Sampling shall be conducted while the highest project-related turbidity levels are crossing the edge of the mixing zone. Since turbidity levels can be related to pumping rates, the dredge pumping rates shall be recorded, and provided to the Contracting Officer upon request. The compliance samples and the corresponding background samples shall be collected at approximately the same time, i.e., one shall immediately follow

W912EP-17-B-0004 SECTION 01 57 25 PAGE 4 Amendment 0004 the other.

3.2 TURBIDITY TESTS

3.2.1 Testing

Whenever there is doubt as to the adequacy of the testing or validity of the results, the Contracting Officer may direct that additional tests be performed at no additional cost to the Government.

3.2.2 Reporting

The monitoring data shall be recorded on summary forms that contain the pertinent information in the following paragraphs. Example forms are on the web site indicated in paragraph CONSTRUCTION FORMS AND DETAILS below.

Other data shall be submitted in the form supplied by the laboratory chosen to do the analysis. All data shall be forwarded (electronically) to the Contracting Officer, Environmental Branch (CESAJ-PD-E), and FDEP within 7 days of collection. Electronic mail addresses of the Corps and FDEP personnel to receive these reports are provided below. Reports shall be provided in Excel Spreadsheet (.xls) files.

NAME ORGANIZATION E-MAIL ADDRESS

To be determined USACE ACO To be determined To be determined CESAJ-PD-E POC To be determined

JCP Compliance Officer FDEP jcpcompliance@dep.state.fl.us

Information to be determined will be provided in the Preconstruction Conference. CESAJ-PD-E POC may also be indicated in the Environmental Compliance Matrix (ECM). See Section 01 57 20 ENVIRONMENTAL PROTECTION.

3.2.2.1 Report Contents

Monitoring reports shall include the following information for each day that samples are taken:

a. time of day samples were taken;

b. dates of sampling and analysis;

c. GPS location of sample;

d. depth of water body;

e. depth of each sample;

f. antecedent weather conditions, including wind direction and velocity;

g. tidal stage and direction of flow;

h. water temperature;

i. a map, overlaid on an aerial photograph, indicating the sampling locations, dredging and discharge locations, and direction of flow;

j. a statement describing the methods used in collection, handling, storage and analysis of the samples;

k. a statement by the individual responsible for implementation of the sampling program concerning the authenticity, precision, limits of detection, calibration of the meter, accuracy of the data and precision of the GPS measurements;

l. When samples cannot be collected, include an explanation in the report. If unable to collect samples due to severe weather conditions, include a copy of a current report from a reliable, independent source, such as an online weather service

W912EP-17-B-0004 SECTION 01 57 25 PAGE 5 Amendment 0004

3.2.2.2 Notification

If monitoring reveals turbidity levels at the compliance sites that are greater than 29 NTUs above the corresponding background turbidity levels outside of Outstanding Florida Waters (OFW), 26 NTUs above the corresponding background turbidity levels within OFW at the beach placement site or 9.6 NTUs above the corresponding background turbidity levels within OFW at the dredge site, the Contractor shall immediately notify Chief, Environmental Branch at 904-232-1665 and the Contracting Officer, or on the morning of the following work day if it occurs after normal work hours. In addition, all dredging or disposal activity shall cease immediately and all measures to reduce turbidity shall be taken.

Dredging or disposal shall not resume until corrective measures have been taken and turbidity has returned to acceptable levels as determined by proper testing described in subparagraph "Dredging and Disposal Locations" above.

Any project-associated turbidity source other than dredging or fill placement for beach nourishment (e.g., scow or pipeline leakage) shall be monitored as close to the source as possible. If the turbidity level exceeds 29 NTUs above background outside of OFW, 26 NTUs above the corresponding background turbidity levels within OFW at the beach placement site or 9.6 NTUs above the corresponding background turbidity levels within OFW at the dredge site, then the construction activities related to the exceedance shall cease immediately and not resume until corrective measures have been taken and turbidity has returned to acceptable levels. The turbidity monitoring shall continue every hour until background turbidity level are restored or unless otherwise directed by the Contracting Officer. The Contractor shall notify the Chief, Environmental Branch and the Contracting Officer of such an event within 24 hours of the time the Contractor first becomes aware of the discharge.

NOTE: Within the project area, the OFW includes Waters of the State of Florida located outside of the authorized Federal Navigation Channel.

Waters of the State extend offshore approximately to STA. 259+63 as denoted in the project plans.

3.3 WORK DELAY

Delays in work due to the fault or negligence of the Contractor or the Contractor's failure to comply with this specification shall not be compensable. Any adjustments to the contract performance period or price that are required as a result of compliance with this section shall be made in accordance with the provisions of the Clause SUSPENSION OF WORK of Section 00700 CONTRACT CLAUSES in Volume 1.

3.4 CONSTRUCTION FORMS AND DETAILS

See the "Construction Forms & Details" module at the following web address:

http://www.saj.usace.army.mil/About/DivisionsOffices/Engineering/DesignBranch /SpecificationsSection.aspx.

-- End of Section --

W912EP-17-B-0004 SECTION 01 57 25 PAGE 6 Amendment 0004

17B0004Am0003Specs.pdf
17B0004Am0003SF30Cont
KBEC18 Bid Schedule 9-28-17 ALT_A
ALTERNATIVE A
KBEC18 Bid Schedule 9-28-17 ALT_B
ALTERNATIVE B
00 31 21
00 31 32 GDR_KBEC_FY18_amendment 3
1 scope
2 Character of materials
2.1 The Local Geology
2.2 Materials Encountered
2.2.9 Range A1, Inner Entrance Channel, Station 8+000 to Station 10+000
2.2.10 Range A2, Inner Entrance Channel, Station 10+000 to Station 12+000
2.2.11 Range B, Inner Entrance Channel, Station 12+000 to Station 15+350
2.2.12 Range C, Inner Entrance Channel, Station 15+350 to Station 22+500
2.2.13 Range D, Inner Entrance Channel, Station 22+500 to Station 30+750
2.2.14 Range E, Inner Entrance Channel, Station 30+750 to Station 31+800
3 Definitions
3.1 Definitions of Basic Terms
3.2 Current Logging Terms
3.3 Previous Logging Terms
3.4 Testing and Procedure Methods
4 Geomechanical Data
4.5 Boring Logs
4.6 Laboratory Testing Data

Blank Page

01 22 00
35 20 23
399376_KBEC18_20171010_Plans_Amd_0003.pdf
G-01
G-02
G-03
G-04
G-05
G-06
C-01
C-02
C-03
C-04
C-05
C-06
C-07
C-08
C-09
C-10
C-11
C-12
C-13
C-14
C-15
C-16
C-17
C-18
C-19
C-20
C-21
C-22
C-23
C-24
C-25
C-26
C-27
C-28
C-29